43 - MH-406C MECHANICAL ENLARGED NEW PLAN - LEVEL 6 AREA C - REV01.pdf

PDF 528 KB Posted

Attached to
Y1NB--Replace Air Handling Unit No. 2 and 3 Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This document package includes a mechanical drawing and related federal contract opportunity notice. The mechanical drawing depicts layout details for replacing air handling units 2 and 3 at a Veterans Affairs medical center located in Gainesville, Florida. Work includes new ductwork, piping, controls and equipment. The related opportunity notice is seeking proposals to replace the air handling units in accordance with the drawing and specifications. Proposals are due by September 12, 2022. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NB--Replace Air Handling Unit No. 2 and 3, newest first.
File Type Posted
S02 - SF30 Amendment 36C24822R0103 0002.pdf PDF
Attachment 07 Wage Determination (Rev).pdf PDF
05 - G005 CONSTRUCTION PHASING PLAN - REV01.pdf PDF
SUPPLEMENTAL INFORMATION - 01.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2-1/2"CWS

6"LPS (15)

2" L

PR

6" CHR

6" CHS

D

6" CHR

6" CHS

6"LPS

2" L

PS

(1

5)

2" L

PS

(1

5) 1-

1/ 2"

L

PR

4" C

H R

4" C

H S

R

RF SD

F SD

F SD

RA BLW

EXH ABV

SA

Econ OA

Min OA

RA

VFD VFD

2" COND 2"COND

2" C

O N

D

2-1/2" LPR

P

P

P

6" CHR

6" CHS

2" COND

6" C

H R

6" C

H S

2" C

O N

D

6" C

H R

6" C

H S

2" C

O N

D

4" L

PS

2" LPR

2" LPR

16Ø EA CAPPED16Ø EA CAPPED

52x50 SA DN

18x12 EA UP x1

EA

U P

109x22 EA

3 CONDENSING UNITS

3" UP TO ET-1

6" CHR/CHS

DOWN TO LEVEL 2

SHIPS LADDER

TO ROOF

24" TALL EQUIPMENT RAIL

AND PIPE PEDESTALS. MAX

10'-0" ON CENTER. REFER TO

SPEC SECTION 230511.2.10

HANG PIPES FROM

PLATFORM(TYP)

COOLING COIL CONDENSATE.

DRAIN TO COOLING TOWER

COOLING COIL CONDENSATE.

DRAIN TO COOLING TOWER

109x22 EA

4" DOMESTIC

WATER DN

6 6

T-11

T-10

1-1/2" LPR

3/4" LPR

4" LPS

T-3

T-2

BAS CONTROL PANEL

MANUAL

BALANCING

DAMPER

EXISTING 16x12 SA

Ø

E A

Ø

E A

E-27

E-11

R M

-A

R

M -A

3R

M

SYS-AC-5

28x16 SA

60x16 TR

E-?

AHU-60

52x50 SA x4

R

A x6

R

A

52x50 SA

52x50SA x1

SA

38x18 SA

4x

S

A

2x

R

A

40x16

HD

40x60 RA

E-4

CO

STATIC PRESSURE

SENSOR (TYPICAL)

CD-60F

CD-60H

x1

SA

3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437

COA: FL #29758

AKEA Project No. AD183-19

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 10

REPLACE AIR HANDLING UNIT

(AHU) 3

GAINESVILLE, FLORIDA

573-18-603

JUNE 4, 2021Revisions: Date:

Design, Inc.

Office of Construction and Facilities Management

ARCHITECT / ENGINEER OF RECORDCONSULTANT

FINAL DESIGN SUBMITTAL

APPROVED FOR CONSTRUCTION

A

B

C

D

E

F

Affiliated Engineers

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Newberry, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

AEI Project No: 19099-01

MECHANICAL ENLARGED

NEW PLAN - LEVEL 6 AREA C

DJE RWD

MH-406C

SCALE:1 1/4" = 1'-0"

MECHANICAL ENLARGED NEW PLAN - LEVEL 6 AREA C

GRAPHIC SCALE 1/4"=1'-0"

SCALE:2 1/4" = 1'-0"

AHU-60 STEAM PREHEAT COIL ELEVATION DETAIL

GENERAL NOTES

SHEET KEYNOTES

PROVIDE ROOF SUPPORTS FOR NEW

ROOFTOP DUCT. MAX 10'-0" ON CENTER.

REUSE EXISTING ROOFTOP DUCT

SUPPORTS WHEREVER POSSIBLE.

EXISTING SUPPORTS MAY NEED TO BE

EXTENDED OR CUT DOWN TO FIT NEW

DUCTWORK.

PROVIDE ROOF SUPPORTS FOR NEW

PIPING. MAX 10'-0" ON CENTER.

REUSE EXISTING PIPE SUPPORTS

WHEREVER POSSIBLE.

HANG PIPE FROM DUCT SUPPORT.

COOLING COIL CONDENSATE LINE TO

EQUAL UNIT CONNECTION SIZE.

ROUTE CONDENSATE DOWN TO 5TH

FLOOR CEILING AND CONNECT INTO

EXISTING CONDENSATE PIPE IN THE 5TH

FLOOR CEILING ENTERING CHASE.

PROVIDE CLEANOUTS ON CHANGE OF

DIRECTION IN COOLING COIL

CONDENSATE PIPE.

CONTROLS CONTRACTOR AND TEST &

BALANCE CONTRACTOR SHALL WORK

TOGETHER AND MANUALLY SHUTOFF

ALL BUT 2 OF THE 8 RETURN FANS FOR

CURRENT LOW LOAD OPERATION.

F&T TRAPS, 1 FROM EACH COIL,

3 TOTAL PER SIDE T-4 THRU T-9

LPS PIPING (15 PSIG)

CONTROL VALVE, 1 PER SIDE

INVERTED BUCKET DRIP TRAP,

1 PER SIDE

ONE OVERALL CONTROL VALVE PER

SIDE PIPED TO ALL THREE STEAM COILS.

EACH STEAM COIL SHALL HAVE ITS OWN

TRAP. REFER TO AHU-60 STEAM

PREHEAT COIL ELEVATION DETAIL THIS

SHEET.

1 SI-01 8/30/22

This item has been digitally signed and sealed by Jack Stewart Neale on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

08/30/2022

2022-08-30T15:17:09-0400
Jack S. Neale

File details come from the government source that posted it. Updated .