SUPPLEMENTAL INFORMATION - 01.pdf

PDF 154 KB Posted

Attached to
Y1NB--Replace Air Handling Unit No. 2 and 3 Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This supplemental information document provides revisions to construction plans and phasing for the Replace Air Handling Unit No. 2 and 3 project at the Malcolm Randall VA Medical Center in Gainesville, Florida. Specifically, it revises sheet notes and mechanical plans to reconnect the pharmacy compounding room (Area A464) to Air Handling Unit 3 by adding a new duct connection, as the VA was unable to complete the separate planned upgrade for that area. The related federal contract opportunity notice states that the purpose is to incorporate the requested RFI responses and ductwork/phasing revisions into the solicitation, and provides the revised wage determination. No other details of the requirement are included.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NB--Replace Air Handling Unit No. 2 and 3, newest first.
File Type Posted
S02 - SF30 Amendment 36C24822R0103 0002.pdf PDF
Attachment 07 Wage Determination (Rev).pdf PDF
05 - G005 CONSTRUCTION PHASING PLAN - REV01.pdf PDF
43 - MH-406C MECHANICAL ENLARGED NEW PLAN - LEVEL 6 AREA C - REV01.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3603 NW 98TH ST., SUITE B

Gainesville, FL 32606

(352) 474-6124 Office ● (352) 553-4437 Fax ISSUE DATE: 8/30/2022

PROJECT

STATION LOCATION VA PROJECT #

MALCOLM RANDALL VA GAINESVILLE, FL. 573-18-602

CONTRACT TITLE

REPLACE AHU-3

ITEM

SHEET/SPECIFICATION NO.

DESCRIPTION

1.

GENERAL

DURING DESIGN, VA INSTRUCTED A/E TO EXCLUDED PHARMACY A464 FROM OUR

AHU-3 PROJECT, AS THIS AREA WAS PLANNED TO HAVE A DEDICATED AHU BY

OTHERS. VA WAS NOT ABLE TO COMPLETE THE SEPARATE PHARMACY A464 PROJECT

IN TIME, SO AFTER SIGNED AND SEALED DOCUMENTS WERE DELIVERED, THE VA

REQUESTED A/E DESIGN TO ADD A DUCT TO RECONNECT THAT ROOM BACK INTO

AHU-3.

2.

G005 CONSTRUCTION PHASING PLAN – REV01 DATED 8/30/22

REVISION 1 TO THE SHEET NOTES OF PHASE 5 TO PROVIDE CLARIFICATION OF

INTERRUPTED SERVICE OF PHARMACY COMPOUNDING ROOM.

3.

MH-406C MECHANICAL ENLARGED NEW PLAN – LEVEL 6 AREA C – REV01 DATED

8/30/22

REVISION 1 CONNECTING THE EXISTING 16X12 TO THE AHU-3 DUCTWORK.

Supplemental Information 01 Design, Inc.