This design narrative and federal contract opportunity document outline a project to correct water intrusion issues at the James L. King Federal Justice Building located in Miami, Florida. The project includes demolishing all existing sealants, applying a water repellent to precast concrete, granite and stucco surfaces, replacing sealants between building material joints and around windows, and conducting water testing to verify the building envelope is watertight. The General Services Administration is soliciting proposals under solicitation number 47PE0722R0011 to complete design documentation and construction for repairing sealants and installing water repellent coatings. Proposals are due by the date specified in Amendment 0003 to the solicitation. The awarded firm must meet all requirements of the General Services Administration Public Buildings Service to maintain the building's warranty and standards.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORRECT WATER INTRUSION ISSUES

JAMES L. KING FEDERAL JUSTICE BUILDING

99 NE 4TH ST., MIAMI, FL 33132

100% DESIGN NARRATIVE

Contract No.: GS-07-P-16-UC-D-7010

Task Order: 47PE0719F0147

CEMS No.: 16-151AD

20 MARCH 2020

Prepared by CEMS Engineering, Inc.

at the direction of GSA

THIS PAGE INTENTIONALLY LEFT BLANK

T A B L E O F C O N T E N T S

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E i

TABLE OF CONTENTS

SECTION 1: PROJECT INTRODUCTION

Overview

SECTION 2: DISCIPLINE NARRATIVES

Architectural

APPENDIX A: PRE-ALTERATION ASSESSMENT...................................................................................... A

T A B L E O F C O N T E N T S

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E ii

P R O J E C T I N T R O D U C T I O N

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 1

S EC T I ON 1 :

PROJECT INTRODUCTION

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 2

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 3

OVERVIEW

1.1.1 PROJECT BACKGROUND

The General Services Administration (GSA) needs Construction Documents including full specifications necessary to repair the water intrusion issues on the east and south sides of the facility that complies with the existing manufacturer requirements to maintain the existing material warranty and GSA standards and requirements.

1.1.2 PROJECT DESCRIPTION

CEMS Engineering will provide architectural design services for a fully functional repair to the water intrusion issue that complies with the existing manufacturer requirements to maintain the existing material warranty. The objective is to maintain 24/7 operation of the building with minimal disturbance to its occupants during construction.

1.1.3 PROJECT LOCATION

The James L. King Federal Justice building is located at 99 NE 4th St in Miami, FL and was constructed in

1993. The building is situated in downtown Miami. The twelve-story, 265,000 sf building has an envelope composed primarily of glass and precast concrete with a modern design.

James L. King Federal Justice

Building

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 4

D I S C I P L I N E N A R R A T I V E S

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 5

S EC T I ON 2 :

DISCIPLINE NARRATIVES

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 6

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 7

ARCHITECTURAL

2.1.1 DESIGN REQUIREMENTS

PBS-P100 Facilities Standards for the Public Buildings Service

PBS Order 3490.2 Document security for sensitive but unclassified paper and electronic building information

PBS P-120 Project Estimating Requirements for the Public Buildings Service, Latest Edition

GSA PBS Pricing Desk Guide, 10/03/2011

PBS Construction Specifications Format and Guidelines

High Performance and Sustainability Buildings Guidance 120/1/2018

FAR 52.244-4

2.1.2 EXISTING CONDITIONS

On October 23 and 24, 2019 CEMS and Terracon performed a water test on two window assemblies and surrounding sealant joints using the test procedure complying with AAMA 501.2 “Quality Assurance and

Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems”.

Water intrusion was observed at one of the window locations. See the window report prepared by

Terracon attached at the end of this Basis of Design report.

Visual observations were made of numerous precast to precast movement joints, rough opening joints around windows, and wet seals at the window glass to aluminum frame to determine the quality of the sealant materials. None of the sealants were original to the building but were showing signs that the sealants were near the end of their performance period. Nearly all the wet seals observed were at or past their service live.

During the water testing the precast was observed to quickly absorb water indicating the lack of a water repellant or a water repellant that has far exceeded its performance capability. The envelope of the building does not have a vapor barrier so liquid water that is being absorbed into the precast and stucco is likely migrating through to the interior of the building in the form of water vapor. This water vapor will over time likely damage interior finishes and put an undue stress on the HVAC system.

Although not a water intrusion location, CEMS did observe at least one window that had a failed

Insulating Glazing Unit (IGU). IGU’s are comprised of two sheets of glass held apart a specific distance with perimeter spacers that seal the air space between the two sheets of glass. This seal prevents moisture and contaminates from getting between the two sheets of glass. When these seals fail the glass will usually “fog” over and make it undesirable to see through.

The results of the visual evaluation and testing indicted that all sealants were at or past their service life and should be replaced to prevent further damage to interior finishes.

Correct Water Intrusion Issues, James L. King Federal Justice Building P A G E 8

The results of the visual evaluation and testing indicted that all sealants were at or past their service life and should be replaced to prevent further damage to interior finishes.

2.1.3 DEMOLITION

The demolition in this project would include removing all sealants, including all wet seals. Although not a water intrusion concern, all failed Insulating Glazing Units (IGU) should be replaced.

2.1.4 NEW WORK

The main goal of this project is to address, correct, and maintain a watertight building for years to come during any wind driven water weather event. This project includes replacement of all sealants between the pre-cast and granite panels, at the perimeter of all windows and curtain wall systems, sealants within the curtain wall system, and sealants at the stucco and granite movement joints. All existing joint materials will be removed, and all joints cleaned and prepped for new sealant joint materials.

Applying a water repellant to all the precast, granite, and stucco surfaces will be done which will significantly reduce the amount of water that is absorbed into these materials and subsequently reduce the amount of water vapor that migrates to the interior of the building.

New work will also include ASTM and AAMA testing of the sealant joints to ensure no water intrusion takes place after installation of the sealants. A water test will be performed to verify adequate coverage of the exterior water repellent.

Correct Water Intrusion Issues, James L. King Federal Justice Building A P P E N D I X A

A PP EN D I X A :

PRE-ALTERATION ASSESSMENT

THIS PAGE INTENTIONALLY LEFT BLANK

Limited Asbestos, Lead Paint, and

Indoor Air Quality Assessment Report

Federal Justice Building 99 NE 4th Street

Miami, Florida December 4, 2019

Terracon Project No. H8197048

Prepared for:

CEMS Engineering, Inc.

Summerville, South Carolina

Prepared by:

Terracon Consultants, Inc.

Fort Lauderdale, Florida

Terracon Consultants, Inc. 5371 NW 33 r d Avenue, Suite 201 Fort Lauderdale, Florida 33309

P [954] 741 8282 F [954] 741 8240 terracon.com

CEMS Engineering, Inc.

320 Midland Parkway, Suite C

Summerville, South Carolina

Attn: Cory Greer, P.E.

Tel: (843) 875 3637

Email: cgreeg@cems-ae.com

Re: Limited Asbestos, Lead Paint, and Indoor Air Quality Assessment Report

99 NE 4th Street

Miami, Florida

Dear Mr. Greer:

Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report to CEMS

Engineering, Inc. The purpose of this report is to present the results of the limited asbestos, lead and Indoor Air Quality (IAQ) surveys performed on October 24, 2019 in the designated areas at the above-referenced building in Miami, Florida. These surveys were conducted in general accordance with Terracon Master Service Agreement PH8197048, dated April 25, 2019.

Asbestos was not identified in the samples collected and analyzed for this project. Lead was not detected above the detection limit in the samples collected. Suspect visible mold (SVG) or suspect moisture-impacted building materials were not observed during the assessment.

Please refer to the attached report for details.

Terracon appreciates the opportunity to provide this service to CEMS Engineering, Inc. If you have any questions regarding this report, please contact Mr. Sergio A. Adasme at (954) 629-2636.

Sincerely, Terracon Consultants, Inc.

Florida Asbestos Consulting Business License No. ZA337

Sergio A. Adasme Tom Holley, CHMM, CIH, CSP, MRSA

Environmental Services Licensed Asbestos Consultant AX-75

Mold Related Services Assessor 1154 Mold Related Services Assessor 2749

Senior Industrial Hygienist Senior Industrial Hygienist

TABLE OF CONTENTS

1.0 INTRODUCTION

1.1 Project Objective

1.2 Reliance

2.0 BUILDING DESCRIPTION

3.0 FIELD ACTIVITIES

3.1 Asbestos

3.2 Lead Paint

3.3 Tape-Lift Sampling………………………………………………………………………………..3

3.4 Moisture Content in Building Materials

4.0 REGULATORY OVERVIEW

4.1 Asbestos

4.2 Lead in Construction

5.0 FINDINGS AND RECOMMENDATIONS

5.1 Asbestos

5.2 Lead Paint

5.3 Indoor Air Quality

6.0 LIMITATIONS/GENERAL COMMENTS

APPENDIX A: ASBESTOS ANALYTICAL LABORATORY RESULTS

APPENDIX B: LEAD PAINT ANALYTICAL LABORATORY RESULTS

APPENDIX C: SAMPLE LOCATION SUMMARY

• ASBESTOS

• LEAD

APPENDIX D: LICENSES AND CERTIFICATIONS

Responsive ■ Resourceful ■ Reliable 1

LIMITED ASBESTOS, LEAD PAINT, AND INDOOR AIR QUALITY

ASSESSMENT REPORT

Federal Justice Building

99 NE 4th Street

Miami, Florida 33132

1.0 INTRODUCTION

Terracon performed a limited asbestos, lead paint and IAQ survey on October 24, 2019 at the

Federal Justice Building located in Miami, Florida. The survey was performed at your request to assess potential hazardous materials that may be present to accommodate the planned future development activities at the facility.

The assessment was conducted by Terracon’s State of Florida accredited asbestos building inspector, Daniel Reyes. Terracon applicable licenses and certifications are presented in Appendix

D.

Building components were surveyed and homogeneous areas of suspect asbestos-containing materials (ACM) and lead paint were visually identified and documented. Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials and/or issues could be located in walls, in voids, below the ground or in other concealed areas.

A Mold Visual Inspection was performed under the direction of a licensed Mold Related Services

Assessor (MRSA) per Florida Statutes. If deemed necessary based on visual observations, surface tape-lift samples were collected from selected building materials and limited moisture content of suspect moisture-impacted materials located within the building was performed based on visual observation.

1.1 Project Objective

We understand this asbestos survey was requested due to the planned future development of the structure to satisfy requirements of the USEPA regulation 40 CFR 61, Subpart M, National Emission

Standards for Hazardous Air Pollutants (NESHAP). NESHAP regulations prohibit the release of asbestos fibers to the atmosphere during demolition activities. The asbestos NESHAP requires that potentially regulated ACM (RACM) be identified, classified and quantified prior to planned disturbances or demolition activities.

Paint samples were obtained to identify potential exposures sources, regulated by the

Occupational Safety and Health Administration (OSHA) 29 CFR 1926.62 and other applicable

Limited Asbestos, Lead Paint, and IAQ Report Federal Justice Building ■ Miami, Florida December 4, 2019 ■ Terracon Project No. H8197048

Responsive ■ Resourceful ■ Reliable 2

EPA regulations that could develop if lead coatings are disturbed during planned renovation activities

IAQ consulting was performed to document the presence or absence of indoor mold / moisture in general accordance with our referenced proposal and guidelines established by the American

Industrial Hygiene Association (AIHA) in Recognition, Evaluation, and Control of Indoor Mold, 2008;

Assessment, Remediation, and Post-Remediation Verification of Mold in Buildings (AIHA Guideline

3-2004); and the US Environmental Protection Agency (EPA), Mold Remediation in Schools and

Commercial Buildings, 2008.

1.2 Reliance

This report is for the exclusive use of CEMS Engineering, Inc. for the project being discussed.

Reliance by any other party on this report is prohibited without written authorization of Terracon and CEMS Engineering, Inc. Reliance on this report by CEMS Engineering, Inc. and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal, this report and Terracon’s Agreement for Services. The limitations of liability defined in Terracon’s

Agreement for Services is the aggregate limit of Terracon’s liability to CEMS Engineering, Inc.

2.0 BUILDING DESCRIPTION

The structure is occupied, and it is scheduled for future development. The structure includes twelve floors. The original construction date for the structure is 1993 according to the Miami Dade

County Property Appraiser. Interior finishes include finished wallboard systems, carpet flooring, and lay-in ceiling tiles. The exterior is finished with a stucco system.

It should be noted that Terracon was limited in the number of floors that could be accessed for observation. Terracon was given access to the East sides of the 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors. The remaining floors were not surveyed during Terracon’s October 24, 2019 site visit. Additional suspect ACM, lead paint coatings, and suspect visible mold / moisture may be present in locations that were not accessible to Terracon during the site visit.

3.0 FIELD ACTIVITIES

3.1 Asbestos

Survey activities were initiated with visual observations of the representative interior and exterior materials in the building to identify homogeneous areas of suspect ACM. Terracon was only given access to the 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors during the October 24, 2019 site visit.

A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application.

A physical assessment of each homogeneous area of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the EPA as a material which can be crumbled, pulverized or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.

Responsive ■ Resourceful ■ Reliable 3

Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with AHERA sampling protocols. Samples of suspect materials were collected from selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.

The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content. Thirty (30) bulk samples were collected from eight (8) homogeneous areas of suspect

ACM.

Bulk samples were submitted under chain of custody to EMSL Analytical, Inc. of Fort Lauderdale, Florida for analysis by PLM per EPA methodology EPA/600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. EMSL Analytical, Inc. is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP Accreditation

No. 500085-0). The asbestos laboratory analytical results area in Appendix A.

3.2 Lead Paint

Terracon performed a visual assessment of the interior 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors and exterior of the building to identify, locate and assess predominant painted surfaces for lead content. Representative paint chip samples were chosen from each unique combination of paint color, component and substrate.

A total of two (2) paint chips samples were collected and submitted to EMSL Analytical, Inc. of Fort

Lauderdale, Florida for analysis. The paint chips were analyzed by Flame Atomic Absorption

Spectrometry (AAS) by NIOSH 7082 and EPA method 7000B Modified. EMSL Analytical, Inc. is accredited under the Environmental Lead Laboratory Accreditation Program (AIHA-LAP, Accreditation No. 100194).

The PCL laboratory analytical results are in Appendix B.

3.3 Tape-Lift Sampling

Terracon performed a visual assessment of the interior of the building to locate and identify any potential sources of microbial growth. As no suspect visible mold growth was observed, Terracon did not collect any tape-lift samples as there were presently no signs of potential microbial growth within the surveyed 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors.

3.4 Moisture Content in Building Materials

Based on Terracon’s visual inspection of the building, moisture testing of building materials such as wallboard was deemed unnecessary. It was reported by the tenants that there was one area of the building wallboard that had water damaged. Said area was cut out and removed. Terracon

Responsive ■ Resourceful ■ Reliable 4 did not observe any signs of water damage or moisture intrusion within the 2nd, 3rd, 4th, 5th, 6th, 7th, 9th, and 10th floors.

4.0 REGULATORY OVERVIEW

4.1 Asbestos

The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. It also requires the identification and classification of existing building materials prior to demolition or renovation activity. Under NESHAP, asbestos-containing building materials are classified as either friable, Category I non-friable or Category II non-friable

ACM. Friable materials are those that, when dry, may be crumbled, pulverized or reduced to powder by hand pressure. Category I non-friable ACM includes packings, gaskets, resilient floor coverings and asphalt roofing products containing more than 1% asbestos. Category II non-friable ACM are any materials other than Category I materials that contain more than 1% asbestos.

Friable ACM, Category I and Category II non-friable ACM which is in poor condition and has become friable or which will be subjected to drilling, sanding, grinding, cutting or abrading and which could be crushed or pulverized during anticipated renovation or demolition activities are considered regulated ACM (RACM).

In the State of Florida, asbestos activities are regulated by the Florida Department of Environmental

Protection (FDEP), which is enforced locally by the Miami Dade County Division of Environmental

Resource Management (DERM). RACM must be removed prior to renovation or demolition activities which will disturb the materials. The owner or operator must provide the FDEP with written notification of planned removal activities at least 10 working days prior to the commencement of asbestos abatement activities. Removal of RACM must be conducted by a State of Florida-licensed asbestos abatement contractor.

The OSHA Asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The OSHA standard requires that employee exposure to airborne asbestos fibers be maintained below 0.1 asbestos fibers per cubic centimeter of air (0.1 f/cc). The OSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.

4.2 Lead in Construction

Lead is regulated by the EPA, HUD, FDEP and OSHA. The EPA and FDEP regulate lead use, removal, and disposal, and OSHA regulates lead exposure to workers. The EPA and HUD, with their small child-safety focus, define Lead-Based Paint (LBP) as paint, varnish, stain, or other applied coating that contains lead equal to or greater than 1.0 mg/cm2, 5,000 mg/kg, or 0.5% by dry weight as determined by laboratory analysis.

However, for the purpose of the OSHA lead standard, with its focus on the safety/exposure of construction workers, paint-containing lead includes any detectable concentrations of

Responsive ■ Resourceful ■ Reliable 5 metallic lead, all inorganic lead compounds, and organic lead soaps. A synopsis of the OSHA regulations (29 CFR 1926.62) and the applicability are as follows:

The OSHA Lead Standard for Construction (29 CFR 1926.62) applies to all construction work where an employee may be occupationally exposed to lead. All work related to construction, alteration, or repair (including painting and decorating) is included. The lead-in-construction standard applies to any detectable concentration of lead in paint, as even small concentrations of lead can result in unacceptable employee exposures depending upon on the method of removal and other workplace conditions.

Under this standard, construction includes, but is not limited to, the following:

◼ Demolition or salvage of structures where lead or materials containing lead are present

◼ Removal or encapsulation of materials containing lead

◼ New construction, alteration, repair, or renovation of structures, substrates, or portions containing lead, or materials containing lead

◼ Installation of products containing lead

◼ Lead contamination/emergency clean-up

◼ Transportation, disposal, storage, or containment of lead or materials containing lead on the site or location at which construction activities are performed

◼ Maintenance operations associated with construction activities described above

The Resource Conservation and Recovery Act (RCRA) gave the USEPA authority to regulate the waste status of demolition or renovation debris, including lead-containing materials. Specific notification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes. Lead containing wastes are considered hazardous waste under

RCRA if Toxicity Characteristic Leaching Procedure (TCLP) results exceed 5 milligrams per liter

(mg/L). EPA exempts from most RCRA requirements those generators whose combined hazardous waste generation is less than 100 kilograms (kg) per month.

Detectable lead quantities may constitute a lead dust hazard during renovation/demolition activities.

Personnel performing renovation/demolition activities that may disturb painted components with concentrations of lead above the designated analytical detection limit should comply with all current

OSHA regulations in order to minimize employee exposure. OSHA defines lead-based paint as a paint, which contains lead, regardless of the concentration. Currently, any proposed renovation/demolition is subject to the OSHA regulations (29 CFR 1926.62 – Lead). The OSHA regulation defines specific training requirements, engineering controls and working practices for construction personnel subject to this standard. Occupational exposure to lead occurring in the course of construction work, including maintenance activities, painting, alteration and repairs is subject to the OSHA Lead Exposure in Construction standard.

Construction work covered by 29 CFR 1926.62 includes any repair or renovation activities or other activities that disturb in-place lead-containing materials but does not include routine cleaning and repainting where there is insignificant damage, wear, or corrosion of existing lead-containing coatings or substrates. Employers must assure that no employee will be exposed to lead at

Responsive ■ Resourceful ■ Reliable 6 concentrations greater than 50 micrograms per cubic meter (g/m3) averaged over an eight-hour period without adequate protection. The OSHA Standard also establishes an action level of 30 g/m3 which if exceeded triggers the requirement for medical monitoring.

5.0 FINDINGS AND RECOMMENDATIONS

5.1 Asbestos

Asbestos was not detected in samples listed below that were collected by Terracon on the

October 24, 2019 survey. A complete list of samples and findings are included in Appendix A.

5.2 Lead Paint

Lead above laboratory reporting limits was not detected in the materials sampled by Terracon on the October 24, 2019 survey. A complete list of samples and findings are included in Appendix B.

5.3 Indoor Air Quality

No suspect visible mold growth or suspect moisture-impacted building materials were observed during the assessment.

Recommendations

Asbestos:

◼ The results of this assessment should be communicated to the demolition contractor and other subcontractors working in the building and a copy of the survey should be on-site during renovation or demolition activities.

◼ Any concealed building materials discovered during the renovation or demolition activities not identified in this report, which are suspected to contain asbestos, should be sampled by an AHERA-accredited asbestos inspector and analyzed by a NVLAP-accredited laboratory to confirm the presence or absence of asbestos prior to disturbing such materials. If the materials are found to contain asbestos, various regulations (EPA

NESHAP, Miami-Dade County DERM, and OSHA) will apply.

◼ In addition, direct contact with the Miami-Dade County DERM at (305) 372-6925 is recommended to confirm their actual regulatory requirements.

Lead Paint:

Based on the findings above, Terracon recommends the following:

Responsive ■ Resourceful ■ Reliable 7

◼ Contractors should be informed of the presence of Lead Paint in order to comply with worker protection standards – OSHA Lead in Construction Standard 29 CFR 1926.62.

If additional suspect lead coated surfaces are found during demolition activities, they should be assumed to contain lead in order to comply with worker protection standards – OSHA Lead in

Construction Standard 29 CFR 1926.62.

Indoor Air Quality:

As no suspect visible mold growth or moisture-impacted building materials were observed, there are no recommendations.

6.0 LIMITATIONS/GENERAL COMMENTS

It should be noted that suspect asbestos materials and lead paint, other than those identified during the October 24, 2019 survey may exist in locations outside of the designated surveyed areas.

Should suspect materials other than those which were identified during this survey be uncovered prior to renovation activities, those materials should be assumed asbestos-containing, and/or paint-containing lead until sampling and analysis can confirm or deny their asbestos content.

The asbestos, lead paint and limited IAQ survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed, and should not be relied upon to represent conditions at a later date.

This report has been prepared on behalf of and exclusively for use by CEMS Engineering, Inc.

for specific application to their project as discussed. This report is not a bidding document.

Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.

APPENDIX A

ASBESTOS ANALYTICAL LABORATORY RESULTS

EMSL Analytical, Inc.

2700 W. Cypress Creek Rd. Ste. C108 Fort Lauderdale, FL 33309

Tel/Fax: (954) 786-9331 / (954) 941-4145 http://www.EMSL.com / pompanobeachlab@emsl.com

561905182EMSL Order:

Customer ID: TERC72

Customer PO: H8197048

Project ID:

Attention: Phone:Sergio Adasme (954) 629-2636

Fax:Terracon Consultants, Inc. (954) 741-8240

Received Date:5371 NW 33rd Ave 11/06/2019 11:18 AM

Analysis Date:Suite 201 11/07/2019

Collected Date:Fort Lauderdale, FL 33309 10/24/2019

Project: James L. King / H8197048

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

1A

561905182-0001

None DetectedNon-fibrous (Other)100%Black/Beige

Non-Fibrous

Homogeneous

Window Sealant

1B

561905182-0002

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Window Sealant

1C

561905182-0003

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Window Sealant

2A-Drywall

561905182-0004

None DetectedNon-fibrous (Other)85%Cellulose

Glass

15%

<1%

Brown/Beige

Fibrous

Homogeneous

Drywall & Joint

Compound

2A-Joint Compound

561905182-0004A

Layer Not PresentDrywall & Joint

Compound

2B-Drywall

561905182-0005

None DetectedNon-fibrous (Other)85%Cellulose

Glass

15%

<1%

Brown/Beige

Fibrous

Homogeneous

Drywall & Joint

Compound

2B-Joint Compound

561905182-0005A

Layer Not PresentDrywall & Joint

Compound

2C

561905182-0006

None DetectedNon-fibrous (Other)88%Cellulose

Glass

10%

2%

Brown/Beige

Fibrous

Homogeneous

Drywall & Joint

Compound

3A

561905182-0007

None DetectedNon-fibrous (Other)10%Cellulose

Min. Wool

45%

45%

Gray/White

Fibrous

Homogeneous

Ceiling Tile

3B

561905182-0008

None DetectedNon-fibrous (Other)10%Cellulose

Min. Wool

45%

45%

Gray/White

Fibrous

Homogeneous

Ceiling Tile

3C

561905182-0009

None DetectedNon-fibrous (Other)10%Cellulose

Min. Wool

45%

45%

Gray/White

Fibrous

Homogeneous

Ceiling Tile

4A-Baseboard

561905182-0010

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4A-Mastic

561905182-0010A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4B-Baseboard

561905182-0011

None DetectedNon-fibrous (Other)100%Green

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4B-Mastic

561905182-0011A

None DetectedNon-fibrous (Other)98%Cellulose2%Yellow

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4C-Baseboard

561905182-0012

None DetectedNon-fibrous (Other)100%Green

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

Initial report from: 11/11/2019 09:28:24

Page 1 of 3ASB_PLM_0008_0001 - 1.78 Printed: 11/11/2019 9:28 AM

Tel/Fax: (954) 786-9331 / (954) 941-4145 http://www.EMSL.com / pompanobeachlab@emsl.com

561905182EMSL Order:

Customer ID: TERC72

Customer PO: H8197048

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

4C-Mastic

561905182-0012A

None DetectedNon-fibrous (Other)98%Cellulose2%Yellow

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4D-Baseboard

561905182-0013

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4D-Mastic

561905182-0013A

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4E-Baseboard

561905182-0014

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4E-Mastic

561905182-0014A

None DetectedNon-fibrous (Other)97%Cellulose3%Yellow

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4F-Baseboard

561905182-0015

None DetectedNon-fibrous (Other)100%Blue

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

4F-Mastic

561905182-0015A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Baseboard (Multiple)

& Mastic

5A

561905182-0016

None DetectedNon-fibrous (Other)98%Synthetic2%Yellow

Non-Fibrous

Homogeneous

Carpet Glue (Multiple)

5B

561905182-0017

None DetectedNon-fibrous (Other)97%Synthetic3%Yellow

Non-Fibrous

Homogeneous

Carpet Glue (Multiple)

5C

561905182-0018

None DetectedNon-fibrous (Other)98%Synthetic2%Gray/Yellow

Non-Fibrous

Homogeneous

Carpet Glue (Multiple)

5D

561905182-0019

None DetectedNon-fibrous (Other)97%Synthetic3%Yellow/Clear

Non-Fibrous

Homogeneous

Carpet Glue (Multiple)

5E

561905182-0020

None DetectedNon-fibrous (Other)97%Synthetic3%Yellow/Clear

Non-Fibrous

Homogeneous

Carpet Glue (Multiple)

5F

561905182-0021

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Carpet Glue (Multiple)

6A

561905182-0022

None DetectedNon-fibrous (Other)100%Gray/Beige

Non-Fibrous

Homogeneous

Window Caulking

6B

561905182-0023

None DetectedNon-fibrous (Other)100%Gray/Beige

Non-Fibrous

Homogeneous

Window Caulking

6C

561905182-0024

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Window Caulking

7A

561905182-0025

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Concrete Panel

Caulking

7B

561905182-0026

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Concrete Panel

Caulking

7C

561905182-0027

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Concrete Panel

Caulking

Page 2 of 3ASB_PLM_0008_0001 - 1.78 Printed: 11/11/2019 9:28 AM

Tel/Fax: (954) 786-9331 / (954) 941-4145 http://www.EMSL.com / pompanobeachlab@emsl.com

561905182EMSL Order:

Customer ID: TERC72

Customer PO: H8197048

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

8A

561905182-0028

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Window Sealant

8B

561905182-0029

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Window Sealant

8C

561905182-0030

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Window Sealant

Analyst(s)

Catalina Lachowski (21)

John Polanco (15)

Catalina Lachowski, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 "Interim

Method"), but augmented with procedures outlined in the 1993 ("final") version of the method. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . Interpretation and use of test results are the responsibility of the client. All samples received in acceptable condition unless otherwise noted. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. EMSL recommends gravimetric reduction for all non -friable organically bound materials prior to analysis. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Fort Lauderdale, FL NVLAP Lab Code 500085-0

Page 3 of 3ASB_PLM_0008_0001 - 1.78 Printed: 11/11/2019 9:28 AM

APPENDIX B

LEAD PAINT ANALTICAL LABORATORY RESULTS

Client Sample Description ConcentrationLab ID Analyzed Weight Lead

Collected

EMSL Analytical, Inc.

200 Route 130 North, Cinnaminson, NJ 08077 Phone/Fax: (856) 303-2500 / (856) 786-5974 http://www.EMSL.com cinnaminsonleadlab@emsl.com

Attn: Sergio Adasme Terracon Consultants, Inc.

5371 NW 33rd Ave Suite 201 Fort Lauderdale, FL 33309

Received: 11/07/19 10:00 AM

James L. King / H8197048

Fax: (954) 741-8240 Phone: (954) 234-4853

Project:

10/24/2019Collected:

Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*

201912020 CustomerID: TERC72 CustomerPO: H8197048 ProjectID:

EMSL Order:

0.0413 Site: green paint - on metal

201912020-0001L-1 <0.048 % wt11/8/2019 g10/24/2019

0.2514 Site: white paint - on drywall

201912020-0002L-2 <0.0080 % wt11/8/2019 g10/24/2019

Phillip Worby, Lead Laboratory Manager or other approved signatory

Test Report ChmSnglePrm/nQC-7.32.3 Printed: 11/12/2019 9:19:17 AM

*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.008 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements unless specifically indicated otherwise.

Definitions of modifications are available upon request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NELAP Certifications: NJ 03036, NY 10872, PA 68-00367, AIHA-LAP, LLC ELLAP 100194, A2LA 2845.01

Initial report from 11/12/2019 09:19:17 http://www.EMSL.com mailto:cinnaminsonleadlab@emsl.com

APPENDIX C

SAMPLE LOCATION SUMMARY

APPENDIX C

Miami, Florida

Terracon Project No. H8197048

ASBESTOS SURVEY SAMPLE LOCATION SUMMARY

HA No. Material Description Sample Number Sample Location Lab Results NESHAP

Category Condition

01 Window Sealant 1A 10th Floor Court Windows None Detected N/A Good

01 Window Sealant 1B 10th Floor Court Windows None Detected N/A Good

01 Window Sealant 1C 10th Floor Court Windows None Detected N/A Good

Drywall w/ White Joint

Compound 2A 10th Floor Court None Detected N/A Good

02 Drywall w/ White Joint Compound 2B 7th Floor None Detected N/A Good

02 Drywall w/ White Joint Compound 2C 4th Floor None Detected N/A Good

03 White 2’x2’ Ceiling Tile 3A 10th Floor Court None Detected N/A Good 03 White 2’x2’ Ceiling Tile 3B 7th Floor None Detected N/A Good 03 White 2’x2’ Ceiling Tile 3C 4th Floor None Detected N/A Good

04 4” Baseboard (Multiple) w/ Tan Mastic 4A 2nd Floor None Detected N/A Good

04 4” Baseboard (Multiple) w/ Tan Mastic 4B 3rd Floor None Detected N/A Good

04 4” Baseboard (Multiple) w/ Tan Mastic 4C 4th Floor None Detected N/A Good

04 4” Baseboard (Multiple) w/ Tan Mastic 4D 5th Floor None Detected N/A Good

04 4” Baseboard (Multiple) w/ Tan Mastic

4E 6th Floor None Detected N/A Good

04 4” Baseboard (Multiple) w/ Tan Mastic 4F 7th Floor None Detected N/A Good

05 Carpet Glue (Multiple) 5A 2nd Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5B 3rd Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5C 4th Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5D 5th Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5E 6th Floor None Detected N/A Good 05 Carpet Glue (Multiple) 5F 7th Floor None Detected N/A Good

HA No. Material Description Sample Number Sample Location Lab Results NESHAP

Category Condition

06 Window Caulking 6A 10th Floor Court Windows

None Detected N/A Good

06 Window Caulking 6B 10th Floor Court Windows

None Detected N/A Good

06 Window Caulking 6C 10th Floor Court Windows

None Detected N/A Good

07 Concrete Panel Caulking 7A Outside Building, E Wall

None Detected N/A Good

07 Concrete Panel Caulking 7B Outside Building, E Wall

None Detected N/A Good

07 Concrete Panel Caulking 7C

Outside Building, E Wall

None Detected N/A Good

08 Black Window Sealant 8A 10th Floor, E Side Light Fixtures, By Windows

None Detected N/A Good

08 Black Window Sealant 8B 10th Floor, E Side Light Fixtures, By Windows

None Detected N/A Good

08 Black Window Sealant 8C 10th Floor, E Side Light Fixtures, By Windows

None Detected N/A Good

Miami, Florida

Terracon Project No. H8197048

PAINT CONTAINING LEAD SAMPLE LOCATION SUMMARY

Sample Number Material Location Component Color Substrate Condition Lab Results

(% By Weight)

L1 10th Floor Court Windows Window Green Metal Intact <0.048 % wt L2 9th Floor Wallboard White Gypsum Wallboard Intact <0.0080 % wt

APPENDIX D

LICENSES AND CERTIFICATIONS

Cover Page
Table of Contents
Section 1: Project Introduction
Section 2: Discipline Narratives
Appendix A: Pre-Alteration Assessment

File details come from the government source that posted it. Updated .