Synopsis 24R2543 AE Large Waterfront North AOR.pdf
PDF 299 KB Posted
- Solicitation number
- N4008524R2543
About this file
This document is a federal contract synopsis for an Indefinite Delivery/Indefinite Quantity (IDIQ) architect and engineer (A&E) services contract. The solicitation is for large waterfront projects primarily supporting the NAVFAC Mid-Atlantic North Area of Responsibility (AOR), including naval installations in Portsmouth (ME), New London (CT), Newport (RI), Earle (NJ), Philadelphia (PA), and Great Lakes (IL). The contract will have a five-year ordering period with a total fee not to exceed $95,000,000, and a guaranteed minimum of $5,000, with firm-fixed price task orders to be negotiated.
Key requirements include comprehensive A&E services for waterfront and related facility projects, encompassing design, planning, site investigations, construction support, and specialized services across multiple engineering disciplines. Firms must demonstrate specialized experience in waterfront structural design, sustainability, design development, local code compliance, and construction phase services. The solicitation is unrestricted but has specific evaluation criteria focusing on specialized experience, professional qualifications, past performance, quality control, program management, small business commitment, and volume of DoD work. Electronic proposals must be submitted via the PIEE Solicitation Module by July 8, 2025, at 2:00 PM local time, with firms required to provide a detailed SF330 package demonstrating their capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24R2543 Amendment 0001.pdf | ||
| Attachment A - Past Performance Questionnaire (PPQ).pdf | ||
| Attachment C - PIEE Vendor Access Instructions.pdf | ||
| Attachment D - Pre-Proposal Inquiry Log.xlsx | XLSX spreadsheet | |
| Attachment B - Small Business Subcontracting Plan (SBSP) Template.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AE IDIQ Large Waterfront Projects N4008524R2543
NAVFAC MIDLANT North AOR Synopsis
N40085-24-R-2543 INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT FOR LARGE
WATERFRONT PROJECTS ARCHITECT & ENGINEER SERVICES IN SUPPORT OF PROJECTS
PRIMARILY IN THE NAVFAC MID-ATLANTIC NORTH AREA OF RESPONSIBILITY (AOR)
INCLUDING PORTSMOUTH NAVAL SHIPYARD (PNSY), NAVAL SUBMARINE BASE
(NAVSUBASE) NEW LONDON, NAVAL STATION (NAVSTA) NEWPORT, NAVAL WEAPONS
STATION EARL, THE PHILADELPHIA NAVY YARD, AND NAVAL STATION GREAT LAKES.
Description: ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A
STANDARD FORM SF330; ARCHITECT ENGINEER QUALIFICATIONS IS CONTAINED
HEREIN. THERE IS NO SEPARATE REQUEST FOR PROPOSALS (RFP) PACKAGE TO
DOWNLOAD.
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 CONTRACT INFORMATION
3.0 PROJECT INFORMATION
3.1 A&E Services
3.1.1 Comprehensive A&E Services
3.1.2 Facility Planning & Project Development
3.1.3 Site Investigative Services
3.1.4 Facility Analysis Services
3.1.5 Design Supporting Services
3.1.6 Construction Services
3.2 Waterfront & Related Project Types
3.2.1 Project Types
3.2.2 Types of Waterfront Facilities
3.2.3 Waterfront Related Utilities
3.2.4 Projects Ancillary to Waterfront
3.3 ADDITIONAL TECHNICAL REQUIREMENTS
3.3.1 Communications
3.3.2 Fire Protection
3.3.3 Hazardous Materials & Confined Spaces
3.4 Contract Documentation
3.4.1 Digitized Contract Drawings
3.4.2 Contract Specifications
3.4.3 RFP Packages for Design-Build Solicitation
3.4.4 Cost Estimates Policy & Procedures
3.4.5 Whole Building Design Guide
3.4.6 International System of Units
4.0 SPECIAL REQUIREMENTS
4.1 System for Award Management (SAM) Database
4.2 Registered/Licensed Firm
4.3 Business Qualifications
4.4 Conflicts of Interest
4.5 Accident Prevention Plan
4.6 Security Clearances
4.7 Selection Interviews
5.0 SELECTION CRITERIA
5.1 Criterion 1 Specialized Experience (SF330 Part 1 Section F)
5.2 Criterion 2 Professional Qualifications (SF330, Part I, Sect E & G)
5.3 Criterion 3 Past Performance (SF330, Part I, Section H)
5.4 Criterion 4 Quality Control (SF330 Part 1 Section H)
5.5 Criterion 5 Program Management, Capacity & Firm Location (SF330 Part 1 Section H)
5.6 Criterion 6 Commitment to Small Business (SF330, Part I, Section H)
5.7 Criterion 7 Volume of DOD Work (SF330 Part 1 Section H)
6.0 SF330 SUBMISSION REQUIREMENTS
7.0 ATTACHMENTS
7.1 Attachment A Past Performance Questionnaire (PPQ)
7.2 Attachment B Small Business Subcontracting Plan Template
7.3 Attachment C PIEE Vendor Access Instructions
1.0 INTRODUCTION
This procurement will result in one Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Large
Waterfront Projects Architect & Engineer (A&E) Services as required for construction, repair, replacement, demolition, alteration, and improvements, for Military Construction (MILCON) facilities and Special Projects with an emphasis on waterfront construction primarily in the NAVFAC Mid-Atlantic
North AOR but may also include work worldwide. These services will be procured in accordance with 40
USC Chapter 11, Selection of Architects and Engineers, as implemented by FAR Subpart 36.6. The majority of work is expected to be located at the following installations:
Primary North Mid-Atlantic Installations
Portsmouth Naval Shipyard (PNSY), ME
Naval Weapons Station (NWS) Earle, NJ
Naval Station (NS) Newport, RI Philadelphia Navy Yard (PNY), PA
Naval Submarine Base (NAVSUBASE)
New London, CT
NS Great Lakes, IL
2.0 CONTRACT INFORMATION
The IDIQ contract shall be for a five-year ordering period, not to exceed 60 months. The total fee for the contract term shall not exceed $95,000,000. The guaranteed minimum for the contract term is $5,000.
Firm-fixed price task orders will be negotiated for this contract. There will be no dollar limit per task order and no dollar limit per year. Estimated start date is December 2025.
This proposed contract is being solicited on an UNRESTRICTED basis. The Small Business size standard classification is North American Industrial Classification System (NAICS) Code 541330 –
Engineering Services, and the Small Business Size Standard is $25,500,000. The Government seeks the most highly qualified firm to perform the required services, based on the demonstrated competence and qualifications, in accordance with the selection criteria.
The market research study N4008524R2543 conducted by NAVFAC MIDLANT included an assessment of relevant qualifications and capabilities of potentially qualified firms. As a result of the market research analysis, a determination was made to solicit this procurement on an unrestricted basis inviting full and open competition. The NAVFAC MIDLANT small business office concurs with this decision.
3.0 PROJECT INFORMATION
The intention of this solicitation is to obtain Engineering and Design Services as required for construction, repair, replacement, demolition, alteration, and improvements, for Military Construction
(MILCON) Projects, Special Projects, or major maintenance projects for waterfront related construction.
3.1 A&E Services
3.1.1 Comprehensive A&E Services
Comprehensive A&E services are required for planning, design, and construction services in support of waterfront new construction, renovations, repairs, replacements, demolition, alteration, and/or improvement of military and other governmental facilities to include utility systems. A&E services may include multiple disciplines or single disciplines, including but not limited to project management, architectural, landscape architecture, structural, mechanical, electrical, civil, geotechnical, fire protection, cost engineering and interior designer. Specialized services for telecommunications, physical security, audio-visual, and collateral equipment may be required.
The selected firm will provide a full range of services for engineering, design, and construction phases of anticipated projects, which may include, but are not limited to any or all of the following:
A&E Services
1) Project design supervision
2) Data management
3) Project programming and master planning
4) Feasibility and concept studies
5) Space utilization
6) Design concepts/standards
7) Investigation of existing conditions
8) Analysis of design proposal solutions
9) Design of various types of waterfront facilities
10) Development of Design/Build request for proposals
11) Engineering During Construction (EDC)
12) Construction phase support for Facility Repair projects involving historic facilities or facilities located in a Historic Districts, including repair, replacement, demolition, and new construction
The Large Waterfront Projects Architect and Engineer Services expected under this contract include, but are not limited to the following paragraphs:
3.1.2 Facility Planning & Project Development
Facility planning and project development include planning studies; project programming documents (DD
Form 1391 development); developing of requirements; preparing engineering evaluations; project scope;
unit guidance or parametric cost estimating; cost valuation surveying; development of alternatives and economic analysis. In addition, analysis of proposed sites for foundations; utilities; access; constraints and identification of environmental issues; concept and site sketches; recommendations on potential utilities impacts; sustainable features; and may require enhancement of previously prepared basic documentation. DD Form 1391 documentation will be required to be prepared in the Navy's Electronic
Procurement Generator (EPG).
Facility Planning & Project Development Services
1) Strategic Planning, Master Planning, Capital Planning, and Facilities and
Infrastructure Planning, including project development
2) Strong knowledge of Federal and DoD budget process, including the Planning, Programming, & Budget Execution System (PPBES)
3) Planning studies
4) Historical studies and Historic American Engineering Record Recordation
Documentation
5) Cultural resource investigations
6) Project programming documents (DD Form 1391 development) prepared in the
Navy's Electronic Procurement Generator (EPG)
7) Functional Analysis Concept Development (FACD)/Design Charrette/other design related workshops and meetings
8) Developing of requirements
9) Preparing engineering evaluations
10) Development of project scope
11) Concept and site sketches
12) Unit guidance or parametric cost estimating
13) Project programming and requirements development
14) Conceptual pricing development
15) Analysis of proposed sites for foundations, utilities, access, and constraints
16) Development of Alternatives including Economic Analysis
17) Supporting Program Objective Memorandum (POM) exhibits, including conceptual graphics representing strategic alignment with DoD and DoN priorities
3.1.3 Site Investigative Services
Site Investigative Services utilizing the following criteria, including but not limited to the listed below.
Site Investigative Services
1) Geotechnical services including investigation in support of foundation design and site pavement recommendations (soil borings & analysis)
2) Pre-design site assessment
3) Utility location/identification
4) Site access studies including wayfinding and pedestrian corridors
5) Site topographic studies and property boundary studies, including flood zones and wetlands topographic and boundary surveys to include survey, mapping, utility investigations
6) Environmental investigations
7) Environmental soil sampling and ground water sampling and analysis
8) Storm drainage analysis
9) Traffic analysis
10) Hydrographic surveys
11) Dive inspections
12) Concrete coring
3.1.4 Facility Analysis Services
Facility Analysis Services utilizing the following criteria, including but not limited to the listed below.
Facility Analysis Services
1) General condition assessment including code compliance
2) Energy utilization studies
3) Cost valuation surveying
4) Concept and site sketches
5) Recommendations on potential utilities impacts
6) Identification of sustainable features
7) Analysis of proposed sites for foundations, utilities, access, constraints
8) Facility Life Safety Code analysis
9) Exterior and interior hazardous material surveys and analysis
10) Studies, evaluations, and testing with associated work
11) Electrical utility surveys
Facility Analysis Services
12) Seismic studies
13) Preparation of performance work statements, plans, specifications, and cost estimates
14) Identification of environmental issues
15) Asbestos, Polychlorinated Biphenyls (PCBs), and lead assessments to determine the presence of asbestos, PCBs or lead
3.1.5 Design Supporting Services
Design Supporting Services, including all supporting activities such as site investigation, surveys, design charrettes, cost estimates, etc.:
Design Supporting Services
1) Development of Design-Build (DB) Request for Proposal (RFP) packages including schematic concept drawings and environmental studies
2) Development of comprehensive Design-Bid-Build (DBB) packages that include full plans and specifications
3) Design of new construction, both vertical and horizontal
4) Alteration of facilities
5) Design Reviews
6) Value engineering
7) Life cycle costing
8) Blast Design
9) Geospatial Information Systems (GIS)
10) Building Information Modeling (BIM)
11) Maintenance and repair of real property
12) Construction Cost Estimates
13) HVAC and Mechanical experience to include work in the following areas: Energy
Supply, Cooling Generating Systems, Distribution Systems, Terminal Package Units, Controls, System Testing/Balancing, & Commercial Equipment
3.1.6 Construction Services
Construction Services utilizing the following criteria, including but not limited to the listed below.
Construction Services
1) Contractor submittal reviews
2) Field consultation and special inspections
3) Electronic Operation and Maintenance Support Information (eOMSI) with a final list of equipment installed and equipment removed during the project that is provided to the government
4) Obtaining environmental permits and regulatory approvals
5) As-built and Record Document preparation
6) Commissioning HVAC, mechanical, and electrical systems
3.2 Waterfront & Related Project Types
3.2.1 Project Types
Most projects will be new, repair, replacement, upgrade, maintenance, energy savings, and sustainability projects covering the full range of the field of engineering for a wide variety of new and existing facilities and systems, utilities, and infrastructure. Projects may include multiple disciplines or single disciplines, including general building renovation work; development of Design-Bid-Build (DBB) packages;
development of Design-Build (DB) request for proposal packages; conducting Life Safety Code Studies;
interior space planning/design studies; engineering and design of site work; paving; landscaping;
communications; fire protection; energy conservation systems; utilities; and facility planning.
3.2.2 Types of Waterfront Facilities
The types of waterfront facilities may include but are not limited to piers; wharves; quay (pronounced
“key”) walls; dry docks; bulkheads; crane rail systems; fender systems; berthing and mooring; dredging;
coastal and shoreline protection; and waterfront utilities for shore support of berthing vessels and for performing operations on piers/wharfs.
3.2.3 Waterfront Related Utilities
Waterfront related utilities may include but not limited to: steam, low and high pressure; compressed air;
fresh water; salt water; pure water; sanitary sewer; oily waste water collection; fuel; high voltage to low voltage electrical; fire protection and alarm systems; control systems; lighting; and communications
(telephone, television, fiber optics, cyber security, Supervisory Control and Data Acquisition (SCADA), and local area network (LAN)).
3.2.4 Projects Ancillary to Waterfront
Work may also include A&E design and engineering services for projects ancillary to waterfront projects, such as: buildings; roads; parking areas; railroads; bridges; culverts; foundations; retaining walls;
underground structures, etc. Engineering services may include but not limited to: failure investigation with destructive and non-destructive testing; seismic evaluation and design progressive collapse analysis;
blast resistant design; structural engineering investigations; utility systems including sanitary and storm water systems; storm water management; sediment and erosion control; earthwork; coastal and shoreline surveying; pavement design; civil engineering studies; borings; hydrographic surveys; dive inspections;
and coring.
3.3 ADDITIONAL TECHNICAL REQUIREMENTS
3.3.1 Communications
Registered Communications Distribution Designer (RCDD) may be required for telecommunication systems. Audio-visual systems may be required on this contract with services of Certified Technology
Specialist-Designer (CTS-D). CTS-D whose certification is American National Standards Institute
(ANSI) accredited under the International Organization of Standardization (ISO) and the International
Electrotechnical Commission (IEC) ISO/IEC 17024 certification of personnel.
3.3.2 Fire Protection
As defined by paragraph 1-5 of Unified Facilities Criteria (UFC) 3-600-01, Fire Protection Engineering for Facilities, this contract will require the services of a licensed fire protection engineer or sub-consultant.
