43 - MH-406C MECHANICAL ENLARGED NEW PLAN - LEVEL 6 AREA C - REV01.pdf
PDF 528 KB Posted
- Attached to
- Y1NB--Replace Air Handling Unit No. 2 and 3 Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document package includes a mechanical drawing and related federal contract opportunity notice. The mechanical drawing depicts layout details for replacing air handling units 2 and 3 at a Veterans Affairs medical center located in Gainesville, Florida. Work includes new ductwork, piping, controls and equipment. The related opportunity notice is seeking proposals to replace the air handling units in accordance with the drawing and specifications. Proposals are due by September 12, 2022. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 - SF30 Amendment 36C24822R0103 0002.pdf | ||
| Attachment 07 Wage Determination (Rev).pdf | ||
| 05 - G005 CONSTRUCTION PHASING PLAN - REV01.pdf | ||
| SUPPLEMENTAL INFORMATION - 01.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2-1/2"CWS
6"LPS (15)
2" L
PR
6" CHR
6" CHS
D
6" CHR
6" CHS
6"LPS
2" L
PS
(1
5)
2" L
PS
(1
5) 1-
1/ 2"
L
PR
4" C
H R
4" C
H S
R
RF SD
F SD
F SD
RA BLW
EXH ABV
SA
Econ OA
Min OA
RA
VFD VFD
2" COND 2"COND
2" C
O N
D
2-1/2" LPR
P
P
P
6" CHR
6" CHS
2" COND
6" C
H R
6" C
H S
2" C
O N
D
6" C
H R
6" C
H S
2" C
O N
D
4" L
PS
2" LPR
2" LPR
16Ø EA CAPPED16Ø EA CAPPED
52x50 SA DN
18x12 EA UP x1
EA
U P
109x22 EA
3 CONDENSING UNITS
3" UP TO ET-1
6" CHR/CHS
DOWN TO LEVEL 2
SHIPS LADDER
TO ROOF
24" TALL EQUIPMENT RAIL
AND PIPE PEDESTALS. MAX
10'-0" ON CENTER. REFER TO
SPEC SECTION 230511.2.10
HANG PIPES FROM
PLATFORM(TYP)
COOLING COIL CONDENSATE.
DRAIN TO COOLING TOWER
COOLING COIL CONDENSATE.
DRAIN TO COOLING TOWER
109x22 EA
4" DOMESTIC
WATER DN
6 6
T-11
T-10
1-1/2" LPR
3/4" LPR
4" LPS
T-3
T-2
BAS CONTROL PANEL
MANUAL
BALANCING
DAMPER
EXISTING 16x12 SA
Ø
E A
Ø
E A
E-27
E-11
R M
-A
R
M -A
3R
M
SYS-AC-5
28x16 SA
60x16 TR
E-?
AHU-60
52x50 SA x4
R
A x6
R
A
52x50 SA
52x50SA x1
SA
38x18 SA
4x
S
A
2x
R
A
40x16
HD
40x60 RA
E-4
CO
STATIC PRESSURE
SENSOR (TYPICAL)
CD-60F
CD-60H
x1
SA
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD183-19
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 10
REPLACE AIR HANDLING UNIT
(AHU) 3
GAINESVILLE, FLORIDA
573-18-603
JUNE 4, 2021Revisions: Date:
Design, Inc.
Office of Construction and Facilities Management
ARCHITECT / ENGINEER OF RECORDCONSULTANT
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
A
B
C
D
E
F
Affiliated Engineers
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Newberry, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
AEI Project No: 19099-01
MECHANICAL ENLARGED
NEW PLAN - LEVEL 6 AREA C
DJE RWD
MH-406C
SCALE:1 1/4" = 1'-0"
MECHANICAL ENLARGED NEW PLAN - LEVEL 6 AREA C
GRAPHIC SCALE 1/4"=1'-0"
SCALE:2 1/4" = 1'-0"
AHU-60 STEAM PREHEAT COIL ELEVATION DETAIL
GENERAL NOTES
SHEET KEYNOTES
PROVIDE ROOF SUPPORTS FOR NEW
ROOFTOP DUCT. MAX 10'-0" ON CENTER.
REUSE EXISTING ROOFTOP DUCT
SUPPORTS WHEREVER POSSIBLE.
EXISTING SUPPORTS MAY NEED TO BE
EXTENDED OR CUT DOWN TO FIT NEW
DUCTWORK.
PROVIDE ROOF SUPPORTS FOR NEW
PIPING. MAX 10'-0" ON CENTER.
REUSE EXISTING PIPE SUPPORTS
WHEREVER POSSIBLE.
HANG PIPE FROM DUCT SUPPORT.
COOLING COIL CONDENSATE LINE TO
EQUAL UNIT CONNECTION SIZE.
ROUTE CONDENSATE DOWN TO 5TH
FLOOR CEILING AND CONNECT INTO
EXISTING CONDENSATE PIPE IN THE 5TH
FLOOR CEILING ENTERING CHASE.
PROVIDE CLEANOUTS ON CHANGE OF
DIRECTION IN COOLING COIL
CONDENSATE PIPE.
CONTROLS CONTRACTOR AND TEST &
BALANCE CONTRACTOR SHALL WORK
TOGETHER AND MANUALLY SHUTOFF
ALL BUT 2 OF THE 8 RETURN FANS FOR
CURRENT LOW LOAD OPERATION.
F&T TRAPS, 1 FROM EACH COIL,
3 TOTAL PER SIDE T-4 THRU T-9
LPS PIPING (15 PSIG)
CONTROL VALVE, 1 PER SIDE
INVERTED BUCKET DRIP TRAP,
1 PER SIDE
ONE OVERALL CONTROL VALVE PER
SIDE PIPED TO ALL THREE STEAM COILS.
EACH STEAM COIL SHALL HAVE ITS OWN
TRAP. REFER TO AHU-60 STEAM
PREHEAT COIL ELEVATION DETAIL THIS
SHEET.
1 SI-01 8/30/22
This item has been digitally signed and sealed by Jack Stewart Neale on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
08/30/2022
| 2022-08-30T15:17:09-0400 | |
| Jack S. Neale |
File details come from the government source that posted it. Updated .