Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
LA PINTORESCA LIBRARY WINDOWS REPLACEMENT PROJECT
Solicitation number
2025-IFB-LM-0028
Issued by
Los Angeles County, California

About this file

This document is a blank Subcontractor Listing/Shoring Design form designed for contractors to list their subcontractors and potential shoring design engineers for a construction project. The form provides two main sections: a Subcontractor Listing where contractors can document the names, addresses, and descriptions of work for subcontractors, and a Shoring Design section where engineers responsible for shoring design can be listed if such design is required for the project. If no shoring is needed, the form instructs the contractor to write "NONE" in the appropriate section. The document appears to be a standard template used in construction bidding and contract preparation to ensure transparency and documentation of project team members and specialized engineering requirements.

The form does not contain any filled-in information, pricing details, or specific project context. It is a blank template with columnar spaces for Name(s), Address, and Description of Work for both subcontractors and potential shoring design engineers. The instructions indicate that even if the shoring design engineer is employed directly by the contractor, they must still be listed on this form. This suggests the document is part of a broader procurement or bidding process that requires comprehensive disclosure of project team members and their respective roles.

View the file

Other files

File Type Posted
CONTRACTOR_VERIFICATION.pdf PDF
DECLARATION_OF_ELIGIBILITY_TO_CONTRACT_(6).pdf PDF
CONTRACTOR_VERIFICATION.pdf PDF
DECLARATION_OF_ELIGIBILITY_TO_CONTRACT_(6).pdf PDF
Public_Contract_Code_Disclosures_(2).pdf PDF
Public_Contract_Code_Disclosures_(2).pdf PDF
MASTER_LABOR_AND_MATERIALS_CONTRACT_(12-18-24).pdf PDF
FAITHFUL_PERFORMANCE_BOND_FORM.pdf PDF
FAITHFUL_PERFORMANCE_BOND_FORM.pdf PDF
MASTER_LABOR_AND_MATERIALS_CONTRACT_(12-18-24).pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
RELEVANT_EXPERIENCE_FORM.pdf PDF
RELEVANT_EXPERIENCE_FORM.pdf PDF
MATERIAL_AND_LABOR_BOND_FORM.pdf PDF
MATERIAL_AND_LABOR_BOND_FORM.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
Subcontractor_Listing.pdf PDF
Master_Labor_and_Materials_Contract_-_12-29-21.pdf PDF
Master_Labor_and_Materials_Contract_-_12-29-21.pdf PDF
APPROVED_PLANS_LA_PINTORESCA_6831dwg.pdf PDF
APPROVED_PLANS_LA_PINTORESCA_6831dwg.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Unique_Entity_ID_(SAM).pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .