TAB 3 SOW.doc
DOC document 53 KB Posted
- Attached to
- TURBO SUPERCHARGER, NGINE, NON-AIRCRAFT
- Solicitation number
- 70Z08523Q49030B00
About this file
This statement of work outlines the requirements for overhauling Napier turbochargers for the Coast Guard. The contractor shall disassemble, repair, and reassemble three turbocharger models in accordance with OEM procedures to restore original operating characteristics. Mandatory replacement parts include rotors, bearings, seals, and housing components. The contractor must perform a turbine end seal upgrade and notify the Coast Guard of inspection and test dates. Following overhaul, the units must pass standard production tests. The contractor shall preserve, package, crate, and mark the units according to military standards, including applying barcodes with stock, CAGE, part, and contract numbers. The contractor shall guarantee units for two years after delivery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TAB 12 FAR CLAUSES.pdf | ||
| TAB 3 PRESERVATION AND PACKAGING.docx | DOCX document | |
| POSTING RD.pdf | ||
| TAB 12 RFQ.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for Napier Turbo-Supercharger Repair
ITEM NAME: TURBOSUPERCHARGER, ENGINE, NON-AIRCRAFT
STOCK NUMBER: 2950-01-491-9233
PART NUMBER: 3GS73B123FJ
APPLICABLE SERIAL NUMBERS: 700612, 700638, 700886
APPLICABLE MODS: 1, 2 and 4
USED ON: 225 WLB B Class Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS
PRELIMINARY INSPECTION:
Each TURBO shall be inspected in order to determine the extent of required repairs. An estimate shall be provided to the Coast Guard Contract Administrator, which shall include new parts required, labor hours required and a total estimate for all required services.
OVERHAUL REQUIREMENTS:
The Contractor shall disassemble, repair/overhaul, remove any existing Caterpillar part numbers, and reassemble the turbochargers with new name plate data in accordance with Napier Turbine’s, (OEM), published repair and refurbishment procedures, which are proprietary to NAPIER TURBINES. To a condition, which shall restore the operating and performance characteristics to the ‘ORIGINAL’ design and technical specifications. All repair parts shall be genuine NAPIER manufactured parts.
BALANCING:
The rotor assembly shall be balanced in accordance with Napier published rotor balancing procedures. The residual unbalance of the rotor shall not exceed Napier’s standards for residual unbalance for a new turbocharger rotor assembly.
UPGRADES/MODS:
The Contractor shall perform the turbine end seal upgrade (MOD 4) listed in Napier Turbocharger Advisory SB-297/357-A-043-01. The following new Napier Turbocharger part numbers are associated with turbine seal upgrade:
Component Name
Part No.
Qty
Blisk Assembly (Turbine and Shaft) SP14383/FJ
Turbine End Housing
GJ2431
Lip Seal
SP14352
The contractor shall ensure that Mod’s 1 and 2 are completed
MANDATORY REPLACEMENT PARTS:
In addition to replacement of parts associated with the turbine end seal upgrade (listed above), the Contractor shall replace the following components on a mandatory basis with new OEM components:
Component Name:
Part No.
Qty
Compressor rotor
Compressor Bearing
EJ 2585
Turbine Bearing
EJ 2584
Bearing Housing O-Rings
354 301 795
Bearing Retaining Rings
239 521 095
Seal Ring
CE EJ 2589
Seal Ring
TE ND 85255
Packing Ring
EJ 3711 (Applicable Size)
Thrust Collar
EJ 406701
Oil Transfer Tube O-Rings
354 160 111
USED PARTS:
The Contractor may re-use parts that are not on the mandatory parts replacement list provided above. Parts shall be Qualified for re-use only in accordance with Napier Turbocharger’s published Standards.
QUALITY ASSURANCE:
A Coast Guard Quality Assurance Representative shall visit the Contractor’s facility. The representative shall witness Rotor balancing inspection, testing, fitting, and clearance measurements and verify conformance to
PACKING requirements. The Contractor shall notify the Coast Guard Contract Administrator 7 days prior to the commencement of these evolutions. Following completion of overhaul, the contractor shall perform standard production tests and inspections to assure maximum design performance. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy for each unit shall be forwarded to the Coast Guard Contract
Administrator.
PRESERVATION/PACKAGING:
The INTERNAL surfaces shall be spray fogged and drained with Code 10, Grade 30 preservative as specified by MIL-STD-2073-1D, APPENDIX J, TABLE J, III. The normally painted EXTERNAL surfaces shall be re-painted in accordance with OEM standards and colors. Unpainted surfaces shall be coated with Code 19, Grade 4, corrosion preventative as specified by MIL-STD-2073-1D APPENDIX J, TABLE J. III. All fittings and openings shall be plugged or capped. The TURBOSUPERCHARGER, ENGINE, NON-AIRCRAFT, shall be placed in a 8-10 mil thickness polyethylene bag and then sealed with 80 units of desiccant inside.
PACKING:
If new crates are required, each TURBOSUPERCHARGER, ENGINE, NON-AIRCRAFT shall be individually crated in accordance with MIL-C-104C(1), Class 2, Style A. Top side and end panels shall be fabricated and assembled to each other as specified for Type I and the combination fastened to skid as specified for type II.
BAR CODING:
Bar code labels shall be supplied on all boxes. All bar coded labels shall be in accordance with IEC/IOC-16388-2007, Code 39 Symbology. Labels shall be Type V, Grade A, Style 2, Composition b with plastic laminate. Each label shall contain encoded data for the Stock Number, OEM CAGE Code, Part Number and the Government Contract Number. The Marking can be applied separately or as part of the Bar Code Label.
MARKING:
Each crate shall be marked in the upper left hand side of the two longest sides, (two opposite sides if square).
Marking shall be 1 inch high, black in color, block format on a white back ground and printed characters.
Marking Layout:
NATIONAL STOCK NUMBER: 2950-01-491-9233
ITEM NAME: TURBO-SUPERCHARGER
NAPIER PART NUMBER: 3GS73B123FJ
SERIAL NUMBER: as applicable
GOVT CONTRACT NUMBER: as applicable
STORAGE WARRANTY DATE: Delivery date to SFLC
SHIPPING WEIGHT: As determined by Contractor
UNIT OF ISSUE: 1 EACH
CONDITION CODE: A
THE WORDS: “COAST GUARD SFLC MATERIAL REUSUABLE CONTAINER, DO NOT DESTROY. REMOVE BOLTS, LIFT BOX FROM SKID” Mandatory Source:
Motor-Services Hugo Stamp (MSHS)
3190 SW 4th Avenue
Fort Lauderdale, Florida 33315
Phone: (954) 763-3660
Fax: (954) 763-2872
WARRANTY:
A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION. Contractor must guarantee item against defects that lead to failure for 2Q days after installation for a period of up to two (2) years after delivery to Coast Guard.