Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
REVERSE OSMOSIS, DEGASIFICATION AND ION EXCHANGE SYSTEM SUPPORT SERVICES
Solicitation number
2026-IFB-LM-0055
Issued by
Los Angeles County, California

About this file

This is a Subcontractor Listing form for the City of Pasadena Water & Power Department's Reverse Osmosis, Degasification and Ion Exchange System Support Services procurement for the Glenarm Power Plant in Pasadena, California. The form is designed to capture information about subcontractors and shoring design engineers that will support the primary contractor in delivering water purification system maintenance and support services. The document provides blank fields for contractors to list up to seven subcontractors with their names, addresses, and descriptions of work, as well as up to six civil or structural engineers responsible for shoring design (if required). A pre-bid meeting is scheduled for February 11, 2026 at 8:30 a.m., with questions due by February 19, 2026 at 3:00 p.m., and sealed bids due by 2:00 p.m. on February 27, 2026. The contract term is three years from the date of execution with no optional renewal periods.

The form serves as a disclosure mechanism requiring bidders to identify all proposed subcontractors and shoring design professionals as part of their bid package submission. Bidders must comply with the City of Pasadena Living Wage Ordinance (for contracts exceeding $25,000), minimum wage requirements, and Equal Employment Opportunity provisions. A bid bond equal to five percent of the total bid price, along with 100% performance bonds and 100% labor and materials bonds, are required. Award will be made to the lowest responsive and responsible bidder based on the Grand Total Price submitted, with bids remaining open for a minimum of 180 calendar days from opening. Successful bidders must submit proof of required insurance prior to contract award, a completed IRS Form W-9 within 10 calendar days of notification, and a Unique Entity ID (UEI) from SAM.gov with their bid package.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .