Submittal Instructions for RFB# 15 Range Water System Final.pdf
PDF 81 KB Posted
- Solicitation number
- IFB-128010
- Issued by
- Dinwiddie County, Virginia
About this file
Submittal Instructions for RFB# 15 Range Water System
This submittal instructions document pertains to the Southwest Regional Recreation Authority (SRRA), d.b.a. Spearhead Trails, located in Virginia, and establishes the procedural requirements for bidders responding to RFB# 15 for a water pressure and storage system project at Dixon Shooting Range in Clintwood, Virginia. The project involves the furnishing and installation of a complete water storage and pressure system connecting from a municipal water line to provide adequate water pressure and volume to facilities located at 418 Dixon Range Road. The instructions outline the specific format, content requirements, and documentation that prospective contractors must submit with their bids, including technical specifications, pricing schedules, contractor qualifications, and evidence of bonding and insurance coverage. Bidders are required to submit sealed proposals according to the specified deadline and format established by SRRA to ensure compliance with the procurement process and contract requirements.
The document establishes mandatory submittal procedures including delivery method, packaging requirements, and specific forms that must accompany bid proposals. All submissions must be received by the stated due date and time to be considered eligible for evaluation. The instructions specify that bids must be submitted in sealed envelopes or containers clearly marked with the RFB number and project title, and designate the physical location for bid delivery. The document may include provisions regarding bid bond requirements, contractor licensing and insurance documentation, references, and other qualifications necessary to demonstrate contractor capability to execute the project successfully. Additional requirements may include compliance with Virginia-specific procurement regulations and any applicable prevailing wage or labor standards for public works projects in the Commonwealth.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SCOPE OF WORK Range Water System Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Instructions for RFB# 15 for Water Pressure and Storage System for Dixon Shooting Range
1. Contractor Information
Provide the following:
• Company name
• Business address
• Contact person
• Telephone number
• Email address
• Virginia contractor license information, if applicable
2. Qualifications and Experience
Provide a brief description of the contractor's experience with:
• Water storage systems
• Booster pump systems
• Plumbing and piping installations
• Electrical connections associated with pump systems
• Similar projects completed within the past five (5) years
Include at least two (2) references for similar projects, including the project name, owner, contact person, telephone number, and email address, if available.
3. Proposed Equipment
Identify the equipment and materials proposed for the project, including:
• Water storage cistern
• Booster pump system
• Concrete utility vault
• Valves, piping, fittings, controls, and related components
• Electrical components
The anticipated equipment includes an approximately 1,800-gallon polyethylene cistern and a DAB Basybox Max all-in-one pump system, 20-amp/240-volt configuration, or approved equal.
If proposing an approved equal, provide the manufacturer's name, model number, specifications, and documentation demonstrating that the proposed equipment meets or exceeds the required capacity, performance, quality, and functionality.
4. Proposed Approach
Provide a brief description of how the contractor will complete the project, including:
• Installation approach
• Pump and cistern installation
• Electrical connection
• Testing and commissioning
• Site cleanup
The contractor shall provide all labor, supervision, equipment, materials, tools, transportation, and incidental items necessary to provide a complete and operational system.
5. Schedule
Provide a proposed project schedule showing the anticipated:
• Estimated Start to Finish timeline. (Estimated Days to Complete Work)
• Installation period
• Testing and commissioning
6. Licensing and Permits
Identify the licenses or certifications applicable to the work. Electrical work must be performed by appropriately licensed personnel. The contractor shall obtain required permits and inspections unless otherwise specified by SRRA.
7. Price Proposal
Provide a lump-sum price for completing the entire Scope of Work.
The price shall include all labor, materials, equipment, transportation, installation, testing, permits, incidental work, cleanup, and other costs necessary to provide a complete and operational system.
SRRA will be responsible for excavation, backfill, and earth-moving activities as identified in the Scope of Work.
8. Warranty
Identify the manufacturer's warranties applicable to the proposed equipment and materials. The contractor shall provide a minimum one-year warranty on workmanship and installation from inlet to outlet on the pump and cistern system following final acceptance, unless a longer warranty is required by the manufacturer or contract.
9. Final Submittal
Proposals should include, at a minimum:
1. Contractor Information
2. Qualifications and Experience
3. Proposed Equipment and Specifications
4. Proposed Approach
5. Proposed Schedule
6. Licensing/Permit Information
7. Lump-Sum Price Proposal
8. Warranty Information
Incomplete proposals may be considered non-responsive.
The selected contractor will be required to provide applicable equipment manuals, warranties, test results, and other required closeout documentation before final payment.
Proposal Due Date
Sealed proposals will be received until:
Date: September 20, 2026
Time: 3:00 PM (Eastern Time)
Late proposals will not be accepted.
Proposal Delivery/Online Submittal:
The eVA Internet electronic procurement solution streamlines and automates government purchasing activities within the Commonwealth of Virginia. SRRA, and other state agencies and institutions have been directed by the Governor to maximize the use of this system in the procurement of goods and services. We are, therefore, requesting that your firm register as a vendor within the eVA system. There are transaction fees involved with the use of eVA.
These fees must be considered in the provision of quotes, bids, and price Bids offered to SRRA. Failure to register within the eVA system may result in the quote, bid, or Bid from your firm being rejected and the award made to another vendor who is registered in the eVA system. Registration in the eVA system is accomplished online. Your firm must provide the necessary information.
Please visit the eVA website portal at http://www.eva.virginia.gov/pages/evaregistrationbuyer-vendor.htm and register with eVA.
If your firm conducts business from multiple geographic locations, please register these locations in your initial registration. For registration and technical assistance, reference the eVA website at: https://eva.virginia.gov/, or call 866-289-7367 or 804-371-2525.
Proposals can also be delivered to:
Southwest Regional Recreation Authority Attn: James Marcum - Procurement Specialist 11325 Norton-Coeburn Road Coeburn, VA 24230
Questions should be sent to:
James Marcum – Procurement Specialist Email: Jmarcum@srra.org
If mailing in a proposal. The outside of the sealed envelope shall be clearly marked:
http://www.eva.virginia.gov/pages/evaregistrationbuyer-vendor.htm https://eva.virginia.gov/ mailto:Jmarcum@srra.org
Request for Bids No. #15 Water Pressure and Storage System for Dixon Shooting Range Due: September 20, 2026 at 3:00 PM (Eastern Time)
The Authority assumes no responsibility for proposals delivered to any location other than that specified herein. Electronic or facsimile proposals will not be accepted unless specifically authorized through a written addendum.
Offerors are solely responsible for ensuring proposals are received by SRRA before the established deadline.
Proposals received after the deadline may be rejected in accordance with applicable procurement requirements.
File details come from the government source that posted it. Updated .