This design narrative and federal contract opportunity document outline a project to correct water intrusion issues at the James L. King Federal Justice Building located in Miami, Florida. The project includes demolishing all existing sealants, applying a water repellent to precast concrete, granite and stucco surfaces, replacing sealants between building material joints and around windows, and conducting water testing to verify the building envelope is watertight. The General Services Administration is soliciting proposals under solicitation number 47PE0722R0011 to complete design documentation and construction for repairing sealants and installing water repellent coatings. Proposals are due by the date specified in Amendment 0003 to the solicitation. The awarded firm must meet all requirements of the General Services Administration Public Buildings Service to maintain the building's warranty and standards.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CORRECT WATER INTRUSION ISSUES
JAMES L. KING FEDERAL JUSTICE BUILDING
99 NE 4TH ST., MIAMI, FL 33132
100% DESIGN NARRATIVE
Contract No.: GS-07-P-16-UC-D-7010
Task Order: 47PE0719F0147
CEMS No.: 16-151AD
20 MARCH 2020
Prepared by CEMS Engineering, Inc.
at the direction of GSA
THIS PAGE INTENTIONALLY LEFT BLANK
T A B L E O F C O N T E N T S
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E i
TABLE OF CONTENTS
SECTION 1: PROJECT INTRODUCTION
Overview
SECTION 2: DISCIPLINE NARRATIVES
Architectural
APPENDIX A: PRE-ALTERATION ASSESSMENT...................................................................................... A
T A B L E O F C O N T E N T S
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E ii
P R O J E C T I N T R O D U C T I O N
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 1
S EC T I ON 1 :
PROJECT INTRODUCTION
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 2
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 3
OVERVIEW
1.1.1 PROJECT BACKGROUND
The General Services Administration (GSA) needs Construction Documents including full specifications necessary to repair the water intrusion issues on the east and south sides of the facility that complies with the existing manufacturer requirements to maintain the existing material warranty and GSA standards and requirements.
1.1.2 PROJECT DESCRIPTION
CEMS Engineering will provide architectural design services for a fully functional repair to the water intrusion issue that complies with the existing manufacturer requirements to maintain the existing material warranty. The objective is to maintain 24/7 operation of the building with minimal disturbance to its occupants during construction.
1.1.3 PROJECT LOCATION
The James L. King Federal Justice building is located at 99 NE 4th St in Miami, FL and was constructed in
1993. The building is situated in downtown Miami. The twelve-story, 265,000 sf building has an envelope composed primarily of glass and precast concrete with a modern design.
James L. King Federal Justice
Building
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 4
D I S C I P L I N E N A R R A T I V E S
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 5
S EC T I ON 2 :
DISCIPLINE NARRATIVES
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 6
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 7
ARCHITECTURAL
2.1.1 DESIGN REQUIREMENTS
PBS-P100 Facilities Standards for the Public Buildings Service
PBS Order 3490.2 Document security for sensitive but unclassified paper and electronic building information
PBS P-120 Project Estimating Requirements for the Public Buildings Service, Latest Edition
GSA PBS Pricing Desk Guide, 10/03/2011
PBS Construction Specifications Format and Guidelines
High Performance and Sustainability Buildings Guidance 120/1/2018
FAR 52.244-4
2.1.2 EXISTING CONDITIONS
On October 23 and 24, 2019 CEMS and Terracon performed a water test on two window assemblies and surrounding sealant joints using the test procedure complying with AAMA 501.2 “Quality Assurance and
Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems”.
Water intrusion was observed at one of the window locations. See the window report prepared by
Terracon attached at the end of this Basis of Design report.
Visual observations were made of numerous precast to precast movement joints, rough opening joints around windows, and wet seals at the window glass to aluminum frame to determine the quality of the sealant materials. None of the sealants were original to the building but were showing signs that the sealants were near the end of their performance period. Nearly all the wet seals observed were at or past their service live.
During the water testing the precast was observed to quickly absorb water indicating the lack of a water repellant or a water repellant that has far exceeded its performance capability. The envelope of the building does not have a vapor barrier so liquid water that is being absorbed into the precast and stucco is likely migrating through to the interior of the building in the form of water vapor. This water vapor will over time likely damage interior finishes and put an undue stress on the HVAC system.
Although not a water intrusion location, CEMS did observe at least one window that had a failed
Insulating Glazing Unit (IGU). IGU’s are comprised of two sheets of glass held apart a specific distance with perimeter spacers that seal the air space between the two sheets of glass. This seal prevents moisture and contaminates from getting between the two sheets of glass. When these seals fail the glass will usually “fog” over and make it undesirable to see through.
The results of the visual evaluation and testing indicted that all sealants were at or past their service life and should be replaced to prevent further damage to interior finishes.
Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 8
The results of the visual evaluation and testing indicted that all sealants were at or past their service life and should be replaced to prevent further damage to interior finishes.
2.1.3 DEMOLITION
The demolition in this project would include removing all sealants, including all wet seals. Although not a water intrusion concern, all failed Insulating Glazing Units (IGU) should be replaced.
2.1.4 NEW WORK
The main goal of this project is to address, correct, and maintain a watertight building for years to come during any wind driven water weather event. This project includes replacement of all sealants between the pre-cast and granite panels, at the perimeter of all windows and curtain wall systems, sealants within the curtain wall system, and sealants at the stucco and granite movement joints. All existing joint materials will be removed, and all joints cleaned and prepped for new sealant joint materials.
Applying a water repellant to all the precast, granite, and stucco surfaces will be done which will significantly reduce the amount of water that is absorbed into these materials and subsequently reduce the amount of water vapor that migrates to the interior of the building.
New work will also include ASTM and AAMA testing of the sealant joints to ensure no water intrusion takes place after installation of the sealants. A water test will be performed to verify adequate coverage of the exterior water repellent.
Correct Water Intrusion Issues, James L. King Federal Justice Building A P P E N D I X A
A PP EN D I X A :
PRE-ALTERATION ASSESSMENT
THIS PAGE INTENTIONALLY LEFT BLANK
Limited Asbestos, Lead Paint, and
Indoor Air Quality Assessment Report
Federal Justice Building 99 NE 4th Street
Miami, Florida December 4, 2019
Terracon Project No. H8197048
Prepared for:
CEMS Engineering, Inc.
Summerville, South Carolina
Prepared by:
Terracon Consultants, Inc.
Fort Lauderdale, Florida
Terracon Consultants, Inc. 5371 NW 33 r d Avenue, Suite 201 Fort Lauderdale, Florida 33309
P [954] 741 8282 F [954] 741 8240 terracon.com
CEMS Engineering, Inc.
320 Midland Parkway, Suite C
Summerville, South Carolina
Attn: Cory Greer, P.E.
Tel: (843) 875 3637
Email: cgreeg@cems-ae.com
Re: Limited Asbestos, Lead Paint, and Indoor Air Quality Assessment Report
99 NE 4th Street
Miami, Florida
Dear Mr. Greer:
Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report to CEMS
Engineering, Inc. The purpose of this report is to present the results of the limited asbestos, lead and Indoor Air Quality (IAQ) surveys performed on October 24, 2019 in the designated areas at the above-referenced building in Miami, Florida. These surveys were conducted in general accordance with Terracon Master Service Agreement PH8197048, dated April 25, 2019.
Asbestos was not identified in the samples collected and analyzed for this project. Lead was not detected above the detection limit in the samples collected. Suspect visible mold (SVG) or suspect moisture-impacted building materials were not observed during the assessment.
Please refer to the attached report for details.
Terracon appreciates the opportunity to provide this service to CEMS Engineering, Inc. If you have any questions regarding this report, please contact Mr. Sergio A. Adasme at (954) 629-2636.
Sincerely, Terracon Consultants, Inc.
Florida Asbestos Consulting Business License No. ZA337
Sergio A. Adasme Tom Holley, CHMM, CIH, CSP, MRSA
Environmental Services Licensed Asbestos Consultant AX-75
Mold Related Services Assessor 1154 Mold Related Services Assessor 2749
Senior Industrial Hygienist Senior Industrial Hygienist
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Project Objective
1.2 Reliance
2.0 BUILDING DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Asbestos
3.2 Lead Paint
3.3 Tape-Lift Sampling………………………………………………………………………………..3
3.4 Moisture Content in Building Materials
4.0 REGULATORY OVERVIEW
4.1 Asbestos
4.2 Lead in Construction
5.0 FINDINGS AND RECOMMENDATIONS
5.1 Asbestos
5.2 Lead Paint
5.3 Indoor Air Quality
6.0 LIMITATIONS/GENERAL COMMENTS
APPENDIX A: ASBESTOS ANALYTICAL LABORATORY RESULTS
APPENDIX B: LEAD PAINT ANALYTICAL LABORATORY RESULTS
APPENDIX C: SAMPLE LOCATION SUMMARY
• ASBESTOS
• LEAD
APPENDIX D: LICENSES AND CERTIFICATIONS
Responsive ■ Resourceful ■ Reliable 1
LIMITED ASBESTOS, LEAD PAINT, AND INDOOR AIR QUALITY
ASSESSMENT REPORT
Federal Justice Building
99 NE 4th Street
Miami, Florida 33132
1.0 INTRODUCTION
Terracon performed a limited asbestos, lead paint and IAQ survey on October 24, 2019 at the
Federal Justice Building located in Miami, Florida. The survey was performed at your request to assess potential hazardous materials that may be present to accommodate the planned future development activities at the facility.
The assessment was conducted by Terracon’s State of Florida accredited asbestos building inspector, Daniel Reyes. Terracon applicable licenses and certifications are presented in Appendix
D.
Building components were surveyed and homogeneous areas of suspect asbestos-containing materials (ACM) and lead paint were visually identified and documented. Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials and/or issues could be located in walls, in voids, below the ground or in other concealed areas.
A Mold Visual Inspection was performed under the direction of a licensed Mold Related Services
Assessor (MRSA) per Florida Statutes. If deemed necessary based on visual observations, surface tape-lift samples were collected from selected building materials and limited moisture content of suspect moisture-impacted materials located within the building was performed based on visual observation.
1.1 Project Objective
We understand this asbestos survey was requested due to the planned future development of the structure to satisfy requirements of the USEPA regulation 40 CFR 61, Subpart M, National Emission
Standards for Hazardous Air Pollutants (NESHAP). NESHAP regulations prohibit the release of asbestos fibers to the atmosphere during demolition activities. The asbestos NESHAP requires that potentially regulated ACM (RACM) be identified, classified and quantified prior to planned disturbances or demolition activities.
Paint samples were obtained to identify potential exposures sources, regulated by the
Occupational Safety and Health Administration (OSHA) 29 CFR 1926.62 and other applicable
Limited Asbestos, Lead Paint, and IAQ Report Federal Justice Building ■ Miami, Florida December 4, 2019 ■ Terracon Project No. H8197048
Responsive ■ Resourceful ■ Reliable 2
EPA regulations that could develop if lead coatings are disturbed during planned renovation activities
IAQ consulting was performed to document the presence or absence of indoor mold / moisture in general accordance with our referenced proposal and guidelines established by the American
Industrial Hygiene Association (AIHA) in Recognition, Evaluation, and Control of Indoor Mold, 2008;
Assessment, Remediation, and Post-Remediation Verification of Mold in Buildings (AIHA Guideline
3-2004); and the US Environmental Protection Agency (EPA), Mold Remediation in Schools and
Commercial Buildings, 2008.
1.2 Reliance
This report is for the exclusive use of CEMS Engineering, Inc. for the project being discussed.
Reliance by any other party on this report is prohibited without written authorization of Terracon and CEMS Engineering, Inc. Reliance on this report by CEMS Engineering, Inc. and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal, this report and Terracon’s Agreement for Services. The limitations of liability defined in Terracon’s
Agreement for Services is the aggregate limit of Terracon’s liability to CEMS Engineering, Inc.
2.0 BUILDING DESCRIPTION
The structure is occupied, and it is scheduled for future development. The structure includes twelve floors. The original construction date for the structure is 1993 according to the Miami Dade
County Property Appraiser. Interior finishes include finished wallboard systems, carpet flooring, and lay-in ceiling tiles. The exterior is finished with a stucco system.
It should be noted that Terracon was limited in the number of floors that could be accessed for observation. Terracon was given access to the East sides of the 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors. The remaining floors were not surveyed during Terracon’s October 24, 2019 site visit. Additional suspect ACM, lead paint coatings, and suspect visible mold / moisture may be present in locations that were not accessible to Terracon during the site visit.
3.0 FIELD ACTIVITIES
3.1 Asbestos
Survey activities were initiated with visual observations of the representative interior and exterior materials in the building to identify homogeneous areas of suspect ACM. Terracon was only given access to the 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors during the October 24, 2019 site visit.
A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application.
A physical assessment of each homogeneous area of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the EPA as a material which can be crumbled, pulverized or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
Responsive ■ Resourceful ■ Reliable 3
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with AHERA sampling protocols. Samples of suspect materials were collected from selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content. Thirty (30) bulk samples were collected from eight (8) homogeneous areas of suspect
ACM.
Bulk samples were submitted under chain of custody to EMSL Analytical, Inc. of Fort Lauderdale, Florida for analysis by PLM per EPA methodology EPA/600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. EMSL Analytical, Inc. is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP Accreditation
No. 500085-0). The asbestos laboratory analytical results area in Appendix A.
3.2 Lead Paint
Terracon performed a visual assessment of the interior 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors and exterior of the building to identify, locate and assess predominant painted surfaces for lead content. Representative paint chip samples were chosen from each unique combination of paint color, component and substrate.
A total of two (2) paint chips samples were collected and submitted to EMSL Analytical, Inc. of Fort
Lauderdale, Florida for analysis. The paint chips were analyzed by Flame Atomic Absorption
Spectrometry (AAS) by NIOSH 7082 and EPA method 7000B Modified. EMSL Analytical, Inc. is accredited under the Environmental Lead Laboratory Accreditation Program (AIHA-LAP, Accreditation No. 100194).
The PCL laboratory analytical results are in Appendix B.
3.3 Tape-Lift Sampling
Terracon performed a visual assessment of the interior of the building to locate and identify any potential sources of microbial growth. As no suspect visible mold growth was observed, Terracon did not collect any tape-lift samples as there were presently no signs of potential microbial growth within the surveyed 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors.
3.4 Moisture Content in Building Materials
Based on Terracon’s visual inspection of the building, moisture testing of building materials such as wallboard was deemed unnecessary. It was reported by the tenants that there was one area of the building wallboard that had water damaged. Said area was cut out and removed. Terracon
Responsive ■ Resourceful ■ Reliable 4 did not observe any signs of water damage or moisture intrusion within the 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors.
4.0 REGULATORY OVERVIEW
4.1 Asbestos
The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. It also requires the identification and classification of existing building materials prior to demolition or renovation activity. Under NESHAP, asbestos-containing building materials are classified as either friable, Category I non-friable or Category II non-friable
ACM. Friable materials are those that, when dry, may be crumbled, pulverized or reduced to powder by hand pressure. Category I non-friable ACM includes packings, gaskets, resilient floor coverings and asphalt roofing products containing more than 1% asbestos. Category II non-friable ACM are any materials other than Category I materials that contain more than 1% asbestos.
Friable ACM, Category I and Category II non-friable ACM which is in poor condition and has become friable or which will be subjected to drilling, sanding, grinding, cutting or abrading and which could be crushed or pulverized during anticipated renovation or demolition activities are considered regulated ACM (RACM).
In the State of Florida, asbestos activities are regulated by the Florida Department of Environmental
Protection (FDEP), which is enforced locally by the Miami Dade County Division of Environmental
Resource Management (DERM). RACM must be removed prior to renovation or demolition activities which will disturb the materials. The owner or operator must provide the FDEP with written notification of planned removal activities at least 10 working days prior to the commencement of asbestos abatement activities. Removal of RACM must be conducted by a State of Florida-licensed asbestos abatement contractor.
The OSHA Asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The OSHA standard requires that employee exposure to airborne asbestos fibers be maintained below 0.1 asbestos fibers per cubic centimeter of air (0.1 f/cc). The OSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
4.2 Lead in Construction
Lead is regulated by the EPA, HUD, FDEP and OSHA. The EPA and FDEP regulate lead use, removal, and disposal, and OSHA regulates lead exposure to workers. The EPA and HUD, with their small child-safety focus, define Lead-Based Paint (LBP) as paint, varnish, stain, or other applied coating that contains lead equal to or greater than 1.0 mg/cm2, 5,000 mg/kg, or 0.5% by dry weight as determined by laboratory analysis.
However, for the purpose of the OSHA lead standard, with its focus on the safety/exposure of construction workers, paint-containing lead includes any detectable concentrations of
Responsive ■ Resourceful ■ Reliable 5 metallic lead, all inorganic lead compounds, and organic lead soaps. A synopsis of the OSHA regulations (29 CFR 1926.62) and the applicability are as follows:
The OSHA Lead Standard for Construction (29 CFR 1926.62) applies to all construction work where an employee may be occupationally exposed to lead. All work related to construction, alteration, or repair (including painting and decorating) is included. The lead-in-construction standard applies to any detectable concentration of lead in paint, as even small concentrations of lead can result in unacceptable employee exposures depending upon on the method of removal and other workplace conditions.
Under this standard, construction includes, but is not limited to, the following:
◼ Demolition or salvage of structures where lead or materials containing lead are present
◼ Removal or encapsulation of materials containing lead
◼ New construction, alteration, repair, or renovation of structures, substrates, or portions containing lead, or materials containing lead
◼ Installation of products containing lead
◼ Lead contamination/emergency clean-up
◼ Transportation, disposal, storage, or containment of lead or materials containing lead on the site or location at which construction activities are performed
◼ Maintenance operations associated with construction activities described above
The Resource Conservation and Recovery Act (RCRA) gave the USEPA authority to regulate the waste status of demolition or renovation debris, including lead-containing materials. Specific notification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes. Lead containing wastes are considered hazardous waste under
RCRA if Toxicity Characteristic Leaching Procedure (TCLP) results exceed 5 milligrams per liter
(mg/L). EPA exempts from most RCRA requirements those generators whose combined hazardous waste generation is less than 100 kilograms (kg) per month.
Detectable lead quantities may constitute a lead dust hazard during renovation/demolition activities.
Personnel performing renovation/demolition activities that may disturb painted components with concentrations of lead above the designated analytical detection limit should comply with all current
OSHA regulations in order to minimize employee exposure. OSHA defines lead-based paint as a paint, which contains lead, regardless of the concentration. Currently, any proposed renovation/demolition is subject to the OSHA regulations (29 CFR 1926.62 – Lead). The OSHA regulation defines specific training requirements, engineering controls and working practices for construction personnel subject to this standard. Occupational exposure to lead occurring in the course of construction work, including maintenance activities, painting, alteration and repairs is subject to the OSHA Lead Exposure in Construction standard.
Construction work covered by 29 CFR 1926.62 includes any repair or renovation activities or other activities that disturb in-place lead-containing materials but does not include routine cleaning and repainting where there is insignificant damage, wear, or corrosion of existing lead-containing coatings or substrates. Employers must assure that no employee will be exposed to lead at
Responsive ■ Resourceful ■ Reliable 6 concentrations greater than 50 micrograms per cubic meter (g/m3) averaged over an eight-hour period without adequate protection. The OSHA Standard also establishes an action level of 30 g/m3 which if exceeded triggers the requirement for medical monitoring.
5.0 FINDINGS AND RECOMMENDATIONS
5.1 Asbestos
Asbestos was not detected in samples listed below that were collected by Terracon on the
October 24, 2019 survey. A complete list of samples and findings are included in Appendix A.
5.2 Lead Paint
Lead above laboratory reporting limits was not detected in the materials sampled by Terracon on the October 24, 2019 survey. A complete list of samples and findings are included in Appendix B.
5.3 Indoor Air Quality
No suspect visible mold growth or suspect moisture-impacted building materials were observed during the assessment.
Recommendations
Asbestos:
◼ The results of this assessment should be communicated to the demolition contractor and other subcontractors working in the building and a copy of the survey should be on-site during renovation or demolition activities.
◼ Any concealed building materials discovered during the renovation or demolition activities not identified in this report, which are suspected to contain asbestos, should be sampled by an AHERA-accredited asbestos inspector and analyzed by a NVLAP-accredited laboratory to confirm the presence or absence of asbestos prior to disturbing such materials. If the materials are found to contain asbestos, various regulations (EPA
NESHAP, Miami-Dade County DERM, and OSHA) will apply.
◼ In addition, direct contact with the Miami-Dade County DERM at (305) 372-6925 is recommended to confirm their actual regulatory requirements.
Lead Paint:
Based on the findings above, Terracon recommends the following:
Responsive ■ Resourceful ■ Reliable 7
◼ Contractors should be informed of the presence of Lead Paint in order to comply with worker protection standards – OSHA Lead in Construction Standard 29 CFR 1926.62.
If additional suspect lead coated surfaces are found during demolition activities, they should be assumed to contain lead in order to comply with worker protection standards – OSHA Lead in
Construction Standard 29 CFR 1926.62.
Indoor Air Quality:
As no suspect visible mold growth or moisture-impacted building materials were observed, there are no recommendations.
6.0 LIMITATIONS/GENERAL COMMENTS
It should be noted that suspect asbestos materials and lead paint, other than those identified during the October 24, 2019 survey may exist in locations outside of the designated surveyed areas.
Should suspect materials other than those which were identified during this survey be uncovered prior to renovation activities, those materials should be assumed asbestos-containing, and/or paint-containing lead until sampling and analysis can confirm or deny their asbestos content.
The asbestos, lead paint and limited IAQ survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed, and should not be relied upon to represent conditions at a later date.
This report has been prepared on behalf of and exclusively for use by CEMS Engineering, Inc.
for specific application to their project as discussed. This report is not a bidding document.
Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
APPENDIX A
ASBESTOS ANALYTICAL LABORATORY RESULTS
EMSL Analytical, Inc.
2700 W. Cypress Creek Rd. Ste. C108 Fort Lauderdale, FL 33309
Tel/Fax: (954) 786-9331 / (954) 941-4145 http://www.EMSL.com / pompanobeachlab@emsl.com
561905182EMSL Order:
Customer ID: TERC72
Customer PO: H8197048
Project ID:
Attention: Phone:Sergio Adasme (954) 629-2636
Fax:Terracon Consultants, Inc. (954) 741-8240
Received Date:5371 NW 33rd Ave 11/06/2019 11:18 AM
Analysis Date:Suite 201 11/07/2019
Collected Date:Fort Lauderdale, FL 33309 10/24/2019
Project: James L. King / H8197048
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
1A
561905182-0001
None DetectedNon-fibrous (Other)100%Black/Beige
Non-Fibrous
Homogeneous
Window Sealant
1B
561905182-0002
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Window Sealant
1C
561905182-0003
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Window Sealant
2A-Drywall
561905182-0004
None DetectedNon-fibrous (Other)85%Cellulose
Glass
15%
<1%
Brown/Beige
Fibrous
Homogeneous
Drywall & Joint
Compound
2A-Joint Compound
561905182-0004A
Layer Not PresentDrywall & Joint
Compound
2B-Drywall
561905182-0005
None DetectedNon-fibrous (Other)85%Cellulose
Glass
15%
<1%
Brown/Beige
Fibrous
Homogeneous
Drywall & Joint
Compound
2B-Joint Compound
561905182-0005A
Layer Not PresentDrywall & Joint
Compound
2C
561905182-0006
None DetectedNon-fibrous (Other)88%Cellulose
Glass
10%
2%
Brown/Beige
Fibrous
Homogeneous
Drywall & Joint
Compound
3A
561905182-0007
None DetectedNon-fibrous (Other)10%Cellulose
Min. Wool
45%
45%
Gray/White
Fibrous
Homogeneous
Ceiling Tile
3B
561905182-0008
None DetectedNon-fibrous (Other)10%Cellulose
Min. Wool
45%
45%
Gray/White
Fibrous
Homogeneous
Ceiling Tile
3C
561905182-0009
None DetectedNon-fibrous (Other)10%Cellulose
Min. Wool
45%
45%
Gray/White
Fibrous
Homogeneous
Ceiling Tile
4A-Baseboard
561905182-0010
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4A-Mastic
561905182-0010A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4B-Baseboard
561905182-0011
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4B-Mastic
561905182-0011A
None DetectedNon-fibrous (Other)98%Cellulose2%Yellow
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4C-Baseboard
561905182-0012
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
Initial report from: 11/11/2019 09:28:24
Page 1 of 3ASB_PLM_0008_0001 - 1.78 Printed: 11/11/2019 9:28 AM
Tel/Fax: (954) 786-9331 / (954) 941-4145 http://www.EMSL.com / pompanobeachlab@emsl.com
561905182EMSL Order:
Customer ID: TERC72
Customer PO: H8197048
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
4C-Mastic
561905182-0012A
None DetectedNon-fibrous (Other)98%Cellulose2%Yellow
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4D-Baseboard
561905182-0013
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4D-Mastic
561905182-0013A
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4E-Baseboard
561905182-0014
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4E-Mastic
561905182-0014A
None DetectedNon-fibrous (Other)97%Cellulose3%Yellow
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4F-Baseboard
561905182-0015
None DetectedNon-fibrous (Other)100%Blue
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
4F-Mastic
561905182-0015A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Baseboard (Multiple)
& Mastic
5A
561905182-0016
None DetectedNon-fibrous (Other)98%Synthetic2%Yellow
Non-Fibrous
Homogeneous
Carpet Glue (Multiple)
5B
561905182-0017
None DetectedNon-fibrous (Other)97%Synthetic3%Yellow
Non-Fibrous
Homogeneous
Carpet Glue (Multiple)
5C
561905182-0018
None DetectedNon-fibrous (Other)98%Synthetic2%Gray/Yellow
Non-Fibrous
Homogeneous
Carpet Glue (Multiple)
5D
561905182-0019
None DetectedNon-fibrous (Other)97%Synthetic3%Yellow/Clear
Non-Fibrous
Homogeneous
Carpet Glue (Multiple)
5E
561905182-0020
None DetectedNon-fibrous (Other)97%Synthetic3%Yellow/Clear
Non-Fibrous
Homogeneous
Carpet Glue (Multiple)
5F
561905182-0021
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Carpet Glue (Multiple)
6A
561905182-0022
None DetectedNon-fibrous (Other)100%Gray/Beige
Non-Fibrous
Homogeneous
Window Caulking
6B
561905182-0023
None DetectedNon-fibrous (Other)100%Gray/Beige
Non-Fibrous
Homogeneous
Window Caulking
6C
561905182-0024
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Window Caulking
7A
561905182-0025
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Concrete Panel
Caulking
7B
561905182-0026
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Concrete Panel
Caulking
7C
561905182-0027
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Concrete Panel
Caulking
Page 2 of 3ASB_PLM_0008_0001 - 1.78 Printed: 11/11/2019 9:28 AM
Tel/Fax: (954) 786-9331 / (954) 941-4145 http://www.EMSL.com / pompanobeachlab@emsl.com
561905182EMSL Order:
Customer ID: TERC72
Customer PO: H8197048
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
8A
561905182-0028
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Window Sealant
8B
561905182-0029
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Window Sealant
8C
561905182-0030
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Window Sealant
Analyst(s)
Catalina Lachowski (21)
John Polanco (15)
Catalina Lachowski, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 "Interim
Method"), but augmented with procedures outlined in the 1993 ("final") version of the method. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . Interpretation and use of test results are the responsibility of the client. All samples received in acceptable condition unless otherwise noted. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. EMSL recommends gravimetric reduction for all non -friable organically bound materials prior to analysis. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Fort Lauderdale, FL NVLAP Lab Code 500085-0
Page 3 of 3ASB_PLM_0008_0001 - 1.78 Printed: 11/11/2019 9:28 AM
APPENDIX B
LEAD PAINT ANALTICAL LABORATORY RESULTS
Client Sample Description ConcentrationLab ID Analyzed Weight Lead
Collected
EMSL Analytical, Inc.
200 Route 130 North, Cinnaminson, NJ 08077 Phone/Fax: (856) 303-2500 / (856) 786-5974 http://www.EMSL.com cinnaminsonleadlab@emsl.com
Attn: Sergio Adasme Terracon Consultants, Inc.
5371 NW 33rd Ave Suite 201 Fort Lauderdale, FL 33309
Received: 11/07/19 10:00 AM
James L. King / H8197048
Fax: (954) 741-8240 Phone: (954) 234-4853
Project:
10/24/2019Collected:
Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*
201912020 CustomerID: TERC72 CustomerPO: H8197048 ProjectID:
EMSL Order:
0.0413 Site: green paint - on metal
201912020-0001L-1 <0.048 % wt11/8/2019 g10/24/2019
0.2514 Site: white paint - on drywall
201912020-0002L-2 <0.0080 % wt11/8/2019 g10/24/2019
Phillip Worby, Lead Laboratory Manager or other approved signatory
Test Report ChmSnglePrm/nQC-7.32.3 Printed: 11/12/2019 9:19:17 AM
*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.008 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements unless specifically indicated otherwise.
Definitions of modifications are available upon request.
Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NELAP Certifications: NJ 03036, NY 10872, PA 68-00367, AIHA-LAP, LLC ELLAP 100194, A2LA 2845.01
Initial report from 11/12/2019 09:19:17 http://www.EMSL.com mailto:cinnaminsonleadlab@emsl.com
APPENDIX C
SAMPLE LOCATION SUMMARY
APPENDIX C
Miami, Florida
Terracon Project No. H8197048
ASBESTOS SURVEY SAMPLE LOCATION SUMMARY
HA No. Material Description Sample Number Sample Location Lab Results NESHAP
Category Condition
01 Window Sealant 1A 10th Floor Court Windows None Detected N/A Good
01 Window Sealant 1B 10th Floor Court Windows None Detected N/A Good
01 Window Sealant 1C 10th Floor Court Windows None Detected N/A Good
Drywall w/ White Joint
Compound 2A 10th Floor Court None Detected N/A Good
02 Drywall w/ White Joint Compound 2B 7th Floor None Detected N/A Good
02 Drywall w/ White Joint Compound 2C 4th Floor None Detected N/A Good
03 White 2’x2’ Ceiling Tile 3A 10th Floor Court None Detected N/A Good 03 White 2’x2’ Ceiling Tile 3B 7th Floor None Detected N/A Good 03 White 2’x2’ Ceiling Tile 3C 4th Floor None Detected N/A Good
04 4” Baseboard (Multiple) w/ Tan Mastic 4A 2nd Floor None Detected N/A Good
04 4” Baseboard (Multiple) w/ Tan Mastic 4B 3rd Floor None Detected N/A Good
04 4” Baseboard (Multiple) w/ Tan Mastic 4C 4th Floor None Detected N/A Good
04 4” Baseboard (Multiple) w/ Tan Mastic 4D 5th Floor None Detected N/A Good
04 4” Baseboard (Multiple) w/ Tan Mastic
4E 6th Floor None Detected N/A Good
04 4” Baseboard (Multiple) w/ Tan Mastic 4F 7th Floor None Detected N/A Good
05 Carpet Glue (Multiple) 5A 2nd Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5B 3rd Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5C 4th Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5D 5th Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5E 6th Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5F 7th Floor None Detected N/A Good
HA No. Material Description Sample Number Sample Location Lab Results NESHAP
Category Condition
06 Window Caulking 6A 10th Floor Court Windows
None Detected N/A Good
06 Window Caulking 6B 10th Floor Court Windows
None Detected N/A Good
06 Window Caulking 6C 10th Floor Court Windows
None Detected N/A Good
07 Concrete Panel Caulking 7A Outside Building, E Wall
None Detected N/A Good
07 Concrete Panel Caulking 7B Outside Building, E Wall
None Detected N/A Good
07 Concrete Panel Caulking 7C
Outside Building, E Wall
None Detected N/A Good
08 Black Window Sealant 8A 10th Floor, E Side Light Fixtures, By Windows
None Detected N/A Good
08 Black Window Sealant 8B 10th Floor, E Side Light Fixtures, By Windows
None Detected N/A Good
08 Black Window Sealant 8C 10th Floor, E Side Light Fixtures, By Windows
None Detected N/A Good
Miami, Florida
Terracon Project No. H8197048
PAINT CONTAINING LEAD SAMPLE LOCATION SUMMARY
Sample Number Material Location Component Color Substrate Condition Lab Results
(% By Weight)
L1 10th Floor Court Windows Window Green Metal Intact <0.048 % wt L2 9th Floor Wallboard White Gypsum Wallboard Intact <0.0080 % wt
APPENDIX D
LICENSES AND CERTIFICATIONS
| Cover Page |
| Table of Contents |
| Section 1: Project Introduction |
| Section 2: Discipline Narratives |
| Appendix A: Pre-Alteration Assessment |