Amendment 002.pdf
PDF 234 KB Posted
- Attached to
- SV0144-24 Cooling Tower
- Solicitation number
- SV0144-24
About this file
This document is an amendment to a solicitation for a cooling tower from the Department of Justice Bureau of Prisons Correctional Facilities. The solicitation number is SV0144-24 and seeks a firm fixed price contract for a water cooling tower to be installed at the UNICOR Central Office in Washington D.C. Interested vendors must complete a business management questionnaire with three references for similar past projects and register on SAM.gov. Quotes are due by email to joshua.hassler2@usdoj.gov with the subject line referencing SV0144-24. The award will be made to the responsible bidder offering the best overall value to the government. No phone calls will be accepted and no copies of the solicitation will be mailed. All responsible bidders may submit a proposal which will be considered.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 001.pdf | ||
| SV0144-24 Cooling Tower.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Amendment #002 02/29/2024
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
UNICOR, FEDERAL PRISON INDUSTRIES, INC.
400 First St NW Washington, DC 20534
UNICOR, FEDERAL PRISON INDUSTRIES, INC.
400 First St NW Washington, DC 20534 Attn: Josh Hassler, Contract Specialist
8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
SV0144-24 X
9B. DATED (SEE ITEM 11)
02/01/2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY
CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers __ is extended___ is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :
X D. OTHER (Specify type of modification and authority) FAR 15.206 Amending the Solicitation.
E. IMPORTANT : Contractor ____is not __X__ is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See attachment A.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Josh Hassler, Contract Specialist
15B. CONTRACTOR/OFFEROR 15C. DATE
SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
_______________________________________ BY
Signature of the person authorized to sign) (Signature of contracting officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDARD FORM 30 (REV. 10-
83) Prescribed by GSA
FAR(48 CFR) 53.243
Attachment A: 03/01/2024
SV0144-24 Amendment #002
1) Solicitation is extended to 03/08/2024.
2) Statement of work is corrected for cooling tower (voltage). Copy of corrected statement of work will follow as pages 3- 4 of this amendment.
3) Amendment #002 is now uploaded to solicitation SV0144-24 in SAM.gov.
4) All other terms and conditions will remain unchanged.
All amendments must be signed, and submitted with proposal.
“Corrected” Cooling Tower Specifications
MOTOR DATA TOWER DIMENSIONS WEIGHTS
Quantity of (1) factory assembled 1-Cell crossflow cooling tower Per 1-cell tower:
1,200 gpm
95.0 °F Hot Water
85.0 °F Cold Water
78.0 °F Entering WB NEMA 30 HP 1 speed / 1 wind 208Volts 1.15sf / TEFC
1800 RPM
Premium Efficiency Inverter duty nameplated Site Voltage;208 Each cell: (without options) Length 8' - 4 3/4" Width 18' - 2" Height 11' - 11 1/4" Per 1-cell tower: (with options) Length 9' - 1 9/16" Width 18' - 2" Height 15' - 0 7/8" Per cell:
Shipping: 8,146 lbs.
Operating: 16,551 lbs.
Per 1-cell tower:
Shipping: 8,146 lb Operating: 16,551 lb Quantities shown below are per tower.
Base Tower Construction/Equipment:
Galvanized Steel casing.
Galvanized Steel structure.
Stainless Steel (per SS Grade) collection basin.
Stainless Steel (per SS Grade) distribution basin.
All stainless steel is series 300.
Quiet fan with aluminum blades.
PVC film fill with integral louvers and drift eliminators.
HDG steel fan guard.
Collection Basin Connections and Accessories:
All flanges are to Class 125 ANSI B16.1 standard.
All threads are to American Standard Pipe Taper Thread.
(1) 8 in (203 mm) diameter bevel and groove cased face outlet(s) with trash screen(s).
4 in (102 mm) diameter combination drain and overflow in each cell
(1) 1 in (25.4 mm) water make-up float valve Probe type electronic water level sensor, in first cell, with the following events: make-up Integrated into control system.
(1) Slow Closing Solenoid 1 in (25.4 mm) diameter valve(s) for makeup 6 kW per cell 480/3 volt/phase electric immersion heater for freeze protection of the collection basin during cold weather system shutdown ABH basin heater control system with control panel/cell and heater elements Heater system circuit breaker Heater system disconnect switch.
Distribution Basin Inlet and Accessories:
(2) 6 in (152 mm) diameter top inlet connections per cell.
(2) 6 in (152 mm) horizontal flow control valves per cell.
Electrical System Requirements Basin Heater 7.2 Auxiliary Load 6 Total Full Load Amps FLA 53.2 Main Circuit Breaker MCB 100 Maximum Over Current Protection MOCP 100 Control Systems:
(1) IMI 686B Smart Electronic sw w/ 30' cord + IB1 interface box vibration cutoff switch per cell
(1) Field installed AIO NEMA 3R painted steel (includes integrated VFD) control panel per cell VFD startup expenses included (no vibration test) Collection water level control integrated in control panel.
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT
File details come from the government source that posted it. Updated .