Surveyor's_Report.pdf
PDF 2 MB Posted
- Attached to
- NW 1ST STREET COMPLETE STREETS IMPROVEMENT LOCAL AGENCY PROGRAM (LAP) PROJECT State and local contract opportunity
- Solicitation number
- 26-015
- Issued by
- Santa Rosa County, Mount Carmel CDP, Florida
About this file
This is a Surveyor's Report prepared by M.G. Vera & Associates, Inc. for the City of Dania Beach's NW 1st Street Complete Streets Improvement Local Agency Program (LAP) Project in Broward County, Florida. The design survey was conducted along NW 1st Street from Bryan Road to U.S. 1/Federal Highway, with fieldwork commencing on June 5, 2025, and concluding on August 7, 2025. The survey obtained existing topographic and digital terrain model (DTM) data along the corridor, including drainage and right-of-way information throughout the project limits. The survey combined conventional data collection methods using a Leica TS06 total station with mobile lidar technology mounted on a vehicle, capturing above-ground features, break-lines, utilities, drainage structures, lighting, pavement markings, trees, pedestrian ramps, driveways, and hardscape elements at 50-foot intervals. Control points were established using the State Plane Coordinate System (Florida East Zone, NAD 83/90) horizontally and North American Vertical Datum of 1988 (NAVD 88) vertically. Quality control measures included dual GPS measurements at mobile lidar targets spaced approximately 500 feet apart, with verification through heat map analysis and trajectory adjustments. The survey produced multiple deliverables including the survey report, MicroStation design files, digital terrain model files, and comprehensive electronic survey data collection folders with attachments documenting control points, mobile lidar diagrams, quality check reports, crew and equipment lists, and heat map analyses.
The survey was certified by Mark Sowers, a Florida Professional Surveyor and Mapper (License Number 5266), acting under the Certificate of Authorization LB No. 2439 for M.G. Vera & Associates, Inc. Project personnel included surveyors, analyst, party chiefs, instrument operators, and rod personnel. Equipment utilized included Leica surveying instruments, Trimble GPS receivers, MicroStation software, Leica Cyclone and Pegasus Manager processing software, and TopoDot modeling applications. Quality control data reported in Attachment D indicates mobile lidar point cloud adjustments with mean deviations of 0.067 feet in X-direction, 0.143 feet in Y-direction, and 0.048 feet in Z-direction, with RMS errors of 0.095, 0.226, and 0.059 feet respectively for horizontal and vertical accuracy. The survey data supports the City of Dania Beach's planned improvements to NW 1st Street, which include roadway improvements, bike lanes, pedestrian traffic signals, sidewalk repairs, and sidewalk harmonization to enhance capacity and safety for pedestrian and bicycle access to schools and bus stops. Bids for the complete streets improvement project were solicited with deadlines of 1:00 p.m. on July 17, 2026, and 10:00 a.m. on July 27, 2026, via the City's e-Procurement Portal.
View the file
Other files for this state and local contract opportunity
Show all 50
NW 1ST STREET COMPLETE STREETS IMPROVEMENT LOCAL AGENCY PROGRAM (LAP) PROJECT has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M. G. Vera & Assoc., Inc. ENGINEERS••••SURVEYORS••••PLANNERS
MANUEL G. VERA & ASSOCIATES, INC. •••• 13960 SOUTHWEST 47TH STREET •••• MIAMI, FL 33175
PHONE (305) 221-6210 • FAX (305) 221-1295 • ON THE WEB @ WWW.MGVERA.COM
SURVEYOR’S REPORT
Design Survey
NW 1st STREET
From Bryan Road to U.S. 1 / Federal Highway
Broward County
Prepared By:
M.G. Vera & Associates, Inc.
13960 SW 47th Street, Miami, Fl 33175
L.B. No. 2439
MG Vera Project No: 25-602
SURVEY REPORT
1. PROJECT INFORMATION
1.1. Manuel G. Vera & Associates, Inc.
1.2. Design Survey
1.3. NW 1st Street
1.4. Project limits: Bryan Raot to U.S. 1 / Federal Highway
Project is located in Broward County, Florida.
1.5. Survey date: Start: 06/05/2025
End: 08/7/2025
1.6. Units of measure: U.S. Survey Feet
2. TYPE OF SURVEY
The Design Survey is in accordance with Rule Chapter 5J-17.050, Florida Administrative Code. This design survey was done to obtain existing topographic/digital terrain model along NW 1st Street. The task included Topographic/DTM on the side streets and all the ground area. Drainage & Right of Way was performed throughout the entirety of the project.
3. METHODOLOGY
A combination of conventional data collection and mobile lidar methods were used to acquire the data. MGV used the Leica TS06 total station and Leica CS18 data collector to collect data in the ground area and obscured areas. All above ground features and improvements, break-lines, high and low points were located with sufficient density of points of 50’ intervals. All topographic features will be located including existing lighting, pavement markings, trees, pedestrian ramps, driveways, visible above ground utilities, sodded and paved areas, drainage structures, etc. The information gathered in the field was then processed using Infinity and then imported and processed in MicroStation.
The mobile lidar information was gathered using a Leica Pegasus Ultimate 2. The Mobile lidar unit was used to locate data along the side streets and hard surfaces. Mobile lidar targets were strategically placed throughout the limits of the project at a maximum of about 500’. See Attachment D for mobile lidar target diagram. These targets were then controlled horizontally using the FPRN network and were measured twice for 3 minutes and with 4 hours difference between measurements.
The average between the two measurements for each target was used as the coordinates for the targets. The targets were controlled vertically from project network control that had been placed throughout the project limits.
The mobile lidar scanner was mounted on a Jeep Cherokee with special mounting brackets. Before the beginning of a mission the unit is calibrated by performing 20 minutes of static GPS. After the static GPS a 10-minute dynamic GPS calibration is performed as well. Once the system is calibrated the mission can begin. The limits of the job are driven by performing multiple passes along the roadways. These drives are performed at a max speed of 40 miles per hour on the highway and 20
MPH on the side streets. Once the limits have been driven a 10-minute dynamic GPS session is performed and then followed by 10 minutes of static GPS.
The Mobile lidar information was then processed in Leica Pegasus manager. The information is first preliminarily processed by running multiple programs including trajectory adjustment, navigation preparation, time alignment, generate image orientation, generate 3D point cloud and create peg tracks. These processes generate the point cloud data that is then adjusted and controlled to the mobile lidar targets that have been placed throughout the project. See attachment D & E for Mobile lidar data analysis. A .las file is exported and then checked to make sure the cloud has been correctly adjusted. The information is imported into MicroStation and using TopoDOT program it is then modeled. The modeled information is checked by heat maps to the cloud data. See attachment G for heat maps. Once the information is confirmed to match the cloud it is merged with the conventional data that was collected, a digital terrain model (DTM) is created with both sets of information
4. PROJECT CONTROL
4.1. Horizontal Datum: State Plane Coordinate System, Florida East Zone, North American Datum (NAD) of 1983, adjustment of 1990. See attachment B for control point values.
4.2. Vertical Datum: North American Vertical Datum of 1988 (NAVD 88)
5. GENERAL NOTES
• Neither the accompanying digital files listed herein nor this report of survey is full and complete without the other.
• Field Book References: FDOT#, MGV 1252 Series
• Design survey measurements were constrained horizontally to the NAD 83/90 and vertically to
NAVD 88
• Any copies of the digital data are invalid without the verified digital seal of the Florida Professional Surveyor and Mapper in responsible charge. Any additions or deletions to this data by anyone other than the signing Professional Surveyor and Mapper are prohibited without the written consent of the signing Professional Surveyor and Mapper.
7. LEGEND AND ABBREVIATIONS
See Attachment “A”
8. FILES LIST
Electronic files delivered:
• MGV Survey Report NW 1st STREET DANIA BEACH.pdf
• SURVRD01_ORD.dgn
• GDTMRD01.tin
• ELECTONIC SURVEY DATA COLLECTION Folder
• Attachment A Legend
• Attachment B Control Points
• Attachment C Mobile Lidar Diagram
• Attachment D Mobile Lidar Data Quality Check
• Attachment E Mobile Lidar Data Control Deviation
• Attachment F Crew and Equipment List
• Attachment G Heat Map
• Attachment H Crossing Chains Report
9. CERTIFICATION
I hereby certify that this survey and all files herein are a true and accurate representation of a field survey made under my responsible charge, and that to the best of my knowledge meets the Standards of Practice as set forth by the Board of Professional Surveyors and Mappers in Rule Chapter 5J-17 of the Florida Administrative Code.
Electronically Signed/Date
Mark Sowers, PSM, Date Florida Professional Surveyor and Mapper License Number 5266 For the Firm of:
Manuel G. Vera & Associates, Inc.
13960 S.W. 47th Street Miami, FL 33175-3616
TEL: (305) 221-6210
Certificate of Authorization: LB 2439
M. G. Vera & Assoc., Inc. ENGINEERS•SURVEYORS•PLANNERS
MANUEL G. VERA & ASSOCIATES, INC. • 13960 SOUTHWEST 47TH STREET • MIAMI, FL 33175
ATTACHMENT A
ATTACHMENT B
Control Points
NAME Y X Z Description
C-2 625980.4633 933259.0763 4.569 NL
C-3 626100.5984 933258.4874 4.284 NL
C-4 626167.1398 933275.8299 4.203 NL
C-5 626242.6241 933232.0194 3.48 NL
C-6 626248.846 933270.4873 4.007 NL
C-7 626136.9316 933528.6784 8.627 NL
C-8 626176.057 933645.3802 8.107 NL
C-9 626212.6914 934577.4864 4.558 NL
C-10 626195.1627 935090.0034 4.604 NL
C-11 626230.4464 935140.7004 4.558 NL
C-12 626206.7273 935741.0284 5.977 NL
C-13 626238.0576 935792.4261 5.997 NL
C-14 626224.6026 936262.2826 6.427 NL
C-15 626255.8489 936299.7748 6.508 NL
C-16 626233.5104 936511.774 9.205 NL
C-17 626264.4641 936570.7434 9.607 NL
C-18 626261.4102 936681.3282 9.497 NL
C-19 626248.8265 937260.587 10.336 NL
C-20 626293.8147 937318.8892 10.33 NL
C-21 626497.6035 937311.8949 10.974 NL
C-22 626503.9654 937253.1529 11.409 NL
C-23 625986.9366 937329.3688 10.299 NL
C-24 625987.4516 937270.8673 10.773 NL
C-25 626292.2515 937486.5804 7.268 NL
T-1 626181.2859 933785.7882 5.206 NL
T-2 626156.7877 933918.9089 4.676 NL
T-3 626162.1304 934044.4119 5.222 NL
T-4 626206.7285 934343.5267 4.946 NL
T-5 626179.0669 934454.3589 5.272 NL
T-6 626222.8343 934865.9347 4.665 NL
T-7 626232.0182 935522.137 7.034 NL
T-8 626216.5485 936017.4067 5.769 NL
T-9 626247.4462 936051.3976 5.375 NL
T-10 626240.3772 936751.135 9.422 NL
T-11 626266.4404 936771.7033 9.464 NL
T-12 626237.8914 937041.0917 10.273 NL
V-1 626194.555 934091.2086 5.239 NL
V-2 626194.2667 935481.5963 5.992 NL
V-3 626278.735 937007.2323 10.106 NL
ATTACHMENT C
Mobile Lidar Diagram
ATTACHMENT D
Mobile Lidar Data Quality Check
NAME FID TRACK XGCP YGCP ZGCP DX DX Abs DY DY Abs DZ DZ Abs D3D FMATCH ANNOT C-3 1 [01 JUL 2025]Tra 933258.487 626100.598 4.284 0.015 0.015 0.051 0.051 0.006 0.006 0.053 Manually reacqu C-4 2 [01 JUL 2025]Tra 933275.83 626167.14 4.203 0.01 0.01 -0.058 0.058 0.005 0.005 0.059 Manually reacqu C-5 3 [01 JUL 2025]Tra 933232.019 626242.624 3.48 -0.092 0.092 -0.07 0.07 -0.01 0.01 0.116 Manually reacqu C-7 4 [01 JUL 2025]Tra 933528.678 626136.932 8.627 0.05 0.05 0.021 0.021 0.107 0.107 0.12 Manually reacqu C-8 5 [01 JUL 2025]Tra 933645.38 626176.057 8.107 0.074 0.074 -0.14 0.14 0.069 0.069 0.173 Manually reacqu C-9 6 [01 JUL 2025]Tra 934577.486 626212.691 4.558 -0.006 0.006 -0.035 0.035 0.066 0.066 0.075 Manually reacqu
C-10 7 [01 JUL 2025]Tra 935090.003 626195.163 4.604 -0.032 0.032 0.024 0.024 0.053 0.053 0.066 Manually reacqu C-11 8 [01 JUL 2025]Tra 935140.7 626230.446 4.558 0.035 0.035 0.019 0.019 0.052 0.052 0.066 Manually reacqu C-12 9 [01 JUL 2025]Tra 935741.028 626206.727 5.977 0.002 0.002 0.03 0.03 0.032 0.032 0.044 Manually reacqu C-13 10 [01 JUL 2025]Tra 935792.426 626238.058 5.997 -0.212 0.212 0.013 0.013 0.037 0.037 0.216 Manually reacqu C-14 11 [01 JUL 2025]Tra 936262.283 626224.603 6.427 0.01 0.01 0.033 0.033 0.026 0.026 0.043 Manually reacqu C-15 12 [01 JUL 2025]Tra 936299.775 626255.849 6.508 -0.046 0.046 0.049 0.049 0.071 0.071 0.098 Manually reacqu C-16 13 [01 JUL 2025]Tra 936511.774 626233.51 9.205 0.078 0.078 0.057 0.057 0.083 0.083 0.127 Manually reacqu C-17 14 [01 JUL 2025]Tra 936570.743 626264.464 9.607 -0.013 0.013 -0.011 0.011 0.107 0.107 0.109 Manually reacqu C-18 15 [01 JUL 2025]Tra 936681.328 626261.41 9.497 -0.099 0.099 0.051 0.051 0.089 0.089 0.142 Manually reacqu C-19 16 [01 JUL 2025]Tra 937260.587 626248.827 10.336 0.086 0.086 -0.026 0.026 0.042 0.042 0.099 Manually reacqu C-20 17 [01 JUL 2025]Tra 937318.889 626293.815 10.33 -0.069 0.069 0.001 0.001 0.041 0.041 0.08 Manually reacqu C-25 18 [01 JUL 2025]Tra 937486.58 626292.252 7.268 -0.043 0.043 -0.022 0.022 0.054 0.054 0.072 Manually reacqu T-1 19 [01 JUL 2025]Tra 933785.788 626181.286 5.206 -0.069 0.069 -0.009 0.009 0.045 0.045 0.083 Manually reacqu T-2 20 [01 JUL 2025]Tra 933918.909 626156.788 4.676 -0.047 0.047 -0.092 0.092 0.043 0.043 0.112 Manually reacqu T-3 21 [01 JUL 2025]Tra 934044.412 626162.13 5.222 -0.053 0.053 -0.014 0.014 0.055 0.055 0.078 Manually reacqu T-4 22 [01 JUL 2025]Tra 934343.527 626206.729 4.946 -0.014 0.014 0.064 0.064 0.092 0.092 0.113 Manually reacqu T-5 23 [01 JUL 2025]Tra 934454.359 626179.067 5.272 0.03 0.03 -0.008 0.008 0.084 0.084 0.09 Manually reacqu T-6 24 [01 JUL 2025]Tra 934865.935 626222.834 4.665 -0.08 0.08 -0.067 0.067 0.038 0.038 0.111 Manually reacqu T-7 25 [01 JUL 2025]Tra 935522.137 626232.018 7.034 -0.079 0.079 0.044 0.044 0.081 0.081 0.122 Manually reacqu T-8 26 [01 JUL 2025]Tra 936017.407 626216.549 5.769 0.038 0.038 -0.009 0.009 0.027 0.027 0.048 Manually reacqu T-9 27 [01 JUL 2025]Tra 936051.398 626247.446 5.375 -0.099 0.099 0.007 0.007 0.044 0.044 0.109 Manually reacqu
T-10 28 [01 JUL 2025]Tra 936751.135 626240.377 9.422 0.015 0.015 0.046 0.046 0.059 0.059 0.076 Manually reacqu T-11 29 [01 JUL 2025]Tra 936771.703 626266.44 9.464 -0.044 0.044 -0.073 0.073 0.083 0.083 0.119 Manually reacqu T-12 30 [01 JUL 2025]Tra 937041.092 626237.891 10.273 0.013 0.013 0.043 0.043 0.015 0.015 0.048 Manually reacqu
QC REPORT
V-1 31 [01 JUL 2025]Tra 934091.209 626194.555 5.239 0.008 0.008 0.069 0.069 0.049 0.049 0.085 Manually reacqu V-2 32 [01 JUL 2025]Tra 935481.596 626194.267 5.992 -0.034 0.034 0.041 0.041 0.076 0.076 0.093 Manually reacqu V-3 33 [01 JUL 2025]Tra 937007.232 626278.735 10.106 0.006 0.006 -0.018 0.018 0.025 0.025 0.032 Manually reacqu C-3 34 [01 JUL 2025]Tra 933258.487 626100.598 4.284 -0.027 0.027 0.033 0.033 -0.039 0.039 0.057 Manually reacqu C-4 35 [01 JUL 2025]Tra 933275.83 626167.14 4.203 -0.05 0.05 -0.051 0.051 -0.01 0.01 0.072 Manually reacqu C-7 36 [01 JUL 2025]Tra 933528.678 626136.932 8.627 0.008 0.008 0.12 0.12 0.054 0.054 0.131 Manually reacqu C-8 37 [01 JUL 2025]Tra 933645.38 626176.057 8.107 -0.019 0.019 -0.02 0.02 0.065 0.065 0.07 Manually reacqu C-9 38 [01 JUL 2025]Tra 934577.486 626212.691 4.558 -0.055 0.055 -0.022 0.022 0.082 0.082 0.101 Manually reacqu
C-10 39 [01 JUL 2025]Tra 935090.003 626195.163 4.604 0.028 0.028 -0.047 0.047 0.066 0.066 0.086 Manually reacqu C-11 40 [01 JUL 2025]Tra 935140.7 626230.446 4.558 -0.029 0.029 0 0 0.068 0.068 0.073 Manually reacqu C-12 41 [01 JUL 2025]Tra 935741.028 626206.727 5.977 0.098 0.098 0.017 0.017 0.04 0.04 0.108 Manually reacqu C-13 42 [01 JUL 2025]Tra 935792.426 626238.058 5.997 -0.091 0.091 -0.031 0.031 0.029 0.029 0.1 Manually reacqu C-14 43 [01 JUL 2025]Tra 936262.283 626224.603 6.427 0.011 0.011 -0.001 0.001 0.032 0.032 0.034 Manually reacqu C-15 44 [01 JUL 2025]Tra 936299.775 626255.849 6.508 -0.022 0.022 0.042 0.042 0.045 0.045 0.066 Manually reacqu C-16 45 [01 JUL 2025]Tra 936511.774 626233.51 9.205 -0.001 0.001 0.034 0.034 0.095 0.095 0.101 Manually reacqu C-17 46 [01 JUL 2025]Tra 936570.743 626264.464 9.607 -0.01 0.01 -0.005 0.005 0.103 0.103 0.104 Manually reacqu C-18 47 [01 JUL 2025]Tra 936681.328 626261.41 9.497 -0.087 0.087 0.013 0.013 0.083 0.083 0.121 Manually reacqu C-19 48 [01 JUL 2025]Tra 937260.587 626248.827 10.336 0.088 0.088 -0.053 0.053 0.04 0.04 0.11 Manually reacqu C-20 49 [01 JUL 2025]Tra 937318.889 626293.815 10.33 -0.078 0.078 0.007 0.007 0.052 0.052 0.094 Manually reacqu C-25 50 [01 JUL 2025]Tra 937486.58 626292.252 7.268 0.028 0.028 -0.076 0.076 0.037 0.037 0.089 Manually reacqu T-1 51 [01 JUL 2025]Tra 933785.788 626181.286 5.206 -0.018 0.018 0.05 0.05 0.036 0.036 0.064 Manually reacqu T-2 52 [01 JUL 2025]Tra 933918.909 626156.788 4.676 -0.019 0.019 -0.104 0.104 0.054 0.054 0.119 Manually reacqu T-3 53 [01 JUL 2025]Tra 934044.412 626162.13 5.222 0.013 0.013 -0.037 0.037 0.047 0.047 0.061 Manually reacqu T-4 54 [01 JUL 2025]Tra 934343.527 626206.729 4.946 -0.05 0.05 0 0 0.079 0.079 0.093 Manually reacqu T-5 55 [01 JUL 2025]Tra 934454.359 626179.067 5.272 0.053 0.053 -0.007 0.007 0.088 0.088 0.103 Manually reacqu T-6 56 [01 JUL 2025]Tra 934865.935 626222.834 4.665 -0.084 0.084 -0.095 0.095 0.013 0.013 0.127 Manually reacqu T-7 57 [01 JUL 2025]Tra 935522.137 626232.018 7.034 -0.054 0.054 0.045 0.045 0.08 0.08 0.107 Manually reacqu T-8 58 [01 JUL 2025]Tra 936017.407 626216.549 5.769 0.02 0.02 -0.013 0.013 0.03 0.03 0.038 Manually reacqu T-9 59 [01 JUL 2025]Tra 936051.398 626247.446 5.375 -0.082 0.082 -0.06 0.06 0.015 0.015 0.103 Manually reacqu
T-10 60 [01 JUL 2025]Tra 936751.135 626240.377 9.422 0.085 0.085 0.04 0.04 0.064 0.064 0.114 Manually reacqu T-11 61 [01 JUL 2025]Tra 936771.703 626266.44 9.464 0.012 0.012 -0.04 0.04 0.049 0.049 0.064 Manually reacqu T-12 62 [01 JUL 2025]Tra 937041.092 626237.891 10.273 0.027 0.027 -0.027 0.027 0.033 0.033 0.05 Manually reacqu V-1 63 [01 JUL 2025]Tra 934091.209 626194.555 5.239 -0.024 0.024 -0.017 0.017 0.053 0.053 0.061 Manually reacqu
V-2 64 [01 JUL 2025]Tra 935481.596 626194.267 5.992 -0.044 0.044 0.022 0.022 0.079 0.079 0.093 Manually reacqu V-3 65 [01 JUL 2025]Tra 937007.232 626278.735 10.106 0.006 0.006 -0.032 0.032 0.02 0.02 0.038 Manually reacqu
T-10 268 [01 JUL 2025]Tra 936751.135 626240.377 9.422 -0.188 0.188 0.268 0.268 0.026 0.026 0.328 Manually reacqu T-11 269 [01 JUL 2025]Tra 936771.703 626266.44 9.464 -0.038 0.038 0.035 0.035 0.024 0.024 0.057 Manually reacqu T-12 270 [01 JUL 2025]Tra 937041.092 626237.891 10.273 0.091 0.091 0.224 0.224 0.022 0.022 0.243 Manually reacqu V-3 271 [01 JUL 2025]Tra 937007.232 626278.735 10.106 0.003 0.003 0.003 0.003 0.014 0.014 0.015 Manually reacqu
C-19 272 [01 JUL 2025]Tra 937260.587 626248.827 10.336 0.035 0.035 -0.011 0.011 0.008 0.008 0.038 Manually reacqu C-21 273 [01 JUL 2025]Tra 937311.895 626497.604 10.974 0.028 0.028 -0.039 0.039 0.01 0.01 0.049 Manually reacqu C-22 274 [01 JUL 2025]Tra 937253.153 626503.965 11.409 -0.006 0.006 -0.018 0.018 0.004 0.004 0.019 Manually reacqu T-3 275 [01 JUL 2025]Tra 934044.412 626162.13 5.222 -0.016 0.016 -0.093 0.093 -0.017 0.017 0.096 Manually reacqu V-1 276 [01 JUL 2025]Tra 934091.209 626194.555 5.239 0.047 0.047 -0.045 0.045 -0.029 0.029 0.071 Manually reacqu
C-10 277 [01 JUL 2025]Tra 935090.003 626195.163 4.604 0.244 0.244 0.405 0.405 0.141 0.141 0.494 Manually reacqu C-11 278 [01 JUL 2025]Tra 935140.7 626230.446 4.558 0.21 0.21 0.395 0.395 0.156 0.156 0.474 Manually reacqu C-12 279 [01 JUL 2025]Tra 935741.028 626206.727 5.977 0.216 0.216 0.507 0.507 0.045 0.045 0.553 Manually reacqu C-13 280 [01 JUL 2025]Tra 935792.426 626238.058 5.997 -0.089 0.089 0.647 0.647 0.048 0.048 0.655 Manually reacqu C-12 281 [01 JUL 2025]Tra 935741.028 626206.727 5.977 0.223 0.223 0.595 0.595 0.028 0.028 0.636 Manually reacqu C-13 282 [01 JUL 2025]Tra 935792.426 626238.058 5.997 -0.006 0.006 0.628 0.628 0.047 0.047 0.63 Manually reacqu T-7 283 [01 JUL 2025]Tra 935522.137 626232.018 7.034 0.128 0.128 0.612 0.612 0.138 0.138 0.64 Manually reacqu V-2 284 [01 JUL 2025]Tra 935481.596 626194.267 5.992 0.064 0.064 -0.014 0.014 0.084 0.084 0.107 Manually reacqu T-8 285 [01 JUL 2025]Tra 936017.407 626216.549 5.769 0.06 0.06 0.451 0.451 0.02 0.02 0.455 Manually reacqu T-9 286 [01 JUL 2025]Tra 936051.398 626247.446 5.375 -0.127 0.127 0.417 0.417 -0.007 0.007 0.436 Manually reacqu
C-16 287 [01 JUL 2025]Tra 936511.774 626233.51 9.205 0.045 0.045 0.255 0.255 0.011 0.011 0.26 Manually reacqu C-17 288 [01 JUL 2025]Tra 936570.743 626264.464 9.607 -0.148 0.148 0.27 0.27 0.002 0.002 0.308 Manually reacqu T-1 289 [01 JUL 2025]Tra 933785.788 626181.286 5.206 -0.05 0.05 -0.099 0.099 -0.03 0.03 0.115 Manually reacqu T-2 290 [01 JUL 2025]Tra 933918.909 626156.788 4.676 -0.015 0.015 -0.267 0.267 -0.021 0.021 0.268 Manually reacqu C-9 291 [01 JUL 2025]Tra 934577.486 626212.691 4.558 0.312 0.312 0.226 0.226 -0.02 0.02 0.386 Manually reacqu T-6 292 [01 JUL 2025]Tra 934865.935 626222.834 4.665 0.15 0.15 0.327 0.327 0.052 0.052 0.364 Manually reacqu T-7 293 [01 JUL 2025]Tra 935522.137 626232.018 7.034 0.053 0.053 0.638 0.638 0.121 0.121 0.651 Manually reacqu V-2 294 [01 JUL 2025]Tra 935481.596 626194.267 5.992 0.202 0.202 0.578 0.578 0.115 0.115 0.623 Manually reacqu
C-14 295 [01 JUL 2025]Tra 936262.283 626224.603 6.427 0.07 0.07 0.353 0.353 0.027 0.027 0.361 Manually reacqu C-15 296 [01 JUL 2025]Tra 936299.775 626255.849 6.508 -0.153 0.153 0.325 0.325 0.046 0.046 0.362 Manually reacqu T-3 297 [01 JUL 2025]Tra 934044.412 626162.13 5.222 -0.044 0.044 -0.005 0.005 -0.033 0.033 0.055 Manually reacqu T-4 298 [01 JUL 2025]Tra 934343.527 626206.729 4.946 0.065 0.065 0.176 0.176 0.041 0.041 0.192 Manually reacqu
V-1 299 [01 JUL 2025]Tra 934091.209 626194.555 5.239 0.054 0.054 0.104 0.104 -0.021 0.021 0.119 Manually reacqu T-4 300 [01 JUL 2025]Tra 934343.527 626206.729 4.946 0.194 0.194 0.136 0.136 0.044 0.044 0.241 Manually reacqu T-5 301 [01 JUL 2025]Tra 934454.359 626179.067 5.272 0.104 0.104 0.13 0.13 0.022 0.022 0.168 Manually reacqu T-2 302 [01 JUL 2025]Tra 933918.909 626156.788 4.676 -0.02 0.02 -0.114 0.114 -0.009 0.009 0.116 Manually reacqu T-3 303 [01 JUL 2025]Tra 934044.412 626162.13 5.222 0.057 0.057 -0.106 0.106 -0.019 0.019 0.122 Manually reacqu C-9 304 [01 JUL 2025]Tra 934577.486 626212.691 4.558 0.147 0.147 0.239 0.239 -0.022 0.022 0.282 Manually reacqu T-5 305 [01 JUL 2025]Tra 934454.359 626179.067 5.272 0.053 0.053 0.225 0.225 0.016 0.016 0.232 Manually reacqu
T-10 306 [01 JUL 2025]Tra 936751.135 626240.377 9.422 -0.087 0.087 0.219 0.219 0.003 0.003 0.236 Manually reacqu T-11 307 [01 JUL 2025]Tra 936771.703 626266.44 9.464 -0.114 0.114 0.066 0.066 0.013 0.013 0.133 Manually reacqu T-12 308 [01 JUL 2025]Tra 937041.092 626237.891 10.273 0.046 0.046 0.059 0.059 0.014 0.014 0.077 Manually reacqu V-3 309 [01 JUL 2025]Tra 937007.232 626278.735 10.106 -0.051 0.051 0.038 0.038 0.025 0.025 0.068 Manually reacqu T-6 310 [01 JUL 2025]Tra 934865.935 626222.834 4.665 0.29 0.29 0.407 0.407 0.054 0.054 0.503 Manually reacqu T-8 311 [01 JUL 2025]Tra 936017.407 626216.549 5.769 0.034 0.034 0.511 0.511 0.022 0.022 0.512 Manually reacqu T-9 312 [01 JUL 2025]Tra 936051.398 626247.446 5.375 -0.034 0.034 0.462 0.462 0.015 0.015 0.464 Manually reacqu
C-14 313 [01 JUL 2025]Tra 936262.283 626224.603 6.427 0.019 0.019 0.431 0.431 0.04 0.04 0.433 Manually reacqu C-15 314 [01 JUL 2025]Tra 936299.775 626255.849 6.508 0.058 0.058 0.41 0.41 0.024 0.024 0.415 Manually reacqu C-16 315 [01 JUL 2025]Tra 936511.774 626233.51 9.205 -0.014 0.014 0.213 0.213 0.009 0.009 0.214 Manually reacqu C-17 316 [01 JUL 2025]Tra 936570.743 626264.464 9.607 -0.051 0.051 0.272 0.272 0.028 0.028 0.278 Manually reacqu T-7 317 [01 JUL 2025]Tra 935522.137 626232.018 7.034 -0.008 0.008 0.451 0.451 0.127 0.127 0.468 Manually reacqu V-2 318 [01 JUL 2025]Tra 935481.596 626194.267 5.992 0.341 0.341 0.435 0.435 0.11 0.11 0.564 Manually reacqu
C-19 319 [01 JUL 2025]Tra 937260.587 626248.827 10.336 -0.02 0.02 -0.093 0.093 -0.011 0.011 0.096 Manually reacqu C-20 320 [01 JUL 2025]Tra 937318.889 626293.815 10.33 -0.064 0.064 0.024 0.024 0.01 0.01 0.07 Manually reacqu C-10 321 [01 JUL 2025]Tra 935090.003 626195.163 4.604 -0.017 0.017 -0.044 0.044 0.133 0.133 0.141 Manually reacqu C-11 322 [01 JUL 2025]Tra 935140.7 626230.446 4.558 0.2 0.2 0.457 0.457 0.151 0.151 0.521 Manually reacqu T-1 323 [01 JUL 2025]Tra 933785.788 626181.286 5.206 -0.011 0.011 -0.245 0.245 -0.036 0.036 0.248 Manually reacqu
DX Abs feetUS US survey foot
STD 0.068 0.068
QC REPORT
Mean 0.067 0.067 Max 0.341 0.341 Min 0.001 0.001
RMS 0.095 0.095
95% CI 0.012 0.012
DY Abs feetUS US survey foot
STD 0.176 0.176
Mean 0.143 0.143 Max 0.647 0.647 Min 0.000 0.000
RMS 0.226 0.226
95% CI 0.031 0.031
DZ Abs feetUS US survey foot
STD 0.035 0.035
Mean 0.048 0.048 Max 0.156 0.156 Min 0.002 0.002
RMS 0.059 0.059
95% CI 0.006 0.006
D3D feetUS US survey foot
STD 0.172 0.172
Mean 0.186 0.186 Max 0.655 0.655 Min 0.015 0.015
RMS 0.252 0.252
95% CI 0.031 0.031
ATTACHMENT E
Mobile Lidar Data Control Deviation
Leica Pegasus:Two Ultimate Mobile Reality Capture
Quality Check - Multiple Points Report
QC REPORT 2
Project Name: 25-602
Operator: EJD
Date: 25 Sep 2025
NAME XGCP YGCP ZGCP
C-5 933232.019 626242.624 3.480
FID TRACK DX DY DZ FMATCH ANNOT TYPE CLASS
3 [01 JUL
2025]Track_A_20250701_130244 Profiler.zfs_0|18245551.gps
-0.092 -0.070 -0.010
Manually reacquired .. Ground Target
Control Point
C-3 933258.487 626100.598 4.284
1 [01 JUL
2025]Track_A_20250701_130244
0.015 0.051 0.006
34 [01 JUL
2025]Track_B_20250701_131038 Profiler.zfs_5|18245551.gps
-0.027 0.033 -0.039
C-4 933275.830 626167.140 4.203
2 [01 JUL
2025]Track_A_20250701_130244
0.010 -0.058 0.005
Control Point
35 [01 JUL
2025]Track_B_20250701_131038
-0.050 -0.051 -0.010
C-7 933528.678 626136.932 8.627
4 [01 JUL
2025]Track_A_20250701_130244
0.050 0.021 0.107
Control Point
36 [01 JUL
2025]Track_B_20250701_131038
Profiler.zfs_4|18245551.gps
0.008 0.120 0.054
C-8 933645.380 626176.057 8.107
5 [01 JUL
2025]Track_A_20250701_130244
0.074 -0.140 0.069
Control Point
37 [01 JUL
2025]Track_B_20250701_131038
-0.019 -0.020 0.065
T-1 933785.788 626181.286 5.206
19 [01 JUL
2025]Track_A_20250701_130244
-0.069 -0.009 0.045
Control Point
51 [01 JUL
2025]Track_B_20250701_131038
-0.018 0.050 0.036
Control Point
289 [01 JUL
2025]Track_F_20250701_131842
-0.050 -0.099 -0.030
Control Point
323 [01 JUL
2025]Track_E_20250701_131811
-0.011 -0.245 -0.036
T-2 933918.909 626156.788 4.676
20 [01 JUL
2025]Track_A_20250701_130244
-0.047 -0.092 0.043
Control Point
52 [01 JUL
2025]Track_B_20250701_131038
-0.019 -0.104 0.054
Control Point
290 [01 JUL
2025]Track_F_20250701_131842
-0.015 -0.267 -0.021
Control Point
302 [01 JUL
2025]Track_G_20250701_131935
-0.020 -0.114 -0.009
T-3 934044.412 626162.130 5.222
21 [01 JUL
2025]Track_A_20250701_130244
-0.053 -0.014 0.055
Control Point
53 [01 JUL
2025]Track_B_20250701_131038
0.013 -0.037 0.047
Control Point
275 [01 JUL
2025]Track_H_20250701_132033
-0.016 -0.093 -0.017
297 [01 JUL
2025]Track_I_20250701_132131
-0.044 -0.005 -0.033
Control Point
303 [01 JUL
2025]Track_G_20250701_131935
0.057 -0.106 -0.019
V-1 934091.209 626194.555 5.239
31 [01 JUL
2025]Track_A_20250701_130244
0.008 0.069 0.049
Control Point
63 [01 JUL
2025]Track_B_20250701_131038
-0.024 -0.017 0.053
Control Point
276 [01 JUL
2025]Track_H_20250701_132033
0.047 -0.045 -0.029
Control Point
299 [01 JUL
2025]Track_I_20250701_132131
0.054 0.104 -0.021
T-4 934343.527 626206.729 4.946
22 [01 JUL
2025]Track_A_20250701_130244
Profiler.zfs_1|18245551.gps
-0.014 0.064 0.092
Control Point
54 [01 JUL
2025]Track_B_20250701_131038
-0.050 0.000 0.079
Control Point
298 [01 JUL
2025]Track_I_20250701_132131
0.065 0.176 0.041
Control Point
300 [01 JUL
2025]Track_J_20250701_132232
0.194 0.136 0.044
T-5 934454.359 626179.067 5.272
23 [01 JUL
2025]Track_A_20250701_130244
0.030 -0.008 0.084
Control Point
55 [01 JUL
2025]Track_B_20250701_131038
0.053 -0.007 0.088
Control Point
301 [01 JUL
2025]Track_J_20250701_132232
0.104 0.130 0.022
305 [01 JUL
2025]Track_K_20250701_132344
0.053 0.225 0.016
C-9 934577.486 626212.691 4.558
6 [01 JUL
2025]Track_A_20250701_130244
-0.006 -0.035 0.066
Control Point
38 [01 JUL
2025]Track_B_20250701_131038
-0.055 -0.022 0.082
Control Point
291 [01 JUL
2025]Track_L_20250701_132436
0.312 0.226 -0.020
Control Point
304 [01 JUL
2025]Track_K_20250701_132344
0.147 0.239 -0.022
T-6 934865.935 626222.834 4.665
24 [01 JUL
2025]Track_A_20250701_130244
-0.080 -0.067 0.038
Control Point
56 [01 JUL
2025]Track_B_20250701_131038
Profiler.zfs_3|18245551.gps
-0.084 -0.095 0.013
Control Point
292 [01 JUL
2025]Track_L_20250701_132436
0.150 0.327 0.052
Control Point
310 [01 JUL
2025]Track_M_20250701_132537
0.290 0.407 0.054
C-10 935090.003 626195.163 4.604
7 [01 JUL
2025]Track_A_20250701_130244
Profiler.zfs_2|18245551.gps
-0.032 0.024 0.053
Control Point
39 [01 JUL
2025]Track_B_20250701_131038
0.028 -0.047 0.066
Control Point
277 [01 JUL
2025]Track_N_20250701_132610
0.244 0.405 0.141
321 [01 JUL
2025]Track_O_20250701_132659
-0.017 -0.044 0.133
C-11 935140.700 626230.446 4.558
8 [01 JUL
2025]Track_A_20250701_130244
0.035 0.019 0.052
Control Point
40 [01 JUL
2025]Track_B_20250701_131038
-0.029 0.000 0.068
Control Point
278 [01 JUL
2025]Track_N_20250701_132610
0.210 0.395 0.156
Control Point
322 [01 JUL
2025]Track_O_20250701_132659
0.200 0.457 0.151
V-2 935481.596 626194.267 5.992
32 [01 JUL
2025]Track_A_20250701_130244
-0.034 0.041 0.076
Control Point
64 [01 JUL
2025]Track_B_20250701_131038
-0.044 0.022 0.079
Control Point
284 [01 JUL
2025]Track_T_20250701_133108
0.064 -0.014 0.084
Control Point
294 [01 JUL
2025]Track_Q_20250701_132810
0.202 0.578 0.115
Control Point
318 [01 JUL
2025]Track_P_20250701_132731
0.341 0.435 0.110
T-7 935522.137 626232.018 7.034
25 [01 JUL
2025]Track_A_20250701_130244
-0.079 0.044 0.081
Control Point
57 [01 JUL
2025]Track_B_20250701_131038
-0.054 0.045 0.080
283 [01 JUL
2025]Track_T_20250701_133108
0.128 0.612 0.138
Control Point
293 [01 JUL
2025]Track_Q_20250701_132810
0.053 0.638 0.121
Control Point
317 [01 JUL
2025]Track_P_20250701_132731
-0.008 0.451 0.127
C-12 935741.028 626206.727 5.977
9 [01 JUL
2025]Track_A_20250701_130244
0.002 0.030 0.032
Control Point
41 [01 JUL
2025]Track_B_20250701_131038
0.098 0.017 0.040
Control Point
279 [01 JUL
2025]Track_R_20250701_132904
0.216 0.507 0.045
Control Point
281 [01 JUL
2025]Track_S_20250701_132953
0.223 0.595 0.028
C-13 935792.426 626238.058 5.997
10 [01 JUL
2025]Track_A_20250701_130244
-0.212 0.013 0.037
Control Point
42 [01 JUL
2025]Track_B_20250701_131038
-0.091 -0.031 0.029
Control Point
280 [01 JUL
2025]Track_R_20250701_132904
-0.089 0.647 0.048
Control Point
282 [01 JUL
2025]Track_S_20250701_132953
-0.006 0.628 0.047
T-8 936017.407 626216.549 5.769
26 [01 JUL
2025]Track_A_20250701_130244
0.038 -0.009 0.027
Control Point
58 [01 JUL
2025]Track_B_20250701_131038
0.020 -0.013 0.030
Control Point
285 [01 JUL
2025]Track_V_20250701_133328
0.060 0.451 0.020
311 [01 JUL
2025]Track_U_20250701_133238
0.034 0.511 0.022
T-9 936051.398 626247.446 5.375
27 [01 JUL
2025]Track_A_20250701_130244
-0.099 0.007 0.044
Control Point
59 [01 JUL
2025]Track_B_20250701_131038
-0.082 -0.060 0.015
Control Point
286 [01 JUL
2025]Track_V_20250701_133328
-0.127 0.417 -0.007
Control Point
312 [01 JUL
2025]Track_U_20250701_133238
-0.034 0.462 0.015
C-14 936262.283 626224.603 6.427
11 [01 JUL
2025]Track_A_20250701_130244
0.010 0.033 0.026
Control Point
43 [01 JUL
2025]Track_B_20250701_131038
0.011 -0.001 0.032
Control Point
295 [01 JUL
2025]Track_X_20250701_133600
0.070 0.353 0.027
Control Point
313 [01 JUL
2025]Track_W_20250701_133513
0.019 0.431 0.040
C-15 936299.775 626255.849 6.508
12 [01 JUL
2025]Track_A_20250701_130244
-0.046 0.049 0.071
Control Point
44 [01 JUL
2025]Track_B_20250701_131038
-0.022 0.042 0.045
Control Point
296 [01 JUL
2025]Track_X_20250701_133600
-0.153 0.325 0.046
314 [01 JUL
2025]Track_W_20250701_133513
0.058 0.410 0.024
C-16 936511.774 626233.510 9.205
13 [01 JUL
2025]Track_A_20250701_130244
0.078 0.057 0.083
Control Point
45 [01 JUL
2025]Track_B_20250701_131038
-0.001 0.034 0.095
Control Point
287 [01 JUL
2025]Track_Z_20250701_133852
0.045 0.255 0.011
Control Point
315 [01 JUL
2025]Track_Y_20250701_133754
-0.014 0.213 0.009
C-17 936570.743 626264.464 9.607
14 [01 JUL
2025]Track_A_20250701_130244
-0.013 -0.011 0.107
Control Point
46 [01 JUL
2025]Track_B_20250701_131038
-0.010 -0.005 0.103
Control Point
288 [01 JUL
2025]Track_Z_20250701_133852
-0.148 0.270 0.002
Control Point
316 [01 JUL
2025]Track_Y_20250701_133754
-0.051 0.272 0.028
C-18 936681.328 626261.410 9.497
15 [01 JUL
2025]Track_A_20250701_130244
-0.099 0.051 0.089
Control Point
47 [01 JUL
2025]Track_B_20250701_131038
-0.087 0.013 0.083
T-10 936751.135 626240.377 9.422
28 [01 JUL
2025]Track_A_20250701_130244
0.015 0.046 0.059
Control Point
60 [01 JUL
2025]Track_B_20250701_131038
0.085 0.040 0.064
Control Point
268 [01 JUL
2025]TrackZ_A_20250701_134044
-0.188 0.268 0.026
Control Point
306 [01 JUL
2025]TrackZ_B_20250701_134126
-0.087 0.219 0.003
T-11 936771.703 626266.440 9.464
29 [01 JUL
2025]Track_A_20250701_130244
-0.044 -0.073 0.083
Control Point
61 [01 JUL
2025]Track_B_20250701_131038
0.012 -0.040 0.049
Control Point
269 [01 JUL
2025]TrackZ_A_20250701_134044
-0.038 0.035 0.024
307 [01 JUL
2025]TrackZ_B_20250701_134126
-0.114 0.066 0.013
V-3 937007.232 626278.735 10.106
33 [01 JUL
2025]Track_A_20250701_130244
0.006 -0.018 0.025
Control Point
65 [01 JUL
2025]Track_B_20250701_131038
0.006 -0.032 0.020
Control Point
271 [01 JUL
2025]TrackZ_E_20250701_134420
0.003 0.003 0.014
Control Point
309 [01 JUL
2025]TrackZ_D_20250701_134317
-0.051 0.038 0.025
T-12 937041.092 626237.891 10.273
30 [01 JUL
2025]Track_A_20250701_130244
0.013 0.043 0.015
Control Point
62 [01 JUL
2025]Track_B_20250701_131038
0.027 -0.027 0.033
Control Point
270 [01 JUL
2025]TrackZ_E_20250701_134420
0.091 0.224 0.022
Control Point
308 [01 JUL
2025]TrackZ_D_20250701_134317
0.046 0.059 0.014
C-22 937253.153 626503.965 11.409
274 [01 JUL
2025]TrackZ_G_20250701_134831
-0.006 -0.018 0.004
C-19 937260.587 626248.827 10.336
16 [01 JUL
2025]Track_A_20250701_130244
0.086 -0.026 0.042
Control Point
48 [01 JUL
2025]Track_B_20250701_131038
0.088 -0.053 0.040
Control Point
272 [01 JUL
2025]TrackZ_G_20250701_134831
0.035 -0.011 0.008
Control Point
319 [01 JUL
2025]TrackZ_F_20250701_134627
-0.020 -0.093 -0.011
C-21 937311.895 626497.604 10.974
273 [01 JUL
2025]TrackZ_G_20250701_134831
0.028 -0.039 0.010
C-20 937318.889 626293.815 10.330
17 [01 JUL
2025]Track_A_20250701_130244
-0.069 0.001 0.041
Control Point
49 [01 JUL
2025]Track_B_20250701_131038
-0.078 0.007 0.052
Control Point
320 [01 JUL
2025]TrackZ_F_20250701_134627
-0.064 0.024 0.010
C-25 937486.580 626292.252 7.268
18 [01 JUL
2025]Track_A_20250701_130244
-0.043 -0.022 0.054
Control Point
50 [01 JUL
2025]Track_B_20250701_131038
0.028 -0.076 0.037
ATTACHMENT F
Crew and Equipment List
Software:
Leica Cyclone Leica Pegasus Manager MicroStation Open Roads TopoDot
EFBP_NT
Trimble Business Center
Equipment:
Leica TS06 total Station Leica CS20 Leica Pegasus Ultimate 2 Trimble R8 Trimble TSC5
People:
Carlos E Alonso – Project Manager / SUR Senior Surveyor Mark Sowers - Project Manager / SUR Senior Surveyor Javier Alonso – SUR Surveyor Analyst 3 Edgar de Moya – SUR Surveyor Analyst 3 Brennen Mosciski - SUR Surveyor Analyst 3 Joel Besteiro – Party Chief Darien Gonzalez – Instrument Man Rafael Pavon – Rod Man John Vera – Party Chief David Mato – Instrument Man Rolando Sara – Rod Man Yadian Garcia – Party Chief Jesus Garcia – Instrument Man Manuel Bueno – Rod Man Jose Yumar – Party Chief Jorge Pitaluga – Rod Man
ATTACHMENT G
Heat Map
ATTACHMENT H
Crossing Chains Report
Terrain Crossing Features Report
Report Created: Thursday, September 25, 2025 Time: 3:21:55 PM
Page 1 of 1Terrain Crossing Features Report
9/25/2025file:///C:/Users/Javier.Alonso/AppData/Local/Temp/RPTisahvmnj.html
| 25602ML YXZ.pdf |
| 25602ML YXZ |
| QC REPORT.pdf |
| Analysis |
| 2026-02-11T13:34:17-0500 | |
| Mark R Sowers |
File details come from the government source that posted it. Updated .