Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
Authorized Kubota Service, Parts and Repair
Solicitation number
2026-IFB-LM-0410
Issued by
Los Angeles County, California

About this file

This is a Subcontractor Listing form for a state and local contract opportunity issued by the City of Pasadena Department of Public Works, Building Systems and Fleet Management Division in California. The form is designed to document subcontractors and shoring design engineers required for projects. The document requests identification of subcontractors performing work on the project as well as civil or structural engineers responsible for shoring design if shoring is required as part of the project scope. The form provides spaces for up to seven subcontractors and up to six shoring design engineers, with fields for each party's name, address, and description of work to be performed. If no shoring is required, the form instructs that "NONE" be entered in the applicable section.

The related contract opportunity involves the City of Pasadena seeking a qualified vendor to provide authorized Kubota equipment service, parts, and repair on an as-needed basis to support the Parks and Recreation and Community Services Department. Services include preventative maintenance, diagnostics, repairs, and Original Equipment Manufacturer parts supply. This formal solicitation is intended to establish a vendor relationship for ongoing service needs beginning in Fiscal Year 2027 with a five-year contract term.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .