T1368 Bid Amendment 3 9.26.24 Answers to Questions, Revisions to Bid Solicitation and Price Sheet, Extended Quote Due Date.docx
DOCX document 100 KB Posted
- Attached to
- T1368 Technical Support for Air Quality, NJDEP
- Solicitation number
- 24DPP00948
- Issued by
- Mercer County, New Jersey
About this file
This document is Bid Amendment #3 to the state of New Jersey Department of Environmental Protection (NJDEP) Bid Solicitation #24DPP00948 for "T1368 Technical Support for Air Quality, NJDEP". The amendment includes answers to questions, extends the quote submission due date from October 4, 2024 to October 11, 2024, and provides revisions to the Bid Solicitation and Price Sheet. The Revised Bid Solicitation updates several sections including Site Logistics, Contractor Personnel, Air Quality Regulation and Planning Management Support, and Assistance to the Bureau of Evaluation and Planning. The contract term is 3 years with no guaranteed minimum or maximum work volumes.
The Revised State-Supplied Price Sheet modifies the Estimated Hours Per Year for Line Item 12. Bidders must submit the Revised State-Supplied Price Sheet as part of their quote. Pricing will be evaluated based on all-inclusive hourly rates for the identified labor categories. The solicitation includes a preference for New Jersey Small Business Enterprises and/or Disabled Veterans' Businesses. The total contract value is not specified, and the solicitation does not include any budget ranges or funding source details. Bidders must complete a certification regarding any prior business relationships with entities that may receive technical support under the contract.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHILIP D. MURPHY
Governor State of New Jersey
DEPARTMENT OF THE TREASURY
DIVISION OF PURCHASE AND PROPERTY
PROCUREMENT BUREAU
33 WEST STATE STREET
P. O. BOX 230
TRENTON, NEW JERSEY 08625-0230
ELIZABETH MAHER MUOIO
State Treasurer
TAHESHA L. WAY
Lt. Governor
AMY F. DAVIS, ESQ.
Acting Director https://www.njstart.gov
September 26, 2024
To: All Interested Bidders
Re: Bid Solicitation #24DPP00948 T1368 Technical Support for Air Quality, NJDEP
Previous Quote Submission Due Date: October 4, 2024 (2:00 p.m. Eastern Time) REVISED Quote Submission Due Date: October 11, 2024 (2:00 p.m. Eastern Time)
Bid Amendment #3
The following constitutes Bid Amendment #3 to the above referenced Bid Solicitation:
· This Bid Amendment includes answers to questions;
· Extends the Quote Submission due date from October 4, 2024 to October 11, 2024 (2:00 p.m. Eastern Time);
· Please note that for all additions, deletions, clarifications and modifications to the State-Supplied Price Sheet, please refer to the Revised State-Supplied Price Sheet entitled “T1368 Revised State-Supplied Price Sheet 9.26.24”, and hereafter referred to as the “Revised State-Supplied Price Sheet” in this document;
· The Revised State-Supplied Price Sheet modifies the Estimated Hours Per Year for Line Item 12. Bidders must submit the Revised State-Supplied Price Sheet as part of its Quote.
· In addition, please note that for all additions, deletions, clarifications and modifications to the Bid Solicitation, please refer to the Revised Bid Solicitation entitled “T1368 Revised Bid Solicitation 9.26.24”, and hereafter referred to as the “Revised Bid Solicitation” in this document. The following sections of the Revised Bid Solicitation have been updated as part of this Bid Amendment:
· Bid Solicitation Cover Sheet;
· Section 3.19, Prior Business Relationship Certification;
· Section 4.1, Site Logistics;
· Section 4.2, Contractor Personnel;
· Section 4.2.2, Requirements For All Contractor Personnel
· Section 4.4.4, Workload and Staffing;
· Section 4.8, Task 6 – Air Quality Regulation and Planning Management Support
· Section 4.8.1, Staffing;
· Section 4.9, Task 7 - Assistance to Bureau of Evaluation and Planning;
· Section 4.9.5, Staffing;
· Section 4.11.1, Detail; and
· Section 9.3, Contract-Specific Definitions.
It is the sole responsibility of the Bidder to be knowledgeable of all of the additions, deletions, clarifications, and modifications to the Bid Solicitation, State-Supplied Price Sheet, and/or the New Jersey Standard Terms and Conditions relative to this Bid Solicitation as set forth in all Bid Amendments.
All other instructions, terms, and conditions of the Bid Solicitation shall remain the same.
Bid Solicitation #24DPP00948 T1368 Technical Support for Air Quality, NJDEP
Answers to Questions
Where applicable, each question references the appropriate Bid Solicitation section. Note: Duplicate questions have been removed.
| # |
| Bid Solicitation |
Section Reference Question (Bolded) and Answer
| 1 |
| PDF Documents |
| When trying to open a Portable Document Format (PDF), I am receiving an error message and am unable to access the PDF. How should I proceed? |
It is recommended that users utilize Microsoft Edge to view PDFs. Certain PDF forms cannot be opened in the Chrome or Firefox built in PDF viewers that are enabled by default. If using Chrome or Firefox it is recommended that the file is downloaded instead by clicking the download button in the upper right-hand corner of the browser after an error message is received. An alternative option is to disable the built in PDF viewers in Chrome or Firefox.
| 2 |
| Cover Sheet |
| When is the Q&A Submission Due Date? |
The Q&A Submission Due Date was August 1, 2024, as specified by Bid Amendment #1.
| 3 |
| Section 1.2.1 – Historical Data |
| It appears that the historical total number of permits per year and the number of expected applications are inadvertently switched for Level-1/2 and Level-3/4 permits. Is the higher number of permits per year (322, 299, etc.) belongs to Level1/2 permits and lower number of permit (33, 25, 24, etc.) belongs to Level-3/4 permits? |
No, this is not a mistake. There are less permits at the 1/2 Level because, for certain types of sources, NJDEP has General Permits, which do not require case-by-case review as the review was performed at the creation of the General Permit. There are many more General Permits issued each year than case-by-case permits. That is why the remaining permits are case-by-case and are much more difficult.
| 4 |
| Section 1.2.1 – Historical Data |
| In Task 1 and Task 2 tables, the Bid Solicitation currently shows average processing time in hours. Is this actual number of hours spent reviewing a permit application or is it number of days for the entire process, for example 360 days processing cycle for initial operating permits. |
The numbers in Task 1 and Task 2 tables are average processing time in hours per permit applications.
| 5 |
| Exceptions |
| Will the State allow Bidders to take exception to any of the Standard Terms and Conditions? |
As stated in Bid Solicitation Section 2.2, Exceptions to the State of NJ Standard Terms and Conditions (SSTC): “Questions regarding the State of New Jersey Standard Terms and Conditions and exceptions to mandatory requirements MUST be posed during the Electronic Question and Answer period and shall contain the Bidder’s suggested changes and the reason(s) for the suggested change(s).” Moreover, as stated in Bid Solicitation Section 3.11, Bidder proposed terms or conditions that conflict with those contained in the State of New Jersey Standard Terms and Conditions may render a Quote non-responsive.
| 6 |
| Section 2.3 – Bid Amendments |
| Will there be any revisions to the Bid Solicitation? |
The Bid Solicitation has been revised as part of this Bid Amendment. Please refer to the Revised Bid Solicitation.
As specified by Bid Solicitation Section 2.3, Bid Amendments, in the event that it becomes necessary to clarify or revise this Bid Solicitation, such clarification or revision will be by Bid Amendment. Any Bid Amendment will become part of this Bid Solicitation and part of any Contract awarded. Bid Amendments will be posted as a file attachment on the “Summary” page of the Bid Solicitation in NJSTART after the cut-off date.
There are no designated dates for release of Bid Amendments. Those Bidders who are on the bid holder list either through commodity code registration in NJSTART or by acknowledging the bid in NJSTART should receive notification of any Bid Amendment(s). If a Bidder is not on the bid holder list, Bid Amendments are still viewable on the “Summary” page of the Bid Solicitation in NJSTART.
It is the sole responsibility of the Bidder to be knowledgeable of all Bid Amendments related to this procurement. An interested Bidder should check the NJSTART “Open Bids” Tab on a daily basis to ensure review of the most updated information.
| 7 |
| Quote Submission |
| Should I check that I have properly completed and attached all of the required documents with my submitted Quote? |
Yes. Prior to the Quote Opening Deadline, a Bidder should review the documents comprising the submitted Quote to ensure that all of the required documents have been completed and attached. Oftentimes a Quote is deemed non-responsive because a Bidder fails to attach a required form or attaches a blank form. To review a submitted a Quote, a Bidder should log into NJSTART and review each document attached to the Quote submission. Instructions on how to review a submitted Quote can be found in the Quick Reference Guide entitled How to Review a Submitted Quote, which is available on the NJSTART Vendor Support Page under Vendor Reference Guides.
| 8 |
| Quote Submission |
| Please confirm a Bidder may deliver a hardcopy quote instead of submitting a response electronically. |
No. Hard copies of quotes will not be accepted. All Quotes must be submitted electronically through NJSTART.
| 9 |
| Quote Submission |
| According to this section, quotes will be publicly opened and announced by telephone conference. Can bid opening be done on camera via Teams? |
No. Quotes will be publicly opened and announced by telephone conference on the date and time of the quote opening.
(Dial-in phone number: 888-204-5984 / Access code: 2602305)
| 10 |
| Quote Submission |
| According to this section, when uploading the documents to NJSTART, the Bidder can select the “Confidential” option for attachments to request that the documents not be displayed publicly through NJSTART. Can the “Confidential” option be used for financial documents, like price sheet, bidder’s financial statements, etc.? |
Yes. When uploading the documents to NJSTART, the Bidder should select the “Confidential” option in NJSTART for attachments on the “Attachments” Tab to request that the documents not be displayed publicly through NJSTART. Marking an attachment as "Confidential" in NJSTART shall not constitute the Bidder's designation of the attachment as exempt from public disclosure under the New Jersey Open Public Records Act (OPRA), N.J.S.A. 47:1A-1 et seq., or the common law right to know.
| 11 |
| Section 3.19 – Prior Business Relationship Certification |
| This section requires a bidder to submit Prior Business Relationships Certification. Is this certification also required for a subcontractor that a bidder plans to utilize? |
If the Bidder intends to utilize Subcontractors as part of its Quote, the Bidder must also submit a completed PBR Certification for each Subcontractor prior to Contract Award. The Bidder should submit the completed PBR Certification(s) with the Quote.
Please refer to Revised Bid Solicitation Section 3.19, Prior Business Relationship Certification, as this section has been revised.
| 12 |
| Section 4.2 – Contractor Personnel |
| This section requires the contractor to undertake certain non-recurring tasks, on an as-needed basis. The bid solicitation states that the scope of work for these non-recurring tasks will be defined on a task-by-task basis. Please confirm that these non-recurring tasks will require the contractor to develop a scope of work and a cost estimate for NJDEP’s approval and that this level of effort (and the associated costs) will be additional work and is not included in the Professional Staffing plan for tasks outlined in Sections 4.3 – 4.13. |
That is correct. Pursuant to Section 4.2, Contractor Personnel, any non-recurring tasks would need a defined work plan and follow up cost estimate which would then have to be approved by the Department. NJDEP anticipates that special projects (i.e., non-recurring tasks) may include administration of federal or state grants received as part of competitive processes. The level of effort to administer such grants depends on the amount of those grants.
Please refer to Revised Bid Solicitation Section 4.2, Contractor Personnel, as this section has been revised.
| 13 |
| Section 4.2.1 – Professional Level Staff |
| For the Typical Title: Table B - Level 2 Staff, Table D - Level 3 Staff, and Table F - Level 4 Staff; the tables show Supervising Engineer/Supervising Env Specialist or equivalent. Whereas, the Qualifications require a degree in engineering or environmental science. It appears that the qualifications are missing the equivalent experience in lieu of an engineering or science degree for the mobile sources’ personnel. Can the appropriate equivalent experience in mobile sources be considered in lieu of an engineering or environmental science degree? |
Yes, equivalent experience can be substituted for an engineering or environmental science degree for Mobile Sources personnel.
| 14 |
| Section 4.4.4 – Workload and Staffing |
| For review of Pre-Construction Permit Applications, the Bid Solicitation requires Contractor to provide sufficient qualified personnel to perform technical evaluations. The labor category includes Level 3 and Level 1, but it appears to be missing Level 2 labor category. Should Level 2 personnel also be included in the staffing? |
Yes, Level 2 personnel has now been included as part of Revised Bid Solicitation Section 4.4.4, Workload and Staffing.
| 15 |
| Section 4.6 – Task 4 – Permit Program Implementation for the Bureau of Stationary Sources |
| Item “O” requires performing case-by-case RACT, BACT, LAER or BART analysis. Do we understand it correctly that these analyses are part of the technical review of operating and preconstruction permit applications? |
Correct, as part the technical review of a permit application. This may be a part of a Contractor assigned permit review or to assist NJDEP permit engineers in such tasks in the NJDEP permit engineer’s technical review.
| 16 |
| Section 4.8 – Task 6 – Air Quality Regulation and Planning Management Support |
| The Bid Solicitation requires the bidder to provide Level 3 personnel to perform Task 6 Air Quality Regulation & Planning Management Support. However, according to Section 3.23 Professional Staffing Plan, Task 6 work is expected to be performed by Level 4 and Level 5 labor category personnel. Should Section 4.8.1 be corrected to include Level 4 and Level 5 labor category personnel? |
Yes, Level 4 and Level 5 labor category has now been included within Revised Bid Solicitation Section 4.8.1, Staffing.
| 17 |
| Section 4.8 – Task 6 – Air Quality Regulation and Planning Management Support |
| Item B. Will the bidder be submitting (e-reporting) stack test data / continuous emissions monitoring data to U.S. EPA WebFire or developing an e-reporting program for NJDEP? |
The requirement previously specified under Item B has been removed from Section 4.8 of the Revised Bid Solicitation. Please refer to Section 4.8 of the Revised Bid Solicitation.
| 18 |
| Section 4.8 – Task 6 – Air Quality Regulation and Planning Management Support |
| Item C. What format (i.e., web browser, submitted excel spreadsheet, etc.) does NJDEP wants for the “importable calculation tables for stack tests”? |
The requirement previously specified under Item C has been removed from Section 4.8 of the Revised Bid Solicitation. Please refer to Section 4.8 of the Revised Bid Solicitation.
| 19 |
| Section 4.8 – Task 6 – Air Quality Regulation and Planning Management Support |
Item J. What pollutants does NJDEP expect to be proposing rules and/or changes to its SIP?
This Question now references Item H within the Section 4.8 of the Revised Bid Solicitation.
NJDEP does not anticipate any rules at this time. The rules will define the specific pollutants based on pollutants regulated by NJDEP or USEPA.
| 20 |
| Section 4.9 – Task 7 – Assistance to Bureau of Evaluation and Planning |
| Can NJDEP provide a workload and staffing estimate for this Task, similar to the other tasks? |
The workload is provided in detail at Sections 4.9.1 – 4.9.4. As stated in Revised Bid Solicitation, Section 4.9, Task 7 – Assistance to Bureau of Evaluation and Planning, this task assignment will be on an as needed basis. At this time, the program does not have any staffing needs and will identify them in the future depending on the workload demands at that time.
As per response to Question #12 above, a work plan would need to be created with a follow up cost estimate and Department approval process according to Revised Bid Solicitation Section 4.2, Contractor Personnel.
| 21 |
| Section 4.10 – Task 8 – Support for Bureau of Air Monitoring |
| What grant programs does NJDEP plan to submit grant applications? Will NJDEP submit a grant application within the EPA Community Change Grants (CCG) program? |
NJDEP continually reviews and evaluates Federal funding opportunities with particular focus on grants that provide funding for innovative local air monitoring approaches such as low cost sensors, geospatial monitoring, and perimeter monitoring. Yes, EPA’s Community Change Grants are an example of the type of Notice of Funding Opportunity the NJDEP would potentially apply for.
| 22 |
| Section 4.11 – Task 9 – Support for Bureau of Mobile Sources and Offices of the Assistant Director and Director |
| Detail A-3. Does this include assessing impacts of program changes, diesel tampering and OEM defeat cases? |
Yes, this includes performing emission estimates and benefit calculations which can be used to inform program changes and regulation analysis. Modeled emission calculations can also be used to show increased emissions resulting from vehicle tampering.
| 23 |
| Section 4.11 – Task 9 – Support for Bureau of Mobile Sources and Offices of the Assistant Director and Director |
| Detail A-7. Does this include migrating from Opacity testing to Heavy duty OBD testing including the J1939 protocol? |
Consultative support on specialized equipment can include the transition to heavy-duty OBD testing but can also include testing and analysis of new commercial tampering detection devices. This can also include new technology that may be used as part of the Inspection and Maintenance Program such as remote sensing or advanced technology that might be considered for future use in the program.
| 24 |
| Section 4.11 – Task 9 – Support for Bureau of Mobile Sources and Offices of the Assistant Director and Director |
| Detail B-2. Does this also include creating MOVES fleet input files, determine weight class, fuel type(s), ZEV Class, vehicle class, for semiannual Alternative Fuel vehicle report, as well as produce extracts for multiple agencies for planning and analysis? |
Yes. Decoded vehicle registration data is used in numerous ways: fleet analysis, program evaluation, emission benefit calculations, status updates and for planning purposes.
| 25 |
| Section 4.11 – Task 9 – Support for Bureau of Mobile Sources and Offices of the Assistant Director and Director |
Detail B-6. Does this include annual ZEV credit verification for New Jersey and assisting other S177 states with their verifications?
Yes. Currently this is for light duty vehicles but will include medium and heavy-duty vehicles in the coming years.
| 26 |
| Section 4.11 – Task 9 – Support for Bureau of Mobile Sources and Offices of the Assistant Director and Director |
| Detail C-3. Does this include working with BPU’s data aggregator for EV charging data, including but not limited to extracting and analyzing network provider data for quality assurance to build reports for EV-Chart reports required under the IRA? |
Yes, this task is associated with data from EV charging stations and telematic devices installed on electric vehicles of varying weight classes. This includes working with any third-party contractor or other State entity that collects this data. Data analysis can support a wide range of uses, including performing quality assurance for reporting for federal and State grants.
| 27 |
| Section 4.11 – Task 9 – Support for Bureau of Mobile Sources and Offices of the Assistant Director and Director |
| Detail C-4. Does this include extracting data from the SAGE system for the IPPI program for dashboard reports and financial tracking/reconciliation of grant funds? |
Yes, the data used in dashboards, visualizations and maps can be extracted data from the SAGE system and/or other databases that contain electric vehicle and electric vehicle charging data.
| 28 |
| Section 4.11 – Task 9 – Support for Bureau of Mobile Sources and Offices of the Assistant Director and Director |
| Detail D-5. Does this include Grants tracking, financial and overall progress, using databases such as MySQL and ACCESS. Will there be importable input mechanisms such as Adobe forms to create and maintain to assure high levels of data quality along with automation for an improved grantee experience? Will the contractor have to automatically check and synchronize the automated grants templates with the CGMU to base template? Will the contractor have to build and maintain field audit recording using TEAMS power apps? Will these apps have to be synchronized with data from the Grants databases? |
The sequential numbering under Section 4.11.1D has been corrected. The Detail D-5 task pertains to bi-directional charging programs and includes administrative and project management tasks as well as data analysis from pilot programs. The Detail D-7 task does include all the tasks as listed in the posed question.
| 29 |
| Section 5.11 – Procurement Efficiency Program |
| We are a professional consulting firm; we do not supply or sell any goods that can be listed on the NJSTART Marketplace Catalog. Please confirm that this provision is not mandatory for this bid solicitation and the bidder has the right to opt out of the Procurement Efficiency Program. |
The Procurement Efficiency Program is mandatory and required under this Bid Solicitation. Please refer to Section 5.11 for additional information.
| 30 |
| State of New Jersey Standard Terms and Conditions |
| Section 4.2 B refers to the Automobile Liability Insurance that “must be provided when the services being procured involve vehicle use on the State’s behalf or on State controlled property”. This bid solicitation is limited to providing technical support to NJDEP and does not specify any work that will require the bidder to use any bidder-owned vehicles on the State’s behalf or on State controlled property. Consistent with Section 4.3.2, for any site visits, transportation will be provided by NJDEP, and bidder’s staff will only accompany (not drive) NJDEP staff. Can the State provide an exemption for the Automobile Liability Insurance for this contract? |
The Vendor is exempted from the Auto insurance requirements if their performance of the contract will not include the use of company owned vehicles.
However, Vendor employees accompanying State employees in State owned vehicles must supply proof of insurance for Workers Comp in the form of a Certificate of Insurance stating the policy information.
The State of NJ is exempted from the purchase of Auto insurance, and it is our requirement that Workers Comp be provided for Vendor employees, as per the SSTC, while accompanying State employees in State owned vehicles and other duties in support of their performance of the contract.
| 31 |
| State-Supplied Price Sheet (Task -9 Mobile Sources) |
| In T1368 State-Supplied Price Sheet, Item 12, Level-4 hours for Task 9 shows 3260. This should be corrected to 7260 hours, consistent with Level 4 hours for Task 9 in Section 3.23 Professional Staffing Plan of the Bid Solicitation. |
The estimated hours should be 7,260 as shown in Bid Section 3.23. This has been updated within the Revised State-Supplied Price Sheet.
New Jersey Is an Equal Opportunity Employer • Printed on Recycled and Recyclable Paper image1.png