Attachment 5 Checklist for Permit Applications 7.25.24.docx
DOCX document 58 KB Posted
- Attached to
- T1368 Technical Support for Air Quality, NJDEP
- Solicitation number
- 24DPP00948
- Issued by
- Mercer County, New Jersey
About this file
This document is an Administrative Completeness Checklist for review of Operating Permit Applications submitted to the New Jersey Department of Environmental Protection (NJDEP). The checklist covers requirements for both Initial Operating Permit Applications and Renewal Permit Applications, including facility profile information, equipment inventories, emission unit and batch process details, potential to emit calculations, and compliance plan documentation. The checklist also outlines NJEMS reporting requirements related to application receipt, assignment, and determination of administrative completeness.
The document provides guidance on eligibility for Seven-Day-Notice Changes, which allow certain facility modifications to be implemented without prior NJDEP approval. Criteria for Seven-Day-Notice Changes include no increase in allowable emissions, no new air contaminants, and no relaxation of monitoring/recordkeeping requirements. The checklist indicates the appropriate steps for processing eligible Seven-Day-Notice Changes in NJEMS.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RADIUS Administrative Completeness Checklist Program Interest Number: __________
ATTACHMENT 5
CHECKLISTS FOR REVIEW OF OPERATING PERMIT APPLICATIONS
ADMINISTRATIVE COMPLETENESS CHECKLIST FOR INITIAL OPERATING PERMIT APPLICATIONS
Facility Name:
Location:
Program Interest Number:
Date Received:
Facility NJID Number:
Permit Activity #:
Administratively Complete?
Reviewed By:
Date:
YES:
Permit Evaluator
NO:
Approved By:
Date:
Supervisor
Notes, Comments, and Follow Up (If application is Incomplete, please explain here)
Notes to the Reviewer:
1. Verify that the Responsible Official is as defined in N.J.A.C. 7:27-1.4.
2. “R” in the checklist indicates item is REQUIRED for Administrative Completeness
3. “NR” in the checklist indicates item is not required for Administrative Completeness. If information is not provided in the application, permit writer must request this information during technical review.
6/30/15
Application
Field
Review Parameters
R/NR
Complete?Y/N/NA
Reviewer Comments
Facility Profile (General)
Location and Industry Information
Contact Information
Facility ID
Program Interest Number
R
Facility Name
Street Address and Mailing Address
Complete addresses including county
Primary SIC
NAICS
NAICS
Contact Type
Owner, Operator, On-Site Manager, Responsible Official, Fee Contact
Facility Profile (Permitting)
Questions 1-12
#4,5 and 7 are NR for AC
Non-Source Fugitive Emissions
FG NJID, Description of Activity Causing Emission, Location
Non-source fugitive emissions greater than emission thresholds must be included
Reasonable Estimates of Emissions
For each FG and for each air pollutant.
Insignificant Source Emissions
IS NJID, Source Description, Equipment Type, Location
Source may be grouped together into same types.
Estimates of Emissions
Estimated total emissions for each air pollutant. (individual estimates for each IS ID not required)
Equipment Inventory
Equip. NJID, Facility’s Designation, E Description, E Type, Certificate Number, Installation Date, Grandfathered, Last Modification Date, E Set ID(s)
Equipment Detail
Must be completed for each equipment
Control Device Inventory
CD NJID, Facility’s Designation, CD Description, CD Type, Installation Date, Grandfathered, Last modification Date, CD Set ID(s)
Grandfathered status is not applicable
CD Detail
Check for each CD
Emission Point Inventory
PT NJID, Facility’s Designation, PT Description, Configuration, Equivalent Diameter, Height, Distance to Property Line, Temperature, Volume, Discharge Directio, PT Set ID
Emission Unit Inventory
U NJID, Facility Designation, U Description
R
U Detail
Check for Each U
Emission Unit Operating Scenarios
UOS NJID, Facility’s Designation, and UOS Description, Operation Type, Significant Equipment, Control Device, Emission Point, SCC(s), Annual Operating Hours, VOC Range, Flow Rate, Temperature
Check for each OS
OS Detail
Check for each OS
Batch Process Inventory
BP NJID, Facility’s Designation, BP Description
BP Operating Scenario
BPOS NJID , Facility’s Designation, BPOS Description, BPOS Type
BPOS Steps
Step NJID , Facility’s Designation, Step Description, Operation Type, Significant Equipment, Control Device(s), Emission Point(s), SCC(s), Step Run Time, VOC Range, Flow, Temperature
Step Detail
Check for each Step
Subject Item Group
Group NJID, Facility Designation, Type, ID, OS, Step, Formal Reasons for Group/Cap, Conditions/Requirements
Potential to Emit
Subject Item: E
NR
Subject Item: FC
Check if tons per year for each applicable air contaminant are entered
Subject Item: U
Check if tons per year for each applicable air contaminant for each Emission Unit are entered in OS0 Summary
OS Scenario
Check if lb/hr are entered for each applicable air contaminant in each Operating Scenario (other than OS0 Summary) of every Emission Unit
Subject Item: BP
Check if tons per year for each applicable air contaminant for each Batch Process are entered in OS0 Summary
Check if lb/batch for each applicable air contaminant for each Operating Scenario are entered in ST0 Summary
Check if lb/batch and lb/step for each applicable air contaminant for each Operating Scenario are entered for each individual Step
Compliance Plan
Subject Item: BP, CD, E, FC, FG, IS, GR, U
NR**
** The Operating Permit Section does not require that the IOP application include compliance plans. However the permit writer and the supervisor must make sure the following items are provided/addressed in the application:
1. Equipment inventory must identify all sources at the facility including those covered by general permits.
2. Each piece of equipment must have at least one operating scenario associated with it.
3. Any equipment can be placed only under one emission unit.
4. Separate operating scenarios must be included for start-up, shutdown and maintenance. Malfunction scenarios are not permitted.
5. Emissions from start-up, shutdown and maintenance must be accounted for in the annual emission limits.
6. a Site plan with E, CD and PT locations
7. Block diagram for each emission unit and batch process.
8. All emissions calculations and supporting documentation.
9. Banked emissions information if applicable.
10. All RACT/SOTA/PSD/Sub 18/MACT/NSPS/NESHAPS applicability determinations.
11. Certifications
12. Compliance status and compliance schedules
13. CAM Plan
RENEWAL PERMIT ADMINISTRATIVE COMPLETENESS CHECKLIST
Facility Name:
Location:
BOP PI:
Activity:
| Yes |
| No |
| NA |
DASHBOARD REQUIREMENTS: Open Activity Tracking in NJEMS and verify that a “Completed Date” for the following Tasks has been entered:
1. Receive app. and record receipt date.
2. Acknowledge receipt of application.
3. Assign application to supervisor.
4. Assign application to evaluator.
In addition, verify that a Permit Document Set has been created and that NJEMS Permit Activity Summary has been updated showing the correct modification type. Click for Procedure.
2a
Was the application marked as “confidential”? (Not required for administrative completeness).
2b
Has the public copy of the application been received? Applicable if 2a is YES (Not required for administrative completeness).
Section 1: Did the Facility Profile match the Facility Profile (General) in the approved Operating Permit? Change “Responsible Party” to “Responsible Official” in NJEMS as applicable. ? (Not required for administrative completeness).
Section 2: Did the Responsible Official certify the application?
Section 3: Did the application contain 7-Day Notice Changes (both old and new)?
Did the application contain changes to the Insignificant Source Operations?
Section 4: Did the application contain a “Summary of the results from Testing and Monitoring” form?
Section 5: Did the application contain any non-compliance issues or compliance schedules?
Section 6: Did the application contain the pollution prevention reporting forms?
Facility Wide Trends
Changes to NOx Emissions for Emission Units
Changes to VOC Emissions for Emission Units
Changes to HAP Emissions for Emission Units
Changes to Insignificant Source Emissions
Changes to Non-Source Fugitive Estimated Emissions
Emissions on Pound per Unit of Product Basis
Five-Year Trends (Optional)
| 9a |
| Did the applicant address health risk assessment for all applicable HAPs (not required for administrative completeness). |
| 10 |
| Email a copy of all metals analysis reports, submitted by the facility, to Joel Leon. Sample Email (click on blue underlined). |
| 11 |
| Did the application contain any new sources? Separate Minor and Significant Modifications applications can be submitted with the renewal application. (Not required for administrative comp.). |
Continue on Page 2…
| 12 |
| Check CAM. Refer to 40CFR 64 for applicability. Guidance is also available at eFinder / Websites/Rules / CAM Guidance. (Not required for administrative completeness). |
ACID RAIN FACILITIES ONLY - (Not required for administrative completeness).
Has the facility completed Section 1 - Acid Rain Program in the renewal forms.
| 14 |
| Was the application submitted “timely” (12 months prior to expiration of approved operating permit). |
| 15 |
| If “Administrative Complete”, issue a “Administrative Completeness - With Application Shield” letter. |
| 16 |
| DASHBOARD REQUIREMENT: If additional administrative information is required, add the following Tasks in Activity Tracking: |
1. *Request administrative information.
2. *Receive administrative information.
3. Enter a “Completed Date” for both Tasks.
DASHBOARD REQUIREMENT: If the application has been determined to be administratively complete and timely.
1. Open Activity Tracking and enter a “Completed Date” for the Task “Determine administrative completeness”.
2. Update Activity Tracking under General for Application Shield Status. Click here for the procedure.
3. Issue an “Administrative Completeness - With Application Shield” letter.
DASHBOARD REQUIREMENT: If the application has been determined to be administratively complete but NOT timely.
1. Open Activity Tracking and enter a “Completed Date” for the Task “Determine administrative completeness”.
2. Update Activity Tracking under General for Application Shield Status. Click here for the procedure.
3. Issue an “Administrative Completeness - Without Application Shield” letter.
Calculate fees ($125 x ______ POE = ________) and send an email to Heidi Jonesto assess calculated fees (No fee required if renewal application was received before 7/2/2002). Sample Email.
Evaluator
Date
Supervisor
SIGNIFICANT MODIFICATION ADMINISTRATIVE COMPLETENESS CHECKLIST
Permit Writer:
The following NJEMS reporting requirements must be completed
DASHBOARD REQUIREMENTS: Verify that the “Completed Date” has been entered for the following Tasks in Activity Tracking:
1. Receive application.
2. Acknowledge receipt of application.
3. Assign application to supervisor
4. Assign application to evaluator.
In addition, verify that a Permit Document Set has been created and NJEMS Permit Activity Summary has been updated showing the correct modification type. Click for Procedure.
| Yes |
| No |
If additional administrative information is requested, the tracking clock in NJEMS can be “stopped’ using the Stop-the-Clock procedure. Open Activity Tracking and add two rows (*Request administrative information and Receive administrative information). Enter a “Completed Date” for the Task “*Request administrative information” (changes to Administrative information requested).
When the administrative information is received, open Activity Tracking and enter a “Completed Date” for the Task “*Receive administrative information” (changes to Administrative information received).
If the application has been determined to be administratively complete using the following checklist: Open Activity Tracking and enter a “Completed Date” for the Task “Determine administrative completeness”.
Significant Modification applications should include the following to be considered administratively complete
Facility Profile with only updated information.
| Yes |
| No |
| NA |
Description of the proposed change.
Any new applicable requirements (State and Federal) which will apply if the change occurs.
Potential to Emit for New Non-Source Fugitive emissions
For New Insignificant Sources
The type of source, estimate of total emissions from ALL insignificant sources for each criteria pollutant and a list of applicable requirements that apply to the insignificant source.
For Each New Significant Source
Brief description of source operations.
Identification of the stack or chimney (Emission Point Inventory)
Identification of the production process
General description of production process in sufficient detail to determine which applicable requirements apply
Product(s) or intermediate products(s) used
Continue on Page 2…
Emission Unit/Batch Process Inventory and Detail screens filled out. . For new sources both screens must be filled out completely. For modified sources, only modified information is required.
| Yes |
| No |
| NA |
Each proposed operating scenario shall include:
1. Description of each proposed operating scenario.
2. The specific source operations that are to be included in the proposed operating scenarios.
3. For combustion sources, type of fuel and maximum annual quantity to be used.
4. The product(s) that will be produced under the proposed operating scenarios.
5. Operating parameters that have an impact on emissions.
Demonstrate compliance with the applicable requirements of N.J.A.C. 7:27-18 for applications that include an emission increase.
Emission Information for Each New Source
Potential to Emit for each air contaminant including non-captured emissions in tons per year and any other unit (e.g. lb/hr) required to verify compliance with any applicable requirement.
| Yes |
| No |
| NA |
Type and quantity each fuel to be used annually.
Raw materials to be used and either the maximum rate of production rate and maximum annual hours of operation or maximum batch size and the maximum number of batches per year.
Control Device Inventory and detail screens filled out. For new sources both screens must be filled out completely. For modified sources, only modified or missing information is required.
Identification and description of all monitoring devices or activities to be used to verify compliance with applicable requirements.
Additional emissions information or emissions-related information needed to verify whether any potentially applicable requirements apply
Any other information required by an applicable requirement.
Calculations upon which the emissions were based.
A proposed compliance plan meeting the requirements of N.J.A.C. 7:27-22.9
Certification by a responsible official, consistent with N.J.A.C. 7:27-1.39.
Any additional information that is reasonably necessary to enable the Department to determine whether the applicant has satisfied the requirements of N.J.A.C. 7:27-22 for the issuance of a permit.
The following applies only to a PSD Affected Source
Increase in emission rates (TPY) of NSR regulated pollutants in case of a major modification. PSD applicability analysis and BACT Analysis.
Ambient Air quality impact analysis including NAAQS compliance, PSD increments and Class I impacts.
Ambient Monitoring - meteorological and pollutants (consult Alan Dresser of BTS, if required).
Additional impact analysis (Growth analysis, visibility impacts and Class I air quality related values).
| Yes |
| No |
| NA |
Permit Writer
MINOR MODIFICATION ADMINISTRATIVE COMPLETENESS CHECKLIST
Permit Writer:
The following NJEMS reporting requirements must be completed
DASHBOARD REQUIREMENTS: Verify that the “Completed Date” has been entered for the following Tasks in Activity Tracking:
5. Receive application.
6. Acknowledge receipt of application
7. Assign application to supervisor
8. Assign application to evaluator.
In addition, verify that a Permit Document Set has been created.
| Yes |
| No |
DASHBOARD REQUIREMENT: If the application has been determined to be administratively complete using the following checklist:
Open Activity Tracking and enter a “Completed Date” for the Task “Determine administrative completeness”.
| Minor Modification applications should include the following to be considered administratively complete |
| Yes |
| No |
| NA |
Facility Profile with only updated information.
Description of the proposed change.
Any new applicable requirements (State and Federal) which will apply if the change occurs.
The proposed sections of the draft operating permit reflecting the proposed change.
Potential to Emit for New Non-Source Fugitive emissions.
For New Insignificant Sources
The type of source, estimate of total emissions from ALL insignificant sources for each criteria pollutant and a list of applicable requirements that apply to the insignificant source.
For Each New Significant Source
Brief description of source operations.
Identification of the stack or chimney (Emission Point Inventory).
Identification of the production process.
General description of production process in sufficient detail to determine which applicable requirements apply.
Product(s) or intermediate products(s) used.
Emission Unit/Batch Process Inventory and Detail screens filled out. . For new sources both screens must be filled out completely. For modified sources, only modified information is required.
Each proposed operating scenario shall include:
6. Description of each proposed operating scenario.
7. The specific source operations that are to be included in the proposed operating scenarios.
8. For combustion sources, type of fuel and maximum annual quantity to be used.
9. The product(s) that will e produced under the proposed operating scenarios.
10. Operating parameters that have an impact on emissions.
Demonstrate compliance with the applicable requirements of N.J.A.C. 7:27-18.
Emission Information for Each New Source
Potential to Emit for each air contaminant including non-captured emissions in tons per year and any other unit (e.g. lb/hr) required to verify compliance with any applicable requirement. Include the allowable and estimated actual emissions before and after the change.
Type and quantity each fuel to be used annually.
Raw materials to be used and either the maximum rate of production rate and maximum annual hours of operation or maximum batch size and the maximum number of batches per year.
Control Device Inventory and detail screens filled out. For new sources both screens must be filled out completely. For modified sources, only modified or missing information is required.
Identification and description of all monitoring devices or activities to be used to verify compliance with applicable requirements.
Additional emissions information or emissions-related information needed to verify whether any potentially applicable requirements apply
Any other information required by an applicable requirement.
Calculations upon which the emissions were based.
A proposed compliance plan meeting the requirements of N.J.A.C. 7:27-22.9
Certification by a responsible official, consistent with N.J.A.C. 7:27-1.39.
Any additional information that is reasonably necessary to enable the Department to determine whether the applicant has satisfied the requirements of N.J.A.C. 7:27-22 for the issuance of a permit.
Permit Writer
PRE-REVIEW CHECKLIST FOR SEVEN-DAY-NOTICE CHANGES
Does not increase allowable emissions.
Does not cause emissions of a new contaminant.
Does not constitute a “modification” per Title I of the CAA (NSPS, NESHAP, MACT, etc.).
Does not relax monitoring, recordkeeping, reporting requirements.
See N.J.A.C. 7:27-22.22 for details. A permittee may make a sevendaynotice change seven days after the NJDEP’s receipt of the notice of the change if the proposed change does not increase actual emissions, does not cause the emission of a new air contaminant, does not violate an applicable requirement, does not relax a monitoring, recordkeeping, or reporting requirements, and does not constitute a minor modification or significant modification. Examples of such changes include reconfiguration of an operating scenario or a change in the production process.
Facility Name:
Date Received:
Program Interest Number:
Activity Number:
Checklist
Review Parameter
Yes
No
Reviewer’s Comments
Provided a description of the planned change and a statement of the reason the change is being made.
Provided the date or schedule for when the change will be made or a description of the types of circumstances under which the change would be made.
Provided the specific subject item and applicable requirement reference numbers that will be changed.
Provided the change in the quantity or rate of actual emissions as a result of the change.
Provided certification of the notice in accordance with N.J.A.C. 7:271.39.
Complete/Eligible?
YES:
File the notice as an attachment to the operating permit and update the Revision History table in NJEMS. Update the Activity Tracker in NJEMS. DO NOT CREATE OR BRING FORWARD A NEW PERMIT DOCUMENT SET (PDS) for seven-day notice changes. If a facility specifically request a revised PDS containing the seven-day notice changes, ask the facility to submit a minor modification application instead of a seven-day notice change.
NO:
If incomplete, call the facility requesting additional information. If ineligible, notify the permittee the change is not eligible for processing as a sevendaynotice change. Update the Activity Tracker in NJEMS.
NJEMS Permit Activity Summary and Activity Tracker has been updated showing the correct modification type. Click for Procedure.
6/30/15 Page 3 of 14