This document contains responses to contractor questions regarding Solicitation Number 47PE0722R0011 from the General Services Administration to correct water intrusion issues at the JL King Federal Justice Building in Miami. The key work includes removing all existing sealants, applying a water repellent to precast, granite and stucco surfaces, replacing sealants between precast and granite panels and around windows and curtain walls, replacing sealants at stucco and granite movement joints, and conducting water intrusion testing of the new sealant joints. Security and access requirements are outlined, with contractors and all personnel requiring badging and escorts while on site. Limited laydown space, parking and availability of water and power on site are also addressed. Commissioning, fall protection, and responsibility for testing requirements are specified. No basis of design is provided for glazing, roof anchors, sealants or water repellents. The contractor must provide a lump sum price according to the RFP requirements, with the proposal due date extended to April 14, 2022 per Amendment 0002.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/31/2022
Number Drawing/ Spec.
Number (RFI) Request for Information GSA Response / Comments
1 N/A Can the proposal due date be extended to April 14th in order to incorporate RFI responses into our proposal?
See SF30 Amendment 0002
2 01 00 00 Is there a laydown area available for contractors use? If so what are the security requirements for the contractors laydown area?
The only storage/laydown space is in the sally port. Need to know what size area is needed and the types of equipment stored.
3 01 00 00 What are the material delivery requirements for this building?
Delivery will need to be done at the sally port. Drivers dropping off items do not need to be badged/cleared but a cleared escort must be present at all times.
4 01 00 00 Is there onsite parking available to the contractor?
Only have 2 parking spots which are normally filled. It will be on a day to day basis if a spot is open.
5 01 00 00 What is the security requirements for this project?
All contractors and must be HSPD12 badged or escorted by a badged contractor at all times. 1 badged person can escort 5 people. A visit request must be processed for any visitors.
6 01 00 00 Are there restricted hours in order to access the building/roof for safety inspections? Are escorts required to access the roof?
Yes and escort is required and it will be during normal hours 7am to
4pm.
7 01 00 00 Are escorts required for non-standard work hours? If so who is responsible for the cost of the escorts?
Yes, escort is required for after hours brfore 7am and after 4pm. Escort required for weekend work.
8 01 00 00 Can the site superintendent and QA-QC role be performed by one person?
Yes
9 19113 Is commissioning required for this project?
Yes. See the government's Division 01 requirements and section 08 80
00 Part 1.8.E
10 02 41 19 Is overhead protection required for this project?
Although the words "overhead protection" may not be used in the specs, section 01 59 50 Part 3.3 Indicates the contractor "…shall take all necessay precautions…" See also section 02 41 19 Part 1.4.B and Part
3.3.A.
11 Various Who is responsible for testing requirements on this project? The contractor
12 Various Does the GSA have water available onsite for contractors use? Yes
13 08 80 00 Is there a basis of design for glazing units? No
14 Various Are there roof davits/anchors available for swing stage installation? None available
15 Various Have the roof davits/anchors been tested/certified? If so please provide a copy of the most recent certification.
N/A
16 Various Is there power available for contractors swing stages?
Yes, power is available in the elevator machine room of the penthouse on roof. No exterior weatherproof GFCI outlets available.
17 07 92 00 Is there a basis of design for "joint sealants"? No
18 07 19 00 Is there a basis of design for "water repellents"? No
19 07 19 00 Please provide a copy of spec section 01 22 00 "unit prices" if required for this proposal.
N/A
20 NA
Is contractor required to provide a proposal breakdown or are we only to provide lump sum pricing according to CLIN 0001.
See RFP price proposal requirements.