Submittal_Register_Mascot_PowerUpgrades.pdf

PDF 203 KB Posted

Attached to
Electrical upgrade at Mascot Saloon located within Federal contract opportunity
Solicitation number
140P9721Q0057
Issued by
Department of the Interior National Park Service Alaska Region

View the file

Other files for this federal contract opportunity

Other files attached to Electrical upgrade at Mascot Saloon located within, newest first.
File Type Posted
Scope_7-12-2021_0002.pdf PDF
Sol_140P9721Q0057_Amd_0002.pdf PDF
Scope_6-28-2021_0001.pdf PDF
Sol_140P9721Q0057_Amd_0001.pdf PDF
Combined_synopsis-solicitation.pdf PDF
Service_Contract_Labor_Wages.pdf PDF
Sol_140P9721Q0057.pdf PDF
General_specifications.pdf PDF
Mascot_PowerUpgrade_AnnotatedPictures_Drawings.pdf PDF
Scope.pdf PDF
Past_performance_questionnaire.pdf PDF
Submittal_Form.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Printed on: National Park Services 4/27/2021

It em

N o

Tr a n sm it ta l N o

Sp ec Se ct io n o r D ra w in g N o

Su b m it ta l

D es cr ip ti o n

Sp ec P ar ag ra p h o r

D ra w in g D et a il N o

Su b m it ta l D a te

R et u rn D a te

26 05 10 Basic Materials and Methods

1 1.11.A SD‐03 2.1 Conduit and Tubing 2 1.11.A SD‐03 2.2 Conductors and Cables 3 1.11.A SD‐03 2.3 Grounding and Bonding 4 1.11.A SD‐03 2.4 Branch Circuit Panelboards 5 1.11.A SD‐03 2.5.A Circuit Breakers

Review Comments

Owner:

Item Description

SD‐01 Preconstruction; SD‐02 Shop Drawings; SD‐03 Product Data; SD‐04 Samples; SD‐05 Design Data; SD‐06 Test Report; SD‐07 Certificates; SD‐08 Manufacturer's Instructions; SD‐09 Manufacturer's Report; SD‐10 O&M Data; SD‐11 Closeout; SD‐12 LEED

1=No Exception Taken; 2 = Accepted as Noted; 3 = Revise & Resubmit; 4 = Submit Specified Item; 5 = Rejected

Actual

Contractor:

Consultant:

C o n tr a ct o r' s

Sc h ed u le d S u b m it ta l

D a te

St a tu s

Project: Mascot Saloon Heating System Conversion

Corrections or comments do not relieve Contractor from compliance with Contract Documents. Submittals are reviewed only for general conformance with the design concept of the project and general compliance with the Contract Documents. The Contractor is responsible for confirming compliance with the Contract Documents, confirming & correlating all quantities & dimensions, selecting fabrication processes, techniques of construction, coordinating his work with that of other trades, and existing conditions; and performing his work in a safe and satisfactory manner.

Reviewed By1 1

Date1 1

File details come from the government source that posted it. Updated .