T10.5_P100__Paving.pdf

PDF 9 MB Posted

Attached to
Paving Replacement Project - World Trade Land Port of Entry
Solicitation number
47PH0425R0010
Issued by

About this file

This file is the GSA P100 Facilities Standards document which establishes mandatory standards and criteria for Public Buildings Service (PBS) owned and leased construction facilities. The document contains both performance-based standards and prescriptive requirements for programming, design, and documentation of GSA buildings, covering areas including general requirements, urban development, architecture, engineering, fire protection, and specialty spaces.

The document outlines key sustainability requirements including LEED Gold certification for new construction and major repairs, net-zero energy and water goals, and grid-interactive building capabilities. It provides detailed technical specifications across multiple disciplines including mechanical, electrical, structural and civil engineering. The standards apply to all GSA construction projects regardless of funding source, including BA51 New Construction, BA54/55 Repairs and Alterations, BA64 Historic Preservation, BA61 Operating Funds, and BA80 Reimbursable Work Authorization. The document serves as the primary technical reference for GSA's building design and construction programs, though it notes it is not meant to be a textbook or substitute for technical competence.

View the file

Other files

File Type Posted
Amendment 0001__Paving.pdf PDF
T10.3_Specs 4 of 4__Paving.pdf PDF
T10.14_Proposal Form__Paving.xlsx XLSX spreadsheet
T10.12_GSA 527__Paving.pdf PDF
T10.3_Specs 3 of 4__Paving.pdf PDF
T10.11_PPQ Form__Paving.pdf PDF
T10.7_Wages__Paving.pdf PDF
T10.10_Reps and Certs__Paving.pdf PDF
T10.3_Specs 1 of 4__Paving.pdf PDF
T10.4_Dwgs__Paving.pdf PDF
T10.1_SF 1442__Paving.pdf PDF
T10.8_Agreement Doc__Paving.pdf PDF
T10.6_CAD Std__Paving.pdf PDF
T10.3_Specs 2 of 4__Paving.pdf PDF
T10.9_Solicitation Doc__Paving.pdf PDF
T10.2_SOW__Paving.pdf PDF
T10.13_Vendor Fitness Det__Paving.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P100 FACILITIES STANDARDS

FOR THE PUBLIC BUILDINGS SERVICE

October 2021

Page 1 PBS P100 2021.v1

Cover: Land Port of Entry Columbus, NM

Figure 2: Land Port of Entry Detail Columbus, NM

TABLE OF CONTENTS

Page 2 PBS P100 2021.v1

TABLE OF CONTENTS 2

INTRODUCTION 9

CHAPTER 1 • GENERAL REQUIREMENTS 10

1.1 PURPOSE OF THE FACILITIES STANDARDS 11

1.2 APPLICATION OF P100 11

1.2.1 REPAIRS AND ALTERATIONS 11

1.2.2 LEASE CONSTRUCTION 11

1.2.3 TENANT IMPROVEMENTS 12

1.2.4 DEVIATIONS FROM P100 12

1.3 FEDERAL LAWS, REGULATIONS, AND STANDARDS 13

1.3.1 PUBLIC BUILDINGS AMENDMENTS OF 1988 13

1.3.2 ENVIRONMENTAL PROTECTION 13

1.3.3 ENERGY AND SUSTAINABLE DESIGN 14

1.3.4 HISTORIC PRESERVATION 14

1.3.5 THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) 15

1.3.6 OCCUPATIONAL SAFETY AND HEALTH REGULATIONS 15

1.3.7 RANDOLPH-SHEPPARD ACT 15

1.3.8 BUY AMERICAN ACT 16

1.3.9 FACILITY DEFINITIONS 16

1.4 NATIONALLY RECOGNIZED CODES AND STANDARDS 16

1.4.1 CONFLICTS BETWEEN CODES OR STANDARDS AND GSA REQUIREMENTS 17

1.4.2 ICC INTERNATIONAL CODES 17

1.4.3 NFPA LIFE SAFETY CODE 17

1.4.4 NFPA NATIONAL ELECTRICAL CODE 17

1.4.5 NATIONAL STANDARDS 17

1.4.6 WILDLAND URBAN INTERFACE 18

1.4.7 INTERAGENCY SECURITY COMMITTEE RISK MANAGEMENT PROCESS FOR FEDERAL FACILITIES 18

1.4.8 ASHRAE 90.1 20

1.5 STATE AND LOCAL CODES 21

1.5.1 STATE AND LOCAL GOVERNMENT CONSULTATION AND REVIEW 21

1.5.2 ZONING AND RELATED ISSUES 21

1.5.3 DESIGN REVIEW FOR CODE COMPLIANCE 22

1.5.4 CONSTRUCTION INSPECTIONS 22

1.6 PROGRAM-SPECIFIC GUIDES AND STANDARDS 22

1.6.1 FEDERAL COURTHOUSES 23

1.6.2 LAND PORTS OF ENTRY 23

1.6.3 CHILD CARE CENTERS 23

1.6.4 SECURITY 23

1.6.5 HISTORIC PRESERVATION 23

1.6.6 FIRST IMPRESSIONS 24

1.6.7 SMART BUILDINGS 24

1.6.8 DESIGN GUIDE FOR OPERATIONAL EXCELLENCE 25

1.6.9 OTHER GUIDES AND STANDARDS 25

1.7 SAFETY AND HEALTH RISK REDUCTION 26

1.7.1 LOSS CATEGORIES 26

1.7.2 SPECIAL EXPOSURES 26

1.7.3 ORDER OF PRECEDENCE 26

1.7.4 SPECIFIC HEALTH AND SAFETY REQUIREMENTS 27

1.8 GENERAL PROCEDURES 28

1.8.1 CONSTRUCTION SIGN 28

1.8.2 SPACE MEASUREMENT AND BUILDING EFFICIENCY 30

1.8.3 BUILDING INFORMATION MODELING (BIM) 31

1.8.4 TOTAL BUILDING COMMISSIONING 31

Page 3 PBS P100 2021.v1

1.8.5 BUILDING OPERATIONS AND MAINTENANCE 32

1.9 SUSTAINABILITY 33

1.9.1 SUSTAINABLE PERFORMANCE TABLE 33

1.9.2 SUSTAINABILITY REQUIREMENTS 35

1.9.3 ENERGY USE TARGETS 38

1.9.4 LIFE-CYCLE COSTING 39

1.10 RESILIENCE 40

1.10.1 MANAGEMENT OF CLIMATE RELATED AND EXTREME WEATHER RISKS 40

1.10.2 THERMAL RESILIENCE 41

CHAPTER 2 • URBAN DEVELOPMENT AND LANDSCAPE DESIGN 42

2.1 URBAN PLANNING AND PUBLIC USE PERFORMANCE TABLE 43

2.2 URBAN PLANNING 46

2.2.1 SUSTAINABLE LOCATIONS 46

2.2.2 COLLABORATIVE DESIGN PROCESS 46

2.2.3 DESIGN FOR PUBLIC USE 47

2.3 URBAN PLANNING, DESIGN, AND SITE PRESCRIPTIVE REQUIREMENTS 47

2.3.1 PROCESS CRITERIA 47

2.3.2 DESIGN CRITERIA 47

2.4 LANDSCAPE PERFORMANCE TABLE 50

2.5 LANDSCAPE PRESCRIPTIVE REQUIREMENTS 52

2.5.1. INTEGRATIVE DESIGN 52

2.5.2 REGULATIONS, STANDARDS AND GUIDANCE 53

2.5.3 WATER 54

2.5.4 SOIL 55

2.5.5 VEGETATION 56

2.5.6 POLLINATORS 57

2.5.7 OPERATIONS AND MAINTENANCE 59

2.5.8 PARKING FIELD DESIGN AND VEGETATED ARCHITECTURAL SURFACES 59

2.5.9 PUBLIC OUTREACH 61

CHAPTER 3 • ARCHITECTURE AND INTERIOR DESIGN 62

3.1 ENCLOSURE PERFORMANCE TABLE 63

3.2 BUILDING ENCLOSURE PERFORMANCE ATTRIBUTES 70

3.2.1 NATURAL HAZARDS 70

3.2.2 SERVICEABILITY 72

3.2.3 WATER PENETRATION RESISTANCE 72

3.2.4 MOISTURE AND CONDENSATE CONTROL 74

3.2.5 AIR TIGHTNESS 74

3.2.6 THERMAL PERFORMANCE 75

3.2.7 BUILDING ENCLOSURE COMMISSIONING 75

3.2.8 ACOUSTIC CONTROL 76

3.2.9 ENCLOSURE SERVICE LIFE 76

3.3 PRESCRIPTIVE ENCLOSURE REQUIREMENTS 76

3.3.1 MOISTURE CONTROL 76

3.3.2 BELOW GRADE SYSTEMS 76

3.3.3 SUBSTRUCTURE 77

3.3.4 WALL SYSTEMS 77

3.3.5 MASONRY AND CONCRETE MATERIALS 79

3.3.6 FENESTRATION SYSTEMS 79

3.3.7 ROOF SYSTEMS 80

3.3.8 QUALITY ASSURANCE 83

3.3.9 SUN CONTROL DEVICES 83

3.3.10 WINDOW CLEANING 83

3.3.11 PROVIDING ACCESS TO MAINTAIN EQUIPMENT IN ATRIUMS 83

3.3.12 SUSPENDED ACCESS TO ELEVATED LOCATIONS 83

Page 4 PBS P100 2021.v1

3.4 INTERIOR PERFORMANCE TABLE 87

3.5 INTERIOR CONSTRUCTION AND INTERIOR FINISHES PERFORMANCE ATTRIBUTES 130

3.5.1 CONSTRUCTION PRODUCTS AND MATERIALS 130

3.5.2 INTERIOR FINISHES AND MATERIALS 133

3.5.3 ACOUSTICS 134

3.5.4 FIRE PERFORMANCE AND SMOKE DEVELOPMENT 139

3.6 GENERAL ARCHITECTURE 140

3.6.1 CORNERSTONE 140

3.6.2 REGISTRY OF DESIGNERS AND BUILDERS 140

3.6.3 PROMOTE THE USE OF STAIRS 141

3.6.4 VERTICAL TRANSPORTATION 141

3.6.5 FAMILY RESTROOMS 143

3.6.6 LACTATION ROOMS 144

3.6.7 BIRD-SAFE BUILDING DESIGN 145

3.7 WORKPLACE PERFORMANCE REQUIREMENTS 145

3.8 WORKPLACE PERFORMANCE ATTRIBUTES 146

3.8.1 PLANNING AND DESIGN STRATEGIES 147

3.8.2 HEALTH AND COMFORT: ENVIRONMENTAL CONTROLS 147

3.8.3 IMAGE 147

3.8.4 WORKPLACE TOOLS AND PROCESSES 148

CHAPTER 4 • STRUCTURAL AND CIVIL ENGINEERING 149

4.1 STRUCTURAL PERFORMANCE TABLE 150

4.2 STRUCTURAL PERFORMANCE ATTRIBUTES 151

4.2.1 LOADS AND NATURAL HAZARDS 151

4.3.8 GENERAL 155

4.4 PHYSICAL SECURITY PERFORMANCE TABLE 155

4.5.2 PROGRESSIVE COLLAPSE DESIGN REQUIREMENTS 156

4.6 CIVIL PERFORMANCE TABLE 156

4.7 CIVIL PERFORMANCE ATTRIBUTES 156

4.7.1 FLOOD MITIGATION 156

4.8 PRESCRIPTIVE CIVIL REQUIREMENTS 156

4.8.1 SITE GRADING AND DRAINAGE 156

4.8.2 SITE UTILITIES 157

4.8.3 SITE CIRCULATION 157

4.8.4 PAVEMENTS 157

4.9 GEOLOGIC HAZARD REPORT 157

4.9.1 REQUIRED INVESTIGATION 158

4.9.2 SURFACE FAULT RUPTURE 158

4.9.3 SOIL LIQUEFACTION 158

4.9.4 LANDSLIDING 159

4.9.5 DIFFERENTIAL SETTLEMENT 159

4.9.6 FLOODING 159

4.9.7 DURATION OF STRONG GROUND SHAKING 159

4.9.8 MITIGATIVE MEASURES 159

4.9.9 REQUIRED DOCUMENTATION 159

CHAPTER 5 • MECHANICAL ENGINEERING 161

5.1 MECHANICAL PERFORMANCE TABLE 162

5.2 MECHANICAL PERFORMANCE ATTRIBUTES 166

5.2.1 TEMPERATURE 166

5.2.2 HUMIDITY CONTROL 166

5.2.3 AIR MOVEMENT 166

5.2.4 PRESSURE 166

5.2.5 VENTILATION 167

5.2.6 FILTRATION 167

Page 5 PBS P100 2021.v1

5.2.7 HVAC NOISE CONTROL 167

5.2.8 TREATING BIOLOGICAL GROWTH IN WATER SYSTEMS 167

5.3 MECHANICAL PRESCRIPTIVE REQUIREMENTS 168

5.3.1 DESIGN CRITERIA 168

5.3.2 HVAC SYSTEMS 169

5.3.3 HVAC COMPONENTS 176

5.3.4 AIR DISTRIBUTION 179

5.3.5 WATER TREATMENT 179

5.4 PLUMBING 181

5.4.1 KITCHEN FAUCETS 181

5.4.2 DRINKING FOUNTAIN WITH BOTTLE FILLING STATION 182

5.4.3 EMERGENCY FIXTURES 182

5.4.4 SOLAR WATER HEATING 182

5.4.5 PLUMBING PIPING 182

5.4.6 FLOOR DRAINS 183

5.4.7 GAS AND FUEL OIL PIPING 183

5.4.8 FUEL STORAGE TANKS 183

5.5 OPERABILITY AND MAINTAINABILITY 183

5.5.1 ACCESSIBLE FOR MAINTENANCE 183

5.5.2 SIMPLE/UNDERSTANDABLE TO OPERATE 184

5.5.3 OPERATIONS 184

5.5.4 ROBUST AND RELIABLE: EXTENDED LIFE EXPECTANCY 184

5.6 ALTERATIONS IN EXISTING BUILDINGS 184

CHAPTER 6 • ELECTRICAL ENGINEERING 186

6.1 LIGHTING PERFORMANCE TABLE 187

6.2 LIGHTING PERFORMANCE ATTRIBUTES 193

6.2.1 LIGHTING QUALITY 193

6.2.2 LIGHTING QUANTITY 194

6.2.3 ENERGY USE 195

6.2.4 POWER QUALITY 195

6.2.5 MAINTENANCE 196

6.2.6 SERVICE LIFE 196

6.3 LIGHTING PRESCRIPTIVE REQUIREMENTS 196

6.3.1 LIGHTING CRITERIA 196

6.3.2 LOAD CRITERIA 198

6.3.3 SECURITY LIGHTING, EXIT SIGNS, AND EMERGENCY LIGHTING 200

6.3.4 SPECIFIC LIGHTING REQUIREMENTS 201

6.4 ELECTRICAL PERFORMANCE REQUIREMENT 202

6.5 PRESCRIPTIVE ELECTRICAL ENGINEERING REQUIREMENTS 207

6.5.1 GOALS AND OBJECTIVES 207

6.5.2 CODES, STANDARDS, AND GUIDELINES 208

6.5.3 UTILITY COORDINATION 213

6.5.4 DISTRIBUTION SYSTEM ALTERNATIVES 216

6.5.5 SPACE CONDITIONS 218

6.5.6 SECONDARY BRANCH POWER DISTRIBUTION 221

6.5.7 BRANCH WIRING DISTRIBUTION SYSTEMS 223

6.5.8 VOICE AND DATA DISTRIBUTION SYSTEM 229

6.5.9 EMERGENCY AND STANDBY POWER SYSTEMS 230

6.5.10 CLEAN POWER SYSTEMS 233

6.5.11 GROUNDING SYSTEMS 236

6.5.12 SAFETY SYSTEMS, EQUIPMENT, AND PERSONAL PROTECTION 237

6.5.13 ALTERATIONS IN EXISTING BUILDINGS AND HISTORIC STRUCTURES 238

6.5.14 PHOTOVOLTAIC SYSTEMS 239

6.5.15 QUALITY ASSURANCE OF ELECTRICAL POWER SYSTEMS AND EQUIPMENT 242

Page 6 PBS P100 2021.v1

6.5.16 REBATE PROGRAMS 243

CHAPTER 7 • FIRE PROTECTION 244

7.1 GOALS AND OBJECTIVES 245

7.1.1 SCOPE 245

7.1.2 APPLICABILITY 245

7.1.3 RESPONSIBILITIES 245

7.2 REFERENCES 247

7.3 FIRE SAFETY DURING PROJECTS 247

7.3.1 FIRE SAFETY DURING NEW CONSTRUCTION PROJECTS 247

7.3.2 FIRE SAFETY DURING REPAIR AND ALTERATION PROJECTS 247

7.3.3 FIRE SAFETY DURING DEMOLITION PROJECTS 247

7.3.4 EXISTING FIRE PROTECTION SYSTEMS 247

7.4 MEANS OF EGRESS 247

7.4.1 SPECIAL REQUIREMENTS 248

7.4.2 EVACUATION ROUTE DIAGRAMS 248

7.4.3 EXIT STAIR PATH MARKINGS 248

7.4.4 EXIT STAIRWAY IDENTIFICATION SIGNAGE 249

7.5 INTERIOR FINISHES 249

7.6 FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEMS 249

7.6.1 MANUAL FIRE ALARM BOXES 250

7.6.2 WATERFLOW SWITCHES 251

7.6.3 SMOKE DETECTORS 251

7.6.4 AUDIBLE NOTIFICATION APPLIANCES 252

7.6.5 VISIBLE NOTIFICATION APPLIANCES 252

7.6.6 OCCUPANT NOTIFICATION 253

7.6.7 FIRE ALARM NOTIFICATION STRATEGIES FOR HIGH-RISE BUILDINGS 253

7.6.8 SURVIVABILITY FOR FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEMS 253

7.6.9 FIRE COMMAND CENTER 255

7.6.10 ANNUNCIATOR 256

7.7 WATER SUPPLY FOR FIRE PROTECTION 256

7.7.1 FIRE PUMPS 256

7.7.2 PRESSURE MAINTENANCE PUMP (JOCKEY PUMP) 256

7.7.3 FIRE HYDRANTS 257

7.7.4 POST INDICATOR VALVE 257

7.8 AUTOMATIC SPRINKLER AND STANDPIPE SYSTEMS 257

7.8.1 TYPES OF SPRINKLERS 258

7.8.2 SPRINKLER PIPING 258

7.8.3 AUTOMATIC SPRINKLER SYSTEMS FOR REMOTE OR ISOLATED FACILITIES 259

7.8.4 FIRE DEPARTMENT CONNECTIONS 260

7.8.5 STANDPIPES 260

7.8.6 FIRE DEPARTMENT HOSE OUTLETS 260

7.9 NON-WATER-BASED FIRE EXTINGUISHING SYSTEMS 261

7.9.1 WET CHEMICAL EXTINGUISHING SYSTEMS 261

7.9.2 DRY CHEMICAL EXTINGUISHING SYSTEMS 261

7.9.3 CLEAN AGENT EXTINGUISHING SYSTEMS 261

7.9.4 CARBON DIOXIDE FIRE EXTINGUISHING SYSTEMS 261

7.9.5 PORTABLE FIRE EXTINGUISHERS 261

7.10 ELEVATOR SYSTEMS 261

7.10.1 FIRE SERVICE ACCESS ELEVATORS 262

7.10.2 OCCUPANT EVACUATION ELEVATORS 262

7.11 SPECIAL FIRE PROTECTION REQUIREMENTS 263

7.11.1 AIR DISTRIBUTION SYSTEMS 263

7.11.2 INFORMATION TECHNOLOGY EQUIPMENT ROOMS 263

7.11.3 PLACES OF CONFINEMENT (HOLDING AREAS) 264

Page 7 PBS P100 2021.v1

7.11.4 ATRIUMS 264

7.11.5 COOLING TOWERS 265

7.11.6 RESIDENTIAL DWELLING UNITS 265

7.11.7 CHEMICAL LABORATORIES 266

7.11.8 RECORD STORAGE FACILITIES 266

7.11.9 FLAMMABLE AND COMBUSTIBLE LIQUID STORAGE ARRANGEMENTS 266

7.11.10 COMPACT STORAGE MODULES 266

7.11.11 STATIONARY ENERGY STORAGE SYSTEMS 266

7.12 REQUIRED DESIGN GUIDES AND MANUALS 267

7.12.1 U.S. COURT FACILITIES 267

7.12.2 U.S. MARSHALS SERVICE SPACE 267

7.12.3 LAND PORT OF ENTRY FACILITIES 267

7.12.4 GSA CHILD CARE CENTERS 267

7.13 HISTORIC STRUCTURES 267

7.13.1 RESPONSIBILITY 267

7.13.2 IMPACT ON HISTORIC FABRIC 268

7.13.3 FIRE PROTECTION ALTERNATIVES FOR CONSIDERATION 268

7.14 MASS NOTIFICATION SYSTEMS 269

7.15 PERFORMANCE-BASED DESIGN 270

7.16 COMMISSIONING FIRE PROTECTION AND LIFE SAFETY SYSTEMS 270

7.17 INTEGRATED FIRE PROTECTION AND LIFE SAFETY SYSTEM TESTING 271

CHAPTER 8 • DESIGN STANDARDS FOR SPECIALTY SPACES 272

8.1 U.S. COURTS 273

8.1.1 GOALS AND OBJECTIVES 273

8.1.2 DESIGN GUIDANCE 273

8.1.3 GENERAL REQUIREMENTS 274

8.1.4 MECHANICAL SYSTEMS 278

8.1.5 FIRE PROTECTION AND SECURITY SYSTEMS 280

8.1.6 ELECTRICAL SYSTEMS 280

8.1.7 SECURITY DESIGN: AGENCY RESPONSIBILITIES 281

8.1.8 BATTERY BACKUP 282

8.2 LPOE 282

8.3 MAILROOMS 282

8.4 INDOOR FIRING RANGES 282

8.5 LOADING DOCKS 282

APPENDIX 283

A.1 GENERAL SUBMISSION REQUIREMENTS 284

A.1.1 BIM (BUILDING INFORMATION MODEL) REQUIREMENT 284

A.1.2 GEOGRAPHIC INFORMATION SYSTEM (GIS) STANDARDS 285

A.1.3 SPATIAL DATA MANAGEMENT 285

A.1.4 DOCUMENT SECURITY REQUIREMENTS 285

A.1.5 SEALS 286

A.1.6 DRAWINGS 286

A.1.7 SPECIFICATIONS 286

A.1.8 DESIGN NARRATIVES AND CALCULATIONS 287

A.1.9 TURNOVER DOCUMENTS 287

A.1.10 COST AND SCHEDULE MANAGEMENT REQUIREMENTS 288

A.2 PERFORMANCE MATRIX 288

A.3 DEFINITIONS 291

A.3.1 SUBMITTAL DEFINITIONS 291

A.3.2 PROJECT DELIVERY METHODS 293

A.3.3 FUNDING CODES 294

A.4 SUBMITTAL MATRIX 294

A.5 SURVEYS AND GEOTECHNICAL REPORTS 294

Page 8 PBS P100 2021.v1

A.5.1 SITE SURVEY 294

A.5.2 GEOTECHNICAL INVESTIGATION AND ENGINEERING REPORT 295

B.1 REFERENCES 298

B1.1 LIST OF REFERENCE PUBLICATIONS AND WEBSITES 298

CHAPTER 1 GENERAL REQUIREMENTS 298

CHAPTER 2 URBAN DEVELOPMENT AND LANDSCAPING 301

CHAPTER 3 ARCHITECTURE AND INTERIOR DESIGN 301

CHAPTER 4 STRUCTURAL AND CIVIL ENGINEERING 303

CHAPTER 5 MECHANICAL ENGINEERING 303

CHAPTER 6 ELECTRICAL ENGINEERING 304

CHAPTER 7 FIRE PROTECTION 306

B.2 ACRONYMS AND ABBREVIATIONS 308

C.1 SUMMARY OF CHANGES FROM THE 2018 VERSION 310

CREDITS 315

Page 9 PBS P100 2021.v1

About P100

The Facilities Standards for the Public Buildings Service (P100) establishes standards and criteria for the Public Buildings Service (PBS) of the U.S. General Services Administration (GSA) owned inventory and lease construction facilities that the Government intends to own or has an option to purchase. This document contains both performance-based standards and prescriptive requirements to be used in the programming, design, and documentation of GSA buildings.

INTRODUCTION

Through its Public Buildings Service (PBS), the U.S. General Services Administration (GSA) designs, constructs, and operates federal civilian buildings. PBS provides workspace to 1.1 million federal employees, primarily with courthouses, land ports of entry, and federal office buildings. It ranks among the largest holders of real estate in the United States.

P100 is GSA's mandatory facilities standard. P100 applies to many project types and sizes across the country and its users span the entire spectrum of building professional disciplines. P100 informs and regulates decisions made throughout a project's life.

Since 2014, P100 has moved to more performance-based requirements. A large portion of the standard now specifies levels of performance, allowing a project team and GSA's other professional partners to identify and implement the best strategies to meet those goals.

In general, four levels of performance are defined throughout P100 in matrices. It is the project manager’s responsibility to use the P100 Performance Matrix to document the “baseline” performance for their project. Different building types may have a higher starting threshold, and the Matrix attempts to identify these cases, but the program specific guides listed in P100 provide the final requirements.

Each project may implement any combination of performance levels to prioritize opportunities that stem from climate, site, program, mandates, and other conditions. Performance goals must be validated at various phases of design with Design Excellence and through construction with total building commissioning.

Page 10 PBS P100 2021.v1

CHAPTER 1 • GENERAL REQUIREMENTS

GENERAL REQUIREMENTS

Figure 4: Sydney R. Yates Federal Building Washington, DC

Page 11 PBS P100 2021.v1

The project team must review and show compliance with the building program and performance at each stage of the project, as required in Appendix A. This ensures that the requirements of the program, P100, and relevant codes and standards have been met and to guard against unplanned expansion of the program because of design and engineering choices.

All prospectus-level projects are required to follow the Design Excellence Policies and Procedures

1.1 PURPOSE OF THE FACILITIES STANDARDS

P100 is a mandatory standard. It is not a guideline, textbook, handbook, training manual, nor substitute for technical competence. P100 represents the current state of practice in designing facilities to meet GSA’s commitments, maximize the efficiency of business processes, and comply with the requirements of law.

P100 must be used in conjunction with the governing standards referenced in this document, as well as the building program for each project. If conflicts exist between the facilities standards and a specific program and project requirements, contact the PBS Office of Design and Construction for resolution.

1.2 APPLICATION OF P100

P100 applies regardless of the funding source. Thus, P100 applies equally to projects funded through BA51 New Construction, BA54 Minor Repairs and Alterations, and BA55 Major Repairs and Alterations, BA64 Historic Preservation, BA61 Operating Funds for the purpose of repairs and alterations, as well as customer-funded projects through BA80 Reimbursable Work Authorization and privately financed projects such as an Energy Savings Performance Contract. This document also applies to certain lease construction facilities.

1.2.1 REPAIRS AND ALTERATIONS

A repair is to restore an item to good working order or safe condition, to fix, or to improve a damaged condition. An alteration is any work that adds or removes items to the building or systems.

P100 applies to repairs and alterations to the extent the work is identified in the approved and funded project scope. All items within the project’s scope of work must be designed in accordance with P100.

Repairs in kind are not required to upgrade to the current P100 but must be limited to singular items. The designer must clarify ambiguities in writing before beginning the design.

1.2.2 LEASE CONSTRUCTION

Lease construction is new construction of a facility for Government use required by GSA’s formal Request for Lease Proposals (RLP).

Page 12 PBS P100 2021.v1

P100 must be included where GSA's formal Request for Lease Proposal (RLP) has an option for GSA to purchase the building at a future date. The requirements of P100 will be included in the RLP on a case-by-case basis, in consultation with the Chief Architect. Exclusion of P100 from lease construction facilities where GSA's formal RLP has an option for GSA to purchase the building requires Chief Architect written approval. In addition to the GSA-adopted nationally recognized codes and requirements, state and local government codes apply. If a conflict exists between applicable state and local government codes and the GSA requirements, the developer must identify these conflicts in writing and request a resolution from the GSA contracting officer.

1.2.3 TENANT IMPROVEMENTS

Tenant Improvements (TI) are the customized alterations GSA makes to rental space as part of a lease agreement, in order to configure the space for the needs of the particular tenant.

The GSA PBS Pricing Desk Guide (PDG) defines the policies used by PBS to price real estate and related services to federal customer agencies.

PDG sets policy for the entire PBS owned and leased portfolio, provides pricing direction for both cases and special circumstances. It is designed to guide PBS employees in the performance of their work and serve as a resource for Customer Agencies seeking a more thorough understanding of the PBS Pricing Policy and its application.

Utilize the latest PDG edition at the time of project solicitation. Coordinate Tenant Improvement alterations and renovations with the PBS P-120 cost and schedule management requirements.

1.2.4 DEVIATIONS FROM P100

1.2.4.1 WAIVERS

Deviations from P100 require an approved waiver except as noted below. Project teams seeking relief from requirements must establish the technical hardships that make compliance impossible.

Alternatively, requests for waivers may demonstrate that non-compliance is life cycle cost beneficial.

Budget and/or time constraints are not technical hardships and will not be considered as they do not ensure the life cycle cost benefits of GSA's real estate investments. Waivers must be requested in writing by the regional commissioner or designee and approved by the Office of Design and Construction before the final concept submission is presented. The following deviations utilize other processes:

● Waivers for addressing the requirements in P100 Chapter 7, Fire Protection, are not permitted.

However, alternative and equivalent compliance requests for deviations from the requirements in P100 Chapter 7 require an approved alternative and/or equivalent compliance solution in accordance with the requirements in Section 1.2.4.2. Such requests for alternative and/or equivalent compliance must also include a concurrence signature from the regional Fire Protection Program Office and follow a similar approval process as the waiver process.

Page 13 PBS P100 2021.v1

● Waivers or modifications from the Architectural Barriers Act Accessibility Standard (ABAAS) must be approved by the Commissioner of PBS. The ABAAS process is explained in the "National Accessibility Program—Standards, Policies and Procedures"

● Metric Waivers—See GSA Metric Order, GSA Metric Program, for guidance.

1.2.4.2 ALTERNATIVE AND EQUIVALENT COMPLIANCE

GSA encourages the development of new and innovative building systems. The provisions of this document are not intended to prohibit the use of alternative systems, methods, or devices not specifically addressed by P100. The use of alternative systems, methods, or devices is permitted to meet the intent of the prescribed requirements in P100 where approved as being equivalent. All technical documentation for alternatives must be submitted and approved by the regional program office prior to final concept submission. Proposed alternatives must be equivalent or superior to P100 requirements concerning quality, cost, strength, effectiveness, fire resistance, durability, efficiency, and safety. All proposed alternatives must be accomplished within the project budget and schedule. The approved alternative will be recognized as being an equivalent design solution and compliant with P100. The use of an alternative and equivalent compliance method is not to be considered a waiver.

1.2.4.3 NEWER VERSIONS OF P100

Project teams may choose to apply a newer version of P100 to ongoing projects. If the project team determines benefits to the project from the newer version, they must document potential changes for the appropriate sections of P100 to submit to the project manager and contracting officer. If approved, a copy of the documentation must be submitted to the central office P100 Waiver Program Manager.

1.3 FEDERAL LAWS, REGULATIONS, AND STANDARDS

The following are federal laws, regulations, and standards applicable to all projects.

1.3.1 PUBLIC BUILDINGS AMENDMENTS OF 1988

The Public Buildings Amendments of 1988, 40 U.S.C. 3312, require that each building constructed or altered by GSA or any other federal agency must, to the maximum extent feasible, comply with one of the nationally recognized model building codes and with other applicable nationally recognized codes.

These projects must consider local zoning laws and other local requirements. It also provides for state and local government consultation, review, and inspection and requires the agency to give due consideration to state and local government recommendations.

1.3.2 ENVIRONMENTAL PROTECTION

In addition to building-specific codes, GSA projects must comply with federal, state, and local environmental laws, regulations, and Executive Orders. GSA’s policy is voluntary conformance with state and local code requirements even when permitting or approvals from local regulators are not required.

Project teams are advised to collaborate with the GSA regional environmental coordinator and the Office of the Chief Architect for assistance during the design process.

Page 14 PBS P100 2021.v1

Among the key mandates is the National Environmental Policy Act (NEPA). NEPA requires that federal agencies consider and document the environmental impacts of proposed actions as part of their decision process. Although NEPA activity often takes place prior to design start, it is vital that project teams are aware of any assertions or commitments GSA made during the NEPA process, to ensure that these are adhered to during design. Depending on the outcome of the NEPA process, relevant commitments, or assertions as to the scope, strategy or scale of the project may be found in a Finding of No Significant Impact (FONSI), a Record of Decision (ROD), or even a Categorical Exclusion (CATEX). The project team must be aware of these legally binding commitments and must address them, as appropriate, in the project design.

1.3.3 ENERGY AND SUSTAINABLE DESIGN

Legislation directed toward energy efficiency and sustainability continues to increase.

Laws, regulations, and Executive Orders affecting the design and operation of federal buildings include:

● EO 14008 Tackling the Climate Crises at Home and Abroad

● EO 13990 Protecting Public Health and the Environment and Restoring Science to Tackle the

Climate Crisis

● Energy Act of 2020

● Energy Independence and Security Act of 2007 (EISA 2007)

● Energy Policy Act of 2005 (EPAct 2005)

● Guiding Principles for Sustainable Federal Buildings (Guiding Principles)

● Farm Security and Rural Investment Act of 2002 (FSRIA)

● Resource Conservation and Recovery Act of 1976 (RCRA)

1.3.3.1 ENERGY ACT OF 2020 REBATES

Project teams must pursue utility rebate and incentive programs and any government grant or incentive programs at the local, state, and federal level. Project teams are encouraged to contact the local utility as early in the design process as possible to determine if the project qualifies for a financial incentive or rebate, as local utilities often offer “custom” or unadvertised rebates. Rebate checks must be submitted to GSA.

Examples of projects that are typically eligible for rebates or incentives include the following:

● Building envelope improvements (windows, roofing, doors, weather stripping)

● HVAC upgrades and new installations (boilers, chillers, VFDs, tune ups, controls, etc.)

● Lighting retrofits (LED upgrades, controls, etc.)

● Appliance purchases (cafeteria equipment, water heaters, etc.)

1.3.4 HISTORIC PRESERVATION

The National Historic Preservation Act (NHPA) of 1966 mandates that federal agencies use historic properties to the greatest extent possible and strive to rehabilitate them in a manner that preserves their

Page 15 PBS P100 2021.v1 architectural character, in accordance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties (36 CFR 67).

Further, projects impacting historic properties must comply with NHPA’s Section 106 process. This process often results in GSA making legal commitments to execute the project in a certain way. In most cases, the Section 106 consultation process, and any resulting agreement documents, should be completed prior to the issuance of a FONSI or a ROD. As with NEPA, the project team must be aware of these commitments and must address them in the project design documents. Project teams must consult with GSA’s Regional Historic Preservation Officer for assistance.

1.3.5 THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD

(ABAAS)

GSA policy is to make all federal buildings accessible without the use of special facilities for persons with disabilities. The intent of this policy is to use standard building products set at prescribed heights and with prescribed maneuvering clearances to allow easy access by disabled employees and visitors. Building elements designated specifically for use by persons with disabilities should be kept to a minimum.

ABAAS is mandatory for all GSA projects. If local accessibility standards exist, the architect/engineer (A/E) must follow the most stringent requirements between the local standards and ABAAS.

The criteria of this standard must be considered a minimum in providing access for persons with disabilities. Dimensions that are not stated as “maximum” or “minimum” are absolute. All dimensions are subject to conventional industry tolerances except where the requirement is stated as a range with specific minimum and maximum end points. The accessibility requirements of the I-codes can only be used if more stringent than ABAAS.

1.3.5.1 ACCESSIBLE PUBLIC ENTRANCES

All public entrances provided in accordance with Paragraph F206.4.1 (Public Entrances) of the ABAAS must have at least one entrance door complying with Section 404.3 (Automatic and Power-Assisted Doors and Gates) of the ABAAS. Where an accessible public entrance has a vestibule with exterior and interior entrance doors, at least one exterior door and one interior door must comply with Section 404.3.

1.3.6 OCCUPATIONAL SAFETY AND HEALTH REGULATIONS

The Department of Labor Occupational Safety and Health Administration (OSHA) does not directly regulate facility design; however, the construction, operation, and occupation of facilities must comply with OSHA regulations. The A/E must ensure that facilities can be constructed in a manner compliant with 29 CFR 1926; the design must anticipate facility operations and maintenance and ensure they can be performed in compliance with 29 CFR 1910; and must not subject building occupants to conditions in violation of 29 CFR 1910.

1.3.7 RANDOLPH-SHEPPARD ACT

Page 16 PBS P100 2021.v1

The Randolph-Sheppard Act provides qualified blind persons the opportunity to operate businesses on federal, state, or other property. The A/E must coordinate design with the vending facility operators to meet the needs of vendors covered by the act.

1.3.8 BUY AMERICAN ACT

Only domestic construction materials must be specified in construction contracts performed in the United States except when a waiver to the Buy American Act is granted or per the requirements in FAR 25.2.

1.3.9 FACILITY DEFINITIONS

1.3.9.1 ESSENTIAL FACILITIES

The International Building Code (IBC) has defined essential facilities as “Any building and other structure that are intended to remain operational in the event of extreme environmental loading from flood, wind, snow or earthquake". Buildings and other structures designated as essential facilities include but are not limited to: Group I-2 occupancies that have surgery or emergency treatment facilities, aviation control towers, or fire and police stations.

1.3.9.2 CRITICAL ACTION FACILITIES

The Department of Homeland Security Federal Emergency Management Agency has defined a facility as "Critical Action” when even a slight chance of flooding is too great. If critical action structures must be located within a 100 or 500-year floodplain (i.e., there are no practicable alternatives), critical infrastructure must be elevated above the 500-year base flood elevation. Critical actions include, but are not limited to, those which create or extend the useful life of structures or facilities, such as: those that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials; or hospitals and nursing homes, and housing for the elderly, which are likely to contain occupants who may not be sufficiently mobile to avoid the loss of life or injury during flood and storm events.

The US Courts has determined that all new Court Houses are critical action facilities.

1.3.9.3 MISSION CRITICAL FACILITY

The tenant will determine this designation during project development. A mission critical facility contains any operation that, if electrical supply is interrupted, will cause a negative impact on business activities, ranging from losing revenue to jeopardizing legal conformity, and loss of life. Examples may include data centers, hospitals, laboratories, public safety centers, court houses, Land Points of Entry, research facilities, law enforcement, and critical file and payroll centers. See resilience, smoke mode, electrical primary distribution, and generator system for requirements.

1.4 NATIONALLY RECOGNIZED CODES AND STANDARDS

For all design and construction work that GSA performs on federal buildings, or those functions under GSA’s construction authority, GSA has adopted the technical requirements of the nationally recognized codes and standards referred to in this subsection. The technical requirements of these codes and standards are supplemented by mandates of federal laws and Executive Orders, as well as GSA and other

Page 17 PBS P100 2021.v1 federal agency criteria. The latest edition of these codes and standards, in effect at the time of design contract solicitation, must be used throughout design and construction of the project.

All new work not identified in P100 is required to meet or exceed the applicable national codes and standards adopted by GSA. If a major portion of the building or an entire building component is being renovated, which affects/impacts multiple codes, the specific codes must be evaluated to determine if the building or component must be brought into compliance with those codes. Any questions or concerns must be discussed with the GSA project manager.

1.4.1 CONFLICTS BETWEEN CODES OR STANDARDS AND GSA

REQUIREMENTS

To ensure flexibility, GSA’s policy is to make maximum use of equivalency clauses in all codes and standards. If a conflict exists between GSA requirements and the GSA-adopted codes or standards, the GSA requirements take precedence. All such conflicts must be brought to the attention of the GSA project manager as appropriate for resolution.

1.4.2 ICC INTERNATIONAL CODES

GSA has adopted the technical requirements of the International Codes, or I-Codes published by the International Code Council (ICC). The International Green Construction Code (IGCC) is required as referenced in specific sections of P100. Exceptions to the I-Codes are noted below. Follow link to the ICC I-Codes.

1.4.3 NFPA LIFE SAFETY CODE

GSA has adopted the technical egress requirements of the National Fire Protection Association (NFPA), Life Safety Code (NFPA 101), in lieu of the technical egress requirements of the IBC. Follow link to The Life Safety Code.

1.4.4 NFPA NATIONAL ELECTRICAL CODE

GSA has adopted the technical electrical requirements of the NFPA, National Electrical Code (NFPA 70).

Follow link to the National Electrical Code.

1.4.5 NATIONAL STANDARDS

Organizations writing voluntary national standards, including NFPA; the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE); the Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA); the National Roofing Contractor Association (NRCA); the Institute of Electrical and Electronics Engineers (IEEE); and the American Society of Mechanical Engineers (ASME), publish standards on health, safety, welfare, and security that are recognized by GSA in various chapters of P100. Consistent with GSA’s long-standing policy to comply with nationally recognized standards to the extent practicable, these standards must be used as indicated in P100. The latest edition

Page 18 PBS P100 2021.v1 of the nationally recognized standards herein, in effect at the time of design contract award, must be used during design and construction.

1.4.6 WILDLAND URBAN INTERFACE

Each building must comply with the latest edition of the International Wildland-Urban Interface Code (IWUIC), promulgated by the International Code Council, if the building is at moderate or greater wildfire risk as defined in the IWIUC, using the USDA “The 2010 Wildland-Urban Interface of the Conterminous United States” map.

1.4.7 INTERAGENCY SECURITY COMMITTEE RISK MANAGEMENT PROCESS

FOR FEDERAL FACILITIES

The Risk Management Process for Federal Facilities: An Interagency Security Committee Standard (ISC) (current edition) defines the criteria and processes that those responsible for a facility's security should use in determining its security level. This standard provides an integrated, single source of physical security countermeasures and guidance on countermeasure customization for all nonmilitary federal facilities. The ISC standard incorporates several appendices (For Official Use Only - FOUO) that are not repeated here. Refer to the ISC standard for more information.

The Facility Security Committee (FSC), consisting of representatives of all federal tenants in the facility, the security organization (for example: Federal Protective Service (FPS) for General Services Administration (GSA) owned and operated facilities), and the owning or leasing department or agency, determines the Facility Security Level (FSL) for the facility.

In general, the FSC is responsible for addressing the facility-specific security issues addressed in the facility security assessment and approving the implementation of security criterion (aka countermeasures) and practices recommended by the security organization. The implementation may be a combination of operational and physical security measures based on the FSL, and the level of protection (LOP) that is deemed both appropriate and achievable. Physical security countermeasures may include architectural, interior design, landscape design, structural, mechanical, and electrical design requirements as part of the security criterion listed in the table below.

Page 19 PBS P100 2021.v1

Table 1.1 Physical Security Countermeasures

Discipline Security Criterion may include but may not be limited to:

(Note: Where discipline specific security requirements are specified and/or guidance is available, the individual P100 technical chapters provide this information)

Structural Blast Resistance - Windows Blast Resistance - Facade and Structure Blast Resistance - Progressive Collapse Blast Resistance - Under-Building Parking Burglary Resistance of Windows Walls and Non-Window Openings Windows in Critical Areas - Ballistic Protection Blast Resistance - Interior Public Spaces Blast Resistance - Mail Screening and Receiving Location Interior Windows

Mechanical Protection of Air Intakes Isolated Ventilation Systems HVAC Control CBR Detection Technology Biological Filtration - General Building Biological Filtration - Lobbies and Mailrooms Chemical Filtration Security of Ventilation Equipment and Controls Location of Utilities and Feeders Protection of Water Supply

Figure 5: Land Port of Entry San Ysidro, CA

Page 20 PBS P100 2021.v1

Discipline Security Criterion may include but may not be limited to:

(Note: Where discipline specific security requirements are specified and/or guidance is available, the individual P100 technical chapters provide this information)

Electrical Site Lighting Vehicle Screening lighting Location of Utilities and Feeders Separation of Emergency and Normal Power Distribution Emergency Generator Protection

Architecture and Interior Design Identification as Federal Facility Pedestrian Access to Site Vehicle Access Points Restricted Areas or Significant Areas and Assets Signage - Sensitive Areas Control of Parking Vehicle Access to Controlled Parking Vehicle Screening Pedestrian Access to Controlled Parking Areas Hazardous Materials Storage Receptacle and Container Placement Location of Utilities and Feeders Emergency Generator Protection Regulatory Signage Lobby Queuing Entrance Co-location Perimeter Doors & Door Locks Employee Convenience Doors Emergency Exit Doors Space Planning Access to Nonpublic Areas Security of Critical Areas Building Systems and Roof Access Publicly Accessible Restrooms Publicly Accessible Retail and Mixed-Use Space

Urban Development Landscaping

Facility Security Level Determinations and Levels of Protection (LOP) must be determined by the FSC for all new construction, renovation and major modernization projects during the requirements definition process and approved security criterion incorporated into the program of requirements. The baseline for GSA buildings is to meet the ISC Risk Management Process (current edition) and Appendices for the given Facility Security Level (FSL). See the PBS, Office of Design and Construction Project Management Guide (PM Guide) for information on Security Requirements, links to the ISC standards and guidance for developing the project program of requirements.

1.4.8 ASHRAE 90.1

The Energy Conservation and Production Act requires the U.S. Department of Energy to publish a rule on Federal Agency’s use of ANSI/ASHRAE/IES Standard 90.1. The final rule is published at 10 CFR, Parts 433-

Page 21 PBS P100 2021.v1

435. The ASHRAE Standard 90.1 listed in the CFR at the time of project solicitation will be used for the project.

1.5 STATE AND LOCAL CODES

Facilities built on federal property are exempt from state and local building codes. GSA recognizes that the national building codes are typically the foundation of state and local building codes, and that state and local codes represent important regional interests and conditions. In keeping with federal law (incl.

the Public Buildings Amendments of 1988 and the Federal Urban Land Use Act of 1949), it is GSA’s policy to comply with state and local building codes to the maximum extent practicable; however, GSA has the final authority to accept or reject any recommendation from state and/or local government officials.

1.5.1 STATE AND LOCAL GOVERNMENT CONSULTATION AND REVIEW

The Public Buildings Amendments of 1988, 40 U.S.C. 3312, direct that GSA must consider all design requirements (except procedural requirements) of state or local governments, which would apply if it were not a building constructed by a federal agency before construction or alteration. This includes zoning as well as laws related to landscape, open space, building massing and orientation, and aesthetic considerations. To meet these requirements, GSA will consult in a timely manner with appropriate local officials in preparing plans for the building.

The GSA project manager must provide the appropriate state and/or local government officials the opportunity to review the project for compatibility with local planning, design objectives, and zoning compliance. Local reviews must occur early in project development so that the design can easily respond to appropriate recommendations. These reviews include, but are not limited to, the review of drawings and specifications, making recommendations for compliance with local regulations, compatibility with local planning goals, and alignment with first responder requirements. In most cases, collaboration with local officials required to meet these standards will be in addition to, and not a substitute for, NEPA consultation with local officials. The GSA project manager must inform state and local government officials that GSA and its contractors are not allowed to pay any fee for any actions taken by the state and/or local government officials in connection with local reviews or inspections. GSA will review all recommendations made by state and local government officials. Each recommendation will be carefully considered based on adequacy, cost, and nationally accepted practice. GSA has the final authority to accept or reject any recommendation from state and/or local government officials. The GSA project manager will maintain a record of all recommendations and comments from state and local government officials for the duration of the project.

The above requirements are also directed by the Federal Urban Land Use Act of 1949 (40 USC Sec. 901-

905) and Executive Order 12072.

1.5.2 ZONING AND RELATED ISSUES

As noted elsewhere, federal law directs that GSA projects, to the greatest extent practicable, be consistent with the zoning, land-use practices, and development objectives of the local government.

Page 22 PBS P100 2021.v1

Further, GSA projects that impact the public realm must be executed only after due consideration of all requirements (other than procedural requirements) of zoning laws; laws relating to landscaping, open space, building orientation and massing, historic preservation, esthetic qualities of a building; and other similar laws of state or local government which would apply to the project if it were not a building constructed or altered by a federal agency.

An exception to state and local codes requirements noted above are local regulations on the design of systems that have a direct impact on off-site terrain or infrastructure. GSA will incorporate these requirements into the project. These systems include, but are not limited to, fire protection services, storm water runoff, erosion control, sanitary sewers and storm drains, water, gas, electrical power, communications, emergency vehicle access, roads, and bridges.

Although federal law gives GSA latitude to determine what design strategies are practicable on each project, compliance with the letter and intent of these laws demands that project teams comply with the collaborative design requirements outlined in this document.

A P100 waiver would be required for designs that deviate from compliance with local zoning, design, and development objectives.

Finally, the project team must offer local officials a timely opportunity to review and comment on the GSA project plans for compatibility with local plans, zoning, and design guidelines. Local review must be done in coordination with the project design schedule. If local officials choose not to review the design concept, the project manager must document this in the project file.

1.5.3 DESIGN REVIEW FOR CODE COMPLIANCE

The GSA project manager must provide the appropriate state and/or local government officials the opportunity to review the design for building code compliance. The GSA project manager will officially forward design submissions to the appropriate local officials.

1.5.4 CONSTRUCTION INSPECTIONS

If state and local government officials elect to perform code compliance construction inspections, the GSA project manager must include provisions in both the A/E and construction contract for coordination of the work with local officials. State and local government officials do not have the authority to reject, accept, or make changes to the work, and their inspections are done only to assist GSA in achieving code compliance.

1.6 PROGRAM-SPECIFIC GUIDES AND STANDARDS

In addition to P100, GSA and its customer agencies use several specific guides and standards that address program requirements. Use of these guides is mandatory. In case of conflicts between P100 and a specific building guide, the more stringent requirement will take precedence. If conflicts exist between the

Page 23 PBS P100 2021.v1 facilities standards and specific program and project requirements, contact the Office of Design and Construction for clarification. Refer to the GSA Pricing Desk Guide for guidance on Tenant Improvements.

1.6.1 FEDERAL COURTHOUSES

The Office of Design and Construction provides guidance on all levels of development of courthouse projects, including Congress, OMB, the Administrative Office of the United States Courts, and GSA serves as a liaison for all courthouse projects. See the Project Manager for access and detailed descriptions of the publications listed below and their application:

● Capital Security Program Handbook

● U.S. Courts Design Guide

● U.S. Marshals Service Judicial Security Systems Requirements and Specifications, Volume 3, Publication 64

● U.S. Marshals Service Requirements and Specifications for Special Purpose and Support Space

1.6.2 LAND PORTS OF ENTRY

The Office of Design and Construction provides guidance on the management of the border station program, including strategic planning, budgeting, benchmarking, and design guidance. For more information:

● United States Land Port of Entry Design Guide, see Project Manager for access

1.6.3 CHILD CARE CENTERS

Requirements for child care centers must be incorporated early in the design and planning process. The references below provide guidance on such topics as site design, emergency evacuation, food services, safety, security, mechanical, electrical, and plumbing:

● Child Care Center Design Guide (PBS-P140)

● Accreditation Criteria and Procedures of the National Association for the Education of Young

Children (NAEYC)

● Interagency Security Committee Appendix C: Child Care Level of Protection Template (FOUO)

1.6.4 SECURITY

Please see the following documents for more information on the security design requirements for federal buildings:

● The Risk Management Process: An Interagency Security Committee Standard

1.6.5 HISTORIC PRESERVATION

Performance requirements for projects affecting historic properties must be incorporated into qualification requirements, project scopes of work, and construction contracts. Project teams

Page 24 PBS P100 2021.v1 undertaking feasibility studies, repairs, alterations, or new construction within or adjoining historic properties must include a historical architect, architectural conservator, or preservation specialist, as applicable, who meets U.S. Department of Interior Professional Qualification Standards and GSA Qualification Requirements.

Projects affecting historic properties, including landscape modifications and infrastructure work involving ground disturbance, must follow the Secretary of the Interior’s Standards for the Treatment of Historic Properties in accordance with GSA ADM 1020.3 Procedures for Historic Properties, as directed by GSA’s Regional Historic Preservation Office. The performance level to be met within the standards will be determined by the historical architect or preservation specialist, who must be integrally involved in the design and analysis of all alternatives affecting restoration or rehabilitation zones as defined in the Building Preservation Plan (BPP) or Historic Structure Report (HSR). The minimum standard treatment is rehabilitation with viable design alternatives that avoid adverse effects on historic spaces and materials.

Each study and design submission must include a Section 106 Compliance Report documenting the development and analysis of preservation design alternatives in photographs, detail drawings, and project descriptions explaining how the recommended solutions address preservation issues raised by the project. Designs must follow applicable GSA Technical Guidelines and requirements for historic buildings in P100.

Contract documents for repair, cleaning, restoration, or alteration of historic building materials must include GSA technical competency requirements for work requiring specialized skills required to meet preservation standards.

1.6.6 FIRST IMPRESSIONS

The First Impressions program extends the vision of Design Excellence into public lobbies of federal buildings. These are the areas that shape a visitor’s “first impression” of the Federal Government. Lobby security is a critical part of these public spaces, and visitors should be able to seamlessly navigate these areas without delay or confusion. The goal is to provide guidance for creating world-class lobbies. Five action points form the foundation of the First Impressions program. These action points are applicable across projects of all scopes and funding levels.

● Reduce Clutter—A place for everything and everything in its place.

● Consolidate Functions—Cluster amenities by function, creating centrally located business centers.

● Unify Signage—A unified signage system…