3.3.3 Hazardous Materials & Confined Spaces
Asbestos, Polychlorinated Biphenyls (PCBs) and or lead-based paint assessments may be required on this contract to determine the presence of hazardous material in existing facilities or at utility points of connections. When asbestos, PCBs, or lead is found, comprehensive asbestos, PCBs, or lead surveys, to include sampling and testing, and the preparation of plans and specifications showing the location of asbestos, PCBs and lead, and specifying the procedure to be followed during construction and/or demolition for removal or abatement, will be required.
Work on and around waterfront structures, including under deck and underwater, and work in confined spaces may be required on this contract. A&E firms must be able to accept work that involves asbestos, PCBs, lead paint, contaminated groundwater/soil and other hazardous materials, work on and under waterfront structures, on active airfields, and in confined spaces.
3.4 Contract Documentation
3.4.1 Digitized Contract Drawings
A&E firms are required to prepare drawings in computer-aided design (CAD) and drafting (CADD) software application marketed by Autodesk® (AutoCAD) using version (2018 or higher) or Revit® marketed by Autodesk using version (2021 or higher) utilizing the National CADD Standards format with
NAVFAC specified modifications. Three-Dimensional (3D) renderings and Building Information
Modeling (BIM) may also be required.
3.4.2 Contract Specifications
A&E firms are required to prepare specifications in the Specifications-Kept-Intact (SPECSINTACT) program, utilizing NAVFAC Masters. The selected firm will be required to provide documents in PDF format.
3.4.3 RFP Packages for Design-Build Solicitation
While Design-Bid-Build methodologies (with the preparation of 100% Plans and Specifications) will continue to be utilized, a significant number will likely require preparation of Requests for Proposal
(RFP) packages for Design-Build solicitations using abbreviated (0% to 35%) design documentation.
Packages would include elements of site/engineering investigation, architectural programming, and functional/performance specifications. Phases and/or pre-priced contract options may be included and will be exercised at the discretion of government for 0% to 35% design, 35% to 100% design, and post construction contract award services. Options are normally exercised within several months of completing prior work; however, delays of up to one year are possible.
3.4.4 Cost Estimates Policy & Procedures
Per NAVFAC Cost Engineering Policy and Procedures, FC 1-300-09N Chapter 9 Cost Estimates, dated
17 May 2024, A&E Firms are required to prepare cost estimates utilizing the Micro-Computer Aided
Cost Estimating System (MCACES) referred to as MII. MII is one of several modules of an integrated suite of cost engineering tools called Tri-Service Automated Cost Engineering Systems (TRACES). It interfaces with other PC based support modules and databases used by the Tri-Service Cost Engineering community. A&E Firms under contract or providing services to NAVFAC may request MII software installation packages from the cognizant NAVFAC Technical Discipline Coordinator (TDC). Contact the
NAVFAC Design Manager to obtain the email address for the TDC. The A&E is to send an email to the
TDC with "MII license Request” in the subject line. The software is generally distributed to A&Es free of charge, however, the accompanying database licenses must be purchased and licensed as appropriate by the user. A&Es are to update cost estimates to the latest Cost book and regional equipment library.
Use the NAVFAC Building Cost Index (BCI) for escalation, unless supporting market analysis dictates otherwise. Update the cost estimate at each submittal to reflect the current escalation. The NAVFAC
BCI can be found on the WBDG website (https://www.wbdg.org/ffc/navy-navfac/cost-engineering-guidance-ceg) – (1) Cost Data Escalation: used to escalate direct material, labor and equipment costs from the cost data source date(s) to the date of the cost estimate – (2) Market Escalation: used to escalate the project from the date of the cost estimate to the mid-point of construction.
3.4.5 Whole Building Design Guide
All engineering and design services shall comply with the most current edition of FC 1-300-09N Navy &
Marine Corps Design Procedures, and other requirements as indicated on the Whole Building Design
Guide Web Site (www.wbdg.org). Selected A&E firm is required to have online access to web-based support programs and email via the internet for routine exchange of correspondence/information.
3.4.6 International System of Units
While it is NAVFAC’s policy to use the metric system International System of Units (SI) of measurement for projects, it should be assumed that projects executed under this contract would use imperial units.
Government’s project manager will prepare a NAVFAC metric waiver for each project task order. As defined by paragraph 1-5 of United Facilities Criteria (UFC) 3-600-01.
4.0 SPECIAL REQUIREMENTS
4.1 System for Award Management (SAM) Database
All contractors are advised that a Unique Entity Identifier is required prior to award of a contract.
Contract must complete the registration in System for Award Management (SAM) Database by selecting
“Entity Information.” Failure to register in the SAM Database may render your firm ineligible for award.
For more information, check the SAM Web site (https://www.sam.gov) Entity Information section.
4.2 Registered/Licensed Firm
In accordance with the FAR 36.601-4(b) the A&E firm must be a registered/licensed architectural and/or engineering firm to be eligible for award. Provide proof that firm is permitted by law to practice the professions of architecture or engineering, (e.g. state registration number, or a brief explanation of the firm’s licensing in jurisdictions that do not register firms, etc.). Failure to submit the required proof could result in a firm’s elimination from consideration.
JOINT VENTURE NOTE: Firms who are offering as a joint venture should include with their submission a copy of the joint venture agreement. failure to include the joint venture agreement will result in the firm’s elimination from further evaluation.
4.3 Business Qualifications
All engineering and design services shall comply with the most current edition of FC 1-300-09N Navy &
Marine Corps Design Procedures, and other requirements as indicated on the Whole Building Design
Guide Web Site (www.wbdg.org). Selected A-E firm is required to have online access to web-based support programs and email via the internet for routine exchange of correspondence/information.
4.4 Conflicts of Interest
The awarded contract will be subject to specific provisions addressing the avoidance of organizational conflicts of interest. The prime firm for this contract will be required to perform throughout the contract term.
A&E firms are advised that the selected firm, its subsidiaries or affiliates, and its sub-consultants, which design, prepare, or provide engineering services in support of construction contract documents cannot http://www.wbdg.org/ https://www/ http://www.wbdg.org/ provide construction services for the same contract. This includes concept design, preparation of project programming documents (DD Form 1391), facility siting studies, environmental assessments, geotechnical services, engineering studies and services, design-build Request for Proposals (RFPs), or other activities that result in identification of project scope and cost.
4.5 Accident Prevention Plan
A&E firm is required to submit and maintain an A&E Accident Prevention Plan (APP) in accordance with U.S. Army Corps of Engineers (USACE) Engineer Manual (EM) 385-1-1, “Safety & Health
Requirements,” for each project on this contract and Activity Hazard Analysis (AHA) for each in-field action.
4.6 Security Clearances
Key personnel, including sub-consultants, MUST be U.S. CITIZENS and able to obtain security clearances as required.
4.7 Selection Interviews
Interviews may be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to clarify information contained in the SF330 submittal. Elaborate presentations are not desired.
5.0 SELECTION CRITERIA
Firms responding to this synopsis will be evaluated to determine the most highly qualified firms to perform the required services in accordance with the published selection criteria. Failure to comply with instructions or provide complete information may affect the firm’s evaluation or disqualify the firm from further consideration. Evaluation criteria (1) through (3) are considered most important and are equal among themselves, criteria (4) through (6) are of slightly less importance and are equal among themselves, criteria (7) is of the least importance and will be used as a tiebreaker among technically equal firms. Specific selection criteria include:
1. Specialized Experience
2. Professional Qualifications
3. Past Performance
4. Quality Control
5. Program Management, Capacity, and Firm Location
6. Commitment to Small Business
7. Volume of Work
5.1 Criterion 1 Specialized Experience (SF330 Part 1 Section F)
Firms will be evaluated based on the demonstration of recent experience (on projects where design was completed within the seven (7) years preceding the date of issuance of this Synopsis) in the type of services expected to be required for this contract. The Specialized Experience Table below lists the type of experience NAVFAC is anticipating for this contract. A project does not need to demonstrate all ten
(10) types of Specialized Experience elements in order to be considered relevant. However, an individual project must demonstrate a minimum of three (3) types of Specialized Experience elements for the project to be considered relevant. Firms should list the types of specialized experience elements performance each example project satisfies from the Specialized Experience Table. Each type of experience element in this table has equal weight among themselves for evaluation purposes. Greater consideration will be given to projects that demonstrate more elements of Specialized Experience.
Specialized Experience
Specialized Experience
1) Waterfront structural design utilizing the following criteria, including but not limited to the U.S. Army Corps of Engineers Engineering Manual (EM) 1110-2 Coastal
Engineering Manual, and the Department of Defense (DoD) United Facilities Criteria
(UFC) listed below –
UFC 4-150-06 – Military Harbors and Costal Facilities
UFC 4-151-10 – General Criteria for Waterfront Construction
UFC 4-152-01 – Piers and Wharves
UFC 4-152-07 – Small Craft Berthing Facilities
2) Designing and providing full construction drawings and specifications for various facility projects including applying sustainability concepts through an integrated, cost-effective design approach and designing in accordance with Guiding Principles for Sustainable
Federal Buildings
3) Experience preparing preliminary design deliverables such as concept plans, facility planning studies, including developing facility requirements, preparing engineering evaluations, project scope, and unit guidance or parametric cost estimating
4) Experience with local codes, laws and permitting procedures
5) Conducting on-site design development workshops and functional analysis
6) Demonstrated ability to design to project budget and schedule
7) Experience preparing design-bid-build RFP packages
8) Experience preparing design-build RFP packages
9) Preparation of designs using AutoCAD and/or Revit
10) Providing construction phase services (shop drawing review, record drawings preparation, construction inspection services, and owner’s manuals).
Specialized Experience Notes
Specialized Experience Notes
Required Items:
1) Project examples with only inspection and condition assessment effort and associated report, do NOT demonstrate specialized experience, and will NOT be considered.
2) Only projects demonstrating charrette or Functional Analysis Concept Design (FACD) workshop effort with varied stakeholder groups with multiple concept presentations will be relevant.
3) Clearly define the professional service role in relationship to the owner. Specifically for
Design-Build projects, whether sub- contractor for Prime construction contractor or
Prime on Design-Build in role of Designer of Record (DOR) or if Design-Build
Preparer.
Additional Specialized Experience
The Additional Specialized Experience Table below lists types of additional specialized experience
NAVFAC may be anticipating for this contract. A project does not need to demonstrate any of the six (6) types of Additional Specialized Experience elements to be considered relevant. The initial relevance determination is based upon the Specialized Experience discussed above. However, greater consideration may be given to projects that demonstrate elements of Additional Specialized Experience. Firms should list the types of Additional Specialized Experience performance elements each example project satisfies from the Additional Specialized Experience Table. Each type of experience element in this table has equal weight among themselves.
Additional Specialized Experience
1) Experience on multiple waterfront facility types, for example submitting projects that cover different specialized experience rather than submitting projects for a single specialized experience including piers; wharves; quay walls; dry docks; bulkheads; or other water-retaining structures, specifically designed to accommodate surface and sub-surface vessel maintenance and berthing.
2) Demonstrated design at Navy facilities within the primary geographic area of the contract and indicate if the documented projects were within budget.
3) Demonstrated experience to provide Value Engineer Study or Cost and Schedule Risk
Analysis (CSRA) per FC 1-300-09N.
4) Demonstrated experience specific to Navy facility projects, demonstrating capability of
A&E firm and individual design team members (A&E staff, key personnel, sub-consultants) to work within the Navy project planning process including:
a) DD 1391 development in the Navy’s Electronic Procurement Generator (EPG)
b) DD 1391 validation procedures including cost validation
c) Demonstrated experience using the MII cost estimating software
Additional Specialized Experience
5) In-House Multidisciplinary design work in preparing Design-Build (DB) RFPs
6) Full design services performed for the Government may be considered more favorably over full design services performed for construction contractors.
Required Reference Project Details include:
Reference Project Details
1) Facility Type
2) Location
3) Owner
4) Estimated Construction Cost
5) Facility Size
6) Design Completion Date
7) Contract: Type (DB, DBB, Study, Etc.)
8) Offerors Role: (Prime, Sub, JV, Etc.)
9) Disciplines Employed for Project
Submission requirements
Provide a maximum of five (5) projects completed (project completion to be defined below) within the past seven (7) years immediately preceding the date of issuance of this notice that best demonstrate specialized experience of the proposed team in the areas outlined above. Relevant projects will be those that meet three (3) types of Specialized Experience elements. Sufficient information to determine the date of completion of the project must be included in the project description or the project will not be considered. If more than the maximum number of projects is submitted, the Government will only evaluate projects up to the maximum number authorized in the order submitted.
Project Completion Date Notes
Date of project completion is defined as –
1) For Full Design Projects, date of project completion is the date of final signed sealed plans & specifications to client.
2) For DB RFP Preparation, date of project completion is the date of final RFP documents submission.
Project Completion Date Notes
Date of project completion is defined as –
3) For DB RFP representing Contractor as DOR, date of project completion is the date of final design acceptance to client.
4) For Design Development/DD1391 and Studies/Investigations, date of project completion is the date of final submission of design development/DD1391 and/or report.
5) A project may not be considered, if insufficient information is provided to clearly show the date of completion.
All projects provided in the SF330 must be completed by the actual office/branch/regional office/individual team member (Offeror) proposed to manage and perform work under this contract.
Projects performed by proposed subcontractors and submitted under this Criterion as experience will not be considered. Projects not meeting this requirement will be excluded from consideration in the evaluation. To enable verification, firms should include the DUNS number along with each firm name in the SF330 Part I, Section F, block 25, “Firm Name” include a contract number or project identification number in block 21. Include an e- mail address and phone number for the point of contact in block 23(c).
In block 24, include in the project description the contract period of performance, date of project completion (MM/DD/YEAR), award contract value, current contract value, and a summary of the work performed that demonstrates relevance to specialized experience as outlined above.
If the contractor served as a subcontractor on a project, indicate the value of the work that firm provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the firm/team should specifically address the work performed by the joint venture partner offering/teaming on this contract.
For projects performed as a subcontractor or a joint venture involving different partners, specifically indicate the value of the work performed as a subcontractor or by those firms proposed for this contract, and identify the specific roles and responsibilities performed as a subcontractor or by those firms on the project rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration.
Likewise, if the firm/team member worked as a subcontractor on a project, the description should clearly describe the work actually performed by the firm/team member proposed for this contract and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. In block 25, clearly define professional service role in relationship to the owner.
Joint Venture Notes
1) If the firm is a joint venture, projects performed by the joint venture should be submitted; however, if there are no projects performed by the joint venture, projects must be submitted for each joint venture partner, not to exceed a total of seven (7) projects overall.
2) If a project was performed by a joint venture, and all joint venture partners are not on the team proposed for this contract, the Offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract.
3) Likewise, if the Offeror/team member worked as a subcontractor on a project, the description should clearly describe the work performed by the Offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project.
4) If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project will be eliminated from consideration.
Projects shall be submitted on the SF330 at Part I, Section F and shall be completed projects. Projects not completed will be excluded from evaluation consideration. For submittal purposes, a task order on an
IDIQ contract is considered a project, as is a stand-alone contract award.
Do not submit an IDIQ contract as an example project. Instead, list relevant task orders or stand-alone contract awards that fit within the definition above. The Government will not evaluate information provided for an IDIQ contract. Examples of project work submitted that do not conform to this requirement will not be evaluated.
All information for Criterion 1 should be submitted in the SF330, Part I, Section F. The
Government WILL NOT consider information submitted in addition to Part I, Section F in the evaluation of Criterion 1.
5.2 Criterion 2 Professional Qualifications (SF330, Part I, Sect E & G)
Firms will be evaluated on professional qualifications, competence, and experience of the proposed key personnel on example projects as outlined in the SF330, Part I, Section G, active registration as a professional engineer, registered architect, or certified planner and/or certification of staff in appropriate supporting disciplines such as, but not limited to, cost estimating, economics, and participation in example projects in the SF330, Part I, Section G. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Failure to provide a balanced workforce in the disciplines required to satisfy the requirements of the scope listed above will result in the firm being considered not qualified. Specific disciplines that must be included in key personnel are as follows:
Required Key Personnel
1) Project Managers
2) Quality Control Specialists
3) Cost Estimators
4) Architects
5) Civil Engineers
6) Structural Engineers
7) Mechanical Engineers
8) Electrical Engineers
9) Licensed Fire Protection Engineers
10) Geotechnical Engineers
11) Registered Communications Distribution
Designer (RCDD)
12) Certified Hazardous Materials Manager
(CHMM)
Firm must state that key personnel, including sub- consultants, hold a valid a security clearance, and at what level.
Submission Requirements
SF330, Part I, Section E. Provide resumes for all proposed key personnel that illustrate qualifications and experience in the work submitted for Criteria 1. Resumes are limited to one (1) page each and should indicate: professional registration, certification, licensure and/or accreditation in appropriate disciplines;
cite recent (within the past ten (10) years) experience in work on projects submitted for Criteria 1.
Indicate participation of key personnel in example projects in the SF330, Part I, Section G.
At a minimum, resumes should indicate academic qualifications, professional licensure, supplemental training or certificates, and total years’ professional experience. State whether team members are U.S.
Citizens. The A&E shall indicate whether the key personnel hold a security clearance, and if so, at what level. Indicate participation of key personnel in example projects in the SF330, Part I, Section G.
5.3 Criterion 3 Past Performance (SF330, Part I, Section H)
Firms will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires
(PPQs) or CPARS for Criterion 1 projects and may include customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. NOTE: Past performance information for projects listed under Criterion 1 may be given greater weight. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified.
Submission Requirements
SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER
CRITERION 1. IF A COMPLETED CPARS/ACASS EVALUATION IS NOT AVAILABLE, the Past
Performance Questionnaire (PPQ) (Attachment (A)) included in this notice is provided for the firm or its team members to submit to the client for each project included under Criterion 1 – Specialized
Experience. DO NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE.
IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your
SF330. If the firm is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, firms should complete and submit with their responses the first page of the
PPQ (Attachment (A)), which will provide contract and client information for the respective project(s).
Firms may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) as long as it is on the same form as posted with this Synopsis. Firms should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Naval Facilities Engineering Systems
Command Mid-Atlantic, Code CON21, Attn: James Godwin, via email at james.a.godwin41.civ@navy.mil, prior to the response date. Firms shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A&E services procurements.
However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Firms may provide any information on problems encountered and the corrective actions taken on projects submitted under Criterion 1—Specialized Experience. Firms may also address any adverse past performance issues. Information shall not exceed two double-sided pages (or four single-sided pages) in total.
Awards, letters of commendation, certificates of appreciation, etc. shall not be submitted and will not be considered in the evaluation.
5.4 Criterion 4 Quality Control (SF330 Part 1 Section H)
Firms will be evaluated on the strength of the quality control program proposed by the firm to ensure quality products and services under this contract and means of ensuring quality services from their consultants/subcontractors. A maximum of five (5) pages (one-sided) is allowed for Criterion 4 response.
Offerors exceed the page limit, the first five (5) pages will be evaluated and pages after page five (5) will not be evaluated.
Submission Requirements
Describe the quality control program that will be utilized for all deliverables of this contract and the management approach for quality control processes and procedures. The description shall:
mailto:james.a.godwin41.civ@navy.mil
Quality Control Program Description
1) Explain the quality control program including an example of how the plan has worked for one of the projects submitted as part of SF330, Section F or how the plan will work if it has not been used previously.
2) Provide a quality control process chart showing the inter-relationship of the management and team components.
3) Describe specific quality control processes and procedures proposed for this contract including technical accuracy of and assurance of overall coordination of plans and specifications, construction cost estimates, and engineering and design services.
4) Identify the quality control manager and any other key personnel responsible for the quality control program and a description of their roles and responsibilities.
5) Describe how the firm’s quality control program extends to management of subcontractors and specialty consultants.
5.5 Criterion 5 Program Management, Capacity & Firm Location
(SF330 Part 1 Section H)
Firms will be evaluated on the firm’s ability to plan for and manage work under the contract, and the capacity to accomplish the work in the required time. A&E firm must provide organization and office management as evidenced by management approach (management plan for these projects), and personnel roles in organization, in particular, management's approach/plan to engage and fully integrate with consultants and sub-consultants, ability to perform multiple tasks simultaneously. In addition, provide timely responsiveness to the requests, and an understanding of national and regional standards, programs for interagency coordination requirements. A maximum of five (5) pages (one-sided) is allowed for Criterion
5 response. If Offerors exceed the page limit, the first five (5) pages will be evaluated and pages after page five (5) will not be evaluated.
NOTE: In response to Criterion 5, the organizational chart provided in SF330, Part 1, Section
D is permissible to be referenced in SF330, Part 1, Section H. The remaining response for
Criterion 5 must be included in SF330, Part 1, Section H.
Firms will be evaluated on the locations of their office or offices that will be performing the work under this contract and demonstrated knowledge of the general geographic areas in which projects could be located. Evaluation of firms will include consideration of their location within the general geographic area of the anticipated projects, primarily at Portsmouth Naval Shipyard, ME; Naval Station Newport, RI;
Naval Submarine Base New London, CT; Naval Weapons Station Earle, NJ; Philadelphia Navy Yard, PA; and Naval Station Great Lakes, IL.
Submission Requirements
Program Management, Capacity, & Firm Location Submission
1) Provide an organizational chart for the team and discuss the management plan for this contract and personnel roles in the organization.
2) Describe the ability of the firm to manage, coordinate, and work effectively with team members, both internal staff and consultants.
3) Discuss the history of working relationships with team members, including joint venture partners where applicable. Teams with a demonstrated history of working together may be considered more favorably.
4) Describe the firm’s present workload and the availability of the project team (including consultants) for the specified contract performance period. Describe the ability of the firm to provide qualified backup staffing for key personnel to ensure continuity of services. General statements of availability/capacity may be considered less favorably.
5) Describe the firm’s ability to sustain the loss of key personnel while accomplishing work within required time limits, to ensure continuity of services and ability to meet surges in unexpected project demands and ability to adhere to schedules and budgets.
6) Indicate location of the office(s) that will be performing the work, including main offices, branch offices, and offices of team members. Evaluation of firms will include considerations of their location within the primary geographic area of the anticipated projects.
7) Provide a narrative describing the team’s knowledge of this IDIQ’s primary geographic
Area of Responsibility (AOR) to be covered by this contract.
8) Provide a narrative to describe the team’s ability to provide timely response to requests for on-site support. Provide timelines and examples of the team’s success in providing this response. Include both primary and sub-contractor support as required. Include both primary and sub-contractor support as required. Teams with a demonstrated history of providing timely support may be considered more favorably.
5.6 Criterion 6 Commitment to Small Business (SF330, Part I, Section H)
Firms will be evaluated in terms of the extent to which they have identified and committed to: Small
Business (SB); Small Disadvantaged Business (SDB); Women-Owned Small Business (WOSB);
Historically Underutilized Business Zone Small Business (HUBZoneSB); Veteran-Owned Small
Business (VOSB); and Service-Disabled Veteran Owned Small Business (SDVOSB). In addition, if applicable, Historically Black Colleges or Universities and Minority Institutions (HBCU/MI) in performance of this contract, whether as a joint venture, teaming arrangement, or subcontractor.
The Government will evaluate proposals based on: (A) Past performance in utilization of small business concerns, and (B) Participation of small business concerns for this requirement.
Submission Requirements
In support of (A), all firms shall provide historical data on utilization of SB, SDB, WOSB, HUBZone
SB, VOSB, SDVOSB, and if applicable, HBCU/MI.
Large Businesses shall submit three (3) “final” or “most recent” Individual Subcontracting Reports
(ISRs) for similar contracts of relative size that show compliance with utilizing the various types of small business firms noted in above text. If ISRs are not FINAL or MOST RECENT, they will not be considered. If subcontracting goals were not met, provide an explanation. If Individual Subcontracting
Reports were not applicable to the similar contracts noted, large businesses shall submit other documentation that shows their utilization of the various types of small business firms for the contracts.
Small Businesses shall also submit documentation that shows their utilization of the various types of small business firms for similar contracts of relative size.
In support of (B), large businesses shall submit a draft Small Business Subcontracting Plan, in which they will be evaluated on the extent to which they identify and commit to the published Small Business
Subcontracting Program. The Secretary of the Navy has assigned the Naval Facilities Engineering
Systems Command goals for FY2025 in terms of percentages of total planned subcontracting dollars for utilization of small businesses. Demonstrate the plan to meet these goals:
NAVFAC FY2025
Small Business Subcontracting Goals
Small Business Program Goal
Small Business (SB) 40%
Historically Underutilized Business
Zone (HUBZone) 3%
Service-Disabled Veteran-Owned
Small Business (SDVOSB) 5%
Small Disadvantaged Business (SDB) 5%
Women-Owned Small Business
(WOSB)
9%
If a large business firm is selected for award, a Small Business Subcontracting Plan, in accordance with
FAR 19.7 and DFAR 219.7, will be required and incorporated into the contract award. A draft Small
Business Subcontracting Plan is not required from small businesses; however, small businesses shall submit similar information on the extent to which they identify and commit to subcontracting to large business (LB), SB, SDB, WOSB, HUBZone SB, VOSB, SDVOSB, and HBCU/MI if applicable in the performance of this contract.
The Small Business size standard classification is North American Industry Classification System
(NAICS) Code 541330, (Engineering Services), size standard ($22,500,000).
The attached Small Business Subcontracting Plan Template, Attachment (B), shall be used by large businesses to complete the draft-subcontracting plan. Firms shall submit their “draft” Small Business
Subcontracting Plans utilizing this template, and ONLY this template.
5.7 Criterion 7 Volume of DOD Work (SF330…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .