Submittal Register Attachment 3.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- New Miter Gate Operating and Valve Operating Hydraulic Cylinders, Braddock L/D Federal contract opportunity
- Solicitation number
- W911WN21Q0767
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003 W911WN21Q0767 .pdf | ||
| Specifications Rev 2 Attachment 1.pdf | ||
| Amendment 0002 W911WN21Q0767 .pdf | ||
| Reference Drawings Rev Attachment 2.pdf | ||
| Specifications Rev Attachment 1.pdf | ||
| Amendment 0001 W911WN21Q0767.pdf | ||
| Specifications Cylinders Attachment 1.pdf | ||
| Reference Drawings Attachment 2.pdf | ||
| Security Background Check Form Attachment 6.docx | DOCX document | |
| Paint Coating Form Attachment 4 .pdf | ||
| Combined Synopsis Solicitation W911WN21Q0767.pdf | ||
| Table 1 Nickel Chromium Piston Rod Coating Requirements Attachment 5.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | TITLE AND LOCATION Braddock L/D - Gate and Valve Operating Hydraulic Cylinder Purchase (FY21) | ||||||||||||||
| CONTRACTOR | CONTRACT NUMBER | ||||||||||||||
| ACTIVITY | |||||||||||||||
| No. | TRANS- MITTAL | ||||||||||||||
| No. | ITEM | ||||||||||||||
| No. | SPEC PARAGRAPH | ||||||||||||||
| No. | DESCRIPTION OF SUBMITTAL | TYPE OF SUBMITTAL | CLASSI- FICATION | CONTRACTOR REVIEWER | CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | GOVERNMENT ACTION | ||||||||
| RO or DO | SUBMIT NEEDED BY | APPROVAL NEEDED BY | MATERIAL NEEDED BY | CODE | CORPS RECEIVED DATE | CODE | CORPS RETURNED DATE | ||||||||
| 1. GENERAL | |||||||||||||||
| 1 | 1.6 | Qualifications of Welding Inspectors | PRECON SUBMTL | G RO | |||||||||||
| 2 | 1.6 | Qualifications of Welders and Welding Operators | PRECON SUBMTL | G RO | |||||||||||
| 3 | 1.6 | Schematic and Drawings | SHOP DRAWINGS | G DO | |||||||||||
| 4 | 1.6 | Red-Line Revisions of Shop Drawings | CLOSEOUT SUBMTL | G DO | |||||||||||
| 5 | 1.6 | Thermal Stress Relief | PRECON SUBMTL | G DO | |||||||||||
| 6 | 1.6 | Welding Procedure Specifications | SHOP DRAWINGS | G DO | |||||||||||
| 7 | 1.9 | Operations and Maintenance | OPERATION AND MAINTENANCE DATA | G DO | |||||||||||
| 8 | 1.13 | Project Schedule | PRECON SUBMTL | G RO |
| 2. PRODUCTS | |||||
| 1 | 2.1 | Materials and Mechanical Equipment | PRODUCT DATA | G DO | |
| 2 | 2.1 | Materials | TEST REPORTS | G DO | |
| 3 | 2.1.2 | Welds | TEST REPORTS | G DO | |
| 4 | 2.2 | Shop Assembly and Testing | PRODUCT DATA | G DO | |
| 5 | 2.2 | Shop Tests | TEST REPORTS | G DO |
RANGE : OUTSTANDING OVERDUE REGISTER : MAIN REGISTER SORT : SECTION & ITEM