T3104 Bid Amendment 1~2.pdf

PDF 517 KB Posted

Attached to
T3104 - Solar Power Purchase Agreements (PPA)
Solicitation number
18DPP00260
Issued by
New Jersey

About this file

This document is Bid Amendment #1 for a Bid Solicitation from the New Jersey Department of the Treasury, Division of Purchase and Property, Procurement Bureau for Solar Power Purchase Agreements (PPA). The bid solicitation is open to all interested vendors and the revised quote submission due date is May 23, 2019 at 2:00 PM Eastern Time. The amendment includes answers to questions, extends the quote submission due date, and provides revised bid solicitation, pricing schedule, and attachment documents. The contract will be awarded based on price and other factors and will be a Blanket P.O. that allows for site-specific Engagements to be issued by Using Agencies.

The bid solicitation requires vendors to provide general base rate pricing for solar installations in different size and regional categories. Vendors are not required to provide preliminary layouts or energy modeling for the proposed sites included in the attachment, as those will be required during the Engagement process. The State will not provide assumptions for SREC pricing or interconnection upgrade costs, as those will be addressed during the Engagement process. Prevailing wage requirements apply to all Engagements under this contract. The State is unwilling to modify the large "medium" size category or the Buy American requirement at this time.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Jersey Is an Equal Opportunity Employer • Printed on Recycled and Recyclable Paper

PHILIP D. MURPHY

Governor

State of New Jersey

DEPARTMENT OF THE TREASURY

DIVISION OF PURCHASE AND PROPERTY

PROCUREMENT BUREAU

33 WEST STATE STREET

P. O. BOX 230

TRENTON, NEW JERSEY 08625-0230

ELIZABETH MAHER MUOIO

State Treasurer

SHEILA Y. OLIVER

Lt. Governor

MAURICE A. GRIFFIN

Acting Director https://www.njstart.gov

April 26, 2019

To: All Interested Vendors {Bidders}

Re: Bid Solicitation # 18DPP00260

Solar Power Purchase Agreements (PPA)

ORIGINAL Quote Submission Due Date: May 9, 2019 (2:00 p.m. Eastern Time) REVISED Quote Submission Due Date: May 23, 2019 (2:00 p.m. Eastern Time)

Bid Amendment #1

The following constitutes Bid Amendment #1 to the above referenced Bid Solicitation:

This Bid Amendment includes answers to questions;

This Bid Amendment extends the Quote submission due date to May 23, 2019; and

Please note that for all additions, deletions, clarifications and modifications to the Bid Solicitation, please refer to the following revised documents:

1. Revised Bid Solicitation entitled “T3104 Revised Bid Solicitation 042619”;

2. Revised Pricing Schedule entitled “T3104 Revised Price Schedule 042619”; and

3. T3104 Attachment 3 – Preliminary Sites.

It is the sole responsibility of the Vendor {Bidder} to be knowledgeable of all of the additions, deletions, clarifications, and modifications to the Bid Solicitation and/or the New Jersey Standard Terms and Conditions relative to this Bid Solicitation as set forth in all Bid Amendments.

All other instructions, terms, and conditions of the Bid Solicitation shall remain the same.

Bid Solicitation #18DPP00260 Solar Power Purchase Agreements (PPA)

Answers to Questions

Where applicable, each question references the appropriate Bid Solicitation section.

Note: This question has been paraphrased in the interest of readability and clarity.

Bid Solicitation

Section Reference Question (Bolded) and Answer

1 PDF Documents When trying to open a Portable Document (PDF) I am receiving an error message and am unable to access the PDF. How should I proceed?

It is recommended that users utilize Internet Explorer to view PDFs. Certain PDF forms cannot be opened in the Chrome or Firefox built in PDF viewers that are enabled by default. If using Chrome or Firefox it is recommended that the file is downloaded instead by clicking the download button in the upper right-hand corner of the browser after an error message is received. An alternative option is to disable the built in PDF viewers in Chrome or Firefox.

2 Quote Submission Should I check that I have properly completed and attached all of the required documents with my submitted Quote?

Yes. Prior to the Quote Opening Deadline, a Vendor {Bidder} should review the documents comprising the submitted Quote to ensure that all of the required documents have been completed and attached. Oftentimes a Quote is deemed non-responsive because a Vendor {Bidder} fails to attach a required form or attaches a blank form. To review a submitted Quote a Vendor {Bidder} should log into NJSTART and review each document attached to the Quote submission. Instructions on how to review a submitted Quote can be found in the Quick Reference Guide entitled How to Review a Submitted Quote which is available on the NJSTART Vendor Support Page under Vendor Reference Guides.

3 Section 9.0 NJ Standard Terms &

Conditions

Will the State allow Vendors to take exception to any of the Standard Terms and Conditions?

As stated in Bid Solicitation Section 1.3.1.1 Exceptions to The State of NJ Standard Terms and Conditions (SSTC) - Questions regarding the State of New Jersey Standard Terms and Conditions (SSTC) and exceptions to mandatory requirements must be posed during this Electronic Question and Answer period and shall contain the Vendor’s {Bidder’s} suggested changes and the reason(s) for the suggested changes. Additionally as stated in Section

4.1 General - Quotes including Vendor {Bidder} proposed terms and conditions may be accepted, but Vendor {Bidder} proposed terms or conditions that conflict with those contained in the Bid Solicitation, as defined in Section 2.0 of this Bid Solicitation, or that diminish the State’s rights under any Blanket P.O.

resulting from the Bid Solicitation, may render a Quote non-responsive.

4 Term Clarification Can you please clarify the difference between Quote, Bid Solicitation and Engagement?

A Bid Solicitation is a series of documents, which establish the bidding and Blanket P.O. requirements and solicits Quotes to meet the needs of the Using Agencies as identified herein, and includes the Bid Solicitation, Sate of NJ

Section Reference Question (Bolded) and Answer

Standard Terms and Conditions (SSTC), State-Supplied Price Sheet, attachments, and Bid Amendments. A Quote is the Vendor’s {Bidder’s} timely response to the Bid Solicitation including, but not limited to, technical Quote, price Quote, and any licenses, forms, certifications, or other documentation required by this Bid Solicitation. An Engagement is a written request of the Vendor {Contractor} to provide services based on the scope of work given by the Using Agency or the Department of Management and Construction.

Please refer to T3104 Revised Bid Solicitation 042619.

5 Escrow account With regard to the escrow account that would serve as an Acceptable Security Instrument, what contract year would the Vendor (Contractor) need to begin making monthly deposits?

The Vendor {Contractor} would need to begin making monthly deposits upon the award of an Engagement. Using monthly deposits towards an escrow account as an Acceptable Security Instrument would begin the first month the system is operational. Vendors {Bidders} are encouraged to re-read Sections

2.2 and 3.16.1 of this Bid Solicitation.

6 Clarification of quote information

A) Can you please elaborate on the bid solicitation selection process and initial quote requirements?

A) Quotes will be technically evaluated, and awarded based on price and other factors.

B) What information is required from developers in order to be selected as a prequalified Vendor?

B) Please refer to Section 4 of this Bid Solicitation.

C) What information is required after prequalified vendors are selected.

C) Using Agencies will issue an Engagement in a mini-bid whereby the prequalified pool of Vendors {Contractors} must provide pricing based on the scope of work in the Engagement.

D) Are developers required to submit engineering designs, price quotes/PPAs in order to be considered for the prequalified vendor pool or is that information that is provided after?

D) No, that information is required after during the Engagement Process.

7 Union Requirements Is union labor required on these jobs?

No, union labor is not required on these jobs.

8 Union Requirements If union labor is not required, will union labor be preferred or favored by the state when vendors are selected?

Union labor is neither preferred nor favored by the State when Vendors {Bidders} are selected.

9 Pricing For pricing purposes should we assume that all systems in each pool would be installed behind the meter?

Section Reference Question (Bolded) and Answer

For pricing purposes, Vendors {Bidders} should assume that all systems in each pool would be installed “behind the meter”. As Community Solar and other programs become available, they will be addressed in the Engagement process within the term of the Blanket P.O.

10 T3104 Solar PPA Price Schedule 1

The “medium” size category is quite large, going from 50 to 2,000 kW.

Projects toward either end of that spectrum will have very different economies of scale. Would you be willing to further divide that up into smaller segments? We might suggest 50-400, 401-1000, and 1001-2000.

This would bring the total number of categories from 3 to 5 – the 3 listed above, plus <50 and >2000.

The State is unwilling to accept this proposed modification.

11 SREC Market In light of the turbulence in the New Jersey SREC market and uncertainty surrounding the SREC Transition Program and Successor Program, can the State of New Jersey provide a SREC price assumption that bidders can use to provide comparative pricing, all using the same assumptions?

No, the State cannot provide a SREC price assumption that Vendors {Bidders} can use to provide comparative pricing.

12 More Detail on Bonds

Section 3.3

A) In Section 3.3 Using Agency Engagement Process, the RFP states that a bid bond, payment bond, and performance bond will be required for each Engagement. Should the bid, payment and performance bonds be considered in the Base Rate or should they be included in the Adder Pricing?

A) The bid bond, payment bond and performance bond shall be considered in the Adder Rate, which will be submitted upon each Engagement. As stated in Section 3.3 of this Bid Solicitation, such bonds shall be provided by the Vendor {Contractor} either with each Engagement response, or prior to any work beginning on any specific Engagement. The Vendor {Bidder} is not required to include the bid bond, payment bond, or performance bond in the Base Rate that will be included in the Vendor’s {Bidder’s} Technical Quote.

B) Could the State of NJ specify how long it would like a performance bond and the dollar amount of security required? Long-term performance bonds throughout the project life will add long term operating costs that will increase PPA rates.

B) Each performance bond will vary in dollar value by each site-specific Engagement between the Vendor {Contractor} and its Subcontractor. The performance bond is only required from the start to the completion of the construction of the Photovoltaic System at any given Site provided in the Power Purchase Agreement (PPA). Yes, performance bonds through the project life would increase operating costs, but a performance bond should only be between the Vendor {Contractor} and its Subcontractor during the construction periods of the project. Long-term performance bonds that extend past the construction close-out period are not required.

Section Reference Question (Bolded) and Answer

13 Interconnection Grid Upgrade Cost Assumption

Section 3.5

In Section 3.5: Electrical Generating Equipment, the RFP states that the Vendor should provide interconnection of the system at no additional cost to the state. Is the State of NJ willing to set an interconnection upgrade cost assumption for all bidders to use to make it easier for the State to compare bidders?

Any utility required interconnection upgrades will be considered in the site-specific Engagement responses as different locations may require varying amounts for system interconnection.

14 Prevailing Wage

Section 9.0, Subsection 2.3

Will each of the engagements for all using agencies under this P.O. be subject to prevailing wage requirements? What about for any opportunities under the cooperative purchasing program?

Yes, all engagements are subject to prevailing wage requirements.

15 Buy American Requirement

Subsection 3.7

In Section 3.7: Buy American, the RFP requests that all manufactured items be produced in the United States. Most high quality solar modules and inverters are manufactured outside of the United States, so only using American made equipment will significantly increase the proposed PPA prices. Is the State of NJ willing to accept proposals from bidders that make a reasonable effort to have some equipment, but not all, meet the Buy American requirement in order to offer the most economic proposal to the State of New Jersey?

Please refer to T3104 Revised Bid Solicitation 042619 Sections 1.1 and 4.4.5.2, and T3104 Revised Price Schedule 042619.

16 Availability of Funds Contingency

Subsection 6.6

In Section 6.6: Availability of Funds, the RFP states that the State's obligation to make payment is contingent on appropriation of funds. In order to propose PPA pricing for a 20 year term, we as the financier will need to have assurance that the state entity will be able to pay for each year of the contract term. How will the state entity manage this financier requirement (included in the draft PPA document) with this Section 6.6 annual re-allocation of appropriate state funds?

The New Jersey State Government is funded on a yearly basis, with its fiscal year July 1 to June 30. While it is highly unlikely that yearly appropriations will not be sufficient to pay utility bills for State-owned and occupied premises, there is no way to guarantee the budget from year to year.

17 Attachment 1 Proposed Sites

A) In Attachment 1, there are proposed sites included. Should our proposal response include any preliminary layouts or energy modeling for the proposed locations?

A) No preliminary layouts or energy modeling for the proposed locations in T3104 Attachment 1 – Location List are to be included with the Vendor’s {Bidder’s} Technical Quote. Those will be requirements of the site-specific Engagements.

B) Are our proposed prices for each size and region (in the PPA Price Schedule) based on these specific sites or just general Base Rate pricing?

Section Reference Question (Bolded) and Answer

B) The proposed prices for each size and region should just be general Base Rate pricing varying with regional labor costs and economies of scale for each size and region.

18 T3104 Attachment 1 What is the address of the “Labor & Industry Building?”

The address of the Labor & Industry Building is One John Fitch Plaza, Trenton, New Jersey 08608.

19 T3104 Attachment 1 What is the address of “Distribution Center – Stuyvesant Road (Trenton)?”

The address for the Distribution Center – Stuyvsesant Road (Trenton) is 1620 Stuyvesant Ave., Trenton, NJ 08618.

20 T3104 Attachment 1 If not already included, would you consider adding the Dept of Heath and Dept of Agriculture on Warren St. in Trenton?

The State is unwilling to modify T3104 Attachment 1 – Location List at this time. Locations will be added to the list as the program is expected to expand to various locations throughout the State that are not currently included in the list. As stated in Section 3.1 of this Bid Solicitation, the State reserves the right to add or delete facilities from T3104 Attachment 1 – Location List during the term of the Blanket P.O.

21 Ground mount systems

Attachment 3

Is it possible to get a Google Earth image markup of the location of any ground mount systems being considered at sites included in the the list of sites?

Please refer to T3104 Attachment 3 – Prelimiary Sites. Included in this attachment are some preliminary studies of site plan mark-ups for solar development based on agency consideration for land use at these facilities.

The preliminary facilities have not been studied yet.