Summary of Work Amendment.pdf

PDF 73 KB Posted

Attached to
Replace Carpet ALS Side Building 10870 Federal contract opportunity
Solicitation number
FA282324Q0070
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document is a Summary of Work Amendment for a federal contract opportunity to remove and replace carpet in the ALS Side of Building 10870 at Eglin Air Force Base. The project scope is limited to the ALS Side of the building and includes removing existing sheet carpet, installing new carpet squares/tiles/planks from approved Tier 1 vendors, and installing new transition strips and 6" cove base as required. The contractor is responsible for disposal of the old carpet and related materials. This is a small business set-aside contract under NAICS code 314110. A site visit is scheduled for September 5, 2024, and all quotes must be submitted by September 12, 2024. The government intends to award a single firm-fixed price contract for this requirement.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Carpet ALS Side Building 10870, newest first.
File Type Posted
Solicitation Amendment FA282324Q00700002 SF 30.pdf PDF
Solicitation Amendment FA282324Q00700001 SF 30.pdf PDF
Site Visit Sign In Sheet_Redacted.pdf PDF
Solicitation - FA282324Q0070.pdf PDF
Summary of Work.pdf PDF
Tier I Carpet Manufacturers POC List.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract # Project Title: Replace Carpet, ALS Side, Bldg 10870 Date: 09/05/24

SUMMARY OF WORK AMENDMENT

1. PURPOSE OF SECTION: The purpose of this section is to provide the Contractor with a Statement of Work for the above mentioned project. The Contractor shall follow the guidelines and Service Summary provided in the PWS of said contract. The Contractor shall seek clarification from the Contracting Officer (CO) if there is any question on the applicability of a provision. These provisions are for the purpose of general information only and are not intended to completely describe the regulations and restrictions that apply on Eglin AFB.

2. PROJECT SCOPE: The project is located on Eglin AFB, Florida. The Contractor shall be required to furnish all materials, equipment, plant, labor and personnel necessary to design, manage, and accomplish this work in accordance with the contract requirements. The Contractor is expected to maintain safety requirements and demonstrate standard construction methods, at all times.

A. Provide everything necessary to remove sheet carpet then replace with carpet squares/tiles/planks as indicated on the Contract. Scope is limited to the ALS Side within building 10870 on Eglin AFB.

B. Contractors shall be responsible for the disposal of the old carpet, vinyl cove base, transition strips and any waste generated by the installation of flooring products.

C. Carpet Tier 1 Carpet Selections are as follows:

a. Mohawk – Geometric – First One Up II – BT443 Color 959

b. Engineered Floors – Geometric – ID 6GL-P – Outfitter Plan – Color 2400

Flocked

c. Interface Americas – Geometric – ID4GM-T – Aerial – Color 104626 Iron

d. Mannington – Geometric – OUTLT – Outline – Color Borough 15217

e. Tarkett – Geometric – ID 3GM – T Fallow Ground – Color Deep Lagoon 62906

f. Bentley Mills – Geometric – ID 5GL-P – Pop Up Shop – Color Fresh Eyes

400072

D. Carpet Tier 1 Carpet Adhesive Selection is as follows:

a. Each Resealable VOC will be purchased through each of the Tier 1 Manufacturers with ID 2A.

3. PRINCIPAL FEATURES: Principal features of work are as follows:

A. Civil:

a. None.

B. Architectural:

a. Remove existing transition strips, as required.

b. Remove existing roll/sheet carpet. Do not disturb substrate to ensure a smooth and secure bonding surface. (~ 384 SY)

c. Install new carpet squares, 24”x24” or approved otherwise. Tier 1 Approved

Carpet Vendor (~ 384SY)

d. Install matching transition strips where required. ~ 45 LF

e. Install 6” Cove base where required. ~ 188 LF

f. All work shall be in accordance with the latest NFPA and NEC requirements to ensure maximum protection against loss of life and property by fire.

g. Design and installation must meet all UFC 3-600-01 and applicable NFPA

Standards.

h. All interior finishes, contents and furnishings must meet NFPA 101 Chapter 10.

C. Mechanical (HVAC):

a. None

D. Electrical

a. N/A

E. COMMUNICATIONS: (Customer and 96 CS will verify)

a. N/A

F. SPECIAL INSTRUCTIONS:

a. This project must be completed in a timely matter with minimal impact. Notify

CO immediately of any impact regarding long lead items, delays or anything that could affect the negotiated schedule and completion date.

b. Customer will provide escorts if needed.

c. The adjacent areas within this facility will be occupied during construction.

d. Ensure adequate ventilation and coordination prior to work generating fumes, dust, debris and vibration, prior to the activity.

e. Provide warranty, certificates of compliance plus maintenance/cleaning instructions, as applicable the COR prior to the invoice being paid.

Point of contact) will be: Curtis Keefer/796 CES/CEOES

Contracting Officer Representative

850-882-5023