Subcontractor_Listing.pdf
PDF 224 KB Posted
- Attached to
- Metal Fence Installation
- Solicitation number
- 2023-IFB-LM-167
- Issued by
- Los Angeles County, California
About this file
The document is a Subcontractor Listing form for a Metal Fence Installation project in California, designed to capture detailed information about subcontractors and potential shoring design requirements. The form provides structured sections for listing subcontractors' names, addresses, and descriptions of work, as well as a specific section for identifying the Civil or Structural Engineer responsible for shoring design if such engineering is required for the project.
The form appears to be a standard procurement document that allows the prime contractor to disclose all subcontractors who will be involved in the project, ensuring transparency and providing project managers with a comprehensive view of the project's workforce. The "Shoring Design" section includes an explicit instruction that if shoring is needed, the engineer must be listed, even if they are employed directly by the contractor, and if no shoring is required, the contractor should write "NONE". This document serves as a critical component of the bid or contract submission process, enabling thorough review of the project's planned workforce and technical design considerations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .