Paint Coating Form Attachment 4 .pdf

PDF 274 KB Posted

Attached to
New Miter Gate Operating and Valve Operating Hydraulic Cylinders, Braddock L/D Federal contract opportunity
Solicitation number
W911WN21Q0767
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

View the file

Other files for this federal contract opportunity

Other files attached to New Miter Gate Operating and Valve Operating Hydraulic Cylinders, Braddock L/D, newest first.
File Type Posted
Amendment 0003 W911WN21Q0767 .pdf PDF
Specifications Rev 2 Attachment 1.pdf PDF
Amendment 0002 W911WN21Q0767 .pdf PDF
Reference Drawings Rev Attachment 2.pdf PDF
Specifications Rev Attachment 1.pdf PDF
Amendment 0001 W911WN21Q0767.pdf PDF
Specifications Cylinders Attachment 1.pdf PDF
Reference Drawings Attachment 2.pdf PDF
Security Background Check Form Attachment 6.docx DOCX document
Submittal Register Attachment 3.xlsx XLSX spreadsheet
Combined Synopsis Solicitation W911WN21Q0767.pdf PDF
Table 1 Nickel Chromium Piston Rod Coating Requirements Attachment 5.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: / / M T W Th F S Su

Project #:

Inspector:

QC Mgr Owner

Project/Client: Contr

Location:

Description: DFT Sheet NCR/CAR

Requirements:

Contractor: Spec # Revision #

1 Pre Surface Pep/Condition & Cleanliness 2 Surface Preparation Monitoring 3 Post Surface Preparation/Cleanliness & Profile 4 Pre Application Prep/Surface Cleanliness 5 Application Monitoring/Wet Film Thickness (WFT) 6 Post Application/Application Defects 7 Post Cure/Dry Film Thickness (DFT) 8 Nonconformance/Corrective Actions Follow-up 9 Final Inspection

Approved By:

New Maint Primer/Paint Age/Dry/Cure Time (Indicate AM or PM) : : : :

Steel Galvanize Concrete Other Dry Bulb Temp0 (C/F)

Hazard Sample Report # Wet Bulb Temp0 (C/F)

Degree of contamination: % Relative Humidity % % % % Test: Cl µg/cm2 / ppm Fe ppm pH Surface Temp0

(C/F) Min/Max / / / / Degree of Corrosion: Dew Point Temp0 (C/F)

Scale Pitting/Holes Crevices Sharp Edges Wind Direction/Speed Weld Moisture Oils Other Weather Conditions:

Painted Surface Condition:

Dry to: Touch Handle Recoat Start Time : Finish Time : Est. Sq/ft.

Dry/Over Spray Runs/Sags Pinholes Holidays Abrasion Fall Out Other Generic Type: Qty Mixed:

Manuf.: Mix Ratio:

Prod Name: Mix Method:

Solvent Clean Hand Tool Power Tool Prod #: Strain/Screen:

HP Wash PSI Other Color: Material Temp: F Abrasive Blast Abrasive Type Sample Kit Sz/Cond.: Sweat-in Time: Min/Hrs

Blast Hose Size Nozzle Size / PSI Shelf Life: Pot Life: Min/Hrs

Air Supply CFM Air Supply Cleanliness Reducer #:

Water/Oil Trap Check Equipment Condition Check (A) Qty Added: Pt/Qt/Gal

(B) % by Vol: %

(C) Specified WFT Avg: Mils

Job Specification SSPC/NACE - SP- Reducer: Achieved WFT Avg: Mils

SSPC/NACE Spec / Visual Stds Profile Check: Disc Tape Gauge Pump Pot Hose Dia. Air Check Specified mils avg. / Achieved mils Ratio/Size Hose Lng. SEP/Trap Surface effect on DFT Gauge/BMR mils GPM/CFM Spray Gun Filter

PSI Tip Sz. Agitator

Total Avg

DFT

Inspector's Signature Date

Airless/Conv. Spray Brush Roller Other

Dry Film Thickness DFT Last

Coat DFT This

Coat Spec Avg.

DFT

Gage Type /

Model Gage

Serial #

Batch #'s

Gage Calib.

Verified

Pg. Of COPY To:

Hold Point Inspections Performed

Ambient Conditions

Surface Cleanliness & Profile Measurement

Surface Preparation

Description of Areas & Work Performed

Attachments:

Paint Inspection:

Daily Coating Inspection Report

Primer Intermediate Topcoat Touch-up

Surface Conditions

Start Time: Finish Time: Est Sq/ft:

Application o o o o o o o o o o o o o o o o o

H4TSTJPP

Typewritten Text

ATTACHMENT 1

H4TSTJPP

Typewritten Text

File details come from the government source that posted it. Updated .