Subcontractor_Listing.pdf
PDF 224 KB Posted
- Attached to
- Tent and Furniture Rentals
- Solicitation number
- 2024-IFB-LM-0140
- Issued by
- Los Angeles County, California
About this file
The document is a Subcontractor Listing form for the Rose Bowl Operating Company (RBOC) related to a tent and furniture rental contract opportunity. The form provides blank tables for listing subcontractors and potential shoring design engineers, with instructions that if shoring is required for the project, the Civil or Structural Engineer responsible for the design must be listed, even if employed by the contractor. If no shoring is needed, the form specifies to write "NONE".
This form is part of a comprehensive solicitation for tent and furniture rental services for the Rose Bowl Stadium and adjacent Brookside Golf Courses, covering Major Events with over 20,000 attendees and additional Enterprise and Community Events. The contract has an initial one-year term beginning July 1, 2023, with two potential one-year renewal options at the discretion of the RBOC Chief Executive Officer/General Manager. The Stadium hosts approximately 25 Major Events annually, including UCLA football games, the Rose Bowl Game, international soccer matches, concerts, and multi-day music festivals, requiring flexible and comprehensive rental services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .