Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
Authorized Dodge, RAM, Chrysler, & Jeep Service, Repair, Maintenance, and OEM Parts
Solicitation number
2026-IFB-LM-0420
Issued by
Los Angeles County, California

About this file

This is a Subcontractor Listing form for the City of Pasadena Department of Public Works, Building Systems and Fleet Management Division's authorized vehicle service contract opportunity for Dodge, RAM, Chrysler, and Jeep vehicles. The form requires contractors to identify and list all subcontractors who will perform work on the project, along with their names, addresses, and descriptions of work to be performed. Additionally, the form contains a dedicated section for shoring design, requiring Civil or Structural Engineers involved in shoring design to be listed with their names, addresses, and work descriptions; if no shoring is required for the project, bidders must indicate "NONE" in this section. The form provides numbered fields for up to seven subcontractors and up to six shoring design engineers, allowing contractors to comprehensively document their project team structure.

This document serves as a transparency and accountability mechanism for the City of Pasadena to review and approve the qualifications and roles of all parties involved in delivering vehicle maintenance, repair, diagnostics, and OEM parts supply services. The subcontractor listing requirement ensures that the City can verify the competency and appropriateness of all proposed team members before contract award and throughout the multi-year contract term, supporting the establishment of a reliable vendor relationship for ongoing fleet support across multiple city departments.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .