About this file

This document summarizes the Statement of Work (SOW) for a federal contract opportunity to remove and replace carpet in the ALS Side of Building 10870 at Eglin Air Force Base in Florida. The project scope includes removing existing carpet, cove base, and transition strips, then installing new carpet squares. The Contractor is responsible for all materials, equipment, and labor required to complete the work in accordance with NFPA and UFC 3-600-01 standards. The contract is a Small Business Set-Aside with NAICS code 314110, and a single firm-fixed price award is anticipated. A site visit is scheduled for September 5, 2024 and all quotes must be submitted by September 12, 2024. The government intends to award the contract, but availability of funds is contingent upon appropriations.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Carpet ALS Side Building 10870, newest first.
File Type Posted
Solicitation Amendment FA282324Q00700002 SF 30.pdf PDF
Summary of Work Amendment.pdf PDF
Solicitation Amendment FA282324Q00700001 SF 30.pdf PDF
Site Visit Sign In Sheet_Redacted.pdf PDF
Solicitation - FA282324Q0070.pdf PDF
Tier I Carpet Manufacturers POC List.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Title: Replace Carpet, ALS Side, Bldg. 10870 Date: 08/23/24

SUMMARY OF WORK

1. PURPOSE OF SECTION: The purpose of this section is to provide the Contractor with a Statement of Work for the above mentioned project. The Contractor shall follow the guidelines and Service Summary provided in the PWS of said contract. The Contractor shall seek clarification from the Contracting Officer (CO) if there is any question on the applicability of a provision. These provisions are for the purpose of general information only and are not intended to completely describe the regulations and restrictions that apply on Eglin AFB.

2. PROJECT SCOPE: The project is located on Eglin AFB, Florida. The Contractor shall be required to furnish all materials, equipment, plant, labor and personnel necessary to design, manage, and accomplish this work in accordance with the contract requirements. The Contractor is expected to maintain safety requirements and demonstrate standard construction methods, at all times.

A. Provide everything necessary to remove sheet carpet then replace with carpet squares/tiles/planks as indicated on the Contract. Scope is limited to the ALS Side within building 10870 on Eglin AFB.

B. Contractors shall be responsible for the disposal of the old carpet, vinyl cove base, transition strips and any waste generated by the installation of flooring products.

3. PRINCIPAL FEATURES: Principal features of work are as follows:

A. Civil:

a. None.

B. Architectural:

a. Remove existing transition strips, as required.

b. Remove existing roll/sheet carpet. Do not disturb substrate to ensure a smooth and secure bonding surface. (~ 384 SY)

c. Install new carpet squares, 24”x24” or approved otherwise. Tier 1 Approved

Carpet Vendor (~ 384SY)

d. Install matching transition strips where required. ~ 45 LF

e. All work shall be in accordance with the latest NFPA and NEC requirements to ensure maximum protection against loss of life and property by fire.

f. Design and installation must meet all UFC 3-600-01 and applicable NFPA

Standards.

g. All interior finishes, contents and furnishings must meet NFPA 101 Chapter 10.

C. Mechanical (HVAC):

a. None

D. Electrical

a. N/A

E. COMMUNICATIONS: (Customer and 96 CS will verify)

a. N/A

F. SPECIAL INSTRUCTIONS:

a. This project must be completed in a timely matter with minimal impact. Notify

CO immediately of any impact regarding long lead items, delays or anything that could affect the negotiated schedule and completion date.

b. Customer will provide escorts if needed.

c. The adjacent areas within this facility will be occupied during construction.

d. Ensure adequate ventilation and coordination prior to work generating fumes, dust, debris and vibration, prior to the activity.

e. Provide warranty, certificates of compliance plus maintenance/cleaning instructions, as applicable the COR prior to the invoice being paid.