SUPPLEMENTAL INFORMATION - 01.pdf
PDF 154 KB Posted
- Attached to
- Y1NB--Replace Air Handling Unit No. 2 and 3 Federal contract opportunity
- Solicitation number
- Not on record
About this file
This supplemental information document provides revisions to construction plans and phasing for the Replace Air Handling Unit No. 2 and 3 project at the Malcolm Randall VA Medical Center in Gainesville, Florida. Specifically, it revises sheet notes and mechanical plans to reconnect the pharmacy compounding room (Area A464) to Air Handling Unit 3 by adding a new duct connection, as the VA was unable to complete the separate planned upgrade for that area. The related federal contract opportunity notice states that the purpose is to incorporate the requested RFI responses and ductwork/phasing revisions into the solicitation, and provides the revised wage determination. No other details of the requirement are included.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 - SF30 Amendment 36C24822R0103 0002.pdf | ||
| Attachment 07 Wage Determination (Rev).pdf | ||
| 05 - G005 CONSTRUCTION PHASING PLAN - REV01.pdf | ||
| 43 - MH-406C MECHANICAL ENLARGED NEW PLAN - LEVEL 6 AREA C - REV01.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3603 NW 98TH ST., SUITE B
Gainesville, FL 32606
(352) 474-6124 Office ● (352) 553-4437 Fax ISSUE DATE: 8/30/2022
PROJECT
STATION LOCATION VA PROJECT #
MALCOLM RANDALL VA GAINESVILLE, FL. 573-18-602
CONTRACT TITLE
REPLACE AHU-3
ITEM
SHEET/SPECIFICATION NO.
DESCRIPTION
1.
GENERAL
DURING DESIGN, VA INSTRUCTED A/E TO EXCLUDED PHARMACY A464 FROM OUR
AHU-3 PROJECT, AS THIS AREA WAS PLANNED TO HAVE A DEDICATED AHU BY
OTHERS. VA WAS NOT ABLE TO COMPLETE THE SEPARATE PHARMACY A464 PROJECT
IN TIME, SO AFTER SIGNED AND SEALED DOCUMENTS WERE DELIVERED, THE VA
REQUESTED A/E DESIGN TO ADD A DUCT TO RECONNECT THAT ROOM BACK INTO
AHU-3.
2.
G005 CONSTRUCTION PHASING PLAN – REV01 DATED 8/30/22
REVISION 1 TO THE SHEET NOTES OF PHASE 5 TO PROVIDE CLARIFICATION OF
INTERRUPTED SERVICE OF PHARMACY COMPOUNDING ROOM.
3.
MH-406C MECHANICAL ENLARGED NEW PLAN – LEVEL 6 AREA C – REV01 DATED
8/30/22
REVISION 1 CONNECTING THE EXISTING 16X12 TO THE AHU-3 DUCTWORK.
Supplemental Information 01 Design, Inc.