This is a Supplemental Price Breakdown by Division Sheet template for Solicitation 36C26126Q1297, a Department of Veterans Affairs project to remediate an old parking garage (Project 654-24-004). The document is designed for price analysis purposes and requires contractors to provide a complete divisional cost breakdown across all applicable construction divisions using the MasterFormat classification system.

The template includes line items for 28 construction divisions spanning the full scope of building construction and site work, including general requirements, concrete, masonry, metals, thermal and moisture protection, doors and windows, finishes, equipment, furnishings, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and transportation. Below the divisional costs, contractors must account for subtotal, other costs, bonds and insurance, overhead, and profit to arrive at the final total price. The form requires signature, date, name, and title of an authorized representative. This is a template document for bid submission and does not specify pricing terms, response dates, or award information.

View the file

Other files

File Type Posted
36C26126Q1297 0001.docx DOCX document
36C26126Q1297_1.docx DOCX document
Attachment - REQUEST FOR INFORMATION RFI FORM.docx DOCX document
Attachment Drawings Remediate Old Parking Garag.pdf PDF
Key Personnel Evaluation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C2612Q1297 654-24-004

SOLICITATION: 36C26126Q1297 PROJECT: 654-24-004

Remediate Old Parking Garage

PROVIDE COMPLETE DIVISIONAL COST BREAK-OUT FOR COMPLETE PROJECT.

*If necessary, add additional lines for each Division applicable to this project.

**This document is to be used only for price analysis

REF
DESCRIPTION
TOTAL

00000

DIVISION 00-SPECIAL SECTIONS
$
01000
DIVISION 1-GENERAL REQUIREMENTS
$
02000
DIVISION 2-EXISTING CONDITIONS
$

03000

DIVISION 3-CONCRETE
$

04000

DIVISION 4-MASONRY
$

05000

DIVISION 5-METALS
$

06000

DIVISION 6-WOOD AND PLASTIC
$

07000

DIVISION 7-THERMAL AND MOISTURE PROTECTION
$

08000

DIVISION 8-DOORS AND WINDOWS
$

09000

DIVISION 9-FINISHES
$

10000

DIVISION 10-SPECIALTIES
$

11000

DIVISION 11-EQUIPMENT
$

12000

DIVISION 12-FURNISHINGS
$

13000

DIVISION 13-SPECIAL CONSTRUCTION
$

14000

DIVISION 14-CONVEYING EQUIPMENT
$

21000

DIVISION 21-FIRE SUPPRESSION
$

22000

DIVISION 22-PLUMBING
$

23000

DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING
$

26000

DIVISION 26-ELECTRICAL
$

27000

DIVISION 27-COMMUNICATIONS
$

28000

DIVISION 28-ELECTRONIC SAFETY AND SECURITY
$

31000

DIVISION 31-EARTHWORK
$

32000

DIVISION 32-EXTERIOR IMPROVEMENTS
$

33000

DIVISION 33-UTILITIES
$

34000

DIVISION 34-TRANSPORTATION
$

SUB TOTAL:

OTHER

BONDS AND INSURANCE

OVERHEAD

PROFIT

TOTAL

__________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)