T3125 20DPP00559 State Supplied Price Sheet~2.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
T3125 Mobile Warehouse Equipment, Batteries, Chargers and Accessories
Solicitation number
20DPP00559
Issued by
Mercer County, New Jersey

About this file

This document is a State-Supplied Price Sheet for a mobile warehouse equipment contract opportunity (T3125, 20DPP00559) issued by the State of New Jersey. The contract covers the procurement of various electric warehouse equipment, including pallet trucks, pallet jacks, forklifts, batteries, and chargers, to be used by Mercer County and the City of Trenton. The price sheet is divided into six grouped price line items, with vendors required to bid on all items within a group to be considered for award of that group. The equipment specifications are detailed in Sections 3.4.1 through 3.4.6 of the bid solicitation. The price sheet requires vendors to provide the make, model, unit price, and percentage discount or markup for each item.

The pricing terms indicate that the state will purchase manufacturer's published options using the percentage discount or markup bid by the vendor. There are no set-asides or incumbent information provided. The contract will be awarded to the responsive and responsible vendor(s) whose proposal(s) are most advantageous to the state, price and other factors considered.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

STATE-SUPPLIED PRICE SHEET
MOBILE WAREHOUSE EQUIPMENT
(20DPP00559, T-3125)
Vendor {Bidder}:
Cash Discount for Expedited Payment (Refer to Bid Solicitation Section 4.4.5.6)
Delivery Days After Receipt of Order:
IMPORTANT: GROUP 1, PRICE LINES 1 THROUGH 4, ARE GROUPED TO CREATE A SINGLE AWARD. A VENDOR {BIDDER]} MUST BID ON ALL PRICE LINE ITEMS WITHIN THE GROUP IN ORDER TO BE CONSIDERED FOR AN AWARD FOR THE GROUP.
NOTE: Unit Price, Make, Model and Percentage Discount or Markup are required fields and must be completed on the State-Supplied Price Sheet.
GroupItem DescriptionQuantityUnit of MeasureUnit Price (Required)

1 PRICE LINE 1: ELECTRIC WALKIE RIDER PALLET TRUCK AS SPECIFIED IN SECTION 3.4.1.1 OF THE BID SOLICITATION. 1 Each

MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 2: BATTERY AS SPECIFIED IN SECTION 3.4.1.2 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 3: CHARGER AS SPECIFIED IN SECTION 3.4.1.3 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasurePercentage Discount or Markup (Required)
Price Line 4: Manufacturer’s Published Option (For The Manufacturer’s Base Unit). This price line is for unit manufacturer’s published options only, which shall be purchased using the percentage discount or markup bid by the Vendor {Bidder}.1Percent
STATE-SUPPLIED PRICE SHEET
MOBILE WAREHOUSE EQUIPMENT
(20DPP00559, T-3125)
Vendor {Bidder}:
Delivery Days After Receipt of Order:
IMPORTANT: GROUP 2, PRICE LINES 5 THROUGH 8, ARE GROUPED TO CREATE A SINGLE AWARD. A VENDOR {BIDDER]} MUST BID ON ALL PRICE LINE ITEMS WITHIN THE GROUP IN ORDER TO BE CONSIDERED FOR AN AWARD FOR THE GROUP.
NOTE: Unit Price, Make, Model and Percentage Discount or Markup are required fields and must be completed on the State-Supplied Price Sheet.
GroupItem DescriptionQuantityUnit of MeasureUnit Price (Required)

2 PRICE LINE 5: ELECTRIC WALKIE RIDER PALLET JACK AS SPECIFIED IN SECTION 3.4.2.1 OF THE BID SOLICITATION. 1 Each

MAKE:

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 6: BATTERY AS SPECIFIED IN SECTION 3.4.2.2 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 7: CHARGER AS SPECIFIED IN SECTION 3.4.2.3 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasurePercentage Discount or Markup (Required)
Price Line 8: Manufacturer’s Published Option (For The Manufacturer’s Base Unit). This price line is for unit manufacturer’s published options only, which shall be purchased using the percentage discount or markup bid by the Vendor {Bidder}.1Percent
STATE-SUPPLIED PRICE SHEET
MOBILE WAREHOUSE EQUIPMENT
(20DPP00559, T-3125)
Vendor {Bidder}:
Delivery Days After Receipt of Order:
IMPORTANT: GROUP 3, PRICE LINES 9 THROUGH 12, ARE GROUPED TO CREATE A SINGLE AWARD. A VENDOR {BIDDER]} MUST BID ON ALL PRICE LINE ITEMS WITHIN THE GROUP IN ORDER TO BE CONSIDERED FOR AN AWARD FOR THE GROUP.
NOTE: Unit Price, Make, Model and Percentage Discount or Markup are required fields and must be completed on the State-Supplied Price Sheet.
GroupItem DescriptionQuantityUnit of MeasureUnit Price (Required)

3 PRICE LINE 9: ELECTRIC FORKLIFT- SWING/PIVOT MAST AS SPECIFIED IN SECTION 3.4.3.1 OF THE BID SOLICITATION. 1 Each

MAKE:

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 10: BATTERY AS SPECIFIED IN SECTION 3.4.3.2 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 11: CHARGER AS SPECIFIED IN SECTION 3.4.3.3 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasurePercentage Discount or Markup (Required)
Price Line 12: Manufacturer’s Published Option (For The Manufacturer’s Base Unit). This price line is for unit manufacturer’s published options only, which shall be purchased using the percentage discount or markup bid by the Vendor {Bidder}.1Percent
STATE-SUPPLIED PRICE SHEET
MOBILE WAREHOUSE EQUIPMENT
(20DPP00559, T-3125)
Vendor {Bidder}:
Delivery Days After Receipt of Order:
IMPORTANT: GROUP 4, PRICE LINES 13 THROUGH 16 , ARE GROUPED TO CREATE A SINGLE AWARD. A VENDOR {BIDDER]} MUST BID ON ALL PRICE LINE ITEMS WITHIN THE GROUP IN ORDER TO BE CONSIDERED FOR AN AWARD FOR THE GROUP.
NOTE: Unit Price, Make, Model and Percentage Discount or Markup are required fields and must be completed on the State-Supplied Price Sheet.
GroupItem DescriptionQuantityUnit of MeasureUnit Price (Required)

4 PRICE LINE 13: ELECTRIC FORKLIFT- STANDUP, NARROW AISLE, SINGLE REACH AS SPECIFIED IN SECTION 3.4.4.1 OF THE BID SOLICITATION. 1 Each

MAKE:

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 14: BATTERY AS SPECIFIED IN SECTION 3.4.4.2 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 15: CHARGER AS SPECIFIED IN SECTION 3.4.4.3 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasurePercentage Discount or Markup (Required)
Price Line 16: Manufacturer’s Published Option (For The Manufacturer’s Base Unit). This price line is for unit manufacturer’s published options only, which shall be purchased using the percentage discount or markup bid by the Vendor {Bidder}.1Percent
STATE-SUPPLIED PRICE SHEET
MOBILE WAREHOUSE EQUIPMENT
(20DPP00559, T-3125)
Vendor {Bidder}:
Delivery Days After Receipt of Order:
IMPORTANT: GROUP 5, PRICE LINES 17 THROUGH 20 , ARE GROUPED TO CREATE A SINGLE AWARD. A VENDOR {BIDDER]} MUST BID ON ALL PRICE LINE ITEMS WITHIN THE GROUP IN ORDER TO BE CONSIDERED FOR AN AWARD FOR THE GROUP.
NOTE: Unit Price, Make, Model and Percentage Discount or Markup are required fields and must be completed on the State-Supplied Price Sheet.
GroupItem DescriptionQuantityUnit of MeasureUnit Price (Required)

5 PRICE LINE 17: ELECTRIC FORKLIFT- SIT- DOWN MODEL, AS SPECIFIED IN SECTION 3.4.5.1 OF THE BID SOLICITATION. 1 Each

MAKE:

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 18: BATTERY AS SPECIFIED IN SECTION 3.4.5.2 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 19: CHARGER AS SPECIFIED IN SECTION 3.4.5.3 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasurePercentage Discount or Markup (Required)
Price Line 20: Manufacturer’s Published Option (For The Manufacturer’s Base Unit). This price line is for unit manufacturer’s published options only, which shall be purchased using the percentage discount or markup bid by the Vendor {Bidder}.1Percent
STATE-SUPPLIED PRICE SHEET
MOBILE WAREHOUSE EQUIPMENT
(20DPP00559, T-3125)
Vendor {Bidder}:
Delivery Days After Receipt of Order:
IMPORTANT: GROUP 6, PRICE LINES 21 THROUGH 24 , ARE GROUPED TO CREATE A SINGLE AWARD. A VENDOR {BIDDER]} MUST BID ON ALL PRICE LINE ITEMS WITHIN THE GROUP IN ORDER TO BE CONSIDERED FOR AN AWARD FOR THE GROUP.
NOTE: Unit Price, Make, Model and Percentage Discount or Markup are required fields and must be completed on the State-Supplied Price Sheet.
GroupItem DescriptionQuantityUnit of MeasureUnit Price (Required)

6 PRICE LINE 21: ELECTRIC FORKLIFT- ORDER PICKER MODEL, AS SPECIFIED IN SECTION 3.4.6.1 OF THE BID SOLICITATION. 1 Each

MAKE:

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 22: BATTERY AS SPECIFIED IN SECTION 3.4.6.2 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasureUnit Price (Required)
PRICE LINE 23: CHARGER AS SPECIFIED IN SECTION 3.4.6.3 OF THE BID SOLICITATION.1Each
MAKE:

(Required)

MODEL:

(Required)

Item DescriptionQuantityUnit of MeasurePercentage Discount or Markup (Required)
Price Line 24: Manufacturer’s Published Option (For The Manufacturer’s Base Unit). This price line is for unit manufacturer’s published options only, which shall be purchased using the percentage discount or markup bid by the Vendor {Bidder}.1Percent

File details come from the government source that posted it. Updated .