Metal_Fence_Installation.pdf

PDF 393 KB Posted

Attached to
Metal Fence Installation
Solicitation number
2023-IFB-LM-167
Issued by
Los Angeles County, California

About this file

This is a competitive bid document from the City of Pasadena, California, issued by the Parks, Recreation and Community Services Department for a Metal Fence Installation project. The project involves fabricating and installing approximately 80 linear feet of removable metal fence panels at Memorial Park, located at 85 E Holly St, with panels matching existing fence design in color and form, featuring an interlocking mechanism to prevent unauthorized removal. The bid was released on March 16, 2023, with a bid submission deadline of April 4, 2023 at 3:00 pm, and a mandatory pre-bid meeting scheduled for March 23, 2023 at 10:00 am. The project must be completed before June 30, 2023, with a total contract duration of one year from execution.

The bid requires contractors to possess a C-13 contractor's license and be registered with the California Department of Industrial Relations. Bidders must submit various forms including equal employment opportunity documentation, a declaration of non-collusion, and relevant experience forms. The contract will be awarded to the lowest responsive and responsible bidder, with pricing to be entered electronically through the City's eProcurement Portal. The project is funded by the City of Pasadena and is subject to local requirements such as the Living Wage Ordinance, Construction and Demolition Waste Management Ordinance, and prevailing wage regulations. Bidders must provide proof of insurance and comply with various city and state regulations, including safety measures and quality control standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMPETITIVE BID

FURNISH AND DELIVER

METAL FENCE INSTALLATION

FOR THE

PARKS, RECREATION AND COMMUNITY SERVICES

DEPARTMENT

CITY OF PASADENA, CALIFORNIA

Competitive Bid - Metal Fence Installation Release Date: Thursday, March 16, 2023

Attachments:

B - REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION 11032022

C - RELEVANT EXPERIENCE FORM

E - FAITHFUL PERFORMANCE BOND FORM

F - Subcontractor Listing H - Removable Metal Fence Panels - Memorial Park Pavilion

1. NOTICE INVITING BIDS

1. Summary

Notice is hereby given that the City of Pasadena is calling for sealed bids for the Parks, Recreation and Community Services Department and will receive sealed bids prior to but not later than 3:00 pm, Tuesday, April 4, 2023 and will electronically unseal and make them available online (https://procurement.opengov.com/portal/pasadena) for this solicitation named "Metal Fence Installation" Project ID: 2023-IFB-LM-167.

Submittal Instructions

Bids will be received via the City's eProcurement Portal. A bid received after the time set for the bid opening shall not be considered. Bidders are required to submit (upload) all items listed in the #Bidder's Submittals/Checklist. Addenda shall be acknowledged via the City's eProcurement Portal. Bids will be received prior to 3:00 pm on Tuesday, April 4, 2023 and will be opened online at that time.

Copies of the Specifications and all required forms may be obtained for this solicitation online:

https://procurement.opengov.com/portal/pasadena/projects/39587

Refer to the Specifications for complete details and bidding requirements. The Specification and this Notice shall be considered a part of any contract made pursuant thereunder.

All bid pricing must be entered into the City's eProcurement Portal or the bid may be considered informal and deemed non-responsive, do not use a separate document attachment to represent your pricing. All required attachments must be completed and uploaded electronically into City's eProcurement Portal prior to the set bid date and time in this Notice Inviting Bids.

• PROJECT TITLE: Metal Fence Installation

• DEPARTMENT: Parks, Recreation and Community Services Department

• CONTACT: Jason Vega

Release Dated: Thursday, March 16, 2023

MIGUEL MÁRQUEZ

City Manager

2. Background

The Department of Parks, Recreation and Community Services - Parks Division seeks a vendor to fabricate and install custom removable metal fence panels, to match existing. Award will be based on the lowest price and pricing must be valid from July 2022 to June 2023.

3. Contact Information https://procurement.opengov.com/portal/pasadena https://procurement.opengov.com/portal/pasadena https://procurement.opengov.com/portal/pasadena/projects/39587?section=323180 https://procurement.opengov.com/portal/pasadena/projects/39587 https://procurement.opengov.com/portal/pasadena

Jason Vega Program Coordinator Email: jvega@cityofpasadena.net Phone: (626) 744-7358 Department:

Parks, Recreation and Community Services Department

4. Timeline

Vendors are strongly advised to complete and submit all required items sufficiently early before the date listed in this solicitation. Bids must be completed and submitted according to the instructions in this solicitation prior to 3:00 pm on Tuesday, April 4, 2023.

Release Project Date March 16, 2023

Pre-Bid Meeting (Mandatory) March 23, 2023, 10:00am

Agenda

Memorial Park 85 E Holly St, Pasadena, CA 91103

Question Submission Deadline March 23, 2023, 3:00pm

Bid Submission Deadline April 4, 2023, 3:00pm mailto:jvega@cityofpasadena.net tel:(626)744-7358 https://government-project.s3.amazonaws.com/39587/7b914626-1b8a-4662-97ab-044a67576241_Removable_Metal_Fence_Panels_-_Memorial_Park_Pavilion.pdf

2. GENERAL INSTRUCTIONS

1. General Bid Requirements

To be considered, a bidder must follow the format for bids in the specifications. Bids must be binding and firm. Any bid may be withdrawn before bid opening but not for 120 days after opening.

2. Funding Source

This procurement is funded by: City of Pasadena. Vendors must submit all required document with their proposal.

3. NOTICE REQUIREMENTS

No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

4. Required Licenses

Bidders must possess and provide the following licenses or certifications to be deemed qualified to perform the work specified: C-13

5. Performance Bonds, and Labor & Materials Bonds

Performance Bonds Required: 100%

Labor & Materials Bonds Required: No Bond Required

6. Special Requirements of Contractors

There is a separate packet of forms as part of these specifications that a bidder must complete to establish compliance with a number of special City of Pasadena requirements, including, but not limited to, Equal Employment and Affidavit of Non Collusion. These forms and their instructions should be considered an integral part of the specifications and failure to complete them shall be grounds, in the sole discretion of the City, for rejection of any bidder.

7. Bidder Must Make Thorough Investigation

It is the bidder's responsibility to examine the location of the proposed work, to fully acquaint themselves with the specifications and the nature of the work to be done. The bidder shall have no claim against the City based upon ignorance of the nature and requirements of the project, misapprehension of site conditions, or misunderstanding of the specifications or contract provisions.

8. Acceptance of Conditions

By submitting a bid, each bidder expressly agrees to and accepts the following conditions:

• All parts of the Instructions to Bidders and Specifications will become part of the Contract between the selected bidder and the City;

• The City may require whatever evidence is deemed necessary relative to the bidder's financial stability and ability to complete this project;

• The City reserves the right to request further information from the bidder, either in writing or orally, to establish any stated qualifications;

• The City reserves the right to solely judge the bidder's representations, and to solely determine whether the bidder is qualified to undertake the project pursuant to the criteria set forth herein. The bidder, by submitting a bid, expressly acknowledges and agrees that the judgment of the City as to whether or not the bidder is qualified to perform the project, shall be final, binding and conclusive;

• The City reserves the right to reject all bids, waive any irregularity in any of the bids, or cancel or delay the project at any time;

• This bidding process does not commit the City to award any contract, and the City is not liable for any costs incurred by the bidder in the preparation and submission of a bid.

9. Truth and Accuracy of Representation

False, incomplete or unresponsive statements in connection with the bid may be sufficient cause for rejection of a bidder.

10. City Changes to the Bid Documents

The City reserves the right to change any part of these Instructions to Bidders and Specifications any time prior to the bid opening. Any changes shall be in the form of addenda and will become a part of the bid documents and of the contract. Addenda shall be made available to each bidder. A bidder's failure to address the requirements of the addenda may result in the bid not being considered. If the City determines that a time extension is required for the bid, the addenda will give the new submission date.

Addenda shall be acknowledged via the City's eProcurement Portal for the project named "Metal Fence Installation." Project ID: 2023-IFB-LM-167. Bidders can view a list of addenda released by the City by clicking on "Addenda & Notices." While drafting a response, there will be a required section for "Addenda Confirmation" where bidders must acknowledge each addenda released.

11. Notice Regarding Disclosure of Contents of Document

All bids accepted by the City at the time of bid opening shall become the exclusive property of the City. Upon opening, all bids accepted by the City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each bid which are identified by the bidder as business or trade secrets and plainly marked as "trade secret," "confidential," or "proprietary." Each element of a bid which a bidder desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e., regarding entire pages, documents, or other non-specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If disclosure is required under the California Public Records Act or otherwise by law (despite the bidder's request for confidentiality), the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof.

12. Award of Bid and Determination of Responsiveness

The contract shall be awarded to the lowest responsive and responsible bidder. In determining whether a bidder is responsible and responsive, the following shall be considered:

• The quality of the material offered;

• The ability, capacity and skill of the bidder to perform the contract or provide the material or services;

• Whether the bidder can perform the contract or provide the service promptly, or within the time specified, without delay or interference;

• The sufficiency of the bidder's financial resources and the effect thereof on his ability to perform the contract or provide the material or services;

• The character, integrity, reputation, judgment, experience and efficiency of the bidder;

• The quality and timeliness of the bidder's performance on previous orders or contracts for the City;

• Litigation by the bidder on previous orders or contracts with the City;

• The ability of the bidder to provide future maintenance and service where such maintenance and service is essential;

13. Construction During the Period of November 15 through January 3

Attention is directed to Chapter 12.24 of the PMC, Excavations, and the Board of Directors (City Council) Policy Statement in Motion 25405 dated September 5, 1967. In general, all streets shall be free and clear of excavations and other construction during the period of November 15th through January 3rd for business districts, and December 15th through January 3rd for other areas. Accordingly, the Contractor will be required to shut down construction operations which would impede traffic movement during this period unless otherwise directed by the Engineer in emergency situations. Any existing excavations shall be backfilled, compacted, and temporarily repaved before the shutdown date. Bidders should reflect any costs of such shutdown in the various items of the Bidder's Proposal, and no additional payment will be allowed therefor. No time will be charged against the contract time for operations which are shut down in accordance with this section. A map showing the appropriate shutdown period for all locations in the City is available at the public counter of the City's Permit Center at 175 Garfield Avenue, Pasadena, 91101.

14. Local Bidders; Refund of Sales and Use Tax

For the purpose of determining the lowest bidder on a contract for materials and supplies only, 1.75% of that portion of the bid subject to sales or use tax shall be deducted from any bid where it is determined that if such bidder were awarded the contract, the City would receive a refund of the 1.75% sales and use tax pursuant to the Uniform Sales and Use Tax Ordinance of the City of Pasadena.

15. Special Requirements of Contractors

There is a separate packet of forms as part of these specifications that a bidder must complete to establish compliance with a number of special City of Pasadena requirements, including, but not limited to, Equal Employment and Affidavit of Non Collusion. These forms and their instructions should be considered an integral part of the specifications and failure to complete them shall be grounds, in the sole discretion of the City, for rejection of any bidder.

16. Public Contract Code Sec. 9204 New Public Works Claims Procedure

As detailed in the Section Titled Public Works Claims Procedure new Public Contract Code Section 9204 (#Public Contract Claims Procedure), effective January 1, 2017, specifies new procedural requirements for claims submitted by a contractor on any public works project.

https://procurement.opengov.com/portal/pasadena/projects/39587?section=323186

3. SUBMITTAL INSTRUCTIONS

1. Training Resources for Vendors:

Videos:

Instructions for the new eProcurement System: The following link https://help.procurement.opengov.com/en/articles/5815468-opengov-procurement-vendor-training will include video instructions for using the new system.

Screen Shots:

A. Subscribing for an agency's notifications - Using the Network Tab

B. Following a project

C. How to respond to a bid, submit a bid, or No bid?

D. Get Notifications

E. Managing Addenda

F. OpenGov Procurement Support

2. Electronic Submission and Delivery Instructions

Parties interested in responding are required to submit electronically through the City of Pasadena's eProcurement Portal prior to 3:00 pm, Tuesday, April 4, 2023. Please upload all required documents as instructed in the section named Submittals/Checklist sufficiently early electronically through the city's eProcurement Portal before the time and day listed in this solicitation. Responses must be received in the system prior to the deadline.

The Specification or Scope of Work included in this Notice shall be considered part of any contract made pursuant thereunder.

3. Withdraw of Proposal

Any Bidder or Proposer may withdraw their response via the City's eProcurement Portal prior to 3:00 pm on Tuesday, April 4, 2023.

4. City Changes to the Solicitation Documents

The City reserves the right to change any part of these Instructions and Specifications any time prior to the bid opening. Any changes shall be in the form of addenda and will become a part of the bid documents and of the contract. Addenda shall be made available to each Bidder or Proposer. A Bidder's or Proposer's failure to address the requirements of the addenda may result in the response not being considered. If the City determines that a time extension is required for the bid, the addenda will give the new submission date.

https://help.procurement.opengov.com/en/articles/5815468-opengov-procurement-vendor-training https://help.procurement.opengov.com/en/articles/5815468-opengov-procurement-vendor-training https://help.procurement.opengov.com/en/articles/5815468-opengov-procurement-vendor-training https://help.procurement.opengov.com/en/articles/3955963-how-to-subscribe-to-organizations-and-find-active-rfps-bids https://help.procurement.opengov.com/en/articles/2478854-follow-a-project https://help.procurement.opengov.com/en/articles/2478772-how-to-respond-to-a-project https://help.procurement.opengov.com/en/articles/2921877-get-notifications https://help.procurement.opengov.com/en/articles/4413350-managing-addenda https://help.procurement.opengov.com/en/articles/5680392-using-support https://procurement.opengov.com/portal/pasadena https://procurement.opengov.com/portal/pasadena/projects/39587?section=undefined

Addenda shall be acknowledged via the City's eProcurement Portal for the project named "Metal Fence Installation." Project ID: 2023-IFB-LM-167. Bidders or Proposers can view a list of addenda released by the City by clicking on "Addenda & Notices." While drafting a response, there is a section for "Addenda Confirmation" where Bidders or Proposers must acknowledge each addenda released.

5. Deadline for Questions

The deadline to submit questions related to this solicitation is Thursday, March 23, 2023, prior to 3:00 pm.

Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered.

6. Follow these simple steps to submit your proposal electronically:

If you are already registered and need help logging in or retrieving your user information utilize the blue chat bubble visible on the lower right hand corner of the screen.

Click on the hyperlink for the City's eProcurement Portal to create your vendor profile.

Electronic Submission of Bids

All Proposers are required to submit their bid pricing electronically via the city's eProcurement Portal. The electronic system will close submission exactly at the date and time set forth in this solicitation or as changed by addenda. In addition, your bid must be submitted via the eProcurement Portal.

Proposers are responsible for submitting and having their bid accepted before the closing time set forth in this solicitation or as changed by addenda. NOTE: It is the Proposer's sole responsibility to ensure their bid and document(s) are uploaded, transmitted, and arrive in time electronically. The City will have no responsibility for bids that do not arrive in a timely manner, no matter what the reason.

Upon closing of the Bid, Bid Results will be available on the City's eProcurement Portal.

In the case of a discrepancy between the electronic bid schedule (pricing) and any uploaded Bid schedule document or pricing, the electronic bid schedule will be the accepted bid.

Steps to Submit Your Electronic Proposal:

To submit an offer to the City, vendor must begin by clicking on the green DRAFT PROPOSAL button.

1. Acknowledge all Addenda

2. Accept City of Pasadena Terms and Conditions Message

3. Answer all required vendor questions.

4. Upload all required forms. Proposer may save their work and return.

5. Review your work and submit proposal when ready.

6. You will receive a confirmation email from OpenGov upon receipt of your bid/proposal.

7. Proposer may withdraw their bid at any time prior to 3:00 pm on Tuesday, April 4, 2023.

Note: If an addenda is issued after a response has been submitted, Proposer or bidder must return to take steps below. Failure to do both steps will result in an invalidated offer.

1- Acknowledge the new addenda; and

2- Resubmit your bid through the City's eProcurement Portal.

7. Vendor Registration Instructions & Customer Service information:

Click here to register onto the City's eProcurement Portal hosted by OpenGov.

If you are already registered and need help logging in or retrieving your user information simply click on the blue chat bubble on the lower right hand corner of your screen or contact OpenGov at procurement-support@opengov.com for help at any time.

Customer Service

For assistance with e-bidding or uploading documents: Contact OpenGov via the blue chat bubble on the lower right hand corner of your screen or email at procurement-support@opengov.com.

Monday through Friday 5am - 5pm PST, except statutory holidays-- response time is typically less than ten minutes.

https://procurement.opengov.com/portal/pasadena mailto:procurement-support@opengov.com mailto:procurement-support@opengov.com mailto:procurement-support@opengov.com

4. CITY REQUIREMENTS

There are of forms included in the section named Submittal/Checklist of these specifications which a bidder must complete to establish compliance with a number of City Requirements, including, but not limited to, equal employment opportunity and affidavit of non-collusion. These forms and their instructions should be considered an integral part of the specifications and failure to complete them may be grounds, in the sole discretion of the city, for rejection of any bidder.

1. Equal Employment Opportunity in Contracting

Policy - The City of Pasadena is committed to a policy of Equal Employment:

• Contracting. Contractors expressly agree to comply with the City’s ordinances and regulations regarding Equal Opportunity Employment as well as regulations that may be mandated by the source of the funds supporting this contract.

Compliance – To the extent permitted by law, Contractor expressly agrees to establish compliance with the Equal Employment Opportunity Practices Provisions of Chapter 4.08 of the Pasadena Municipal Code, and the Rules and Regulations adopted pursuant to said ordinance.

The successful bidder may be required to submit documentation during the term of the contract to evidence on going compliance with the City’s Equal Opportunity Practices Provisions. Such documentation may include, but not be limited to certified payroll records and Current Permanent Workforce Utilization reports.

Required Forms – Each bidder must submit a completed Form AA-1. Failure to submit this form will result in automatic disqualification with no exceptions unless bidder has an approved Form on file with the City.

Questions regarding Chapter 4.08 of the Pasadena Municipal Code and regulations adopted pursuant thereto should be directed to the Department of Finance, Purchasing Division 626.744.6755.

2. Declaration of Non-Collusion by Contractor

The City requires that each bidder executes and submits to the City with the Bid, the attached Declaration of Non Collusion in the #Bidder's Submittals/Checklist.

3. System for Award Management (SAM.Gov)

Prior to contract award, the winning contractor must provide an active registration with "Sam.Gov." Vendors seeking to register can register for free at the following link:

https://sam.gov/content/entity-registration

4. CHANGE ORDER MANAGEMENTCHANGE ORDER MANAGEMENT

https://procurement.opengov.com/portal/pasadena/projects/39587?section=undefined https://sam.gov/content/entity-registration

Any additional work identified during the course of the project that is deemed necessary, but outside the original Scope of Services, must be recorded as a Change Order and approved by the City in writing before work is started.

5. Local Preferences

The City of Pasadena is committed to promoting the economic health and well being of its residents. To this end, contractor agrees to recruit Pasadena residents initially and to give them preference, if all other factors are equal, for any new positions that result from the performance of this contract and which are performed within the City.

6. Protest Procedure

This procedure specifies the process to be utilized by the City of Pasadena in resolving protests regarding this solicitation. In order for a protest to be considered by the City of Pasadena, it must be submitted in accordance with the procedures outlined in the FORMAL SOLICATION PROTEST PROCURE found at the following link: (https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/). A protest submitted that is not in accordance with this procedure, may be returned to the submitting party without any further action by the City of Pasadena.

7. Pasadena Business License

Awarded bidder(s) may be required to obtain and pay for any required business license under Title 5 of the Pasadena Municipal Code.

• If the business will not come into the City for the purpose of providing services for this contract they are not required to obtain a business license.

• If the business will only be coming into the city no more than 10 times to work on projects, they are charged 33% of the annual tax (5.04.130C)

• If they come into the City more than 10 times they are required to pay the annual fee.

• Any subcontractors used by the awarded bidder will be required to obtain a license if they will be coming into the City to perform services.

For further information contact Municipal Services Department at (626) 744-4166, Monday- Friday between 7:15 am and 5:15 pm. Additional Information regarding business license fees can be found here: https://www.cityofpasadena.net/finance/general-fund/fees-tax-schedules/

8. CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT ORDINANCE

https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/ https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/ https://www.cityofpasadena.net/finance/general-fund/fees-tax-schedules/

Construction and Demolition Waste Management Ordinance - In addition to complying with all applicable federal, state and local laws and regulations, the Contractor shall take note of the specific requirements of the Construction and Demolition Waste Management Ordinance, Pasadena Municipal Code Chapter 8.62. The Contractor shall comply with all provisions of the Ordinance, as a material part of the work under this Contract in order to divert a minimum of 75% of the construction and demolition debris resulting from the work. The Waste Management Plan required by the Ordinance shall be submitted no later than fifteen (15) calendar days after the Contract award.

Pasadena has partnered with Green Halo Systems to receive and keep track of the construction and demolition waste management documents.

The Contractor shall not commence work until (1) the invoice payment has been made for both the Performance Security Deposit equal to 3% of the project value not to exceed $30,000, and the non-refundable Administrative Review Fee based on the City's General Fee Schedule available online at: www.cityofpasadena.net/finance/general-fund/fees-tax-schedules; and (2) the Waste Management Plan has been submitted through Green Halo and approved by the City's waste management compliance official.

The Contractor shall be required to certify compliance with the Construction and Demolition Waste Management Ordinance and provide required documentation during and at the end of the contract term. The refund of the Performance Security Deposit is subject to this compliance.

The cost to comply with the City's Construction and Demolition Waste Management Ordinance shall be included in the unit or lump sum prices for the applicable items of work listed in the Bidder's Proposal and no additional compensation will be allowed.

Failure to comply with any provisions of the Construction and Demolition Waste Management Ordinance, Pasadena Municipal Code Chapter 8.62 may result in forfeiture of the Performance Security Deposit.

Instructions

The contractor awarded the project will receive an invoice to pay the C&D administrative fee and C&D performance security deposit and an email with instructions to activate an account with Green Halo, complete the C&D plan and submit the weigh tickets of the receipt for the project.

To receive the Administrative Fee and C&D Performance Security Deposit Invoice and instructions to complete the C&D requirements in Green Halo, send an email to canddrecycling@cityofpasdena.net with the following information.

• Project name

• Contract Number

• Email account of the person that will be assigned as the account holder in the Green Halo

For additional information visit the Construction and Demolition Debris Recycling webpage www.cityofpasadena.net/public-works/engineering-and-construction/construction-and-demolition-debris-recycling/ mailto:canddrecycling@cityofpasdena.net http://www.cityofpasadena.net/public-works/engineering-and-construction/construction-and-demolition-debris-recycling/ http://www.cityofpasadena.net/public-works/engineering-and-construction/construction-and-demolition-debris-recycling/

9. Construction During the Period of November 15 through January 3

Attention is directed to Chapter 12.24 of the PMC, Excavations, and the Board of Directors (City Council) Policy Statement in Motion 25405 dated September 5, 1967. In general, all streets shall be free and clear of excavations and other construction during the period of November 15th through January 3rd for business districts, and December 15th through January 3rd for other areas. Accordingly, the Contractor will be required to shut down construction operations which would impede traffic movement during this period unless otherwise directed by the Engineer in emergency situations. Any existing excavations shall be backfilled, compacted, and temporarily repaved before the shutdown date. Bidders should reflect any costs of such shutdown in the various items of the Bidder's Proposal, and no additional payment will be allowed therefor. No time will be charged against the contract time for operations which are shut down in accordance with this section. A map showing the appropriate shutdown period for all locations in the City is available at the public counter of the City's Permit Center at 175 Garfield Avenue, Pasadena, 91101.

10. Stormwater Management and Discharge Control

In addition to complying with all applicable federal, state and local laws and regulations, the Contractor shall take note of the specific requirements of the Stormwater Management and Discharge Control, Pasadena Municipal Code Chapter 8.70. The Contractor shall comply with all provisions of the Stormwater Management and Discharge Control Ordinance, also known as NPDES Requirements, as a material part of the work under this Contract.

11. PDES Requirements

In addition, the Contractor shall adhere to NPDES (National Pollution Discharge Elimination System) Best Management Practices to prevent deleterious materials or pollutants from entering the City or county storm drain systems, including, but not limited to implementing the Best Management Practices specified below, and the Contractor shall comply with all directions of the City in this regard during construction:

The following shall be implemented:

A. Handle, store, and dispose of materials properly.

B. Avoid excavation and grading activities during wet weather.

C. Construct diversion dikes and drainage swales around working sites.

D. Cover stockpiles and excavated soil with secured tarps or plastic sheeting.

E. Develop and implement erosion control plans (if applicable).

F. Check and repair leaking equipment away from construction sites.

G. Designate a location away from storm drains for refueling.

H. Cover and seal catch basins if work in their vicinity may allow debris or deleterious liquids to enter.

I. Use vacuum with all concrete sawing operations.

J. Never wash excess material from aggregate, concrete, or equipment onto a street.

K. Catch drips from paving equipment with drip pans or absorbent material.

L. Clean up all spills using dry methods.

12. Invoice Submission Portal

Invoice Submission Portal

The invoice submission process is activated when an invoice is submitted through the Vendor Invoice Portal. Invoices submitted are automatically sent to the department being invoiced for review. Once the city department verifies its accuracy, the department will submit the invoice to Accounts Payable for payment processing. One final review and approval by the department who was invoiced is needed in order for a check to be issued. Checks are issued on Tuesday and Thursday.

How to submit invoices to the City of Pasadena?

Create an account: Visit the City’s Invoice Submission website:

https://invoice.cityofpasadena.net/ and select “Create Account”

Refer to the "Invoice Submission Portal - Vendor User Guide" for detailed instructions.

13. Pasadena Living Wage Ordinance

This project is subject to the City of Pasadena's Living Wage Ordinance, Pasadena Municipal Code Chapter 4.11. The ordinance requires that contractors providing labor or services to the City under contracts in excess of $25,000 pay no less than the City’s Living Wage to all employees who spend any of their time providing labor or delivering services to the City.

The selected contractor will be required to evidence compliance with the Living Wage Ordinance by submitting payroll records as requested by the City. Each record shall include the full name of each employee performing labor or providing services under the contract; job classification; rate of pay and benefit rate.

Failure to comply with the provisions of the Pasadena Living Wage Ordinance is grounds for termination of the contract and a basis for penalties as stated in Pasadena Municipal Code Chapter 4.11. Questions concerning the Pasadena Living Wage Ordinance should be directed to:

Finance Department Purchasing Division 626-744-6755 - phone 626-744-6757 – fax

Please visit https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/ for the current calendar year Pasadena Living Wage rate.

14. Errors and Omissions https://invoice.cityofpasadena.net/PortalGuide.pdf https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/

Bidders shall not be allowed to take advantage of any errors or omissions in the Instructions to Bidders or Specifications. Full instructions will be given if such error or omission is discovered and timely called to the attention of the City.

15. Patent Fees; Patent, Copyright, Trade Secret, and Trademark Fees

Each bidder shall include in the price bid any patent fees, royalties and charges on any patented article or process to be furnished or used in the prosecution of the Work.

16. Taxes

Price bid shall include all federal, state, local and other taxes.

17. Certificate of Insurance

Proof of insurance is not required to be submitted with your bid, but will be required prior to the City's award of the contract. Refer to the Insurance requirements in the "Insurance Requirements" section of this document.

18. REQUEST FOR TAXPAYER IDENTIFICATION NUMBER AND CERTIFICATION (IRS Form W-9)

The winning proposal may be required to submit a completed and signed IRS Form W-9. Failure to submit this form may result in the response being deemed non-responsive.

Link: https://www.irs.gov/pub/irs-pdf/fw9.pdf

19. Technical Questionnaire Form

(NOT USED)

https://www.irs.gov/pub/irs-pdf/fw9.pdf https://www.irs.gov/pub/irs-pdf/fw9.pdf

5. GENERAL SPECIFICATIONS

1. BID PROPOSAL QUANTITIES

The quantities contained in the bid documents are approximate only and are for the sole purpose of comparing bids. The City may, in accordance with the specifications, order more equipment and/or materials as necessary at the City's sole discretion, as increased by the unit price noted and payment will be made for the amount of material actually provided as determined by the City and accepted at the unit prices noted in the bid.

2. EVALUATION OF BID

Bids will be evaluated based on the lowest Grand Total Price submitted in the Bidders' Proposal.

The contract award will be made from among responsive and responsible bidders. In case of a discrepancy between the unit prices and item total, the unit price shall govern. In the event of a discrepancy between the item totals and the grand total price the item totals shall prevail. The prices will be subject to adjustment by the City on that basis in the event of discrepancy and bid awarded.

3. SAMPLE CONTRACT

A sample of the contract the successful bidder will be required to enter into with the City is attached hereto and by this reference incorporated herein and made part of these specifications.

TERMS AND CONDITIONS OF PURCHASE ORDER CONTRACT

https://www.cityofpasadena.net/wp-content/uploads/sites/27/Terms-Conditions-of-Purchase- Order.pdf

4. SUBSTITUTION FOR PATENTED AND SPECIFIED ARTICLES

Wherever these Specifications specify any material or process by patent or proprietary name, or by name of manufacturer, such specification is only for the purpose of describing the material or process desired and shall be deemed to be followed by the words and/or approved equivalent.

Any bidder may offer in the proposal any material or process that is equivalent in every respect to the material or process specified. This statement of alternate unit shall clearly describe the material or process for which the substitution is proposed and shall provide technical data establishing equivalency.

5. BID YOUR FULL EQUAL OR BETTER

Materials and equipment furnished shall be new, complete, ready-for-use and of the latest model, shall not have been used in demonstration or other services and have all the usual equipment as shown by manufacturer’s current specifications and catalogs unless otherwise specified.

https://www.cityofpasadena.net/wp-content/uploads/sites/27/Terms-Conditions-of-Purchase-Order.pdf https://www.cityofpasadena.net/wp-content/uploads/sites/27/Terms-Conditions-of-Purchase-Order.pdf

6. PAYMENT

Section 9-3 of the “STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION” is hereby replaced with the following: Payment will be made when invoice has been submitted upon the completion this project.

7. INSURANCE

Proof of insurance is not required to be submitted with your bid, but will be required prior to the City's award of the contract. A copy of the City standard is included in the attachments.

8. DURATION OF CONTRACT

The initial term of the contract resulting from these Specifications shall be for one year from the date of execution by the City. No optional extension periods will be included with this contract.

9. System for Award Management (SAM.Gov)

Prior to contract award, the lowest responsive and responsible bidder must provide an active registration with "Sam.Gov." Vendors seeking to register can register for free at the following link: https://sam.gov/content/entity-registration

10. PREVAILING WAGE RATE PROJECT

The prevailing wage rate provisions of Section 1770-1777 of the Labor Code and Section 7-2, entitled "Labor", of the Standard Specifications shall apply to this project. However, if there is a difference between the Pasadena Living Wage and Prevailing Wage rates for similar classifications of labor, the contractor and his subcontractors shall pay no less than the highest wage rate.

11. NOTICE REQUIREMENTS

No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

12. STANDARD SPECIFICATIONS

https://sam.gov/content/entity-registration

In connection with contracts related to the subject “Bidder’s Proposal,” and except as otherwise provided below, all work shall be done in accordance with the provisions of the 2018 edition of “STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION” (commonly known as the “GREENBOOK”), Including Supplements, prepared and promulgated by Public Works Standards, Inc., a mutual benefit corporation. The Pasadena Department of Public Works has published a booklet titled, “SUPPLEMENTS AND MODIFICATIONS TO THE ‘GREENBOOK’ (STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION)” dated September 2006, hereinafter referred to as the Pasadena Supplements. The provisions of these Specifications and the Pasadena Supplements shall apply and take precedence over the Greenbook, in that order of precedence. The Pasadena Supplements and the “Greenbook” are available online at:

https://ww5.cityofpasadena.net/public-works/wp-content/uploads/sites/52/2016/10/Supplements-and-Modifications-to-the-Green-Book-2006- Edition.pdf. All references in these Specifications to “Standard Specifications” shall mean the Pasadena Supplements and the Greenbook, taken together.

13. CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT ORDINANCE

Construction and Demolition Waste Management Ordinance - In addition to complying with all applicable federal, state and local laws and regulations, the Contractor shall take note of the specific requirements of the Construction and Demolition Waste Management Ordinance, Pasadena Municipal Code Chapter 8.62. The Contractor shall comply with all provisions of the Ordinance, as a material part of the work under this Contract in order to divert a minimum of 75% of the construction and demolition debris resulting from the work. The Waste Management Plan required by the Ordinance shall be submitted no later than fifteen (15) calendar days after the Contract award.

Pasadena has partnered with Green Halo Systems to receive and keep track of the construction and demolition waste management documents.

The Contractor shall not commence work until (1) the invoice payment has been made for both the Performance Security Deposit equal to 3% of the project value not to exceed $30,000, and the non-refundable Administrative Review Fee based on the City's General Fee Schedule available online at: www.cityofpasadena.net/finance/general-fund/fees-tax-schedules; and (2) the Waste Management Plan has been submitted through Green Halo and approved by the City's waste management compliance official.

The Contractor shall be required to certify compliance with the Construction and Demolition Waste Management Ordinance and provide required documentation during and at the end of the contract term. The refund of the Performance Security Deposit is subject to this compliance.

The cost to comply with the City's Construction and Demolition Waste Management Ordinance shall be included in the unit or lump sum prices for the applicable items of work listed in the Bidder's Proposal and no additional compensation will be allowed.

Failure to comply with any provisions of the Construction and Demolition Waste Management Ordinance, Pasadena Municipal Code Chapter 8.62 may result in forfeiture of the Performance Security Deposit.

Instructions https://ww5.cityofpasadena.net/public-works/wp-content/uploads/sites/52/2016/10/Supplements-and-Modifications-to-the-Green-Book-2006-Edition.pdf https://ww5.cityofpasadena.net/public-works/wp-content/uploads/sites/52/2016/10/Supplements-and-Modifications-to-the-Green-Book-2006-Edition.pdf https://ww5.cityofpasadena.net/public-works/wp-content/uploads/sites/52/2016/10/Supplements-and-Modifications-to-the-Green-Book-2006-Edition.pdf

The contractor awarded the project will receive an invoice to pay the C&D administrative fee and C&D performance security deposit and an email with instructions to activate an account with Green Halo, complete the C&D plan and submit the weigh tickets of the receipt for the project.

To receive the Administrative Fee and C&D Performance Security Deposit Invoice and instructions to complete the C&D requirements in Green Halo, send an email to canddrecycling@cityofpasdena.net with the following information.

• Project name

• Contract Number

• Email account of the person that will be assigned as the account holder in the Green Halo

For additional information visit the Construction and Demolition Debris Recycling webpage www.cityofpasadena.net/public-works/engineering-and-construction/construction-and-demolition-debris-recycling/

14. CONTRACT BONDS

The Bidder to whom a contract is awarded shall file the bonds specified by Section 2-4, "Contract Bonds," of the Standard Specifications before execution of the contract. The term "Contract Price" shall be deemed to mean the total contract "not to exceed" amount consisting of the base bid stated in the Bidder's Proposal plus such additional amounts provided for adjustments to the estimated quantities contained in the Bidder's Proposal and for extra work covered by approved change orders, if any. See Section P-2-4 of the Pasadena Supplements.

15. RELEVANT EXPERIENCE

Provide experience with governmental agencies for two projects/contracts of similar scope and size. Complete and submit the attached Relevant Experience Form with your bid to demonstrate experience with projects of similar scope and size to that which is to be performed.

16. ACCEPTANCE OF WORK

The Contractor shall provide written notification to the City when the Contractor deems the work complete and ready for final inspection. Upon the receipt of this notice, the City will make a final inspection and notify the Contractor within five (5) working days that the work is approved or that additional work is needed before approval. The work will neither be final nor accepted until the City notifies the contractor in writing that the entire work is completed to the specifications. No deviations from the Specifications will be accepted unless previously approved in writing by the City. Within ten (10) days after the work is accepted, the City will record a Notice of Completion. The Contractor shall be responsible for risk of loss or damage to the work until the date of the written notice of acceptance from the City. The period of any guarantee or warranty provided under these Specifications, shall commence on the date the work is accepted.

17. STORAGE

mailto:canddrecycling@cityofpasdena.net http://www.cityofpasadena.net/public-works/engineering-and-construction/construction-and-demolition-debris-recycling/ http://www.cityofpasadena.net/public-works/engineering-and-construction/construction-and-demolition-debris-recycling/

The Contractor shall, at its own expense provide a storage location for his materials and equipment. The contractor must request and coordinate with Public Works Department for an approved location.

18. PROTECTION OF EXISTING IMPROVEMENTS AND OTHER UTILITIES

The Contractor shall, at its own expense, preserve and protect from injury all improvements existing at the site, such as equipment, trees, parkways, flowers, shrubbery, lawns, fences, curbs, gutters, sidewalks, walls, manholes and all other improvements of whatever nature. If any such improvements are injured, damaged, or destroyed by the Contractor, or its employees, subcontractors or agents, they shall promptly be restored by the Contractor, at the Contractor’s expense, to the condition existing before such injury, damage, or destruction. The Contractor shall protect and maintain in uninterrupted service any existing sub-surface utilities and shall promptly repair any damages to such utilities at his own expense. Existing utilities of record in the area affected by this contract may be shown in the drawings, however, if any pipe or conduit is encountered, the contractor shall determine their usage and arrange with the proper utility concerned for its removal or protection. The Contractor shall be held responsible for all damage to work installed by him or others that is caused by his work or by anyone employed by him. The Contractor shall utilize “UNDERGROUND SERVICE ALERT’ (USA) of Southern California (1-800- 422-4133) to obtain marking of underground pipeline and utility locations. The contractor shall notify “USA” at least two working days in advance of beginning any excavation and/ or jacking operations. Utilities that are not subscribers or members of “USA” shall be notified separately and independently. To avoid unnecessary marking of utilities in the street and sidewalk areas, the Contractor shall specifically indicate those areas where underground utility information is needed using a temporary water based marking chalk (“AERVOE” brand or approved equal) with a visible life not to exceed three (3) weeks. Such markings shall be limited to only those areas where the Contractor’s operation could damage buried utilities. Unnecessary markings resulting from Contractor’s failure to identify only critical locations shall be removed by the Contractor at his expense. If the Contractor fails to properly and completely remove all unnecessary markings, the City will remove and bill the Contractor for all direct and indirect removal costs.

19. PROTECTION OF WORK, MATERIALS AND EQUIPMENT

The Contractor shall bear all risk of loss or damage to the work until its final completion and acceptance by the City. In this connection, the Contractor shall be responsible for proper storage and handling of all materials, including those materials furnished by the City, and for the care of all work until such final completion and acceptance. The Contractor shall, at its own expense, promptly replace material damaged or lost during this period, and shall repair any portion of the work damaged during this period. If the Contractor neglects or refuses to do so, the City may do so at the Contractor’s expense. However, the Contractor shall not be responsible for damage exceeding five percent of the Contract amount from Acts of God as defined in California Government Code Section 4151, such as earthquakes in excess of magnitude 3.5 on the Richter Scale, provided such damaged work was done according to the Specifications. Contractor shall not sell, assign, mortgage, hypothecate or remove equipment or materials which have been installed or delivered, and which may be necessary for the completion of the work, without written consent of the General Manager.

20. WARRANTIES GUARANTEES

The Contractor shall transfer to the City the manufacturer's warranty or guarantee for each item delivered or installed under the Contract. Where applicable, the City shall be named as owner-beneficiary in any such warranty or guarantee. The Contractor shall ensure that each warranty or guarantee is in full force and effect from the date the City commences operation and use of the item. All such manufacturer's warranties or guarantees shall be in addition to the Contractor's warranty under this Contract. In addition to the above and any special guarantees required by the Detailed Specifications, the Contractor shall warrant that its work is fit for the City's particular purpose as indicated in the Specifications, fulfills all requirements of these Specifications, and is free from defects in materials, equipment, workmanship or installation. For a period of one two (2) years following the City's acceptance of the Work as provided in herein in this Specification, the Contractor shall repair or replace at its own expense any portion of the Work, including any material or equipment incorporated into the Work, that is defective or otherwise fails to conform to the above warranty or special guarantees. The City will notify Contractor of any such defect or nonconformity. Such notice will be given in writing, if possible, or by the means most practical under the circumstances.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .