T202501101 Location Display.pdf

PDF 15 MB Posted

Attached to
OPEN-END PEDESTRIAN ACCESS ROUTES & SIDEWALK IMPROVEMENTS, NCC FY25-FY27
Solicitation number
T202501101
Issued by
New Castle County, Delaware

View the file

Other files

File Type Posted
T202501101 BOS.xlsx XLSX spreadsheet
public.ejs?command=PublicBusinessPlanholderList&projid=T202501101 —
T202501101 Plans.pdf PDF
T202501101 Proposal.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

DELDOT

N

PEDESTRIAN ACCESS ROUTES AND SIDEWALK IMPROVEMENTS, NEW CASTLE COUNTY FY25-FY27

Work Order #5

SCALE

FEET

5000 10000 15000

DELDOT PROJECT NO. T202501101

M A

R Y L A

N D

NEW JERSEY

D E L A

W A

R E

PENNSYLVANIA

MARYLAND

NEWARK

CLAYMONT

DEL

AW

ARE

RI

VE

R

S R

I9

I295

I4

U S

U S

S R

NEWPORT

WILMINGTON

CITY OF

S R

SR

S R

S R

S R

S R

BEAR

CHRISTIANA

DETERMINED WORK ORDER LOCATIONS

OUT THE PROPOSED IMPROVEMENTS USING THE ITEM 763622 - CONSTRUCTION ENGINEERING, PAR REHABILITATION.

AND WILL NOT BE PROVIDED FOR THESE LOCATIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR SURVEYING AND LAYING

* DESIGN WAS COMPLETED USING AERIAL IMAGERY AND GIS LEVEL INFORMATION. TOPOGRAPHIC SURVEY WAS NOT COMPLETED *

Work Order #7 Brandywine Boulevard, Edgemoor Road to River Road and River Road Edgemoor Road, Paladin Drive to Blue Rock Boulevard and

Work Order #1 New Castle Avenue, Paper Place to Ryan Avenue

N Market Street, 41st Street to Edgemoor Road

Work Order #4*

Twin C Lane Old Churchmans Road, Rockford Drive to Ogletown Stanton Road and Ogletown Stanton Road, Old Churchmans Road to Stanton Christiana Road and

Work Order #8* S Chapel Street, Pencader Plaza North Entrance to South Entrance

Work Order #2 Old Capitol Trail, Walmsley Drive to Delaware Park Drive

Work Order #3 Milltown Road, Saint John Church Entrance to E Parris Drive

Work Order #6

Race Street and Old DuPont Road DuPont Road, Valley Road to Richardson Lane and

Maryland Avenue, Boxwood Plaza Entrance to Brookside Drive and

SR 2

NEW1

N

NEW3

NEW4

NEW2

L A

M B S O

N L

N

NEW CASTLE AVE

P A P E R P

L

10 11

M A P

LE

A

V E R

O S E L

N

R E

V

IS

A

V E

R

IZ

Z O A

V E

M A

N S

IO

N P

K W

Y

R Y

A N A

V E

SU

TT

O N L

N

H

IL

L V

IE

W A

V E

NEW CASTLE AVE

NEW1

14 15 16 17

19 20

POINT NO. NORTHING EASTING ELEV.

HORIZONTAL/VERTICAL CONTROL DATA

621058.7690

621471.9700

621967.1137

622349.4169NEW4

NEW1

NEW2

NEW3

618461.6480

618666.3660

618703.1819

618899.9949

50.67

51.55

54.47

55.29

SCALE

FEET

100 200 300

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS SECTION

SHEET NO.

a d .r k k .c o m \f s \C lo u d \P r o je c t s \2

\1

P

A R

D e s ig n \T a s k

P

A R

A

D A

O p e n

E n d \C a d d \W o r k

O r d e r

N e w C a s t le

A v e \C o n t r a c t \P la n s \i s

N C

A

B id

P a c k a g e .d g n

:3

-O

C T -2

NEW CASTLE

RKK

N/A T202501101

M. MAYES

M. GOUDY

INDEX OF SHEETS

WORK ORDER #1

CASTLE COUNTY FY25-FY27

AND SIDEWALK IMPROVEMENTS, NEW

OPEN END PEDESTRIAN ACCESS ROUTES

Steven Nickel (Wallace Montgomery) Text Box

DESCRIPTION OF WORK:

T202501101 - Work Order #1 - New Castle Avenue, Paper Place to Ryan Avenue

The scope of work along New Castle Avenue includes the reconstruction of the existing non-compliant sidewalk (approximately 5,000 SF), curb ramps (approximately 2,500SF), and driveways. It also encompasses pavement striping, sign relocations, and signal upgrades at Lambson Lane within the project limits.

The work involves patching, milling and overlaying entrances, sealing cracks, and joint sealing. Additionally, approximately 850 LF of curb installation will be performed. Utilities will be adjusted vertically, including drainage manholes and drainage inlets.

Survey information, grades, and geometry sheets will be provided for this location.

The project duration is set for 60 calendar days.

WV

WV

WV

WV

WV

WV

WV

WV

F.H.

W.

M.

W.

M.

W.M.

W.

M.

W.

M.

W.

M.

W.

M.

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S.C .O.

S.C .O.

S.C .O.

S.C .O.

G.V

G.V

E

EM

LAMP

J.W.

J.W.

D.I.

D.I

D.I

D.I.

MB

MB

MB

MB

MB

MB

MB

M B

MB

MB

MB

MB

MB

MB

MB

MB

MB

MB

D6

DST0

G R A V E L D

R

IV

E W

A Y

D6

7/

/ 1

1D6DST C

O

VZ6

30449

80-

DST C

O

DST C

O

DST C

O

MD6

BSTCS

VZ7

VZ

PSK60

KOP

VZ73

HBX

4'X

3'

DOT H

BX3'X

1.5

C O

N C R E T E S

ID

E W

A L K

C O

N C R E T E S

ID

E W

A

LK

C O

N C R E T E

C O

N C R E T E

PAVERS

C O

N C R E T E S

ID

E W

A L K

C O

N C R E T E S

ID

E W

A L K

C O

N C R E T E S

ID

E W

A L K

M A C

A D

A M S

ID

E W

A L K

D R

IV

E W

A Y

B

IT

U M

IN

O U S

C O

N C R E T E D

R

IV

E W

A Y

G R A V E L D

R

IV

E W

A Y

BIT

UMI

NOUS

BIT

UMI

NOUS

D R

IV

E W

A Y

B

IT

U M

IN

O U S

D R

IV

E W

A Y

B

IT

U M

IN

O U S

D R

IV

E W

A Y

B

IT

U M

IN

O U S

D R

IV

E W

A Y

B

IT

U M

IN

O U S

D R

IV

E W

A Y

B

IT

U M

IN

O U S

D R

IV

E W

A Y

B

IT

U M

IN

O U S

D R

IV

E W

A Y

B

IT

U M

IN

O U S

D R

IV

E W

A Y

B

IT

U M

IN

O U S

D R

IV

E W

A Y

B

IT

U M

IN

O U S

D R

IV

E W

A Y

C O

N C R E T E

C O

N C R E T E D

R

IV

E W

A Y

42" RCP

" C

M P

C M

P

36" RCP

R C P

" R

C P

8"

HDPE

" R

C P

" R

CP

' W

O O

D P

O S T S M

E

TA

L W

IR

E

D.I

U

U

D.I

MB

MB

MB

U

D.I.

MB

D.I

D.I

M B

D.I

D.I

S

G R A S S D

R

IV

E W

A Y

D.I

G.V

G.V

LAMP

LAMP

WV

WV

F.H

U

W.

M.

G.V

MB

MB

-4

29#

VZ 6

0-2

AZALE

A

-42

DP&L 4

1 S

TORY V

INYL

PORCH

-42

141DP&L 4

-421

44DP 4

A

D.S .T

RC

P

15"

RCP

D .I.

D .I.

S

CONCRETE

S

IDEWALK

C O

N C R E T E S

ID

E W

A

LK

CONCRETE

S

IDEWALK

CONCRETE

S

IDEWALK

CONC

CONCRETE

S

IDEWALK

CONCRETE

S

IDEWALK

CONC

CONCRET

E

SI

DEW

ALK

CONCRETE

S

IDEWALK

C O

N C

R E T E S

ID

E W

A L K

C O

N C

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

M U L C

H

MULC

H

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

MULC

H

GRASS

GRASS

GRASS

GRASS

GRASS

MULC

H

CONCRETE

S

IDEWALK

CONCRETE

SID

EWALK

CONCRETE

SID

EWALK

CONCRETE

SID

EWALK

CONCRETE

SID

EWALK

CONCRETE

SID

EWALK

CONCRETE

SID

EWALK

CONCRETE

SID

EWALK

CONCRETE

SID

EWALK

CONCRETE SIDEWALK

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

W.

M.

WV

WV

D

D

D

RCP

" R

CP

" R

CP

M P R

O J\ .0

\H ig h w a y s\ _C a d d

W O

IS

.d g n

:4

:5

P

M /2

/2

CONTRACT

COUNTY

DES

IG

NED

BY:

CHECKED

BY:

BRID

GE

NO.

ADDENDA

/ R

EVIS

IO

NS

SECTIO

N

SHEET N

O.

WM

N/A

M.

S

TEIM

ER

S.

NIC

KEL

NEW

CASTLE

T2

NEW

CASTLE

COUNTY F

Y2

3-2

SID

EWALK I

MPROVEMENTS

PEDESTRIA

N A

CCESS

ROUTES A

ND

M P R

O J\ .0

\H ig h w a y s\ _C a d d

W O

IS

.d g n

:4

:5

P

M /2

/2

CONTRACT

COUNTY

DES

IG

NED

BY:

CHECKED

BY:

BRID

GE

NO.

ADDENDA

/ R

EVIS

IO

NS

SECTIO

N

SHEET N

O.

WM

N/A

M.

S

TEIM

ER

S.

NIC

KEL

NEW

CASTLE

T2

NEW

CASTLE

COUNTY F

Y2

3-2

SID

EWALK I

MPROVEMENTS

PEDESTRIA

N A

CCESS

ROUTES A

ND

M P R

O J\ .0

\H ig h w a y s\ _C a d d

W O

IS

.d g n

:4

:5

P

M /2

/2

CONTRACT

COUNTY

DES

IG

NED

BY:

CHECKED

BY:

BRID

GE

NO.

ADDENDA

/ R

EVIS

IO

NS

SECTIO

N

SHEET N

O.

WM

N/A

M.

S

TEIM

ER

S.

NIC

KEL

NEW

CASTLE

T2

NEW

CASTLE

COUNTY F

Y2

3-2

SID

EWALK I

MPROVEMENTS

PEDESTRIA

N A

CCESS

ROUTES A

ND

M P R

O J\ .0

\H ig h w a y s

C a d d

W O

IS

.d g n

:4

:5

P

M /2

/2

CONTRACT

COUNTY

DES

IGNED B

Y:

CHECKED B

Y:

BRID

GE N

O.

ADDENDA /

REVIS

IONS

SECTIO

N

SHEET N

O.

WM

N/A

M.

STEIM

ER

S.

NIC

KEL

NEW

CASTLE

T2

NEW C

ASTLE

COUNTY F

Y23

-26

SID

EWALK IM

PROVEMENTS

PEDESTRIA

N A

CCESS

ROUTES A

ND

M P R

O J\ .0

\H ig h w a y s

C a d d

W O

IS

.d g n

:4

:5

P

M /2

/2

CONTRACT

COUNTY

DES

IGNED B

Y:

CHECKED B

Y:

BRID

GE N

O.

ADDENDA /

REVIS

IONS

SECTIO

N

SHEET N

O.

WM

N/A

M.

STEIM

ER

S.

NIC

KEL

NEW

CASTLE

T2

NEW C

ASTLE

COUNTY F

Y23

-26

SID

EWALK IM

PROVEMENTS

PEDESTRIA

N A

CCESS

ROUTES A

ND

M P R

O J\ .0

\H ig h w a y s

C a d d

W O

IS

.d g n

:4

:5

P

M /2

/2

CONTRACT

COUNTY

DES

IGNED B

Y:

CHECKED B

Y:

BRID

GE N

O.

ADDENDA /

REVIS

IONS

SECTIO

N

SHEET N

O.

WM

N/A

M.

STEIM

ER

S.

NIC

KEL

NEW

CASTLE

T2

NEW C

ASTLE

COUNTY F

Y23

-26

SID

EWALK IM

PROVEMENTS

PEDESTRIA

N A

CCESS

ROUTES A

ND

M P R

O J\ .0

\H ig h w a y s

C a d d

W O

IS

.d g n

:4

:5

P

M /2

/2

CONTRACT

COUNTY

DESI

GNED B

Y:

CHECKED B

Y:

BRID

GE N

O.

ADDENDA /

REVIS

IONS

SECTIO

N

SHEET N

O.

WM

N/A

M.

STEIM

ER

S.

NIC

KEL

NEW

CASTLE

T20

NEW C

ASTLE

COUNTY F

Y23

-26

SID

EWALK IM

PROVEMENTS,

PEDESTRIA

N A

CCESS

ROUTES A

ND

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS SECTION

SHEET NO.

/2

/2

:4

:5

P

M

M

P R

O J\

.0

\H ig h w a y s\

C a d d \W

O

IS

.d g n

WM

N/A

M. STEIMER

S. NICKEL

NEW CASTLE

S. NICKEL

NEW CASTLE COUNTY FY25-27

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

T202501101

1+

2+0

3+0

+00

+00

+00

+0

+0

4+

+0

5+

5+

6+

+0

7+

8+0

+0

+0

9+

+0

+0

+0

+0

+0

+0

N

INDEX OF SHEETS

WORK ORDER #2

OLD C

APIT

OL T

RAIL

(N 20)

SCALE

FEET

75 150 225

INDEX OF SHEETS

41RIGHT-OF-WAY DATA SHEET

34-40RIGHT-OF-WAY PLANS (RW)

33RIGHT-OF-WAY MOSAIC

25-32SIGNING, STRIPING AND CONDUIT PLANS (SS)

23-24CONSTRUCTION PHASING, MOT AND EROSION CONTROL PLANS (CS)

22CONSTRUCTION DETAILS

15-21GRADES AND GEOMETRICS (GG)

8-14CONSTRUCTION PLANS (CP)

7HORIZONTAL AND VERTICAL CONTROL

6TYPICAL SECTIONS

5NOTES

4LEGEND

3ADDENDA AND REVISIONS

2INDEX OF SHEETS

1TITLE

SHEET NO(S)SHEET DESCRIPTION

(N B

W O

L L A S T O

N R

O A

D

(N

W A L

M S L E

Y D

R

IV

E

L O

U

IS

A A

V E N

U

O A K S

T R E

T

O T H

O S O

N A

V E N

R

IV

E (N

11A

D E

LA

W A R E P

A

K

KI

R

KW

O O D H

IG

H W

AY

(N

MADELIN

E D

RIV

E (

N124

Steven Nickel (Wallace Montgomery) Text Box

DESCRIPTION OF WORK:

T202501101 - Work Order #2 - Old Capitol Trail, Walmsley Drive to Delaware Park Drive

The scope of work along Old Capitol Trail includes the reconstruction of the existing non-compliant sidewalk (approximately 7,000 SF), curb ramps (approximately 3,600 SF), and driveways. It also encompasses pavement striping and sign relocations within the project limits.

The work involves patching, milling and overlaying roads/entrances (approximately 2,500 SYIN of roadway milling), sealing cracks, and joint sealing. Additionally, approximately 2,000 LF of curb installation will be performed, along with the installation of underdrains (900 LF), and drainage inlets and pipes (100 LF). Utilities will be adjusted vertically, including water valve boxes, gas valve boxes, sanitary manholes, and drainage inlets/manholes.

The project duration is set for 75 calendar days.

© 2024 Microsoft Corporation Earthstar Geographics SIO

17-20RIGHT-OF-WAY PLANS AND DATA SHEET

14-16GRADES AND GEOMETRICS

13CONSTRUCTION DETAILS

12PERMANENT SIGN SCHEDULE

9-11CONSTRUCTION PLANS (CP)

8HORIZONTAL AND VERTICAL CONTROL

7TYPICAL SECTIONS

5-6NOTES

4LEGEND

3ADDENDA AND REVISIONS

2INDEX OF SHEETS

1TITLE

SHEET NO(S)SHEET DESCRIPTION

INDEX OF SHEETS

SCALE

FEET

100 200 300

N

MI

LL

TOW

N

ROAD

MI

LL

TOW

N

ROAD

E P

A R

R

IS

D

R

IV

E

DARTM

OUTH ROAD

M A C

LA

R Y D

R

IV

E

W R

O B

IN

O D

R

IV

E

S H E E N R

O A D

H A R T

LE

Y P

L

O W

E N D

R

IV

E

C A L F R

U N D

R

IV

E

Drawing

1:100

B E

LF

O R D D

R

IV

E

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

NEW CASTLE COUNTY FY25-FY27

AND SIDEWALK IMPROVEMENTS

PEDESTRIAN ACCESS ROUTES N/A

J. BRIONES

O. GREEN

PAI

U

A c c o u n ts

\D E

D O

T \D

E D

O T

D e lD

O T

A G

R F

T a sk

N

C C

S id e w a lk a n d \D

E S

IG

N

\C T

\D G

N \W

O -M il lt o w n \I

S N

E W

.d g n

:2

-O

C T

-2

T202501101

INDEX OF SHEETS

WORK ORDER #3

+00

+00

+00

+00

+00

+00

+00

+00

+00

0+

1+

2+

3+

4+

5+

6+

7+

8+

9+

0+

1+

2+

3+

4+

5+

N5 6°

'1 2.

"E

+00

0+

5+

0+

5+

Steven Nickel (Wallace Montgomery) Text Box

DESCRIPTION OF WORK:

T202501101 - Work Order #3 - Milltown Road, Saint John Church Entrance to E Parris Drive

The scope of work along Milltown Road includes approximately 7,800 SF of both the new installation of missing sidewalk and the reconstruction of the existing non-compliant sidewalk, curb ramps (approximately 1,500 SF), and driveways. It also encompasses pavement striping and sign relocations within the project limits.

The work involves patching as required for curb ramp construction. Additionally, approximately 420 LF of curb installation will be performed. Utilities will be adjusted horizontally for a guy wire and vertically for impacted telephone manholes.

The project duration is set for 45 calendar days.

C O

N T R A C

TC

O

U N T Y

D E S

IG

N E D B

Y

C H E C K E D B

Y

B R

ID

G E N

O

A D

D E N D

A / R

E V

IS

IO

N S

S E C T

IO

NS

H E E T N

O

W M

N /A

M . S

T E

IM

E R

S . N

IC

K E L

N E

W C

A S T

LE

T

N E

W C

A S T

LE

C

O U N T Y

FY

20-23

S

ID

E W

A

LK

IM

P R O

V E

M E N T S

P E D E S T R

IA

N A

C C E S S R

O U T E S A

N T R A C

TC

O

U N T Y

D E S

IG

N E D B

Y

C H E C K E D B

Y

B R

ID

G E N

O

A D

D E N D

A / R

E V

IS

IO

N S

S E C T

IO

NS

H E E T N

O

W M

N /A

M . S

T E

IM

E R

S . N

IC

K E L

N E

W C

A S T

LE

T

N E

W C

A S T

LE

C

O U N T Y

FY

20-23

S

ID

E W

A

LK

IM

P R O

V E

M E N T S

P E D E S T R

IA

N A

C C E S S R

O U T E S A

CONTRACT

COUNTY

DESIG

NED B

Y:

CHECKED B

Y:

BRIDGE N

O.

ADDENDA /

REVISI

ONS

SECTION

SHEET NO.

WM

N/A

M. S

TEIMER

S. N

ICKEL

NEW C

ASTLE

T20

NEW C

ASTLE C

OUNTY FY20-

SIDEWALK IM

PROVEMENTS,

PEDESTRIAN ACCESS R

OUTES AND

C O

N T R

A C T

C O

U N

T Y

D E S

IG

N E

D B

Y

C H

E C

K E

D B

Y

B R

ID

G E N

O

A D

D E

N D

A / R

E V

IS

IO

N S

S E C T

IO

N

S H

E E T N

O

W M

N /A

M . S

T E

IM

E R

S . N

IC

K E L

N E

W C

A S T L E

T

N E

W C

A S T L E C

O U

N T

Y F

Y -2

S

ID

E W

A L K

IM

P R

O V E

M E

N T S

P E

D E S T R

IA

N A

C C E S S R

O U T E S A

DESIG

NED B

Y:

CHECKED B

Y:

BRIDGE N

O.

ADDENDA /

REVISI

ONS

SECTION

SHEET NO.

WM

N/A

M. S

TEIMER

S. N

ICKEL

NEW C

ASTLE

T20

NEW C

ASTLE C

OUNTY FY20-

SIDEWALK IM

PROVEMENTS,

PEDESTRIAN ACCESS R

OUTES AND

CONTRACT

COUNTY

DESIG

NED B

Y:

CHECKED B

Y:

BRIDGE N

O.

ADDENDA /

REVISI

ONS

SECTION

SHEET NO.

WM

N/A

M. S

TEIMER

S. N

ICKEL

NEW C

ASTLE

T20

NEW C

ASTLE C

OUNTY FY20-

SIDEWALK IM

PROVEMENTS,

PEDESTRIAN ACCESS R

OUTES AND

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / R

EVISIO

NS

SECTION

SHEET NO.

WM

N/A

M. STEIMER

S. NIC

KEL

NEW CASTLE

T2019 01401

NEW CASTLE COUNTY FY20-2

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS

SECTION

SHEET NO.

WM

N/A

M. STEIMER

S. NICKEL

NEW CASTLE

T201901401

NEW CASTLE COUNTY FY20-23

SIDEWALK IMPROVEMENTS,PEDESTRIAN ACCESS ROUTES AND

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS

SECTION

SHEET NO.

WM

N/A

M. STEIMER

S. NICKEL

NEW CASTLE

T201901401

NEW CASTLE COUNTY FY20-23

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS

SECTION

SHEET NO.

WM

N/A

M. STEIMER

S. NICKEL

NEW CASTLE

T201901401

NEW CASTLE COUNTY FY20-23

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS

SECTION

SHEET NO.

WM

N/A

M. STEIMER

S. NICKEL

NEW CASTLE

T201901401

NEW CASTLE COUNTY FY20-23

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS

SECTION

SHEET NO.

WM

N/A

M. STEIMER

S. NICKEL

NEW CASTLE

T201901401

NEW CASTLE COUNTY FY20-23

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS

SECTION

SHEET NO.

WM

N/A

M. STEIMER

S. NICKEL

NEW CASTLE

T201901401

NEW CASTLE COUNTY FY20-23

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS SECTION

SHEET NO.

/2

/2

:4

:5

P M

M

P R

O J\

.0

\H ig h w a y s\

C a d d \W

O

IS

.d g n

WM

N/A

M. STEIMER

S. NICKEL

NEW CASTLE

T202301101

NEW CASTLE COUNTY FY23-26

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

S. NICKEL

INDEX OF SHEETS

WORK ORDER #4

T W

IN

C L

A N E (N

C

O G

L E T O

W N S

T A

N T O

N R

O A

D (N

A

OGLETOWN S

TANTON R

OAD (

N358

A)

C E

N T

U R

IA

N D

R

IV

E

ROCKFORD D

RIV

E

S R N

B

N

S R S

B

N

SR 4 EB (N358)

SR 4 WB (N358)

SCALE

FEET

150 300 450

PL

AZ

A

ENTR

ANCE

CE

NTE

R

PO

IN

TE

S R N

B N

S R S

B N

SR 4

WB (N

358)

SR 4

EB (N

358)

O

LD

C

H U R C H

M

AN

S R O

AD

(N

315)

N E

W H

A V E

N D

R

IV

E (N

(N127894

)ADVENT COURT

R O

A D N

S

TA

N T O

N C

H R

IS

T

IA

N A

14 15 16 17 18

PLAN SHEET INDEX CROSS REFERENCE

8 9 10 11

CONSTRUCTION PLANS 7

23 24

AND EROSION CONTROL PLANS

CONSTRUCTION PHASING, M.O.T.,

26SIGN SCHEDULEWM

21-25CONSTRUCTION PHASING, M.O.T. AND EROSION CONTROL PLANSWM

20CONSTRUCTION DETAILSWM

7-19CONSTRUCTION PLANSWM

6TYPICAL SECTIONSWM

5NOTESWM

4LEGENDWM

3ADDENDA AND REVISIONSWM

2INDEX OF SHEETSWM

1TITLEWM

SHEET NO(S)SHEET DESCRIPTIONSECTION

INDEX OF SHEETS

Steven Nickel (Wallace Montgomery) Text Box

DESCRIPTION OF WORK:

T202501101 - Work Order #4 - Ogletown Stanton Road, Old Churchmans Road to Stanton Christiana Road and Old Churchmans Road, Rockford Drive to Ogletown Stanton Road and Twin C Lane

The scope of work along SR4 and Old Churchmans Road includes the reconstruction of the existing non-compliant/missing sidewalk (approximately 12,700 SF), curb ramps (approximately 1,500 SF), entrances, and shared-use path (5,200 SF). It also encompasses pavement striping and sign relocations within the project limits.

The work involves patching, milling and overlaying roads (750 SYIN), sealing cracks, and joint sealing. Additionally, approximately 900 LF of curb installation will be performed, along with the installation of 9 curb openings and slight ditch regrading. Utilities will be adjusted vertically, including sanitary manholes and junction wells.

Survey information, grades, and geometry sheets will NOT be provided for this location.

The project duration is set for 90 calendar days.

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS SECTION

SHEET NO.

/1

/2

:5

:3

P

M

M

P R

O J\

.0

\H ig h w a y s\

C a d d \W

O

IS

.d g n

WM

N/A

S. NICKEL

NEW CASTLE

S. NICKEL

C. YUSYPCHUKNEW CASTLE COUNTY FY25-27

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

T202501101

J.W

J.W

J.W

J.W

CONTRACT

COUNTY

DES

IG

NED

BY:

CHECKED

BY:

BRI

DGE

NO.

ADDENDA

/ R

EVI

SI

ONS

SECTIO

N

SHEET

NO.

W M

N/ A

M.

S

TE

IM

ERS.

N

IC

KEL

NEW

C

ASTL

E

T2

NEW

CAS

TLE

C

OUNTY F

Y2

3-2

SID

EWALK I

MPROVEMENTS

PEDES

TRI

AN A

CCES

S R

OUTES

AND

CONTRACT

COUNTY

DES

IG

NED

BY:

CHECKED

BY:

BRI

DGE

NO.

ADDENDA

/ R

EVI

SI

ONS

SECTIO

N

SHEET

NO.

W M

N/ A

M.

S

TE

IM

ERS.

N

IC

KEL

NEW

C

ASTL

E

T2

NEW

CAS

TLE

C

OUNTY F

Y2

3-2

SID

EWALK I

MPROVEMENTS

PEDES

TRI

AN A

CCES

S R

OUTES

AND

CONTRACT

COUNTY

DES

IG

NED

BY:

CHECKED

BY:

BRI

DGE

NO.

ADDENDA

/ R

EVI

SI

ONS

SECTIO

N

SHEET

NO.

W M

N/ A

M.

S

TE

IM

ERS.

N

IC

KEL

NEW

C

ASTL

E

T2

NEW

CAS

TLE

C

OUNTY F

Y2

3-2

SID

EWALK I

MPROVEMENTS

PEDES

TRI

AN A

CCES

S R

OUTES

AND

CONTRACT

COUNTY

DES

IG

NED

BY:

CHECKED

BY:

BRI

DGE

NO.

ADDENDA

/ R

EVI

SI

ONS

SECTIO

N

SHEET

NO.

W M

N/ A

M.

S

TE

IM

ERS.

N

IC

KEL

NEW

C

ASTL

E

T2

NEW

CAS

TLE

C

OUNTY F

Y2

3-2

SID

EWALK I

MPROVEMENTS

PEDES

TRI

AN A

CCES

S R

OUTES

AND

CONTRACT

COUNTY

DES

IG

NED

BY:

CHECKED

BY:

BRI

DGE

NO.

ADDENDA

/ R

EVI

SI

ONS

SECTIO

N

SHEET

NO.

W M

N/ A

M.

S

TE

IM

ERS.

N

IC

KEL

NEW

C

ASTL

E

T2

NEW

CAS

TLE

C

OUNTY F

Y2

3-2

SID

EWALK I

MPROVEMENTS

PEDES

TRI

AN A

CCES

S R

OUTES

AND

C O

N T R

A C T

C O

U N

T Y

D E S

IG

N E

D B

Y

C H

E C

K E

D B

Y

B R

ID

G E N

O

A D

D E

N D

A / R

E V

IS

IO

N S

S E C T

IO

N

S H

E E T N

O

W M

N /A

M . S

T E

IM

E R

S . N

IC

K E L

N E

W C

A S T L E

T

N E

W C

A S T L E C

O U

N T Y F

Y -2

S

ID

E W

A L K

IM

P R

O V E

M E

N T S

P E

D E S T R

IA

N A

C C E S S R

O U T E S A

+00

+00

N59 °2

8'2 8.3

7" E

+00

+00

+00

N59 °2

2'5 8.3

7" E

+00

S °1

'0 .6

"E

INDEX OF SHEETS

37RIGHT-OF-WAY DATA SHEET

31-36RIGHT-OF-WAY PLANS (RW)

30RIGHT-OF-WAY MOSAIC

23-29SIGNING, STRIPING AND CONDUIT PLANS (SS)

21-22CONSTRUCTION PHASING, MOT AND EROSIONS CONTROL PLANS (CS)

15-20GRADES AND GEOMETRICS (GG)

9-14CONSTRUCTION PLANS (CP)

8HORIZONTAL AND VERTICAL CONTROL

6-7TYPICAL SECTIONS

5NOTES

4LEGEND

3ADDENDA AND REVISIONS

2INDEX OF SHEETS

1TITLE

SHEET NO(S)SHEET DESCRIPTION

E D

G E

M O

O R R

O A

D (N

(N 100700)

39T H S

T R E E T

(N 100260)

40T H S

T R E E T

(N 100270)

41S T S

T R E E T

(N 100290)

42N D S

T R E E T

LE

A B

O U

LE

V A R

D (N

502)

(N 100280)

44T H S

T R E E T

N

SCALE

FEET

100 200 300

INDEX OF SHEETS

WORK ORDER #5

N

MARKET S

TREET (

N2

4)

LE

A B

O U

LE

V A R

D (N

502)

(N

S H

IP

L E

Y R

O A

D

N

SHI

PLE

Y S

TREET (

N5

TAT

NALL

STREET (

N5

MATSON RUN PARKWAY (N51193)

PHI

LADELP

HI

A P

IKE (

N2

4)

HILLCREST AVENUE (N499)

M

ARLO

W E

ROAD

(N 9)

Steven Nickel (Wallace Montgomery) Text Box

DESCRIPTION OF WORK:

T202501101 - Work Order #5 - N Market Street, 41st Street to Edgemoor Road

The scope of work along N Market Street includes the reconstruction of the existing non-compliant sidewalk (approximately 8,500 SF), curb ramps (approximately 3,800 SF), and driveways. It also encompasses pavement striping and sign relocations within the project limits.

The work involves patching, milling and overlaying entrances, sealing cracks, and joint sealing. Additionally, approximately 1,600 LF of curb/curb wall installation will be performed, along with the installation of pedestrian signal. Utilities will be adjusted vertically, including water valve boxes, gas valve boxes, sanitary manholes, and drainage inlets.

A T

A L P

A A

V E

N U E

W E S T

M O

R E L A

N D A

V E

N U E

R E

A M

E R A

V E

N U E

C H

A M

P L A

IN

A

V E

N U E

W E S T S

U M

M

IT

A

V E N U E

E

LM

H U R S T P

LA

C E

M A T T

H E S A

V E

N U E

SOUTH MARYLAND AVENUE

SOUTH MARYLAND AVENUE

N

CURB RAMP SCHEDULE

NO. DESCRIPTION PLAN SHEET NO.

DRIVEWAY/SIDEWALK SCHEDULE

NO. DESCRIPTION PLAN SHEET NO.

1 2 3 4 5 2 3

4 5

10 15NON-COMPLIANT - IMPROVED BY STD. DETAIL

X

DRIVEWAY WITH SIDEWALK

PEDESTRIAN CONNECTION

X

1A 7NON-COMPLIANT - RPE NEEDED

S D

U P O N T

R O A D

VALLEY RO

AD

3 9, 24DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

4 10, 25DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

5 10, 25DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

7 13NON-COMPLIANT - RPE NEEDED

6 12, 34DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

12 14, 41, 42DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

13 13, 43DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

11 14, 41DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

10 14, 40DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

9 14, 40DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

14 13, 43, 44DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

18 18, 59NON-COMPLIANT - IMPROVED BY DESIGN

19 18, 59NON-COMPLIANT - IMPROVED BY DESIGN

6 12,34NON-COMPLIANT - IMPROVED BY STD. DETAIL

2 9NON-COMPLIANT - RPE NEEDED

8 13NON-COMPLIANT - RPE NEEDED

15 16, 47NON-COMPLIANT - RPE NEEDED

16 16, 47NON-COMPLIANT - RPE NEEDED

17 17, 55DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

18 17, 57DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

19 17, 58DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

7A 13COMPLIANT - DO NOT DISTURB

7 61NON-COMPLIANT - IMPROVED BY STD. DETAIL

8 61NON-COMPLIANT - IMPROVED BY STD. DETAIL

9 61NON-COMPLIANT - IMPROVED BY STD. DETAIL

11 16, 62NON-COMPLIANT - IMPROVED BY STD. DETAIL

12 16, 62NON-COMPLIANT - IMPROVED BY STD. DETAIL

13 16, 50, 62NON-COMPLIANT - IMPROVED BY DESIGN

14 16, 62NON-COMPLIANT - IMPROVED BY STD. DETAIL

15 16, 62NON-COMPLIANT - IMPROVED BY STD. DETAIL

16 17, 63NON-COMPLIANT - IMPROVED BY STD. DETAIL

17 17, 56, 63NON-COMPLIANT - IMPROVED BY DESIGN

2 8, 22NON-COMPLIANT - IMPROVED BY STD. DETAIL

3 8, 22NON-COMPLIANT - IMPROVED BY STD. DETAIL

1 2

20 10, 26DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

21 11, 26DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

22 11, 27DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

23 11, 27DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

4 8NON-COMPLIANT - IMPROVED BY ADJ PROJECT

5 8NON-COMPLIANT - IMPROVED BY ADJ PROJECT

A1A

1 7,19NON-COMPLIANT - IMPROVED BY DESIGN

1A 7,19NON-COMPLIANT - IMPROVED BY STD. DETAIL

1 7NON-COMPLIANT - RPE NEEDED

SHEET NUMBER

7 8 9 10 11

M A T C

H L

IN

E I S

SCALE

FEET

100 200 300

X

W

IN

S T O

N A

V E N U E

L O

R E

W O

O D A

V E

N U E

THE PROJECT DURATION IS APPROXIMATELY 90 CALENDAR DAYS.

SURVEY INFORMATION,AND GRADES AND GEOMETRICS SHEETS WILL BE PROVIDED.

DRAINAGE INLETS.

BE ADJUSTED VERTICALLY, INCLUDING WATER VALVE BOXES, GAS VALVE BOXES,SANITARY MANHOLES, AND SEALING.ADDITIONALLY APPROXIMATELY 3400 LF OF CURB INSTALLATION WILL BE PERFORMED. UTILITIES WILL THE WORK INVOLVES PATCHING, MILLING AND OVERLAYING ENTRANCES, SEALING CRACKS, AND JOINT

DRIVEWAYS. IT ALSO ENCOMPASSES PAVEMENT STRIPING AND SIGN RELOCATIONS WITHIN THE PROJECT LIMITS.

EXISTING CONCRETE SIDEWALK (APPROXIMATELY 16000 SF), CURB RAMPS (APPROXIMATELY 5000 SF),AND THE SCOPE OF WORK ALONG MARYLAND AVENUE AND DUPONT ROAD INCLUDES THE RECONSTRUCTION OF THE

ROAD, RICHARDSON LANE TO VALLEY ROAD.

WORK ORDER NO. 6 - T202501101 - MARYLAND AVENUE, CATALPA AVENUE TO BROOKSIDE DRIVE AND DUPONT

DESCRIPTION OF WORK:

CONTRACT

T202501101

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

a d .r k k .c o m \f s \C lo u d \P r o je c t s \2

\1

P

A R

P R

S v c s \T a s k P

A R

S u p p o r t E d g e m o o r

R o a d \C

A D

D \P la n s \M a r y la n d

A v e \D is p la y -i s

M d

A v e .d g n

:4

-O

C T -2

N/A

L. WALSH

M. GOUDY

RKK

CASTLE COUNTY FY25-FY27

AND SIDEWALK IMPROVEMENTS, NEW

OPEN END PEDESTRIAN ACCESS ROUTES

INDEX OF SHEETS

WORK ORDER #6

100+00 102+00 104+00 106+00 108+00 110+00 112+00 114+00 116+00 118+00 120+00 122+00 124+00 126+00 128+00 130+00

302+00

4+

130+00

P

B

Y

P

G

P

B

Y

P

G

KPL50

M

RY1

MRY8

JPH16

MRY9

MRY2 MRY3

MRY50

MRY51

MRY5

MRY6

MRY7

MRY4

Steven Nickel (Wallace Montgomery) Snapshot

Steven Nickel (Wallace Montgomery) Text Box

DESCRIPTION OF WORK:

T202501101 - Work Order #6 - Maryland Avenue, Boxwood Plaza Entrance to Brookside Drive and DuPont Road, Valley Road to Richardson Lane and Race Street and Old DuPont Road

The scope of work along Maryland Avenue and DuPont Road includes the reconstruction of the existing non-compliant sidewalk (approximately 16,000 SF), curb ramps (approximately 5,000 SF), and driveways. It also encompasses pavement striping and sign relocations within the project limits.

The work involves patching, milling and overlaying entrances, sealing cracks, and joint sealing. Additionally, approximately 3,400 LF of curb installation will be performed. Utilities will be adjusted vertically, including water valve boxes, gas valve boxes, sanitary manholes, and drainage inlets.

RACE STREET

N . M

A R

Y L A

N D A

V E

N

OLD DUPONT ROAD

DUPONT ROAD

N. DUPONT ROAD

CURB RAMP SCHEDULE

NO. DESCRIPTION PLAN SHEET NO.

DRIVEWAY/SIDEWALK SCHEDULE

NO. DESCRIPTION PLAN SHEET NO.

13 17

10 15NON-COMPLIANT - IMPROVED BY STD. DETAIL

X

DRIVEWAY WITH SIDEWALK

PEDESTRIAN CONNECTION

X

1A 7NON-COMPLIANT - RPE NEEDED

3 9, 24DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

4 10, 25DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

5 10, 25DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

7 13NON-COMPLIANT - RPE NEEDED

6 12, 34DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

12 14, 41, 42DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

13 13, 43DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

11 14, 41DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

10 14, 40DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

9 14, 40DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

14 13, 43, 44DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

18 18, 59NON-COMPLIANT - IMPROVED BY DESIGN

19 18, 59NON-COMPLIANT - IMPROVED BY DESIGN

6 12,34NON-COMPLIANT - IMPROVED BY STD. DETAIL

2 9NON-COMPLIANT - RPE NEEDED

8 13NON-COMPLIANT - RPE NEEDED

15 16, 47NON-COMPLIANT - RPE NEEDED

16 16, 47NON-COMPLIANT - RPE NEEDED

17 17, 55DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

18 17, 57DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

19 17, 58DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

EUREKA STREET

G

LE

NRI

CH

AVE

NUE

7A 13COMPLIANT - DO NOT DISTURB

7A

7 61NON-COMPLIANT - IMPROVED BY STD. DETAIL

8 61NON-COMPLIANT - IMPROVED BY STD. DETAIL

9 61NON-COMPLIANT - IMPROVED BY STD. DETAIL

11 16, 62NON-COMPLIANT - IMPROVED BY STD. DETAIL

12 16, 62NON-COMPLIANT - IMPROVED BY STD. DETAIL

13 16, 50, 62NON-COMPLIANT - IMPROVED BY DESIGN

14 16, 62NON-COMPLIANT - IMPROVED BY STD. DETAIL

15 16, 62NON-COMPLIANT - IMPROVED BY STD. DETAIL

16 17, 63NON-COMPLIANT - IMPROVED BY STD. DETAIL

17 17, 56, 63NON-COMPLIANT - IMPROVED BY DESIGN

2 8, 22NON-COMPLIANT - IMPROVED BY STD. DETAIL

3 8, 22NON-COMPLIANT - IMPROVED BY STD. DETAIL

20 10, 26DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

21 11, 26DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

22 11, 27DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

23 11, 27DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

4 8NON-COMPLIANT - IMPROVED BY ADJ PROJECT

5 8NON-COMPLIANT - IMPROVED BY ADJ PROJECT

1 7,19NON-COMPLIANT - IMPROVED BY DESIGN

1A 7,19NON-COMPLIANT - IMPROVED BY STD. DETAIL

1 7NON-COMPLIANT - RPE NEEDED

SHEET NUMBER

SCALE

FEET

100 200 300

XX

THE PROJECT DURATION IS APPROXIMATELY 90 CALENDAR DAYS.

SURVEY INFORMATION,AND GRADES AND GEOMETRICS SHEETS WILL BE PROVIDED.

DRAINAGE INLETS.

BE ADJUSTED VERTICALLY, INCLUDING WATER VALVE BOXES, GAS VALVE BOXES,SANITARY MANHOLES, AND SEALING.ADDITIONALLY APPROXIMATELY 3400 LF OF CURB INSTALLATION WILL BE PERFORMED. UTILITIES WILL THE WORK INVOLVES PATCHING, MILLING AND OVERLAYING ENTRANCES, SEALING CRACKS, AND JOINT

DRIVEWAYS. IT ALSO ENCOMPASSES PAVEMENT STRIPING AND SIGN RELOCATIONS WITHIN THE PROJECT LIMITS.

EXISTING CONCRETE SIDEWALK (APPROXIMATELY 16000 SF), CURB RAMPS (APPROXIMATELY 5000 SF),AND THE SCOPE OF WORK ALONG MARYLAND AVENUE AND DUPONT ROAD INCLUDES THE RECONSTRUCTION OF THE

ROAD, RICHARDSON LANE TO VALLEY ROAD.

WORK ORDER NO. 6 - T202501101 - MARYLAND AVENUE, CATALPA AVENUE TO BROOKSIDE DRIVE AND DUPONT

DESCRIPTION OF WORK:

MATCHLINE IS01

CONTRACT

T202501101

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

a d .r k k .c o m \f s \C lo u d \P r o je c t s \2

\1

P

A R

P R

S v c s \T a s k P

A R

S u p p o r t E d g e m o o r

R o a d \C

A D

D \P la n s \M a r y la n d

A v e \D is p la y -i s

M d

A v e .d g n

:4

-O

C T -2

N/A

L. WALSH

M. GOUDY

RKK

CASTLE COUNTY FY25-FY27

AND SIDEWALK IMPROVEMENTS, NEW

OPEN END PEDESTRIAN ACCESS ROUTES

INDEX OF SHEETS

WORK ORDER #6

502+00 504+00 506+00 508+00

+00

+8

04+

06+

210+00

+0

+0

+00

218+00 220+00

222+00

402+00

404+00

T

P

F

G

A T

E

.9

D I)

M R

Y

MRY101

MRY52

M R

Y

MRY102

KPL53

MRY103

JP

H

KPL52

KPL51

Steven Nickel (Wallace Montgomery) Text Box

DESCRIPTION OF WORK:

T202501101 - Work Order #6 - Maryland Avenue, Boxwood Plaza Entrance to Brookside Drive and DuPont Road, Valley Road to Richardson Lane and Race Street and Old DuPont Road

The scope of work along Maryland Avenue and DuPont Road includes the reconstruction of the existing non-compliant sidewalk (approximately 16,000 SF), curb ramps (approximately 5,000 SF), and driveways. It also encompasses pavement striping and sign relocations within the project limits.

The work involves patching, milling and overlaying entrances, sealing cracks, and joint sealing. Additionally, approximately 3,400 LF of curb installation will be performed. Utilities will be adjusted vertically, including water valve boxes, gas valve boxes, sanitary manholes, and drainage inlets.

