This document outlines requirements for the overhaul and repair of turbochargers to be used by the U.S. Coast Guard. The contractor will be required to disassemble, repair, and reassemble three turbocharger models in accordance with the original equipment manufacturer's procedures. Mandatory replacement parts include rotors, bearings, seals, and other components. The contractor must also perform upgrades listed in the manufacturer's service bulletins. Quality assurance provisions require balancing rotors and providing test certifications. Units will be preserved, packaged, marked, and warranted according to specifications. The related solicitation is for this turbocharger overhaul effort and was issued by the U.S. Coast Guard under number 70Z08523Q49030B00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TAB 12 FAR CLAUSES.pdf | ||
| TAB 3 PRESERVATION AND PACKAGING.docx | DOCX document | |
| TAB 12 RFQ.doc | DOC document | |
| TAB 3 SOW.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME TURBO SUPERCHARGER,NGINE,NON-AIRCRAFT
STOCK NUMBER 2950-01-491-9233
PART NUMBER 3GS73B123FJ
USED ON 225 WLB
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
Statement of Work for Napier Turbo-Supercharger Repair
ITEM NAME: TURBOSUPERCHARGER, ENGINE, NON-AIRCRAFT
STOCK NUMBER: 2950-01-491-9233
PART NUMBER: 3GS73B123FJ
APPLICABLE SERIAL NUMBERS: 700612, 700638, 700886
APPLICABLE MODS: 1, 2 and 4 USED ON: 225 WLB B Class
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS
PRELIMINARY INSPECTION:
Each TURBO shall be inspected in order to determine the extent of required repairs. An estimate shall be provided to the Coast Guard Contract Administrator, which shall include new parts required, labor hours required and a total estimate for all required services.
OVERHAUL REQUIREMENTS:
The Contractor shall disassemble, repair/overhaul, remove any existing Caterpillar part numbers, and reassemble the turbochargers with new name plate data in accordance with Napier Turbine?s, (OEM), published repair and refurbishment procedures, which are proprietary to NAPIER TURBINES. To a condition, which shall restore the operating and performance characteristics to the ORIGINAL design and technical specifications. All repair parts shall be genuine NAPIER manufactured parts. The Contractor shall provide a copy of the OEM Test, Overhaul, and Inspection procedure documentation to the Coast Guard Quality Assurance Representative.
BALANCING:
The rotor assembly shall be balanced in accordance with Napier published rotor balancing procedures. The residual unbalance of the rotor shall not exceed Napier?s standards for residual unbalance for a new turbocharger rotor assembly.
UPGRADES/MODS:
The Contractor shall perform the turbine end seal upgrade (MOD 4) listed in Napier Turbocharger Advisory SB-297/357-A-043-01. The following new Napier Turbocharger part numbers are associated with turbine seal upgrade:
Component Name Part No. Qty Blisk Assembly (Turbine and Shaft) SP14383/FJ 01 Turbine End Housing GJ2431 01 Lip Seal SP14352 01
The contractor shall ensure that Mod?s 1 and 2 are completed
MANDATORY REPLACEMENT PARTS:
In addition to replacement of parts associated with the turbine end seal upgrade (listed above), the Contractor shall replace the following components on a mandatory basis with new OEM components:
Component Name: Part No. Qty Compressor rotor 01 Compressor Bearing EJ 2585 01 Turbine Bearing EJ 2584 01 Bearing Housing O-Rings 354 301 795 02 Bearing Retaining Rings 239 521 095 02 Seal Ring CE EJ 2589 01 Seal Ring TE ND 85255 01 Packing Ring EJ 3711 (Applicable Size) 01 Thrust Collar EJ 406701 01 Oil Transfer Tube O-Rings 354 160 111 03
USED PARTS:
The Contractor may re-use parts that are not on the mandatory parts replacement list provided above. Parts shall be Qualified for re-use only in accordance with Napier Turbocharger?s published Standards.
QUALITY ASSURANCE:
A Coast Guard Quality Assurance Representative shall visit the Contractor?s facility. The representative shall witness Rotor balancing inspection, testing, fitting, and clearance measurements and verify conformance to PACKING requirements. The Contractor shall notify the Coast Guard Contract Administrator 7 days prior to the commencement of these evolutions. Following completion of overhaul, the contractor shall perform standard production tests and inspections to assure maximum design performance. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy for each unit shall be forwarded to the Coast Guard Contract Administrator. The Contractor shall be required to maintain a test equipment calibration program in compliance with ANSI/NCSL Z540-1, documented and traceable to the National Institute of Standards (NIST). A copy of the MT&E calibration certification shall be provided to the Coast Guard Quality Assurance Representative.
PRESERVATION/PACKAGING:
The INTERNAL surfaces shall be spray fogged and drained with Code 10, Grade 30 preservative as specified by MIL-STD-2073-1D, APPENDIX J, TABLE J, III.
The normally painted EXTERNAL surfaces shall be re-painted in accordance with OEM standards and colors. Unpainted surfaces shall be coated with Code 19, Grade 4, corrosion preventative as specified by MIL-STD-2073-1D APPENDIX J, TABLE J. III. All fittings and openings shall be plugged or capped. The TURBOSUPERCHARGER, ENGINE, NON-AIRCRAFT, shall be placed in a 8-10 mil thickness polyethylene bag and then sealed with 80 units of desiccant inside.
PACKING:
If new crates are required, each TURBOSUPERCHARGER, ENGINE, NON-AIRCRAFT shall be individually crated in accordance with MIL-C-104C(1), Class 2, Style A. Top side and end panels shall be fabricated and assembled to each other as
SHELF LIFE CD 0
Statement of Work for Napier Turbo-Supercharger Repair
ITEM NAME: TURBOSUPERCHARGER, ENGINE, NON-AIRCRAFT
STOCK NUMBER: 2950-01-491-9233
PART NUMBER: 3GS73B123FJ
APPLICABLE SERIAL NUMBERS: 700612, 700638, 700886
APPLICABLE MODS: 1, 2 and 4 USED ON: 225 WLB B Class
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS
PRELIMINARY INSPECTION:
Each TURBO shall be inspected in order to determine the extent of required repairs. An estimate shall be provided to the Coast Guard Contract Administrator, which shall include new parts required, labor hours required and a total estimate for all required services.
OVERHAUL REQUIREMENTS:
The Contractor shall disassemble, repair/overhaul, remove any existing Caterpillar part numbers, and reassemble the turbochargers with new name plate data in accordance with Napier Turbine?s, (OEM), published repair and refurbishment procedures, which are proprietary to NAPIER TURBINES. To a condition, which shall restore the operating and performance characteristics to the ORIGINAL design and technical specifications. All repair parts shall be genuine NAPIER manufactured parts. The Contractor shall provide a copy of the OEM Test, Overhaul, and Inspection procedure documentation to the Coast Guard Quality Assurance Representative.
BALANCING:
The rotor assembly shall be balanced in accordance with Napier published rotor balancing procedures. The residual unbalance of the rotor shall not exceed Napier?s standards for residual unbalance for a new turbocharger rotor assembly.
UPGRADES/MODS:
The Contractor shall perform the turbine end seal upgrade (MOD 4) listed in Napier Turbocharger Advisory SB-297/357-A-043-01. The following new Napier Turbocharger part numbers are associated with turbine seal upgrade:
Component Name Part No. Qty Blisk Assembly (Turbine and Shaft) SP14383/FJ 01 Turbine End Housing GJ2431 01 Lip Seal SP14352 01
The contractor shall ensure that Mod?s 1 and 2 are completed
MANDATORY REPLACEMENT PARTS:
In addition to replacement of parts associated with the turbine end seal upgrade (listed above), the Contractor shall replace the following components on a mandatory basis with new OEM components:
Component Name: Part No. Qty Compressor rotor 01 Compressor Bearing EJ 2585 01 Turbine Bearing EJ 2584 01 Bearing Housing O-Rings 354 301 795 02 Bearing Retaining Rings 239 521 095 02 Seal Ring CE EJ 2589 01 Seal Ring TE ND 85255 01 Packing Ring EJ 3711 (Applicable Size) 01 Thrust Collar EJ 406701 01 Oil Transfer Tube O-Rings 354 160 111 03
USED PARTS:
The Contractor may re-use parts that are not on the mandatory parts replacement list provided above. Parts shall be Qualified for re-use only in accordance with Napier Turbocharger?s published Standards.
QUALITY ASSURANCE:
A Coast Guard Quality Assurance Representative shall visit the Contractor?s facility. The representative shall witness Rotor balancing inspection, testing, fitting, and clearance measurements and verify conformance to PACKING requirements. The Contractor shall notify the Coast Guard Contract Administrator 7 days prior to the commencement of these evolutions. Following completion of overhaul, the contractor shall perform standard production tests and inspections to assure maximum design performance. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy for each unit shall be forwarded to the Coast Guard Contract Administrator. The Contractor shall be required to maintain a test equipment calibration program in compliance with ANSI/NCSL Z540-1, documented and traceable to the National Institute of Standards (NIST). A copy of the MT&E calibration certification shall be provided to the Coast Guard Quality Assurance Representative.
PRESERVATION/PACKAGING:
The INTERNAL surfaces shall be spray fogged and drained with Code 10, Grade 30 preservative as specified by MIL-STD-2073-1D, APPENDIX J, TABLE J, III.
The normally painted EXTERNAL surfaces shall be re-painted in accordance with OEM standards and colors. Unpainted surfaces shall be coated with Code 19, Grade 4, corrosion preventative as specified by MIL-STD-2073-1D APPENDIX J, TABLE J. III. All fittings and openings shall be plugged or capped. The TURBOSUPERCHARGER, ENGINE, NON-AIRCRAFT, shall be placed in a 8-10 mil thickness polyethylene bag and then sealed with 80 units of desiccant inside.
PACKING:
If new crates are required, each TURBOSUPERCHARGER, ENGINE, NON-AIRCRAFT shall be individually crated in accordance with MIL-C-104C(1), Class 2, Style A. Top side and end panels shall be fabricated and assembled to each other as specified for Type I and the combination fastened to skid as specified for type II.
BAR CODING:
Bar code labels shall be supplied on all boxes. All bar coded labels shall be in accordance with SFLC specification 4330-D-000-100 Rev. F, dated 6/00.
Labels shall be Type V, Grade A, Style 2, Composition b with plastic laminate. Each label shall contain encoded data for the Stock Number, OEM CAGE Code, Part Number and the Government Contract Number. The Marking can be applied separately or as part of the Bar Code Label.
MARKING:
Each crate shall be marked in the upper left hand side of the two longest sides, (two opposite sides if square).
Marking shall be 1 inch high, black in color, block format on a white back ground and printed characters.
Marking Layout:
NATIONAL STOCK NUMBER: 2950-01-491-9233
ITEM NAME: TURBO-SUPERCHARGER
NAPIER PART NUMBER: 3GS73B123FJ
SERIAL NUMBER: as applicable GOVT CONTRACT NUMBER: as applicable STORAGE WARRANTY DATE: Delivery date to SFLC SHIPPING WEIGHT: As determined by Contractor
UNIT OF ISSUE: 1 EACH
CONDITION CODE: A
THE WORDS: ?COAST GUARD SFLC MATERIAL REUSUABLE CONTAINER, DO NOT DESTROY.
REMOVE BOLTS, LIFT BOX FROM SKID?
Mandatory Source:
Motor-Services Hugo Stamp (MSHS) 3190 SW 4th Avenue Fort Lauderdale, Florida 33315 Phone: (954) 763-3660 Fax: (954) 763-2872
WARRANTY:
A. Standard Manufacturer's Warranty B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION. Contractor must guarantee item against defects that lead to failure for 2Q days after installation for a period of up to two (2) years after delivery to Coast Guard.
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for
120 days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
PACKAGING AND MARKING FOR SHIPMENT:
X
A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
2950-01-491-9233
TURBO SUPERCHARGER,NGINE,NON-AIRCRAFT
3GS73B123FJ
PRESERVATION / PACKAGING:
A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
X B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"