Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
Carpet Cleaning
Solicitation number
2023-IFB-LM-267
Issued by
Los Angeles County, California

About this file

The document is a Subcontractor Listing form for the Rose Bowl Operating Company (RBOC) related to a carpet cleaning services contract. The form provides blank tables for listing subcontractors and potential shoring design engineers, with specific instructions to list the names, addresses, and descriptions of work for each. The contract is for carpet cleaning services at the Rose Bowl Stadium, covering Major Events with over 20,000 patrons, with an initial three-year term from July 1, 2023, and options for two additional one-year renewals at the RBOC General Manager's discretion.

The document does not provide specific pricing details or funding information. It is a standard form for contractors to document their subcontractor and engineering team details, which would be part of the bid submission process for the carpet cleaning services contract. The form requires bidders to transparently disclose all subcontractors and any engineers involved in specialized design work, such as shoring, ensuring full transparency in the bidding process for this stadium services contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .