T0125 State Supplied Price Sheet 7.19.24~1.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
T0125 Tower Maintenance
Solicitation number
24DPP01046
Issued by
New Jersey

About this file

This document is a state-supplied price sheet for a state and local contract opportunity for T0125 Tower Maintenance services in New Jersey. The solicitation is seeking bids for land mobile radio and broadcast services tower maintenance, including labor categories, hourly rates, and response times across three regions (South, Central, and North). The contract term is for 3 years, with the option to renew.

The pricing sheet includes all-inclusive hourly labor rates for scheduled non-emergency, weekend/holiday, and emergency response services across 8 labor categories. It also includes pricing for a variety of parts, equipment, and materials. Bidders are required to provide pricing on the specified items, with the ability to add additional equipment pricing. The contract will be awarded to the lowest responsible and responsive bidder in each region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule A Bid Solicitation 24DPP01046 T0125 Tower Maintenance: Land Mobile Radio & Broadcast Services State-Supplied Price Sheet

Bidder Name:
REGION A: SOUTH
Price Line #TOWER MAINTENANCE LABOR CATEGORIES (as designated by ANSI/ASSE A10.48-2016 standard)ALL-INCLUSIVE HOURLY LABOR RATES

(includes mobilization, maintenance, inspection, and repair costs incurred during a site visit)

Scheduled Non-Emergency Rate (Monday to Friday Only) Year 1Scheduled Non-Emergency Rate (Monday to Friday Only) Year 2Scheduled Non-Emergency Rate (Monday to Friday Only) Year 3
1A. Apprentice/Authorized Climber$0.00$0.00$0.00
2B. Technician/Competent Climber$0.00$0.00$0.00
3C. Working Foreman/Competent Rescuer$0.00$0.00$0.00
4D. Foreman/Supervisor/Qualified Person$0.00$0.00$0.00
5E. Heavy Equipment Operator/Competent Rigger$0.00$0.00$0.00
6F. Electrician$0.00$0.00$0.00
7G. Mechanical/Structural/Civil Engineer$0.00$0.00$0.00
8H. Project Manager$0.00$0.00$0.00
Weekend (Saturday & Sunday) & Holiday Rate Year 1Weekend (Saturday & Sunday) & Holiday Rate Year 2Weekened (Saturday & Sunday) & Holiday Rate Year 3
9A. Apprentice/Authorized Climber$0.00$0.00$0.00
10B. Technician/Competent Climber$0.00$0.00$0.00
11C. Working Foreman/Competent Rescuer$0.00$0.00$0.00
12D. Foreman/Supervisor/Qualified Person$0.00$0.00$0.00
13E. Heavy Equipment Operator/Competent Rigger$0.00$0.00$0.00
14F. Electrician$0.00$0.00$0.00
15G. Mechanical/Structural/Civil Engineer$0.00$0.00$0.00
16H. Project Manager$0.00$0.00$0.00
Emergency Response Rate Year 1Emergency Response Rate Year 2Emergency Response Rate Year 3
17A. Apprentice/Authorized Climber$0.00$0.00$0.00
18B. Technician/Competent Climber$0.00$0.00$0.00
19C. Working Foreman/Competent Rescuer$0.00$0.00$0.00
20D. Foreman/Supervisor/Qualified Person$0.00$0.00$0.00
21E. Heavy Equipment Operator/Competent Rigger$0.00$0.00$0.00
22F. Electrician$0.00$0.00$0.00
23G. Mechanical/Structural/Civil Engineer$0.00$0.00$0.00
24H. Project Manager$0.00$0.00$0.00
Response Times
Emergency4 hours onsite
Non-Emergency24 hours onsite - (Monday to Friday only)
Scheduled120 hours onsite - (Monday to Friday only)
Mobilization charge includes but not limited to survey, travel, setup, crane, unloading equipment and setup, rigging, unloading of material, etc.
REGION B: CENTRAL
Price Line #TOWER MAINTENANCE LABOR CATEGORIES (as designated by ANSI/ASSE A10.48-2016 standard)ALL-INCLUSIVE HOURLY LABOR RATES

(includes mobilization, maintenance, inspection, and repair costs incurred during a site visit)

Scheduled Non-Emergency (Monday to Friday only) Year 1Scheduled Non-Emergency (Monday to Friday only) Year 2Scheduled Non-Emergency (Monday to Friday only) Year 3
25A. Apprentice/Authorized Climber$0.00$0.00$0.00
25B. Technician/Competent Climber$0.00$0.00$0.00
27C. Working Foreman/Competent Rescuer$0.00$0.00$0.00
28D. Foreman/Supervisor/Qualified Person$0.00$0.00$0.00
29E. Heavy Equipment Operator/Competent Rigger$0.00$0.00$0.00
30F. Electrician$0.00$0.00$0.00
31G. Mechanical/Structural/Civil Engineer$0.00$0.00$0.00
32H. Project Manager$0.00$0.00$0.00
Weekend Rate (Saturday and Sunday Only) Year 1Weekend Rate (Saturday and Sunday Only) Year 2Weekend Rate (Saturday and Sunday Only) Year 3
33A. Apprentice/Authorized Climber$0.00$0.00$0.00
34B. Technician/Competent Climber$0.00$0.00$0.00
35C. Working Foreman/Competent Rescuer$0.00$0.00$0.00
36D. Foreman/Supervisor/Qualified Person$0.00$0.00$0.00
37E. Heavy Equipment Operator/Competent Rigger$0.00$0.00$0.00
38F. Electrician$0.00$0.00$0.00
39G. Mechanical/Structural/Civil Engineer$0.00$0.00$0.00
40H. Project Manager$0.00$0.00$0.00
Emergency Response Rate Year 1Emergency Response Rate Year 2Emergency Response Rate Year 3
41A. Apprentice/Authorized Climber$0.00$0.00$0.00
42B. Technician/Competent Climber$0.00$0.00$0.00
43C. Working Foreman/Competent Rescuer$0.00$0.00$0.00
44D. Foreman/Supervisor/Qualified Person$0.00$0.00$0.00
45E. Heavy Equipment Operator/Competent Rigger$0.00$0.00$0.00
46F. Electrician$0.00$0.00$0.00
47G. Mechanical/Structural/Civil Engineer$0.00$0.00$0.00
48H. Project Manager$0.00$0.00$0.00
Response Times
Emergency4 hours onsite
Non-Emergency24 hours onsite - (Monday to Friday only)
Scheduled120 hours onsite - (Monday to Friday only)
Mobilization charge includes but not limited to survey, travel, setup, crane, unloading equipment and setup, rigging, unloading of material, etc.
REGION C: NORTH
Price Line #TOWER MAINTENANCE LABOR CATEGORIES (as designated by ANSI/ASSE A10.48-2016 standard)ALL-INCLUSIVE HOURLY LABOR RATES

(includes mobilization, maintenance, inspection, and repair costs incurred during a site visit)

Scheduled Non-Emergency (Monday to Friday only) Year 1Scheduled Non-Emergency (Monday to Friday only) Year 2Scheduled Non-Emergency (Monday to Friday only) Year 3
49A. Apprentice/Authorized Climber$0.00$0.00$0.00
50B. Technician/Competent Climber$0.00$0.00$0.00
51C. Working Foreman/Competent Rescuer$0.00$0.00$0.00
52D. Foreman/Supervisor/Qualified Person$0.00$0.00$0.00
53E. Heavy Equipment Operator/Competent Rigger$0.00$0.00$0.00
54F. Electrician$0.00$0.00$0.00
55G. Mechanical/Structural/Civil Engineer$0.00$0.00$0.00
56H. Project Manager$0.00$0.00$0.00
Weekend Rate (Saturday and Sunday Only) Year 1Weekend Rate (Saturday and Sunday Only) Year 2Weekend Rate (Saturday and Sunday Only) Year 3
57A. Apprentice/Authorized Climber$0.00$0.00$0.00
58B. Technician/Competent Climber$0.00$0.00$0.00
59C. Working Foreman/Competent Rescuer$0.00$0.00$0.00
60D. Foreman/Supervisor/Qualified Person$0.00$0.00$0.00
61E. Heavy Equipment Operator/Competent Rigger$0.00$0.00$0.00
62F. Electrician$0.00$0.00$0.00
63G. Mechanical/Structural/Civil Engineer$0.00$0.00$0.00
64H. Project Manager$0.00$0.00$0.00
Emergency Response Rate Year 1Emergency Response Rate Year 2Emergency Response Rate Year 3
65A. Apprentice/Authorized Climber$0.00$0.00$0.00
66B. Technician/Competent Climber$0.00$0.00$0.00
67C. Working Foreman/Competent Rescuer$0.00$0.00$0.00
68D. Foreman/Supervisor/Qualified Person$0.00$0.00$0.00
69E. Heavy Equipment Operator/Competent Rigger$0.00$0.00$0.00
70F. Electrician$0.00$0.00$0.00
71G. Mechanical/Structural/Civil Engineer$0.00$0.00$0.00
72H. Project Manager$0.00$0.00$0.00
Response Times
Emergency4 hours onsite
Non-Emergency24 hours onsite - (Monday to Friday only)
Scheduled120 hours onsite - (Monday to Friday only)
Mobilization charge includes but not limited to survey, travel, setup, crane, unloading equipment and setup, rigging, unloading of material, etc.

SECTION D: ADDITIONAL LINES

73Materials & Equipment (% Mark-Up for Items not Already Listed in Schedule B)0%0%0%
ADDITIONAL COSTS

(includes miscellaneous costs) 74 Pass-Through Net Line for Additional Costs not Covered by Hourly Rate, Equipment Costs, or Mark-Up Price Lines $ $ $

Schedule B

Bidders are to provide pricing for the items listed below. Bidders may add
additional equipment pricing in the space provided. Bidders may attach additional sheets.
CostCost
ADAPTERS:CABLE:
11"-2" Round Member$104LDF4-50A 1/2"$
22" - 3" Round Member$105LDF5-50A 7/8”$
33" - 4" Round Member$106LDF6-50A 1 1/4"$
44"-5" Round Member$107LDF7-50A 1 5/8”$
55"-6" Round Member$108RG8$
66"-8" Round Member$109Messenger 1/8”$
7Galv Adapter Bracket$
8SS Adapter Bracket$MICROWAVE CABLE:
9Universal Angle Adapters$110EW52$
10Coax Support Box (galv.)$111EW63$
112EW90$
ANTENNAS:113EW127A$
11HF long wire antennas$
12SRL210C4$
13ASP680$
14DB201$CLAMP SETS:
15DB205$114VCCS-4 8” x 6”$
16DB205-L$115VCCS-6 18” x 8”$
17DB212$116VCCS-9 18” x 12”$
18DB408$
19DB420-B$CONNECTORS:
20DB806$117L4N M/F 1/2"$
21DB809$118L44P M 1/2"$
22DB810$119L44U F 1/2"$
23DB812$120L5PN M/F 7/8”$
24DB812K$121L6PN M/F 1 1/4"$
25PD201$122L7PN M/F 1 5/8”$
26PD220$123RG8$
27PD455$
28PD1142$CONNECTORS & PRESSURE WINDOWS:
29PD1167$124EW52 Connector Square$
30PD1610$125EW52 Connector Round$
31PD10108$126EW52 Pressure Window$
127EW63 Connector Round$
BUSS BARS:$128EW63 Connector Square$
32Copper 2” x 10”$129EW63 Pressure Window$
33Copper 2” x 12:$130EW90 Connector Square$
34Copper 2” x 14”$131EW90 Pressure Window$
35Copper 4” x 12”$132EW127 Connector Square$
36Copper 4” x 14”$133EW127 Connector Square$
37Copper 4” x 24”$134EW127 Pressure Window$
38Copper 4” x 32”$
CRIMP ON LUGS:JUMPERS: TYPE-N & DIN
39#2 AWG-2 hole lug$135RG8 Jumpers 18”$
40#2 Solid-2 hole lug$1363' 1/2"$
41#6 AWG-2 hole lug$1376' 1/2"$
42#6 AWG-Universal lug$1388' 1/2"$
43Crimp Splices$13910' 1/2"$
44C- Crimps$
FLEX 2 FOOT ( 2' ) JUMPERS:
DEHYDRATOR SYSTEMS:140EW52$
45Dehydrator$141EW63$
46Polyethylene Tubing$142EW90$
473/8" Male Elbow Connector$143EW127$
48Manifold$
49Needle Valve$LIGHTING:
503/8" Male Connector$144Beacon Bulbs$
51Wall Shelf$145Sidemarkers$
52Low Pressure Alarm$146Flash Tube$
147Light Shield Mount$
ENTRY'S:148Single Red Light Fixture$
534" Entry Boot & Assembly$149Control Cable (price per foot)
545" Entry Boot & Assembly$
LIGHTING SYSTEMS & ACCESSORIES:
ENTRY PANELS:
55Single Port$FTB311 System:
56Two Port 1 x 2$150308 Flash Head$
57Three Port 1 x 3$151PC311 Controller$
58Four Port 1 x 4$
59Four Port 2 x 2$FTB310 System:
60Six Port 2 x 3$152308 Flash Head$
61Eight Port 2 x 4$153PC310 Controller$
62Nine Port 3 x 3$
63Ten Port 2 x 5$FTB312 System:
64Twelve Port 3 x 4$154306 Flash Head$
65Sixteen Port 4 x 4$155PC312 Controller$
GROUNDING:FH308 Flash Head Spare Parts:
66Universal GND Kit$156Flashtube$
67Cadweld #65$157Trigger Transformer$
68Cadweld # 90$158RC101 Network$
159RC102 Network$
GROUND RODS ( 8' RODS ):160Coupling Transformer$
698' - 10' 5/8”$161Ceramic Spacer 1/2" Dia.$
708' - 10' 3/4”$162Ceramic Spacer 1/2" Dia. Tall$
163Ceramic Spacer 3/4" Dia.$
164Flashtube Socket/Lugs$
GROUND ROD CLAMPS:FH306- SINGLE TUBE FLASHHEAD:
71Copper Alloy 1/2 “$165Flashtube$
72Copper Alloy 5/8”$166Trigger Transformer$
73Galv Steel 5/8”$167RC101 Network$
168RC102 Network$
HOISTING GRIPS:169Coupling Transformer$
741/2"$170Ceramic spacer, 1/2" Dia. (short)$
757/8"$171Ceramic spacer, 1/2" Dia. (tall)$
761 1/4"$172Ceramic spacer, 3/4" Dia.$
771 5/8"$173Flashtube socket/lugs$
782 1/4"$174Side marker bulbs$
175Side marker red lens$
LIGHTING SYSTEMS & ACCESSORIES:
LIGHTNING PREVENTION SYSTEMS:
PC-311-3 Controller Spare Parts:(all materials listed are needed for 1 install)
79Capacitor, 70mf, 1kv$1763- LPS-ALS Elements$
80Capacitor, .5, 1.8kv$1771-Lot Of Attachment Wire$
81Capacitor, 3mf, tuning, 1kv$1783 Lots Mounting Hardware$
82Fuse, Power MDL8, 120V$1793- 2' Side Mounts$
83Fuse, Marker MDL5$
84Fuse, Beacon MDL20$LIGHTNING RODS:
85Relay, mode, 24V$180Solid Copper 1/2" x 2’$
86Relay, discharge, 120V$181Solid Copper 1/2" x 2’$
87Timing & Trigger Board$182Galv Steel 5/8” x 4’$
88Timing & Trigger Board$
89HV Rectifier Board$LIGHTNING RODS:
90Metal Oxide Varistor, 120V$183Copper Clad 5/8” x 8’$
184Galv Steel 5/8” x 10’$
310-4 Spare Parts:
91Capacitor, 70mf, 1kv$LINE HANGERS:
92Capacitor, 40mf, 1kv$185Snap-in: 1/2"$
93Capacitor, .5mf, 1.8kv$1867/8”$
94Capacitor, 3mf, 1kv$1871 1/4"$
95Fuse, Power, MDL8, 120V$1881 5/8”$
96Relay, mode, 24V$1892 1/4"$
97Relay, discharge$190Bolt-on: 1/2"$
98Marker Relay, 24V$1917/8”$
99Timing & Trigger Board$1921 1/4"$
100HV Rectifier Board$1931 5/8”$
101Interlock Switch$1942 1/4"$
102Metal Oxide Varistor, 120V$
103Metal Oxide Varistor, 240V$

ITEM Cost

1957/8" foam heliaxper foot$
1961&1/4" foam heliaxper foot$
1971&5/8" foam heliaxper foot$
1987/8" air heliaxper foot$
1991&5/8" air heliaxper foot$
2002&1/4" air heliaxper foot$
2013" air heliaxper foot$
2024" air heliaxper foot$
2037/8 EIA flange conn for 7/8" foamEach$
2047/8 EIA flange conn for 7/8" airEach$
2057/8 EIA flange conn for 1&1/4" foamEach$
2067/8 EIA flange conn for 1&1/4" airEach$
2077/8 EIA flange conn for 1&5/8" foamEach$
2087/8 EIA flange conn for 1&5/8" airEach$
209Type "N" male conn for 7/8" foamEach$
210Type "N" male conn for 7/8" airEach$
2111&5/8" EIA flange conn for 1&5/8" foamEach$
2121&5/8" EIA flange conn for 1&5/8" airEach$
2131&5/8" EIA flange conn for 2&1/4" airEach$
2143" EIA flange conn for 2&1/4" airEach$
2153" EIA flange conn for 3" airEach$
2163" EIA flange conn for 4" airEach$
2177/8 " hanger & angle mounting kits kitspkgs of ten$
2187/8" ground kitEach$
2197/8" hoisting gripEach$
2201&1/4" hanger& mounting kits kitspkgs of ten$
2211&1/4" ground kitEach$
2221&1/4" hoisting gripEach$
2231&5/8" hanger& mounting kits kitspkgs of ten$
2241&5/8" ground kitEach$
2251&5.8" hoisting gripEach$
2262&1/4" hanger& mounting kits kitspkgs of ten$
2272&1/4" ground kitEach$
2282&1/4" hoisting gripEach$
2293" hanger& mounting kits kitspkgs of ten$
2303" ground kitEach$
2313" hoisting gripEach$
2324" hanger& mounting kits kitspkgs of ten$
2334" ground kitEach$
2344" hoisting gripEach$
$
Tower lighting$
235110 watt incandesant side bulbsEach$
236Strobe tubes Flash FTB205AEach$
237Strobe tube top beacon FTB300Each$
238Strobe tubes Flash Series 2000/3000Each$
239Strobe tube top beacon Series 2000/3000Each$
Additional EquipmentCost
(use number for each item)
240$
241$
242$
243$
244$
245$
246$
247$
248$
249$
250$
251$
252$
253$
254$
255$
256$
257$
258$
259$
260$
261$
262$
263$
264$
265$
266$
267$
268$
269$
270$

&"Arial,Bold"Tower Maintenance 09-X-20847 &12Schedule B&"Arial,Regular"&10

&D &P

File details come from the government source that posted it. Updated .