GOVERNOR PRINTZ BLVD TO HAY ROAD

BICYCLE AND PEDESTRIAN IMPROVEMENTS,

CONTRACT T202001103 - EDGEMOOR ROAD

FOR PROPOSED IMPROVEMENTS, REFER TO

N

CURB RAMP SCHEDULE

NO. DESCRIPTION PLAN SHEET NO.

4 7NON-COMPLIANT - IMPROVED BY DESIGN

5 7NON-COMPLIANT - IMPROVED BY DESIGN

6 7NON-COMPLIANT - IMPROVED BY DESIGN

DRIVEWAY/SIDEWALK SCHEDULE

NO. DESCRIPTION PLAN SHEET NO.

9 8NON-COMPLIANT - IMPROVED BY DESIGN

10 10NON-COMPLIANT - IMPROVED BY DESIGN

1 9DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

2 12DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

7 14, 15DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

8 15DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

10 15DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

11 16DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

13 16DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

X

DRIVEWAY WITH SIDEWALK

ED

G

EM

O O R R

O

AD

E D

G E

M O

O R R

O A D

BEEKMAN R

OAD

D E N

N Y R

O A D

BRANDYWI

NE B

OULE

VARD RIVER ROAD

11 10NON-COMPLIANT - IMPROVED BY DESIGN

12 11NON-COMPLIANT - IMPROVED BY DESIGN

13 11NON-COMPLIANT - IMPROVED BY DESIGN

PEDESTRIAN CONNECTION

INDEX OF SHEETS

WORK ORDER #7

7 8NON-COMPLIANT - IMPROVED BY DESIGN

8 8NON-COMPLIANT - IMPROVED BY DESIGN

3 13NON-COMPLIANT DRIVEWAY - RPE NEEDED

4 13, 14DRIVEWAY IMPROVEMENTS - IMPROVED BY DESIGN

9 15NON-COMPLIANT DRIVEWAY - RPE NEEDED

12 16NON-COMPLIANT DRIVEWAY - RPE NEEDED

6 14NON-COMPLIANT DRIVEWAY - RPE NEEDED

5 14NON-COMPLIANT DRIVEWAY - RPE NEEDED

14 17NON-COMPLIANT DRIVEWAY - RPE NEEDED

X

SHEET NO.X

1 -

ENTRACE PLAN

NON-COMPLIANT - SEE MERCHANTS SQUARE

2 -

ENTRACE PLAN

NON-COMPLIANT - SEE MERCHANTS SQUARE

3 7NON-COMPLIANT - IMPROVED BY DESIGN

SCALE

FEET

100 200 300

2+

1+

3+

5+

4+

0+

6+

8+

7+

9+

6+

5+

7+

9+

1+

4+

11+

CONTRACT

T202501101

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

a d .r k k .c o m \f s \C lo u d \P r o je c t s \2

\1

P

A R

P R

S v c s \T a s k P

A R

S u p p o r t E d g e m o o r

R o a d \C

A D

D \P la n s \E d g e m o o r

R d \i s E d g e m o o r .d g n

:4

-O

C T -2

CASTLE COUNTY FY25-FY-27

AND SIDEWALK IMPROVEMENTS, NEW

OPEN END PEDESTRIAN ACCESS ROUTES

N/A

B. LEE & L. WALSH

M. GOUDY

RKK

Steven Nickel (Wallace Montgomery) Text Box

DESCRIPTION OF WORK:

T202501101 - Work Order #7 - Edgemoor Road, Paladin Drive to Blue Rock Road and Brandywine Boulevard, Edgemoor Road to River Road and River Road

The scope of work along Edgemoor Road, Brandywine Boulevard, and River Road includes the reconstruction of the existing non-compliant sidewalk (approximately 3,200 SF), curb ramps (approximately 2,400 SF), and driveways. It also encompasses pavement striping, sign relocations, and signal upgrade within the project limits.

The work involves patching, milling and overlaying entrances, sealing cracks, and joint sealing. Additionally, approximately 1,000 LF of curb installation will be performed, along with the installation of pedestrian signal. Utilities will be adjusted vertically, including drainage manholes and drainage inlets.

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS SECTION

SHEET NO.

WM

N/A

M. STEIMER

S. NICKEL

NEW CASTLE

T201901401

NEW CASTLE COUNTY FY20-23

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

CONTRACT

COUNTY

DESIGNED BY:

CHECKED BY:

BRIDGE NO.

ADDENDA / REVISIONS SECTION

SHEET NO.

/2

/2

:5

:5

P M

M

P R

O J\

.0

\H ig h w a y s\

C a d d \W

O

IS

.d g n

WM

N/A

NEW CASTLE

J. NICKEL

S. NICKELNEW CASTLE COUNTY FY25-27

SIDEWALK IMPROVEMENTS,

PEDESTRIAN ACCESS ROUTES AND

T202501101

S CHAPEL STREET (N356)

SCALE

FEET

60 120 180

INDEX OF SHEETS

WORK ORDER #8

N

9-10CONSTRUCTION PHASING, MOT, AND EROSION CONTROL PLANS (CS)

8 CONSTRUCTION DETAILS

7 CONSTRUCTION PLANS (CP)

6 TYPICAL SECTIONS

5NOTES

4LEGEND

3ADDENDA AND REVISIONS

2INDEX OF SHEETS

1TITLE

SHEET NO(S)SHEET DESCRIPTION

INDEX OF SHEETS

PENCADER PLAZA

KENMAR DRIVE

E C

H E S T

N U T H

IL

L R

O A

D

N

KELLER ROAD

K O

L L

M A

N D

R

IV

E

S O

U T

H E

N T R

A N

C E

P E

N C

A D E

R P

L A Z A

N O

R T

H E

N T R

A N

C E

P E

N C

A D E

R P

L A Z A

Steven Nickel (Wallace Montgomery) Text Box

DESCRIPTION OF WORK:

T202501101 - Work Order #8 - S Chapel Street, Pencader Plaza North Entrance to South Entrance

The scope of work along South Chapel Street includes the reconstruction of the existing non-compliant sidewalk (approximately 2,700 SF).

The work involves patching, sealing cracks, and joint sealing. Additionally, approximately 150 LF of curb and 80 LF of curb retaining wall installation will be performed, along with the installation of approximately 180 LF of pedestrian railing. Utilities will be adjusted vertically, including communication manholes.

Survey information, grades, and geometry sheets will NOT be provided for this location.

The project duration is set for 45 calendar days.

File details come from the government source that posted it. Updated .