SV0204-26 AMD 00002.pdf
PDF 2 MB Posted
- Attached to
- UNICOR ROOF AND HVAC REPLACEMENT - LEXINGTON
- Solicitation number
- SV0204-26
About this file
This document is Amendment 00002 (AMD 00002) to Solicitation SVO204-26, issued by Federal Prison Industries (UNICOR) on April 13, 2026, with an effective date of 04/13/2026. The amendment provides the government's responses to questions submitted by prospective offerors following a mandatory site visit conducted on 03/24/2026 at the UNICOR Warehouse facility in Washington, DC. The amendment identifies a secure laydown area within the warehouse on the included facility map and clarifies numerous aspects of the project scope, which involves HVAC replacement, asbestos abatement, roofing system replacement, and related construction work at a federal correctional facility.
Key clarifications provided include: contractor-provided staging is the contractor's responsibility; allowable working hours are 7:00 AM to 3:00 PM EST; steam service typically shuts down in May; the owner will remove roof ballast prior to roofing demolition; the contractor must make all steam radiator connections; steam coil specifications are referenced on drawing M601 dated 4/24/2025; no temporary office is required; contractors should expect six working hours per day excluding entry/exit procedures; all contracted staff require background checks including fingerprinting and badging; FBOP security training (one-hour presentation) is mandatory; up to four escorts will be provided daily with visual oversight capability; liquidated damages are $1,250.00 per day; the 10-day submittal review turnaround applies; the facility is federal property with the Owner as the Authority Having Jurisdiction; and the contractor must provide a 25-year roof manufacturer's warranty and 5-year installer warranty per specification section 075423. The amendment confirms that no BIM modeling, fire sprinkler modifications, or general building permits are required, and that the Owner is responsible for third-party special inspection costs.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable jmorgan Sticky Note Both cages will not provided jmorgan Sticky Note The COMM and Chemical rooms will not be provided.
jmorgan Sticky Note There are two restrooms that will be accessible.
jmorgan Sticky Note The staff offices are occupied.
jmorgan Sticky Note The warehouse has dock access.
Ref Question 1 Section H – Contractor’s
Responsibility Can the Contractor utilize contractor-owned shipping containers within the secure prison yard for material and equipment staging during the performance of the work? Please refer to the warehouse-laydown area
2 Section F – Performance Site / Section H – Contractor’s Responsibility
Is the Contractor permitted to use any existing UNICOR warehouse or on-site facilities for staging of materials, tools, and equipment, or must all staging be contractor-provided? Yes, staging is the responsibility of the con
3 Section F – Delivery & Performance / Performance Site; Section H – Special Security Requirements
Please confirm the allowable working hours and days for construction activities within the facility, including any restrictions due to security operations or inmate movement. 7:00 AM -3:00 PM EST
4 Section C – Scope of Work (HVAC replacement and asbestos abatement); Section H
– Contractor’s Responsibility
Given that the facility utilizes a steam heating system and asbestos abatement is required in affected areas, please confirm when the facility typically shuts down steam service for the season. Usually May.
5 Section C – Scope of Work (removal of existing ballasted EPDM roofing system)
Please confirm whether the Government intends to retain any existing ballast material for reuse (e.g., site fill or maintenance purposes), or if all ballast is to be removed and disposed of by the Contractor.
Per work note #1 on roof demolition drawings and spec 070150.19, para.
3.2C, the Owner will remove the roof ballast prior to roofing demo for each roof area. Coordinate the schedule with the Owner.
6 Section C – Scope of Work (HVAC replacement); Section H – Contractor’s Responsibility
During the site visit, it was indicated that facility maintenance personnel are responsible for aspects of the steam system. Please confirm whether prison maintenance staff will perform final connections to the new steam radiators, or if this work is to be completed by the Contractor as part of the project scope.
The Contractor is to make all connections.
Additional Question The steam coil part numbers identified in the drawings/specifications cannot be located through standard suppliers. Please confirm the correct manufacturer and model number, or provide an approved equal specification/substitution for the required steam coils.
Response: See Steam Heating Coil Schedule on drawing M601 dated 4/24/2025 for steam coil data, capacities and Manuf/Model numbers.
mailto:mquinn@mtnt.net jmorgan Highlight jmorgan Highlight
RFI No. Spec Reference Question / Clarification Request Response
1 General Please provide as-builts, if available, for additional existing conditions information. No drawings are available.
2 Spec 015930 Please confirm typical processing duration for NCIC/background clearances and whether work may proceed with temporary badging while clearances are pending.
The average is 6 weeks. Work can begin with temporary cleared approval.
Solicitation, Contract Period of Performance, page 10 of 79
Regarding the Period of performance, based on the work scope complexity and weather constraints, facility logistics, and limited work hours, we recommend extending the period of performance to 365 calendar days from NTP for this work scope.
The Government will retain the current period of performance.
Solicitation, page marked "THE
FOLLOWING INFORMATION IS
REQUIRED TO BE COMPLETED BY THE
OFFEROR," page 7 of 79
Where would the government like this form included in offerors' proposals, and is the form required if that information is already within our proposal?
Return the completed SF1442 to include page 7 with the proposal.
Solicitation, Section J, list of Attachments
The government provides a Past Performance Questionnaire but gives no requirements. Are PPQs to be filled out and returned to the government or submitted with the proposal?
Please provide the completed PPQs and submit with the proposal.
General question about past performance
As personnel often move on from positions it is sometimes difficult to get PPQs filled out. Can offerors use PPQs filled out for previous proposals or existing CPARS? Yes
Solicitation, Part V: Proposal Submission Requirements
Solicitation states: "Offeror must ensure all SAM documentation is completed and current, Representations and Certifications FAR 52.212-3."
There is no Representations and Certifications section in the solicitation to fill out. Please clarify what is needed here as reps and certs can usually be fulfilled by ensuring all requirements in SAM.gov are filled out -- Will stating that SAM.gov is up to date and providing screenshots meet both of these requirements?
Ensure all SAM documentation is completed and current. The offerors current SAM registration is required and will be utilized to access reps and certs.
8 General Due to complex requirements, will the government provide a 10-day extension so offerors may collect all required information and analyze responses to RFIs?
Please monitor www.sam.gov for any all solicitation updates.
Solicitation, Past Performance, page
Solicitation states: "The projects submitted must be self performed…." As this is an 8(a) set aside and these types of firms subcontract a percentage of work and don't normally self perform work, will the government please clarify this statement?
The awardee will be required to be a current 8(a) participant and self preform the necessary amount work according to the SBA standards.
10 Drawings A101-A109 Provide square footage breakdown by roof areas A–F. General dimensions are shown on the drawings. Bidders are responsible to determine areas and quantities.
11 SOW / General Clarify phasing constraints in occupied secure facility.
The Government will require a detailed schedule with a critical path. The contractor must adhere to the schedule so key phases of the project aren't skipped over or missed.
12 Roof Plans What temporary weatherproofing is required during roof replacement?
The contractor shall determine the means and methods to protect the building and will be responsible for any damage.
13 Scope Narrative Provide roof core data and deck condition verification. Roof core info is included in the BOD attachment and a description of the roofing assembles is indicated on the architectural drawings.
14 Fall Protection Scope Confirm structural capacity for new roofing and railing systems.
The new roofing system weighs less than the existing system being removed, so adequate capacity is assumed.
15 HVAC Scope Provide equipment schedules and controls requirements.
See the mechanical drawings.
16 Abatement Scope Provide asbestos and mold quantities/locations. See the notes on the architectural drawings, the hazmat specifications, and the hazmat report in the BOD.
17 Access Requirements Clarify access hours, escorts, and restrictions impacting productivity.
18 SF1442 / Bid Bond Confirm bond percentages and submission timelines. Bond percentages are found on Page 20-21 of the solicitation.
19 Davis-Bacon KY20260090 Confirm correct wage determination and no pending updates. General Decision Number 20260090, dated 01/30/2026.
20 Period of Performance Confirm liquidated damages and milestones. liquidated damages are $1,250.00 per day
21 General Conditions Confirm review durations for submittals and RFIs. 10 day turn-around or less
22 General Conditions Clarify handling of unforeseen conditions. Notify the CO and COR immediately
23 General If PPQs are expected to be filled out, can offerors use CPARS or previously submitted PPQs? CPARS can be provided
24 Section L - Schedule The schedule requires "all milestones referred to in the statement of work" however there are no milestones or other schedule activities listed in any provided documentation. Please provide milestone and schedule requirements.
The offeror will submitt a detailed schedule with all features of work to include milestones with the proposal. The offeror will establish the milestones as well as the flow of work.
1. Please confirm if the contractor be required to have a temporary office at the project site at a location specified by the owner? No requirement on Facilities side.
No temporary office will be required.
2. Please confirm the amount of time the contractor can expect on entry and exit methods. Time for processing has too many variables to estimate a time frame.
Contractors should expect to work six hours per day, not including entry and exit procedures.
3. Please clarify the entry and exit procedures on a daily basis. Contractor employees must clear the metal detector, and all belongings must clear through scanner. All tools must be accounted for.
4. Please confirm the background check includes a 60+ page background and includes fingerprinting and badging? All contracted staff performing services will require a background check that will include fingerprinting and badging.
5. Please confirm at any time during the project, the contractor be required to resubmit NCIC packets for already approved and working employees? No
6. Please confirm that credit checks be subject to approval for contractor submitted employees to be able to work on-site? Yes
7. Please confirm if the contractor be required to attend and go through training by the FBOP regarding security protocol before working on-site? If so, how long should the contractor accommodate for this? Yes. Contractors are typically required to attend a one-hour presentation.
8. Please clarify if certain subcontractors and vendors that are visiting the site for a short period of time (1-2 weeks) be required to submit the long background form?
No
9. Please clarify how many Fog, Rain, or inclement weather days are included in the contract? The performance period assigned to the project has considered historical inclement weather averages. If unseasonal conditions arise the Government may grant consideration for that time.
10. Please clarify being the extensive time frame for this project and variables that slow the project down, can the contractor produce an order on all material for the project and receive payment? If so, will product be required to be stored on-site at an owner specified location? Will there be a location large enough to store all material for this project? (This remits any price increases during the duration of the project) Yes, materials that can be stored on site, secured, and properly inventoried by the Governments will be eligible for payment. The contractor will be responsible for determining the volume of materials that can be stored on site. The Government will not provide assistance in transporting any materials to or from the Warehouse-laydown area.
11. Please clarify if there any material from the project that is being demoed that the Owner is wanting to keep/store? Any special recycling requirements? See specs, including Section 017419.
12. Please clarify if dumpsters be allowed to remain within the facility at the discretion of the owner of location with a locked top grate? Full dumpsters will be required to be staged in a secure area for 24 hours before they can exit the secure confines of the institution. Partially full dumpsters can remain in approved areas determined by the Captain.
13. Please confirm if dumpsters are allowed to remain within the facility, once ready to remove, will the dumpster have to remain for a 24 hour period before removal?
Please see the response under question 12.
14. Please clarify if any locked tool box be allowed to be within the facility on an overnight basis locked and inventoried by the owner? Yes
15. Please clarify if the contractor will be able to store a storage container within the perimeter? This will not be necessary with the space in the warehouse.
16. Please clarify if there any restrictions on special motorized equipment that are not allowed within the facility compound? This pertains to Security and the Captain will have to approve. Must specify the type of vehicle
17. Please clarify any testing, inspection, or startup services that the contractor is responsible for inquiring and paying thereof. See the specifications for required scope of services. The “Commissioning Provider” will be the responsibility of the Owner.
18. Please clarify being the involvement of a third-party architecture firm, whom will be the deciding inspecting party, provide punch list/inspections, approve payments and other contractual items? The Owner is the approving authority with assistance from the AE.
19. Please clarify how many escorts will the contractor be given and how many contractors can be within the supervision of each escort? Will the contractor be able to work at different locations with separate crews? Up to four escorts will be provided daily. Each escort must be able to visually see all the contractors working in a particular work area free of obstacles. Contractors will be allowed to work in different locations providing they are within the escorts line of sight.
20. Please Clarify if any structural drawings, calculations, or prior assessments of the existing roof framing are available, as none are indicated in the Basis of Design. (Response: No original structural drawings or calculations for the existing roof framing are available. A field survey of existing conditions was conducted as part of the project; however, access was limited and field measurements were restricted to observable conditions without destructive investigation. Based on the field survey and measurements obtained, an analysis of the existing roof framing was performed, and the associated assumptions, calculations, and findings are documented in Appendix D.)
21. Please Confirm whether the Contractor is responsible for verifying structural capacity of the existing roof deck and framing for new RTUs, insulation loading, and snow drift conditions shown in calculations. (Response: The design team has evaluated the existing roof deck and framing for the proposed RTU loads, insulation loading, and snow drift conditions based on available field survey information, as documented in Appendix D and structural drawings. The Contractor is responsible for verifying existing field conditions and confirming that the actual roof construction conforms to the assumptions used in the documents. Any discrepancies affecting structural capacity shall be reported to the EOR for review.)
22. Please Clarify if structural reinforcement (if required due to new loading or code compliance) is to be included in base bid or handled as an allowance/change order.
(Response: Structural reinforcement specifically indicated on the Contract Documents shall be included in the base bid. Any additional structural reinforcement required due to unforeseen field conditions, shall be addressed as a change order.)
23. Please Clarify how RTU-6, RTU-9, RTU-10, and RTU-11 are to be replaced given no available nameplate or performance data.
Mechanical Response: See the Packaged Rooftop Unit Schedule on M601 dated 4/24/2025 for RTU performance data and manufacturer/model numbers.
24. Please Confirm whether the Contractor is responsible for performing load calculations and sizing replacement RTUs, or if engineered selections will be issued.
Mechanical Response: Engineer has performed loads and/or sized replacement units. See the Packaged Rooftop Unit Schedule on M601 dated 4/24/2025 for RTU performance data and manufacturer/model numbers.
25. Please Clarify if “match existing” performance requirements apply, or if new code-compliant units with updated capacities may be proposed.
Mechanical Response: See the mechanical drawings for the capacities and performance requirements. New equipment must meet the relevant building/mechanical/energy codes for the project.
26. Please Confirm whether all existing RTU curbs and dunnage are to be removed and replaced with new insulated curbs as indicated for Area A.
Mechanical Response: See the Mechanical Demolition dwgs MD301.1, MD301.2, MD302 and MD303 dated 4/24/2025 for keyed demolition notes on the dwgs for RTU curbs/dunnage. See the Packaged Rooftop Unit Schedule on M601 dated 4/24/2025 Remark 3 for new RTU curb information.
27. Please Clarify if the DDC system is a proprietary (sole-source) system or if approved equal manufacturers are acceptable.
Mechanical Response: Per Spec Section 230923 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC subsection 2.1, Siemens is the clearly preferred BMS manufacturer but specs show ‘Approved Equal’. However approval of another controls manufacturer will only be given if the new UNICOR BMS can be proven to be tied into the existing Siemens Prison BMS. This tie in is not part of this current project. The existing Prison BMS is Siemens Desigo CC System. Ben Fagan of Siemens in Louisville, Kentucky Cell: 502-424-9650, Office: 502-267-
1571, benjamin.fagan@siemens.com may be able to give more information.
William Martin or Robert Harris may also be able to help.
SIEMENS Industry, Inc.
Building Technologies Division 2400 Nelson Miller Parkway Suite 130 Louisville, KY 40223, USA
28. Please Confirm the extent of controls integration with existing systems, including whether existing infrastructure will remain or be fully replaced.
Mechanical Response: There is no existing HVAC Building Management System for the UNICOR building portion. All current controls are local controls and are being demolished.
29. Please Clarify who is responsible for programming, commissioning, and integration of the DDC system.
Mechanical Response: The mechanical contractor is ultimately responsible for programming and integration of DD controls even if they subcontract that work out to a controls contractor. Paladin Engineers of Lexington, Kentucky will be the Commissioning Provider. Phone 859.252.3047 PaladinEngineers.com
30. Please Clarify if permanent roof access systems (ladders, stairs, hatches) are required to comply with IMC ladder restrictions. Adding roof access stairs or ladders is not in the project scope.
31. Please Confirm if fall protection systems (guardrails, anchors, or safety railings) are required, as code references indicate a need but Basis excludes scope.
Provide railings as indicated on the drawings.
32. Please Clarify if roof hatch safety railings shown in specifications are to be included in base bid. Yes, see work note #8 on drawing A106.
33. Please Clarify the design and load requirements for new gas piping supports at
10’-0” on center. See work note #12 on sheet A106.
Mechanical Response: 10 feet of 6” diameter schedule 40 steel/black iron piping = 10 ft x 20 lbs/ft = 200 lbs
34. Please Clarify the extent of fire alarm system replacement, including panel, devices, and wiring. Will drawings for the fire alarm be provided. Please provide direct guidance to this scope as stated in specifications. The extent of the fire alarm replacement is noted on sheet E101.2 and E301 – E304 and was coordinated with the current fire alarm vendor JCI in Lexington.
35. Please Confirm whether fire alarm work is fully coordinated with HVAC and controls scope. Coordination confirmed as shown on the project set and with JCI.
36. Please Clarify if multiple roof areas (A–F) may be worked simultaneously or must be phased. See the response to question 19.
37. Please Clarify requirements for permits, inspections, and coordination with authorities having jurisdiction. The facility is federal property;
the Owner is the AHJ.
38. Please clarify the extent of the interior ceiling scope being that the ductwork is being replaced. Can each room scope be provided the existing to be removed and the new mailto:benjamin.fagan@siemens.com https://nam12.safelinks.protection.outlook.com/?url=http%3A%2F%2Fcp.mcafee.com%2Fd%2FFZsS71MAd6Qm4QShObMV4TsSztAQsIcTd7bMUSztAQsIcET7e6QrICzBxCVEVuudETpd7b3adTD3uQ9A6UMY5bqvG4E5iTbCRJfR2k2FrBPvESQtpx_HYyzssCPRXBQhPXD9EKce8YJt6OaqGab_axVZicHs3jq9J4TsTsS02mQ_k9g-16kf-denMSgzYVYHmcpk1nMcBFgDYtJehD-ndzCmhNEVdwIqid44fc6y2vQCq8ai8CQn3v0kpwRUS&data=05%7C02%7Cdmartin%40gpinet.com%7Cf67f4bdd33c041d6418008dd7d141fa8%7C46fdd3b402d24121a5621f51ee5848b4%7C0%7C0%7C638804248317783286%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=Qs%2Ffazurf8koVB4JCXfpEw8mGzL9qhRyNopSwOTKg9c%3D&reserved=0 to be installed. See work notes on drawings for ceilings, including sheets A110 and A111.
39. Please clarify with pictures the interior ceiling scope. Site visit was afforded to clarify interior ceiling scope.
40. Please clarify Will interior rooms receiving new HVAC scope and ceiling scope be occupied during construction. No
41. Please clarify with the involvement of the ceiling scope, if the contractor will be responsible for remounting of existing owner utilities and equipment? Yes, see work notes on drawings for ceilings, including sheets A110 and A111.
42. Please clarify if any scope of work being a historic building will require special certifications or inspections. Assume none is required.
43. Please confirm that On-site Visitation was a requirement for the bid review process.
The site visit was mandatory for this project.
44. Please confirm if the contractor is to allow a percentage for roof decking replacement. Yes, see spec section 070150.19.
45. Please clarify if the 20 year warranty is manufacture or contractor? Per spec section 075423, provide a 25-year roof manufacturer’s warranty and a 5-year installer warranty.
1. I see references to BIM Modeling, but no specific requirements are called out.
Will BIM Modeling be required? No requirements for BIM in the specs.
2. Can you confirm that no Fire Sprinkler modifications or work will be required? There is no sprinkler work in the design documents.
3. Will a general building permit be required or just trade specific for MEPs? If a general permit is required, has the Design Team already obtained the For Construction permit? The facility is federal property, so it is assumed that the localities do not have any jurisdiction on the project.
4. Will Builders Risk Insurance be required? See Section H for insurance requirements.
5. There are references for 3rd Party Special Inspections. If required, will the Owner be responsible for this cost? Yes, see the specific spec sections.
| ADP4A9A.tmp |
| Sheet1 |
| RESPONSE 2.pdf |
| Sheet1 |
| topmostSubform[0]: |
| Page1[0]: |
| ContractIDCode[0]: |
| Page[0]: 1 |
| Pages[0]: 10 |
| AmendmentNo[0]: AMD 00002 |
| EffectiveDate[0]: 04/13/2026 |
| ReqNumber[0]: |
| ProjectNo[0]: |
| IssuedBy[0]: FEDERAL PRISON INDUSTRIES, UNICOR |
400 FIRST STREET, N.W.
WASHINGTON, DC 20534
ATTN: Jason Morgan, Contract Specialist
| Code[0]: |
| AdministeredBy[0]: SEE BLOCK 6. |
| Code[2]: |
| NameandAddress[0]: |
| Code[1]: |
| FacilityCode[0]: |
| CheckBox9[0]: Off |
| AmendmentNo[1]: SVO204-26 |
| Dated9B[0]: 03/06/2026 |
| CheckBox10[0]: Off |
| ModificationNo[0]: |
| Dated10B[0]: |
| CheckBox11[0]: 1 |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| Copies[0]: 1 |
| AccountingData[0]: |
| CheckBox13A[0]: 1 |
| A13[0]: |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| C13[0]: |
| CheckBox13D[0]: Off |
| D13[0]: |
| IsNot[0]: Off |
| Is[0]: 1 |
| CopiesReturned[0]: 1 |
| Description[0]: The solicitation identified in block 9A is hereby amended as followed: |
Provide the Government's response to the questions submitted by the prospective offerors following the site-visit conducted on 03/24/2026.
Please refer to page 2, identifying the secure laydown area within the UNICOR Warehouse.
As provided, all other terms and conditions remain unchanged.
| NameandTitleSigner[0]: |
| DateSigned[0]: |
| NameandTitleOfficer[0]: |
| DateSigned[1]: |
| 2026-04-13T13:59:22-0400 | |
| JASON MORGAN |