Surveyor's_Report.pdf

PDF 2 MB Posted

Attached to
NW 1ST STREET COMPLETE STREETS IMPROVEMENT LOCAL AGENCY PROGRAM (LAP) PROJECT State and local contract opportunity
Solicitation number
26-015
Issued by
Santa Rosa County, Mount Carmel CDP, Florida

About this file

This is a Surveyor's Report prepared by M.G. Vera & Associates, Inc. for the City of Dania Beach's NW 1st Street Complete Streets Improvement Local Agency Program (LAP) Project in Broward County, Florida. The design survey was conducted along NW 1st Street from Bryan Road to U.S. 1/Federal Highway, with fieldwork commencing on June 5, 2025, and concluding on August 7, 2025. The survey obtained existing topographic and digital terrain model (DTM) data along the corridor, including drainage and right-of-way information throughout the project limits. The survey combined conventional data collection methods using a Leica TS06 total station with mobile lidar technology mounted on a vehicle, capturing above-ground features, break-lines, utilities, drainage structures, lighting, pavement markings, trees, pedestrian ramps, driveways, and hardscape elements at 50-foot intervals. Control points were established using the State Plane Coordinate System (Florida East Zone, NAD 83/90) horizontally and North American Vertical Datum of 1988 (NAVD 88) vertically. Quality control measures included dual GPS measurements at mobile lidar targets spaced approximately 500 feet apart, with verification through heat map analysis and trajectory adjustments. The survey produced multiple deliverables including the survey report, MicroStation design files, digital terrain model files, and comprehensive electronic survey data collection folders with attachments documenting control points, mobile lidar diagrams, quality check reports, crew and equipment lists, and heat map analyses.

The survey was certified by Mark Sowers, a Florida Professional Surveyor and Mapper (License Number 5266), acting under the Certificate of Authorization LB No. 2439 for M.G. Vera & Associates, Inc. Project personnel included surveyors, analyst, party chiefs, instrument operators, and rod personnel. Equipment utilized included Leica surveying instruments, Trimble GPS receivers, MicroStation software, Leica Cyclone and Pegasus Manager processing software, and TopoDot modeling applications. Quality control data reported in Attachment D indicates mobile lidar point cloud adjustments with mean deviations of 0.067 feet in X-direction, 0.143 feet in Y-direction, and 0.048 feet in Z-direction, with RMS errors of 0.095, 0.226, and 0.059 feet respectively for horizontal and vertical accuracy. The survey data supports the City of Dania Beach's planned improvements to NW 1st Street, which include roadway improvements, bike lanes, pedestrian traffic signals, sidewalk repairs, and sidewalk harmonization to enhance capacity and safety for pedestrian and bicycle access to schools and bus stops. Bids for the complete streets improvement project were solicited with deadlines of 1:00 p.m. on July 17, 2026, and 10:00 a.m. on July 27, 2026, via the City's e-Procurement Portal.

View the file

Other files for this state and local contract opportunity

Other files attached to NW 1ST STREET COMPLETE STREETS IMPROVEMENT LOCAL AGENCY PROGRAM (LAP) PROJECT, newest first.
File Type Posted
NW_1ST_STREET_COMPLETE_STREETS_IMPROVEMENT_LOCAL_AGENCY_PROGRAM_(LAP)_PROJECT_(Addendum_#5_Revision).pdf PDF
NW_1ST_STREET_COMPLETE_STREETS_IMPROVEMENT_LOCAL_AGENCY_PROGRAM_(LAP)_PROJECT.pdf PDF
DRAFT_Construction_Agreement_052026.pdf PDF
DRAFT_Construction_Agreement_052026.pdf PDF
BCSWM_Exemption.pdf PDF
Civil_Plans-S&S.pdf PDF
Drainage_Technical_Specifications-S&S.pdf PDF
Geotechnical_Report.pdf PDF
BCSWM_Exemption.pdf PDF
BCTED_Tech_Policy_Memo_TPM-23-001_Specifications_for_Retroreflective_Traffic_Sign_Materials.pdf PDF
BCTED_Approved_Plans.pdf PDF
BCTED_Tech_Policy_Memo_TPM-23-001_Specifications_for_Retroreflective_Traffic_Sign_Materials.pdf PDF
FDOT_LAP_Technical_Specifications.pdf PDF
Surveyor's_Report.pdf PDF
Drainage_Technical_Specifications-S&S.pdf PDF
Geotechnical_Report.pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
Parks_Landscape_Services.pdf PDF
Parks_Landscape_Services.pdf PDF
Parks_Landscape_Services.pdf PDF
Draft_Contract_for_ITB-26-015_Parks_Landscape_Services.pdf PDF
Draft_Contract_for_ITB-26-015_Parks_Landscape_Services.pdf PDF
Draft_Contract_for_ITB-26-015_Parks_Landscape_Services.pdf PDF
EastMiltonPark24x24MapOfParkAndAthleticSpaces.pdf PDF
EastMiltonPark24x24MapOfParkAndAthleticSpaces.pdf PDF
EastMiltonPark24x24MapOfParkAndAthleticSpaces.pdf PDF
BennyRussellPark24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
TigerPointPark24x24MapofParkAndAthleticSpaces.jpg JPG image
TigerPointPark24x24MapofParkAndAthleticSpaces.jpg JPG image
BennyRussellPark24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
EntireSantaRosaSoccerField24x24MapOfParkAndAthleticSpaces.jpg JPG image
BagdadMillSitePark24x24MapofParkAndAthleticSpaces.jpg JPG image
PaceAreaRecreationalPark24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
BagdadMillSitePark24x24MapofParkAndAthleticSpaces.jpg JPG image
PaceAreaRecreationalPark24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
SantaRosaSportsPlex24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
TigerPointPark24x24MapofParkAndAthleticSpaces.jpg JPG image
SantaRosaSoccerPark24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
SantaRosaSportsPlex24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
BennyRussellPark24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
SantaRosaSportsPlex24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
SantaRosaSoccerPark24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
EntireSantaRosaSoccerField24x24MapOfParkAndAthleticSpaces.jpg JPG image
EntireSantaRosaSoccerField24x24MapOfParkAndAthleticSpaces.jpg JPG image
SantaRosaSoccerPark24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
BagdadMillSitePark24x24MapofParkAndAthleticSpaces.jpg JPG image
PaceAreaRecreationalPark24x24MapOfParkAndAthleticSpaces(1).jpg JPG image
Show all 50

NW 1ST STREET COMPLETE STREETS IMPROVEMENT LOCAL AGENCY PROGRAM (LAP) PROJECT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M. G. Vera & Assoc., Inc. ENGINEERS••••SURVEYORS••••PLANNERS

MANUEL G. VERA & ASSOCIATES, INC. •••• 13960 SOUTHWEST 47TH STREET •••• MIAMI, FL 33175

PHONE (305) 221-6210 • FAX (305) 221-1295 • ON THE WEB @ WWW.MGVERA.COM

SURVEYOR’S REPORT

Design Survey

NW 1st STREET

From Bryan Road to U.S. 1 / Federal Highway

Broward County

Prepared By:

M.G. Vera & Associates, Inc.

13960 SW 47th Street, Miami, Fl 33175

L.B. No. 2439

MG Vera Project No: 25-602

SURVEY REPORT

1. PROJECT INFORMATION

1.1. Manuel G. Vera & Associates, Inc.

1.2. Design Survey

1.3. NW 1st Street

1.4. Project limits: Bryan Raot to U.S. 1 / Federal Highway

Project is located in Broward County, Florida.

1.5. Survey date: Start: 06/05/2025

End: 08/7/2025

1.6. Units of measure: U.S. Survey Feet

2. TYPE OF SURVEY

The Design Survey is in accordance with Rule Chapter 5J-17.050, Florida Administrative Code. This design survey was done to obtain existing topographic/digital terrain model along NW 1st Street. The task included Topographic/DTM on the side streets and all the ground area. Drainage & Right of Way was performed throughout the entirety of the project.

3. METHODOLOGY

A combination of conventional data collection and mobile lidar methods were used to acquire the data. MGV used the Leica TS06 total station and Leica CS18 data collector to collect data in the ground area and obscured areas. All above ground features and improvements, break-lines, high and low points were located with sufficient density of points of 50’ intervals. All topographic features will be located including existing lighting, pavement markings, trees, pedestrian ramps, driveways, visible above ground utilities, sodded and paved areas, drainage structures, etc. The information gathered in the field was then processed using Infinity and then imported and processed in MicroStation.

The mobile lidar information was gathered using a Leica Pegasus Ultimate 2. The Mobile lidar unit was used to locate data along the side streets and hard surfaces. Mobile lidar targets were strategically placed throughout the limits of the project at a maximum of about 500’. See Attachment D for mobile lidar target diagram. These targets were then controlled horizontally using the FPRN network and were measured twice for 3 minutes and with 4 hours difference between measurements.

The average between the two measurements for each target was used as the coordinates for the targets. The targets were controlled vertically from project network control that had been placed throughout the project limits.

The mobile lidar scanner was mounted on a Jeep Cherokee with special mounting brackets. Before the beginning of a mission the unit is calibrated by performing 20 minutes of static GPS. After the static GPS a 10-minute dynamic GPS calibration is performed as well. Once the system is calibrated the mission can begin. The limits of the job are driven by performing multiple passes along the roadways. These drives are performed at a max speed of 40 miles per hour on the highway and 20

MPH on the side streets. Once the limits have been driven a 10-minute dynamic GPS session is performed and then followed by 10 minutes of static GPS.

The Mobile lidar information was then processed in Leica Pegasus manager. The information is first preliminarily processed by running multiple programs including trajectory adjustment, navigation preparation, time alignment, generate image orientation, generate 3D point cloud and create peg tracks. These processes generate the point cloud data that is then adjusted and controlled to the mobile lidar targets that have been placed throughout the project. See attachment D & E for Mobile lidar data analysis. A .las file is exported and then checked to make sure the cloud has been correctly adjusted. The information is imported into MicroStation and using TopoDOT program it is then modeled. The modeled information is checked by heat maps to the cloud data. See attachment G for heat maps. Once the information is confirmed to match the cloud it is merged with the conventional data that was collected, a digital terrain model (DTM) is created with both sets of information

4. PROJECT CONTROL

4.1. Horizontal Datum: State Plane Coordinate System, Florida East Zone, North American Datum (NAD) of 1983, adjustment of 1990. See attachment B for control point values.

4.2. Vertical Datum: North American Vertical Datum of 1988 (NAVD 88)

5. GENERAL NOTES

• Neither the accompanying digital files listed herein nor this report of survey is full and complete without the other.

• Field Book References: FDOT#, MGV 1252 Series

• Design survey measurements were constrained horizontally to the NAD 83/90 and vertically to

NAVD 88

• Any copies of the digital data are invalid without the verified digital seal of the Florida Professional Surveyor and Mapper in responsible charge. Any additions or deletions to this data by anyone other than the signing Professional Surveyor and Mapper are prohibited without the written consent of the signing Professional Surveyor and Mapper.

7. LEGEND AND ABBREVIATIONS

See Attachment “A”

8. FILES LIST

Electronic files delivered:

• MGV Survey Report NW 1st STREET DANIA BEACH.pdf

• SURVRD01_ORD.dgn

• GDTMRD01.tin

• ELECTONIC SURVEY DATA COLLECTION Folder

• Attachment A Legend

• Attachment B Control Points

• Attachment C Mobile Lidar Diagram

• Attachment D Mobile Lidar Data Quality Check

• Attachment E Mobile Lidar Data Control Deviation

• Attachment F Crew and Equipment List

• Attachment G Heat Map

• Attachment H Crossing Chains Report

9. CERTIFICATION

I hereby certify that this survey and all files herein are a true and accurate representation of a field survey made under my responsible charge, and that to the best of my knowledge meets the Standards of Practice as set forth by the Board of Professional Surveyors and Mappers in Rule Chapter 5J-17 of the Florida Administrative Code.

Electronically Signed/Date

Mark Sowers, PSM, Date Florida Professional Surveyor and Mapper License Number 5266 For the Firm of:

Manuel G. Vera & Associates, Inc.

13960 S.W. 47th Street Miami, FL 33175-3616

TEL: (305) 221-6210

Certificate of Authorization: LB 2439

M. G. Vera & Assoc., Inc. ENGINEERS•SURVEYORS•PLANNERS

MANUEL G. VERA & ASSOCIATES, INC. • 13960 SOUTHWEST 47TH STREET • MIAMI, FL 33175

ATTACHMENT A

ATTACHMENT B

Control Points

NAME Y X Z Description

C-2 625980.4633 933259.0763 4.569 NL

C-3 626100.5984 933258.4874 4.284 NL

C-4 626167.1398 933275.8299 4.203 NL

C-5 626242.6241 933232.0194 3.48 NL

C-6 626248.846 933270.4873 4.007 NL

C-7 626136.9316 933528.6784 8.627 NL

C-8 626176.057 933645.3802 8.107 NL

C-9 626212.6914 934577.4864 4.558 NL

C-10 626195.1627 935090.0034 4.604 NL

C-11 626230.4464 935140.7004 4.558 NL

C-12 626206.7273 935741.0284 5.977 NL

C-13 626238.0576 935792.4261 5.997 NL

C-14 626224.6026 936262.2826 6.427 NL

C-15 626255.8489 936299.7748 6.508 NL

C-16 626233.5104 936511.774 9.205 NL

C-17 626264.4641 936570.7434 9.607 NL

C-18 626261.4102 936681.3282 9.497 NL

C-19 626248.8265 937260.587 10.336 NL

C-20 626293.8147 937318.8892 10.33 NL

C-21 626497.6035 937311.8949 10.974 NL

C-22 626503.9654 937253.1529 11.409 NL

C-23 625986.9366 937329.3688 10.299 NL

C-24 625987.4516 937270.8673 10.773 NL

C-25 626292.2515 937486.5804 7.268 NL

T-1 626181.2859 933785.7882 5.206 NL

T-2 626156.7877 933918.9089 4.676 NL

T-3 626162.1304 934044.4119 5.222 NL

T-4 626206.7285 934343.5267 4.946 NL

T-5 626179.0669 934454.3589 5.272 NL

T-6 626222.8343 934865.9347 4.665 NL

T-7 626232.0182 935522.137 7.034 NL

T-8 626216.5485 936017.4067 5.769 NL

T-9 626247.4462 936051.3976 5.375 NL

T-10 626240.3772 936751.135 9.422 NL

T-11 626266.4404 936771.7033 9.464 NL

T-12 626237.8914 937041.0917 10.273 NL

V-1 626194.555 934091.2086 5.239 NL

V-2 626194.2667 935481.5963 5.992 NL

V-3 626278.735 937007.2323 10.106 NL

ATTACHMENT C

Mobile Lidar Diagram

ATTACHMENT D

Mobile Lidar Data Quality Check

NAME FID TRACK XGCP YGCP ZGCP DX DX Abs DY DY Abs DZ DZ Abs D3D FMATCH ANNOT C-3 1 [01 JUL 2025]Tra 933258.487 626100.598 4.284 0.015 0.015 0.051 0.051 0.006 0.006 0.053 Manually reacqu C-4 2 [01 JUL 2025]Tra 933275.83 626167.14 4.203 0.01 0.01 -0.058 0.058 0.005 0.005 0.059 Manually reacqu C-5 3 [01 JUL 2025]Tra 933232.019 626242.624 3.48 -0.092 0.092 -0.07 0.07 -0.01 0.01 0.116 Manually reacqu C-7 4 [01 JUL 2025]Tra 933528.678 626136.932 8.627 0.05 0.05 0.021 0.021 0.107 0.107 0.12 Manually reacqu C-8 5 [01 JUL 2025]Tra 933645.38 626176.057 8.107 0.074 0.074 -0.14 0.14 0.069 0.069 0.173 Manually reacqu C-9 6 [01 JUL 2025]Tra 934577.486 626212.691 4.558 -0.006 0.006 -0.035 0.035 0.066 0.066 0.075 Manually reacqu

C-10 7 [01 JUL 2025]Tra 935090.003 626195.163 4.604 -0.032 0.032 0.024 0.024 0.053 0.053 0.066 Manually reacqu C-11 8 [01 JUL 2025]Tra 935140.7 626230.446 4.558 0.035 0.035 0.019 0.019 0.052 0.052 0.066 Manually reacqu C-12 9 [01 JUL 2025]Tra 935741.028 626206.727 5.977 0.002 0.002 0.03 0.03 0.032 0.032 0.044 Manually reacqu C-13 10 [01 JUL 2025]Tra 935792.426 626238.058 5.997 -0.212 0.212 0.013 0.013 0.037 0.037 0.216 Manually reacqu C-14 11 [01 JUL 2025]Tra 936262.283 626224.603 6.427 0.01 0.01 0.033 0.033 0.026 0.026 0.043 Manually reacqu C-15 12 [01 JUL 2025]Tra 936299.775 626255.849 6.508 -0.046 0.046 0.049 0.049 0.071 0.071 0.098 Manually reacqu C-16 13 [01 JUL 2025]Tra 936511.774 626233.51 9.205 0.078 0.078 0.057 0.057 0.083 0.083 0.127 Manually reacqu C-17 14 [01 JUL 2025]Tra 936570.743 626264.464 9.607 -0.013 0.013 -0.011 0.011 0.107 0.107 0.109 Manually reacqu C-18 15 [01 JUL 2025]Tra 936681.328 626261.41 9.497 -0.099 0.099 0.051 0.051 0.089 0.089 0.142 Manually reacqu C-19 16 [01 JUL 2025]Tra 937260.587 626248.827 10.336 0.086 0.086 -0.026 0.026 0.042 0.042 0.099 Manually reacqu C-20 17 [01 JUL 2025]Tra 937318.889 626293.815 10.33 -0.069 0.069 0.001 0.001 0.041 0.041 0.08 Manually reacqu C-25 18 [01 JUL 2025]Tra 937486.58 626292.252 7.268 -0.043 0.043 -0.022 0.022 0.054 0.054 0.072 Manually reacqu T-1 19 [01 JUL 2025]Tra 933785.788 626181.286 5.206 -0.069 0.069 -0.009 0.009 0.045 0.045 0.083 Manually reacqu T-2 20 [01 JUL 2025]Tra 933918.909 626156.788 4.676 -0.047 0.047 -0.092 0.092 0.043 0.043 0.112 Manually reacqu T-3 21 [01 JUL 2025]Tra 934044.412 626162.13 5.222 -0.053 0.053 -0.014 0.014 0.055 0.055 0.078 Manually reacqu T-4 22 [01 JUL 2025]Tra 934343.527 626206.729 4.946 -0.014 0.014 0.064 0.064 0.092 0.092 0.113 Manually reacqu T-5 23 [01 JUL 2025]Tra 934454.359 626179.067 5.272 0.03 0.03 -0.008 0.008 0.084 0.084 0.09 Manually reacqu T-6 24 [01 JUL 2025]Tra 934865.935 626222.834 4.665 -0.08 0.08 -0.067 0.067 0.038 0.038 0.111 Manually reacqu T-7 25 [01 JUL 2025]Tra 935522.137 626232.018 7.034 -0.079 0.079 0.044 0.044 0.081 0.081 0.122 Manually reacqu T-8 26 [01 JUL 2025]Tra 936017.407 626216.549 5.769 0.038 0.038 -0.009 0.009 0.027 0.027 0.048 Manually reacqu T-9 27 [01 JUL 2025]Tra 936051.398 626247.446 5.375 -0.099 0.099 0.007 0.007 0.044 0.044 0.109 Manually reacqu

T-10 28 [01 JUL 2025]Tra 936751.135 626240.377 9.422 0.015 0.015 0.046 0.046 0.059 0.059 0.076 Manually reacqu T-11 29 [01 JUL 2025]Tra 936771.703 626266.44 9.464 -0.044 0.044 -0.073 0.073 0.083 0.083 0.119 Manually reacqu T-12 30 [01 JUL 2025]Tra 937041.092 626237.891 10.273 0.013 0.013 0.043 0.043 0.015 0.015 0.048 Manually reacqu

QC REPORT

V-1 31 [01 JUL 2025]Tra 934091.209 626194.555 5.239 0.008 0.008 0.069 0.069 0.049 0.049 0.085 Manually reacqu V-2 32 [01 JUL 2025]Tra 935481.596 626194.267 5.992 -0.034 0.034 0.041 0.041 0.076 0.076 0.093 Manually reacqu V-3 33 [01 JUL 2025]Tra 937007.232 626278.735 10.106 0.006 0.006 -0.018 0.018 0.025 0.025 0.032 Manually reacqu C-3 34 [01 JUL 2025]Tra 933258.487 626100.598 4.284 -0.027 0.027 0.033 0.033 -0.039 0.039 0.057 Manually reacqu C-4 35 [01 JUL 2025]Tra 933275.83 626167.14 4.203 -0.05 0.05 -0.051 0.051 -0.01 0.01 0.072 Manually reacqu C-7 36 [01 JUL 2025]Tra 933528.678 626136.932 8.627 0.008 0.008 0.12 0.12 0.054 0.054 0.131 Manually reacqu C-8 37 [01 JUL 2025]Tra 933645.38 626176.057 8.107 -0.019 0.019 -0.02 0.02 0.065 0.065 0.07 Manually reacqu C-9 38 [01 JUL 2025]Tra 934577.486 626212.691 4.558 -0.055 0.055 -0.022 0.022 0.082 0.082 0.101 Manually reacqu

C-10 39 [01 JUL 2025]Tra 935090.003 626195.163 4.604 0.028 0.028 -0.047 0.047 0.066 0.066 0.086 Manually reacqu C-11 40 [01 JUL 2025]Tra 935140.7 626230.446 4.558 -0.029 0.029 0 0 0.068 0.068 0.073 Manually reacqu C-12 41 [01 JUL 2025]Tra 935741.028 626206.727 5.977 0.098 0.098 0.017 0.017 0.04 0.04 0.108 Manually reacqu C-13 42 [01 JUL 2025]Tra 935792.426 626238.058 5.997 -0.091 0.091 -0.031 0.031 0.029 0.029 0.1 Manually reacqu C-14 43 [01 JUL 2025]Tra 936262.283 626224.603 6.427 0.011 0.011 -0.001 0.001 0.032 0.032 0.034 Manually reacqu C-15 44 [01 JUL 2025]Tra 936299.775 626255.849 6.508 -0.022 0.022 0.042 0.042 0.045 0.045 0.066 Manually reacqu C-16 45 [01 JUL 2025]Tra 936511.774 626233.51 9.205 -0.001 0.001 0.034 0.034 0.095 0.095 0.101 Manually reacqu C-17 46 [01 JUL 2025]Tra 936570.743 626264.464 9.607 -0.01 0.01 -0.005 0.005 0.103 0.103 0.104 Manually reacqu C-18 47 [01 JUL 2025]Tra 936681.328 626261.41 9.497 -0.087 0.087 0.013 0.013 0.083 0.083 0.121 Manually reacqu C-19 48 [01 JUL 2025]Tra 937260.587 626248.827 10.336 0.088 0.088 -0.053 0.053 0.04 0.04 0.11 Manually reacqu C-20 49 [01 JUL 2025]Tra 937318.889 626293.815 10.33 -0.078 0.078 0.007 0.007 0.052 0.052 0.094 Manually reacqu C-25 50 [01 JUL 2025]Tra 937486.58 626292.252 7.268 0.028 0.028 -0.076 0.076 0.037 0.037 0.089 Manually reacqu T-1 51 [01 JUL 2025]Tra 933785.788 626181.286 5.206 -0.018 0.018 0.05 0.05 0.036 0.036 0.064 Manually reacqu T-2 52 [01 JUL 2025]Tra 933918.909 626156.788 4.676 -0.019 0.019 -0.104 0.104 0.054 0.054 0.119 Manually reacqu T-3 53 [01 JUL 2025]Tra 934044.412 626162.13 5.222 0.013 0.013 -0.037 0.037 0.047 0.047 0.061 Manually reacqu T-4 54 [01 JUL 2025]Tra 934343.527 626206.729 4.946 -0.05 0.05 0 0 0.079 0.079 0.093 Manually reacqu T-5 55 [01 JUL 2025]Tra 934454.359 626179.067 5.272 0.053 0.053 -0.007 0.007 0.088 0.088 0.103 Manually reacqu T-6 56 [01 JUL 2025]Tra 934865.935 626222.834 4.665 -0.084 0.084 -0.095 0.095 0.013 0.013 0.127 Manually reacqu T-7 57 [01 JUL 2025]Tra 935522.137 626232.018 7.034 -0.054 0.054 0.045 0.045 0.08 0.08 0.107 Manually reacqu T-8 58 [01 JUL 2025]Tra 936017.407 626216.549 5.769 0.02 0.02 -0.013 0.013 0.03 0.03 0.038 Manually reacqu T-9 59 [01 JUL 2025]Tra 936051.398 626247.446 5.375 -0.082 0.082 -0.06 0.06 0.015 0.015 0.103 Manually reacqu

T-10 60 [01 JUL 2025]Tra 936751.135 626240.377 9.422 0.085 0.085 0.04 0.04 0.064 0.064 0.114 Manually reacqu T-11 61 [01 JUL 2025]Tra 936771.703 626266.44 9.464 0.012 0.012 -0.04 0.04 0.049 0.049 0.064 Manually reacqu T-12 62 [01 JUL 2025]Tra 937041.092 626237.891 10.273 0.027 0.027 -0.027 0.027 0.033 0.033 0.05 Manually reacqu V-1 63 [01 JUL 2025]Tra 934091.209 626194.555 5.239 -0.024 0.024 -0.017 0.017 0.053 0.053 0.061 Manually reacqu

V-2 64 [01 JUL 2025]Tra 935481.596 626194.267 5.992 -0.044 0.044 0.022 0.022 0.079 0.079 0.093 Manually reacqu V-3 65 [01 JUL 2025]Tra 937007.232 626278.735 10.106 0.006 0.006 -0.032 0.032 0.02 0.02 0.038 Manually reacqu

T-10 268 [01 JUL 2025]Tra 936751.135 626240.377 9.422 -0.188 0.188 0.268 0.268 0.026 0.026 0.328 Manually reacqu T-11 269 [01 JUL 2025]Tra 936771.703 626266.44 9.464 -0.038 0.038 0.035 0.035 0.024 0.024 0.057 Manually reacqu T-12 270 [01 JUL 2025]Tra 937041.092 626237.891 10.273 0.091 0.091 0.224 0.224 0.022 0.022 0.243 Manually reacqu V-3 271 [01 JUL 2025]Tra 937007.232 626278.735 10.106 0.003 0.003 0.003 0.003 0.014 0.014 0.015 Manually reacqu

C-19 272 [01 JUL 2025]Tra 937260.587 626248.827 10.336 0.035 0.035 -0.011 0.011 0.008 0.008 0.038 Manually reacqu C-21 273 [01 JUL 2025]Tra 937311.895 626497.604 10.974 0.028 0.028 -0.039 0.039 0.01 0.01 0.049 Manually reacqu C-22 274 [01 JUL 2025]Tra 937253.153 626503.965 11.409 -0.006 0.006 -0.018 0.018 0.004 0.004 0.019 Manually reacqu T-3 275 [01 JUL 2025]Tra 934044.412 626162.13 5.222 -0.016 0.016 -0.093 0.093 -0.017 0.017 0.096 Manually reacqu V-1 276 [01 JUL 2025]Tra 934091.209 626194.555 5.239 0.047 0.047 -0.045 0.045 -0.029 0.029 0.071 Manually reacqu

C-10 277 [01 JUL 2025]Tra 935090.003 626195.163 4.604 0.244 0.244 0.405 0.405 0.141 0.141 0.494 Manually reacqu C-11 278 [01 JUL 2025]Tra 935140.7 626230.446 4.558 0.21 0.21 0.395 0.395 0.156 0.156 0.474 Manually reacqu C-12 279 [01 JUL 2025]Tra 935741.028 626206.727 5.977 0.216 0.216 0.507 0.507 0.045 0.045 0.553 Manually reacqu C-13 280 [01 JUL 2025]Tra 935792.426 626238.058 5.997 -0.089 0.089 0.647 0.647 0.048 0.048 0.655 Manually reacqu C-12 281 [01 JUL 2025]Tra 935741.028 626206.727 5.977 0.223 0.223 0.595 0.595 0.028 0.028 0.636 Manually reacqu C-13 282 [01 JUL 2025]Tra 935792.426 626238.058 5.997 -0.006 0.006 0.628 0.628 0.047 0.047 0.63 Manually reacqu T-7 283 [01 JUL 2025]Tra 935522.137 626232.018 7.034 0.128 0.128 0.612 0.612 0.138 0.138 0.64 Manually reacqu V-2 284 [01 JUL 2025]Tra 935481.596 626194.267 5.992 0.064 0.064 -0.014 0.014 0.084 0.084 0.107 Manually reacqu T-8 285 [01 JUL 2025]Tra 936017.407 626216.549 5.769 0.06 0.06 0.451 0.451 0.02 0.02 0.455 Manually reacqu T-9 286 [01 JUL 2025]Tra 936051.398 626247.446 5.375 -0.127 0.127 0.417 0.417 -0.007 0.007 0.436 Manually reacqu

C-16 287 [01 JUL 2025]Tra 936511.774 626233.51 9.205 0.045 0.045 0.255 0.255 0.011 0.011 0.26 Manually reacqu C-17 288 [01 JUL 2025]Tra 936570.743 626264.464 9.607 -0.148 0.148 0.27 0.27 0.002 0.002 0.308 Manually reacqu T-1 289 [01 JUL 2025]Tra 933785.788 626181.286 5.206 -0.05 0.05 -0.099 0.099 -0.03 0.03 0.115 Manually reacqu T-2 290 [01 JUL 2025]Tra 933918.909 626156.788 4.676 -0.015 0.015 -0.267 0.267 -0.021 0.021 0.268 Manually reacqu C-9 291 [01 JUL 2025]Tra 934577.486 626212.691 4.558 0.312 0.312 0.226 0.226 -0.02 0.02 0.386 Manually reacqu T-6 292 [01 JUL 2025]Tra 934865.935 626222.834 4.665 0.15 0.15 0.327 0.327 0.052 0.052 0.364 Manually reacqu T-7 293 [01 JUL 2025]Tra 935522.137 626232.018 7.034 0.053 0.053 0.638 0.638 0.121 0.121 0.651 Manually reacqu V-2 294 [01 JUL 2025]Tra 935481.596 626194.267 5.992 0.202 0.202 0.578 0.578 0.115 0.115 0.623 Manually reacqu

C-14 295 [01 JUL 2025]Tra 936262.283 626224.603 6.427 0.07 0.07 0.353 0.353 0.027 0.027 0.361 Manually reacqu C-15 296 [01 JUL 2025]Tra 936299.775 626255.849 6.508 -0.153 0.153 0.325 0.325 0.046 0.046 0.362 Manually reacqu T-3 297 [01 JUL 2025]Tra 934044.412 626162.13 5.222 -0.044 0.044 -0.005 0.005 -0.033 0.033 0.055 Manually reacqu T-4 298 [01 JUL 2025]Tra 934343.527 626206.729 4.946 0.065 0.065 0.176 0.176 0.041 0.041 0.192 Manually reacqu

V-1 299 [01 JUL 2025]Tra 934091.209 626194.555 5.239 0.054 0.054 0.104 0.104 -0.021 0.021 0.119 Manually reacqu T-4 300 [01 JUL 2025]Tra 934343.527 626206.729 4.946 0.194 0.194 0.136 0.136 0.044 0.044 0.241 Manually reacqu T-5 301 [01 JUL 2025]Tra 934454.359 626179.067 5.272 0.104 0.104 0.13 0.13 0.022 0.022 0.168 Manually reacqu T-2 302 [01 JUL 2025]Tra 933918.909 626156.788 4.676 -0.02 0.02 -0.114 0.114 -0.009 0.009 0.116 Manually reacqu T-3 303 [01 JUL 2025]Tra 934044.412 626162.13 5.222 0.057 0.057 -0.106 0.106 -0.019 0.019 0.122 Manually reacqu C-9 304 [01 JUL 2025]Tra 934577.486 626212.691 4.558 0.147 0.147 0.239 0.239 -0.022 0.022 0.282 Manually reacqu T-5 305 [01 JUL 2025]Tra 934454.359 626179.067 5.272 0.053 0.053 0.225 0.225 0.016 0.016 0.232 Manually reacqu

T-10 306 [01 JUL 2025]Tra 936751.135 626240.377 9.422 -0.087 0.087 0.219 0.219 0.003 0.003 0.236 Manually reacqu T-11 307 [01 JUL 2025]Tra 936771.703 626266.44 9.464 -0.114 0.114 0.066 0.066 0.013 0.013 0.133 Manually reacqu T-12 308 [01 JUL 2025]Tra 937041.092 626237.891 10.273 0.046 0.046 0.059 0.059 0.014 0.014 0.077 Manually reacqu V-3 309 [01 JUL 2025]Tra 937007.232 626278.735 10.106 -0.051 0.051 0.038 0.038 0.025 0.025 0.068 Manually reacqu T-6 310 [01 JUL 2025]Tra 934865.935 626222.834 4.665 0.29 0.29 0.407 0.407 0.054 0.054 0.503 Manually reacqu T-8 311 [01 JUL 2025]Tra 936017.407 626216.549 5.769 0.034 0.034 0.511 0.511 0.022 0.022 0.512 Manually reacqu T-9 312 [01 JUL 2025]Tra 936051.398 626247.446 5.375 -0.034 0.034 0.462 0.462 0.015 0.015 0.464 Manually reacqu

C-14 313 [01 JUL 2025]Tra 936262.283 626224.603 6.427 0.019 0.019 0.431 0.431 0.04 0.04 0.433 Manually reacqu C-15 314 [01 JUL 2025]Tra 936299.775 626255.849 6.508 0.058 0.058 0.41 0.41 0.024 0.024 0.415 Manually reacqu C-16 315 [01 JUL 2025]Tra 936511.774 626233.51 9.205 -0.014 0.014 0.213 0.213 0.009 0.009 0.214 Manually reacqu C-17 316 [01 JUL 2025]Tra 936570.743 626264.464 9.607 -0.051 0.051 0.272 0.272 0.028 0.028 0.278 Manually reacqu T-7 317 [01 JUL 2025]Tra 935522.137 626232.018 7.034 -0.008 0.008 0.451 0.451 0.127 0.127 0.468 Manually reacqu V-2 318 [01 JUL 2025]Tra 935481.596 626194.267 5.992 0.341 0.341 0.435 0.435 0.11 0.11 0.564 Manually reacqu

C-19 319 [01 JUL 2025]Tra 937260.587 626248.827 10.336 -0.02 0.02 -0.093 0.093 -0.011 0.011 0.096 Manually reacqu C-20 320 [01 JUL 2025]Tra 937318.889 626293.815 10.33 -0.064 0.064 0.024 0.024 0.01 0.01 0.07 Manually reacqu C-10 321 [01 JUL 2025]Tra 935090.003 626195.163 4.604 -0.017 0.017 -0.044 0.044 0.133 0.133 0.141 Manually reacqu C-11 322 [01 JUL 2025]Tra 935140.7 626230.446 4.558 0.2 0.2 0.457 0.457 0.151 0.151 0.521 Manually reacqu T-1 323 [01 JUL 2025]Tra 933785.788 626181.286 5.206 -0.011 0.011 -0.245 0.245 -0.036 0.036 0.248 Manually reacqu

DX Abs feetUS US survey foot

STD 0.068 0.068

QC REPORT

Mean 0.067 0.067 Max 0.341 0.341 Min 0.001 0.001

RMS 0.095 0.095

95% CI 0.012 0.012

DY Abs feetUS US survey foot

STD 0.176 0.176

Mean 0.143 0.143 Max 0.647 0.647 Min 0.000 0.000

RMS 0.226 0.226

95% CI 0.031 0.031

DZ Abs feetUS US survey foot

STD 0.035 0.035

Mean 0.048 0.048 Max 0.156 0.156 Min 0.002 0.002

RMS 0.059 0.059

95% CI 0.006 0.006

D3D feetUS US survey foot

STD 0.172 0.172

Mean 0.186 0.186 Max 0.655 0.655 Min 0.015 0.015

RMS 0.252 0.252

95% CI 0.031 0.031

ATTACHMENT E

Mobile Lidar Data Control Deviation

Leica Pegasus:Two Ultimate Mobile Reality Capture

Quality Check - Multiple Points Report

QC REPORT 2

Project Name: 25-602

Operator: EJD

Date: 25 Sep 2025

NAME XGCP YGCP ZGCP

C-5 933232.019 626242.624 3.480

FID TRACK DX DY DZ FMATCH ANNOT TYPE CLASS

3 [01 JUL

2025]Track_A_20250701_130244 Profiler.zfs_0|18245551.gps

-0.092 -0.070 -0.010

Manually reacquired .. Ground Target

Control Point

C-3 933258.487 626100.598 4.284

1 [01 JUL

2025]Track_A_20250701_130244

0.015 0.051 0.006

34 [01 JUL

2025]Track_B_20250701_131038 Profiler.zfs_5|18245551.gps

-0.027 0.033 -0.039

C-4 933275.830 626167.140 4.203

2 [01 JUL

2025]Track_A_20250701_130244

0.010 -0.058 0.005

Control Point

35 [01 JUL

2025]Track_B_20250701_131038

-0.050 -0.051 -0.010

C-7 933528.678 626136.932 8.627

4 [01 JUL

2025]Track_A_20250701_130244

0.050 0.021 0.107

Control Point

36 [01 JUL

2025]Track_B_20250701_131038

Profiler.zfs_4|18245551.gps

0.008 0.120 0.054

C-8 933645.380 626176.057 8.107

5 [01 JUL

2025]Track_A_20250701_130244

0.074 -0.140 0.069

Control Point

37 [01 JUL

2025]Track_B_20250701_131038

-0.019 -0.020 0.065

T-1 933785.788 626181.286 5.206

19 [01 JUL

2025]Track_A_20250701_130244

-0.069 -0.009 0.045

Control Point

51 [01 JUL

2025]Track_B_20250701_131038

-0.018 0.050 0.036

Control Point

289 [01 JUL

2025]Track_F_20250701_131842

-0.050 -0.099 -0.030

Control Point

323 [01 JUL

2025]Track_E_20250701_131811

-0.011 -0.245 -0.036

T-2 933918.909 626156.788 4.676

20 [01 JUL

2025]Track_A_20250701_130244

-0.047 -0.092 0.043

Control Point

52 [01 JUL

2025]Track_B_20250701_131038

-0.019 -0.104 0.054

Control Point

290 [01 JUL

2025]Track_F_20250701_131842

-0.015 -0.267 -0.021

Control Point

302 [01 JUL

2025]Track_G_20250701_131935

-0.020 -0.114 -0.009

T-3 934044.412 626162.130 5.222

21 [01 JUL

2025]Track_A_20250701_130244

-0.053 -0.014 0.055

Control Point

53 [01 JUL

2025]Track_B_20250701_131038

0.013 -0.037 0.047

Control Point

275 [01 JUL

2025]Track_H_20250701_132033

-0.016 -0.093 -0.017

297 [01 JUL

2025]Track_I_20250701_132131

-0.044 -0.005 -0.033

Control Point

303 [01 JUL

2025]Track_G_20250701_131935

0.057 -0.106 -0.019

V-1 934091.209 626194.555 5.239

31 [01 JUL

2025]Track_A_20250701_130244

0.008 0.069 0.049

Control Point

63 [01 JUL

2025]Track_B_20250701_131038

-0.024 -0.017 0.053

Control Point

276 [01 JUL

2025]Track_H_20250701_132033

0.047 -0.045 -0.029

Control Point

299 [01 JUL

2025]Track_I_20250701_132131

0.054 0.104 -0.021

T-4 934343.527 626206.729 4.946

22 [01 JUL

2025]Track_A_20250701_130244

Profiler.zfs_1|18245551.gps

-0.014 0.064 0.092

Control Point

54 [01 JUL

2025]Track_B_20250701_131038

-0.050 0.000 0.079

Control Point

298 [01 JUL

2025]Track_I_20250701_132131

0.065 0.176 0.041

Control Point

300 [01 JUL

2025]Track_J_20250701_132232

0.194 0.136 0.044

T-5 934454.359 626179.067 5.272

23 [01 JUL

2025]Track_A_20250701_130244

0.030 -0.008 0.084

Control Point

55 [01 JUL

2025]Track_B_20250701_131038

0.053 -0.007 0.088

Control Point

301 [01 JUL

2025]Track_J_20250701_132232

0.104 0.130 0.022

305 [01 JUL

2025]Track_K_20250701_132344

0.053 0.225 0.016

C-9 934577.486 626212.691 4.558

6 [01 JUL

2025]Track_A_20250701_130244

-0.006 -0.035 0.066

Control Point

38 [01 JUL

2025]Track_B_20250701_131038

-0.055 -0.022 0.082

Control Point

291 [01 JUL

2025]Track_L_20250701_132436

0.312 0.226 -0.020

Control Point

304 [01 JUL

2025]Track_K_20250701_132344

0.147 0.239 -0.022

T-6 934865.935 626222.834 4.665

24 [01 JUL

2025]Track_A_20250701_130244

-0.080 -0.067 0.038

Control Point

56 [01 JUL

2025]Track_B_20250701_131038

Profiler.zfs_3|18245551.gps

-0.084 -0.095 0.013

Control Point

292 [01 JUL

2025]Track_L_20250701_132436

0.150 0.327 0.052

Control Point

310 [01 JUL

2025]Track_M_20250701_132537

0.290 0.407 0.054

C-10 935090.003 626195.163 4.604

7 [01 JUL

2025]Track_A_20250701_130244

Profiler.zfs_2|18245551.gps

-0.032 0.024 0.053

Control Point

39 [01 JUL

2025]Track_B_20250701_131038

0.028 -0.047 0.066

Control Point

277 [01 JUL

2025]Track_N_20250701_132610

0.244 0.405 0.141

321 [01 JUL

2025]Track_O_20250701_132659

-0.017 -0.044 0.133

C-11 935140.700 626230.446 4.558

8 [01 JUL

2025]Track_A_20250701_130244

0.035 0.019 0.052

Control Point

40 [01 JUL

2025]Track_B_20250701_131038

-0.029 0.000 0.068

Control Point

278 [01 JUL

2025]Track_N_20250701_132610

0.210 0.395 0.156

Control Point

322 [01 JUL

2025]Track_O_20250701_132659

0.200 0.457 0.151

V-2 935481.596 626194.267 5.992

32 [01 JUL

2025]Track_A_20250701_130244

-0.034 0.041 0.076

Control Point

64 [01 JUL

2025]Track_B_20250701_131038

-0.044 0.022 0.079

Control Point

284 [01 JUL

2025]Track_T_20250701_133108

0.064 -0.014 0.084

Control Point

294 [01 JUL

2025]Track_Q_20250701_132810

0.202 0.578 0.115

Control Point

318 [01 JUL

2025]Track_P_20250701_132731

0.341 0.435 0.110

T-7 935522.137 626232.018 7.034

25 [01 JUL

2025]Track_A_20250701_130244

-0.079 0.044 0.081

Control Point

57 [01 JUL

2025]Track_B_20250701_131038

-0.054 0.045 0.080

283 [01 JUL

2025]Track_T_20250701_133108

0.128 0.612 0.138

Control Point

293 [01 JUL

2025]Track_Q_20250701_132810

0.053 0.638 0.121

Control Point

317 [01 JUL

2025]Track_P_20250701_132731

-0.008 0.451 0.127

C-12 935741.028 626206.727 5.977

9 [01 JUL

2025]Track_A_20250701_130244

0.002 0.030 0.032

Control Point

41 [01 JUL

2025]Track_B_20250701_131038

0.098 0.017 0.040

Control Point

279 [01 JUL

2025]Track_R_20250701_132904

0.216 0.507 0.045

Control Point

281 [01 JUL

2025]Track_S_20250701_132953

0.223 0.595 0.028

C-13 935792.426 626238.058 5.997

10 [01 JUL

2025]Track_A_20250701_130244

-0.212 0.013 0.037

Control Point

42 [01 JUL

2025]Track_B_20250701_131038

-0.091 -0.031 0.029

Control Point

280 [01 JUL

2025]Track_R_20250701_132904

-0.089 0.647 0.048

Control Point

282 [01 JUL

2025]Track_S_20250701_132953

-0.006 0.628 0.047

T-8 936017.407 626216.549 5.769

26 [01 JUL

2025]Track_A_20250701_130244

0.038 -0.009 0.027

Control Point

58 [01 JUL

2025]Track_B_20250701_131038

0.020 -0.013 0.030

Control Point

285 [01 JUL

2025]Track_V_20250701_133328

0.060 0.451 0.020

311 [01 JUL

2025]Track_U_20250701_133238

0.034 0.511 0.022

T-9 936051.398 626247.446 5.375

27 [01 JUL

2025]Track_A_20250701_130244

-0.099 0.007 0.044

Control Point

59 [01 JUL

2025]Track_B_20250701_131038

-0.082 -0.060 0.015

Control Point

286 [01 JUL

2025]Track_V_20250701_133328

-0.127 0.417 -0.007

Control Point

312 [01 JUL

2025]Track_U_20250701_133238

-0.034 0.462 0.015

C-14 936262.283 626224.603 6.427

11 [01 JUL

2025]Track_A_20250701_130244

0.010 0.033 0.026

Control Point

43 [01 JUL

2025]Track_B_20250701_131038

0.011 -0.001 0.032

Control Point

295 [01 JUL

2025]Track_X_20250701_133600

0.070 0.353 0.027

Control Point

313 [01 JUL

2025]Track_W_20250701_133513

0.019 0.431 0.040

C-15 936299.775 626255.849 6.508

12 [01 JUL

2025]Track_A_20250701_130244

-0.046 0.049 0.071

Control Point

44 [01 JUL

2025]Track_B_20250701_131038

-0.022 0.042 0.045

Control Point

296 [01 JUL

2025]Track_X_20250701_133600

-0.153 0.325 0.046

314 [01 JUL

2025]Track_W_20250701_133513

0.058 0.410 0.024

C-16 936511.774 626233.510 9.205

13 [01 JUL

2025]Track_A_20250701_130244

0.078 0.057 0.083

Control Point

45 [01 JUL

2025]Track_B_20250701_131038

-0.001 0.034 0.095

Control Point

287 [01 JUL

2025]Track_Z_20250701_133852

0.045 0.255 0.011

Control Point

315 [01 JUL

2025]Track_Y_20250701_133754

-0.014 0.213 0.009

C-17 936570.743 626264.464 9.607

14 [01 JUL

2025]Track_A_20250701_130244

-0.013 -0.011 0.107

Control Point

46 [01 JUL

2025]Track_B_20250701_131038

-0.010 -0.005 0.103

Control Point

288 [01 JUL

2025]Track_Z_20250701_133852

-0.148 0.270 0.002

Control Point

316 [01 JUL

2025]Track_Y_20250701_133754

-0.051 0.272 0.028

C-18 936681.328 626261.410 9.497

15 [01 JUL

2025]Track_A_20250701_130244

-0.099 0.051 0.089

Control Point

47 [01 JUL

2025]Track_B_20250701_131038

-0.087 0.013 0.083

T-10 936751.135 626240.377 9.422

28 [01 JUL

2025]Track_A_20250701_130244

0.015 0.046 0.059

Control Point

60 [01 JUL

2025]Track_B_20250701_131038

0.085 0.040 0.064

Control Point

268 [01 JUL

2025]TrackZ_A_20250701_134044

-0.188 0.268 0.026

Control Point

306 [01 JUL

2025]TrackZ_B_20250701_134126

-0.087 0.219 0.003

T-11 936771.703 626266.440 9.464

29 [01 JUL

2025]Track_A_20250701_130244

-0.044 -0.073 0.083

Control Point

61 [01 JUL

2025]Track_B_20250701_131038

0.012 -0.040 0.049

Control Point

269 [01 JUL

2025]TrackZ_A_20250701_134044

-0.038 0.035 0.024

307 [01 JUL

2025]TrackZ_B_20250701_134126

-0.114 0.066 0.013

V-3 937007.232 626278.735 10.106

33 [01 JUL

2025]Track_A_20250701_130244

0.006 -0.018 0.025

Control Point

65 [01 JUL

2025]Track_B_20250701_131038

0.006 -0.032 0.020

Control Point

271 [01 JUL

2025]TrackZ_E_20250701_134420

0.003 0.003 0.014

Control Point

309 [01 JUL

2025]TrackZ_D_20250701_134317

-0.051 0.038 0.025

T-12 937041.092 626237.891 10.273

30 [01 JUL

2025]Track_A_20250701_130244

0.013 0.043 0.015

Control Point

62 [01 JUL

2025]Track_B_20250701_131038

0.027 -0.027 0.033

Control Point

270 [01 JUL

2025]TrackZ_E_20250701_134420

0.091 0.224 0.022

Control Point

308 [01 JUL

2025]TrackZ_D_20250701_134317

0.046 0.059 0.014

C-22 937253.153 626503.965 11.409

274 [01 JUL

2025]TrackZ_G_20250701_134831

-0.006 -0.018 0.004

C-19 937260.587 626248.827 10.336

16 [01 JUL

2025]Track_A_20250701_130244

0.086 -0.026 0.042

Control Point

48 [01 JUL

2025]Track_B_20250701_131038

0.088 -0.053 0.040

Control Point

272 [01 JUL

2025]TrackZ_G_20250701_134831

0.035 -0.011 0.008

Control Point

319 [01 JUL

2025]TrackZ_F_20250701_134627

-0.020 -0.093 -0.011

C-21 937311.895 626497.604 10.974

273 [01 JUL

2025]TrackZ_G_20250701_134831

0.028 -0.039 0.010

C-20 937318.889 626293.815 10.330

17 [01 JUL

2025]Track_A_20250701_130244

-0.069 0.001 0.041

Control Point

49 [01 JUL

2025]Track_B_20250701_131038

-0.078 0.007 0.052

Control Point

320 [01 JUL

2025]TrackZ_F_20250701_134627

-0.064 0.024 0.010

C-25 937486.580 626292.252 7.268

18 [01 JUL

2025]Track_A_20250701_130244

-0.043 -0.022 0.054

Control Point

50 [01 JUL

2025]Track_B_20250701_131038

0.028 -0.076 0.037

ATTACHMENT F

Crew and Equipment List

Software:

Leica Cyclone Leica Pegasus Manager MicroStation Open Roads TopoDot

EFBP_NT

Trimble Business Center

Equipment:

Leica TS06 total Station Leica CS20 Leica Pegasus Ultimate 2 Trimble R8 Trimble TSC5

People:

Carlos E Alonso – Project Manager / SUR Senior Surveyor Mark Sowers - Project Manager / SUR Senior Surveyor Javier Alonso – SUR Surveyor Analyst 3 Edgar de Moya – SUR Surveyor Analyst 3 Brennen Mosciski - SUR Surveyor Analyst 3 Joel Besteiro – Party Chief Darien Gonzalez – Instrument Man Rafael Pavon – Rod Man John Vera – Party Chief David Mato – Instrument Man Rolando Sara – Rod Man Yadian Garcia – Party Chief Jesus Garcia – Instrument Man Manuel Bueno – Rod Man Jose Yumar – Party Chief Jorge Pitaluga – Rod Man

ATTACHMENT G

Heat Map

ATTACHMENT H

Crossing Chains Report

Terrain Crossing Features Report

Report Created: Thursday, September 25, 2025 Time: 3:21:55 PM

Page 1 of 1Terrain Crossing Features Report

9/25/2025file:///C:/Users/Javier.Alonso/AppData/Local/Temp/RPTisahvmnj.html

25602ML YXZ.pdf
25602ML YXZ
QC REPORT.pdf
Analysis
2026-02-11T13:34:17-0500
Mark R Sowers

File details come from the government source that posted it. Updated .