Subcontractor_Listing.pdf
PDF 224 KB Posted
- Solicitation number
- 2026-IFB-LM-0055
- Issued by
- Los Angeles County, California
About this file
This is a Subcontractor Listing form for a construction project involving the City of Pasadena's Glenarm Power Plant, which requires submission of subcontractor and engineering information prior to project execution. The form mandates that contractors identify all subcontractors performing work on the project, with particular emphasis on civil or structural engineers responsible for shoring design if shoring is required as part of the work. The document provides spaces for up to seven subcontractors and six shoring design engineers, each with associated name, address, and description of work fields. If no shoring is required for the project, contractors must indicate "NONE" in the designated shoring design section.
The form serves as a pre-award documentation requirement for the reverse osmosis, degasification, and ion exchange system support services contract at the City of Pasadena's Glenarm Power Plant, where the city produces approximately 8 million gallons of demineralized and deionized water annually for electric power production. Completion and accurate submission of this subcontractor listing is a standard compliance requirement ensuring transparency regarding all parties involved in project delivery and allowing the government entity to evaluate the qualifications and experience of proposed subcontractors before contract award.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .