This document is a Survey Request from the National Park Service (NPS) seeking feedback from potential contractors and subcontractors for a project at Grand Canyon National Park. The survey follows an Industry Day event held on June 10, 2025, and covers multiple project areas including Housing (SR WWTF), North Rim Utilities, SCADA Integration, and Construction Partnering. Key details include 12 planned RV sites on the South Rim for contractor use, questions about staffing, borehole construction, contracting approaches, and a planned follow-up industry day in August 2025. The survey requests contractor input on project specifications, construction schedules, and geophysical information, with a response deadline of August 11, 2025. Contractors are asked to provide detailed feedback on various aspects of the project, including potential challenges with winter construction and a four-year overall project timeline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SURVEY REQUEST
This survey is to obtain feedback from contractors and subcontractors who are interested in the project, as a follow-up to the Industry Day event that was held on June 10, 2025 at Grand Canyon National Park, which provided an opportunity to visit the site and provide input for the development of the project requirements.
The DEADLINE FOR SURVEY RESPONSE IS: August 11, 2025.
FEEDBACK provided to NPS will be considered confidential, and not shared outside of the NPS & DSC Design Team.
NPS is requesting feedback from potential contractors and subcontractors on the subject project:
• Housing (SR WWTF)
• North Rim Utilities
• SCADA Integration (SR WWTF)
• Construction Partnering
• Industry Day Feedback
Please return your survey response to the following Points of Contact
• Contracting O icer: Tim Burger (Timothy_burger@nps.gov)
• Contracting Specialist: Kristin Tauber (Kristin_Tauber@nps.gov)
Housing (SR WWTF)
12 RV Sites are currently planned on the South Rim (located near the helibase) with power, water and sewer connections for the construction contractor use during the period of performance.
Q2 - How would you utilize RV sites to meet project workload needs?
CONTRACTOR RESPONSE:
Q3 - Please provide the maximum range of sta you’d expect to be on site at one time.
North Rim Utilities
Project scope and potential Contracting Approach (Option A or Option B) are identified in the Industry Day presentation. Handouts have also been provided with proposed/draft CLIN schedules for the boring construction.
Borehole Construction: Is the CLIN schedule acceptable for this type of work?
Borehole Construction: What information is needed to develop a bid for the Volume 2 work? How would you like to see the geophysical information?
Contracting Approach: Provide feedback and preference on the contracting approach:
Borehole as separate contract, or bid as a single larger project (Option A or Option B)?
August Industry Day: NPS is planning for an on-site visit the week of August 25th for the next industry day. What would you like to see?
Construction Schedule: What are your thoughts and/or concerns with regard to working through the winter and an overall construction schedule of four years?
SCADA Integration (SR WWTF)
Referencing the provided draft specification section 01 11 00-1.4, the intent is for the construction contractor to provide all other aspects of the contract except what is listed here.
Timely and thoughtful coordination will be required between the construction contractor and the government furnished Process Control System Integrator (PCSI). The construction contractor will be required to implement and provide all other network communication scope, physical hardware, Program Instrumentation and Control (PIC), and all other aspects of the project.
The intent of specification section 01 11 00-1.4 is to identify what will be provided by the third party (government furnished PCSI). Also, refer to other provided draft specifications:
26 05 10 - Network Communication System 40 90 00 – Instrumentation and Control for Process Systems
SCADA CONTRACTOR RESPONSE
1 Please provide feedback on the draft specifications and government furnished Process Control System Integrator (PCSI)
Industry Day Feedback (June 10th, 2025 @ South Rim)
INDUSTRY DAY FEEDBACK CONTRACTOR RESPONSE
XX Please let us know the value/benefit of
Industry Day?
XX Please let us know what could be improved.
XX Please provide any additional feedback