Mascot_PowerUpgrade_AnnotatedPictures_Drawings.pdf

PDF 571 KB Posted

Attached to
Electrical upgrade at Mascot Saloon located within Federal contract opportunity
Solicitation number
140P9721Q0057
Issued by
Department of the Interior National Park Service Alaska Region

View the file

Other files for this federal contract opportunity

Other files attached to Electrical upgrade at Mascot Saloon located within, newest first.
File Type Posted
Scope_7-12-2021_0002.pdf PDF
Sol_140P9721Q0057_Amd_0002.pdf PDF
Scope_6-28-2021_0001.pdf PDF
Sol_140P9721Q0057_Amd_0001.pdf PDF
Combined_synopsis-solicitation.pdf PDF
Service_Contract_Labor_Wages.pdf PDF
Sol_140P9721Q0057.pdf PDF
General_specifications.pdf PDF
Scope.pdf PDF
Submittal_Register_Mascot_PowerUpgrades.pdf PDF
Submittal_Form.pdf PDF
Past_performance_questionnaire.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Other Notes: Electrical service will enter the building through the crawls space above grade, but under boardwalk. Then enter Mascot Mechanical Room through the floor. If a crawl space vent is not available a 4” hole will be drilled through the stem wall.

Constructed Valve Pit

Shed and Fuel tank

Fence

H-Frame (red) to extend 108” from the existing power pole (blue) to mount the new 400 am CT meter and Main Disconnect (green rectangles) for the Upgraded Mascot Electrical

Service. Protected by bollards (yellow). Dumpster pad (grey) will be re-established after

Electrical Service installation. Bollards and H-Frame posts to be buried 4’ below grade.

Approx. Privy Location.

New electrical service (red line) will be one 4” conduit. Top of conduit is 24” below grade until under the boardwalk when it is raised and

“daylighted” above grade before entering the crawlspace.

Approx. Privy Location.

Code allows for exemptions to disconnect or shunt trip attached to building when the building is operated by a single owner. Engineer recommends placard, identifying disconnect on H-Frame by the power pole be attached to wall by back door.

Representation of H-Frame and Gear is not to scale (actual dimensions listed on page 4). Location of the post on the left side of the picture is in the correct location relative to the distance from the south side of the power pole and Westmark

Building. Bollards (yellow) will be placed to protect electrical service from vehicular damage. Dumpster pad will be replaced after installation.

400 Amp

Main

Disconnect

For Building

400 Amp

Current

Transformer

(CT) Meter

Existing Disconnect for 6 meter pack attached to the

Verb Cribs to be replaced with new.

Location of H-Frame post (brown) is 108” north of the side of the power pole (just out of view of the picture. Area inside of green oval is where new conduit follows trenching that occurred in 2019.

New electrical service

(red line) will be one 4” conduit and one 1” conduit. Top of conduit is 24” below grade until under the boardwalk when it is raised and

“daylighted” above grade before entering the crawlspace.

Electrical gear sketch and dimensions to be mounted to H-Frame connected to power pole.

Panel M to be surface mounted. Services enters room through crawlspace. 150 amp connection from Panel M to Panel A will also be routed through the crawlspace. Fiber Optic ONT, hydrant and conjunction box to be relocated, removed, or abandoned prior to Panel M installation.

Panel M

Location

Panel A