Submittal_Register_Mascot_PowerUpgrades.pdf
PDF 203 KB Posted
- Attached to
- Electrical upgrade at Mascot Saloon located within Federal contract opportunity
- Solicitation number
- 140P9721Q0057
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Scope_7-12-2021_0002.pdf | ||
| Sol_140P9721Q0057_Amd_0002.pdf | ||
| Scope_6-28-2021_0001.pdf | ||
| Sol_140P9721Q0057_Amd_0001.pdf | ||
| Combined_synopsis-solicitation.pdf | ||
| Service_Contract_Labor_Wages.pdf | ||
| Sol_140P9721Q0057.pdf | ||
| General_specifications.pdf | ||
| Mascot_PowerUpgrade_AnnotatedPictures_Drawings.pdf | ||
| Scope.pdf | ||
| Past_performance_questionnaire.pdf | ||
| Submittal_Form.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Printed on: National Park Services 4/27/2021
It em
N o
Tr a n sm it ta l N o
Sp ec Se ct io n o r D ra w in g N o
Su b m it ta l
D es cr ip ti o n
Sp ec P ar ag ra p h o r
D ra w in g D et a il N o
Su b m it ta l D a te
R et u rn D a te
26 05 10 Basic Materials and Methods
1 1.11.A SD‐03 2.1 Conduit and Tubing 2 1.11.A SD‐03 2.2 Conductors and Cables 3 1.11.A SD‐03 2.3 Grounding and Bonding 4 1.11.A SD‐03 2.4 Branch Circuit Panelboards 5 1.11.A SD‐03 2.5.A Circuit Breakers
Review Comments
Owner:
Item Description
SD‐01 Preconstruction; SD‐02 Shop Drawings; SD‐03 Product Data; SD‐04 Samples; SD‐05 Design Data; SD‐06 Test Report; SD‐07 Certificates; SD‐08 Manufacturer's Instructions; SD‐09 Manufacturer's Report; SD‐10 O&M Data; SD‐11 Closeout; SD‐12 LEED
1=No Exception Taken; 2 = Accepted as Noted; 3 = Revise & Resubmit; 4 = Submit Specified Item; 5 = Rejected
Actual
Contractor:
Consultant:
C o n tr a ct o r' s
Sc h ed u le d S u b m it ta l
D a te
St a tu s
Project: Mascot Saloon Heating System Conversion
Corrections or comments do not relieve Contractor from compliance with Contract Documents. Submittals are reviewed only for general conformance with the design concept of the project and general compliance with the Contract Documents. The Contractor is responsible for confirming compliance with the Contract Documents, confirming & correlating all quantities & dimensions, selecting fabrication processes, techniques of construction, coordinating his work with that of other trades, and existing conditions; and performing his work in a safe and satisfactory manner.
Reviewed By1 1
Date1 1
File details come from the government source that posted it. Updated .