SU-060226 2-Drawings.pdf
PDF 11 MB Posted
- Attached to
- HVAC Updates for Dance Studio in PAC Sub-C Level
- Solicitation number
- 2135757
- Issued by
- Westchester County, New York
About this file
HVAC Updates for Dance Studio in PAC Sub-C Level
This file comprises construction drawings and specifications for State University of New York at Purchase College's HVAC system installation project for the Sub-C Dance Studio in the Performing Arts Center Building. The project, designated SU-060226, requires the installation of a heat pump split system with an energy recovery ventilator (ERV) for mechanical ventilation, a condensate pump, and a digital thermostat with setback capabilities. The sealed bid deadline is 3:00 p.m. local time on October 27, 2026, with submission to the Procurement and Accounts Payable Office, Campus Center South, 735 Anderson Hill Road, Purchase, New York. A non-mandatory pre-bid conference and site walk-through will be held at 10:00 a.m. on October 1, 2026, at the Capital Facilities Office Conference Room on the same campus address. All work must be completed within 156 calendar days after the Notice to Proceed is issued. Bidding and contract documents must be obtained by emailing Kathiusca Nunez, Associate Director of Contracts and Procurement Services at kathiusca.nunez@purchase.edu. Bids must be submitted in duplicate.
Security in the amount of not less than five percent of the total bid is required for each proposal. The project includes comprehensive mechanical and electrical work encompassing ductwork installation, equipment scheduling, vibration isolation, condensate drainage systems, fire stopping at penetrations, coordination with existing building systems, and selective ceiling demolition and replacement. Contractors are responsible for obtaining all permits, inspections, and approvals, with permit fees to be paid by the contractor. The State University of New York encourages minority business enterprise participation and reserves the right to reject any or all bids. All work must comply with applicable building codes, NFPA, ASHRAE standards, NYS Energy Code 2020, and manufacturer recommendations. Equipment and materials installed shall carry a one-year warranty from the date of acceptance by the owner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SU-060226 3-Attachments.pdf | ||
| SU-060226 Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-001
(not to scale)
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
1. CONTRACTOR SHALL COORDINATE THE WORK SHOWN ON THESE DRAWINGS WITH ALL OTHER
TRADES.
2. ALL WORK TO COMPLY WITH THE PROVISIONS OF THE:
LOCAL BUILDING CODE
LOCAL ENERGY CODE
NFPA
ASHRAE
3. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS OF THE SITE AND/OR BUILDING.
4. UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, SECURE AND PAY FOR THE
REQUIRED CONSTRUCTION PERMIT(S), FEES, LICENSES AND INSPECTIONS NECESSARY FOR THE
PROPER EXECUTION OF THE WORK. APPLICATION FOR CONSTRUCTION PERMITS SHALL BE
PROCESSED THRU THE DOB.
5. COORDINATION OF ALL WORK UNDER THIS CONTRACT SHALL BE MAINTAINED TO ENSURE THE
QUALITY AND TIMELY COMPLETION OF THE WORK/PROJECT.
6. PERFORM ALL CUTTING AND PATCHING REQUIRED TO COMPLETE THE WORK OR TO MAKE ITS
PARTS FIT TOGETHER PROPERLY WITHOUT COMPROMISING THE QUALITY OF THE WORK.
7. ADEQUATELY BRACE AND PROTECT ALL WORK DURING CONSTRUCTION AGAINST DAMAGE,
WRECKAGE, COLLAPSE, DISTORTIONS AND ALL ALIGNMENTS ACCORDING TO CODES AND
STANDARDS OF GOOD PRACTICE.
8. PATCH REPAIR ALL FLOORS, WALLS, CEILINGS, ETC. DAMAGED OR EXPOSED DUE TO WORK OR
REMOVALS AND FINISH TO MATCH ADJOINING SURFACES.
9. WHERE MANUFACTURER'S NAMES AND PRODUCT NUMBERS ARE INDICATED ON THE DRAWINGS
IT SHALL BE CONSTRUED TO MEAN THE ESTABLISHING OF QUALITY AND PERFORMANCE
STANDARDS OF SUCH ITEMS. ALL MANUFACTURED PRODUCTS ARE TO BE ENGINEER/ARCHITECT
APPROVED. ALL PRODUCTS MUST BE SUBMITTED TO THE ARCHITECT/ENGINEER FOR APPROVAL.
10. FIRE STOPPING SHALL BE INSTALLED AT ALL PENETRATIONS OF FIRE RATED CONSTRUCTION AS
PER SPECIFICATIONS.
11. ADDITIONAL NOTES WHICH ARE APPLICABLE TO THIS PROJECT MAY BE FOUND THROUGHOUT
THE CONTRACT DRAWINGS.
12. NO DOB VIOLATIONS ARE BEING CORRECTED IN THIS APPLICATION.
13. THE CONTRACTOR SHALL, UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS,
SECURE AND PAY FOR REQUIRED INSPECTIONS, PERMIT(S), FEES, LICENSE AND INSPECTIONS
NECESSARY FOR THE PROPER EXECUTION OF THE WORK.
14. ALL NEW EQUIPMENT SHALL BE SET OR MOUNTED ON A LEVEL BASE CAPABLE OF SUPPORTING
AND DISTRIBUTING THE WEIGHT CONTAINED THEREON. ALL EQUIPMENT SHALL BE SECURED IN
ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.
GENERAL NOTES
DUCT SYMBOLS
PIPING SYMBOLS
REFRIGERANT LIQUID GAS LINE
INDICATES SUPPLY AIR
INDICATES EXHAUST/RETURN AIR
ACCESS DOOR (SIZES VARY AS SHOWN
ON DRAWINGS)
A.A.D. - AUTOMATIC AIR OPERATED LOUVER DAMPER
C.F.M. - CUBIC FEET PER MINUTE
C.C. - COOLING COIL
C.O.D. - CLEAN OUT DOOR
EX. - EXHAUST
M.D. - MOTORIZED DAMPER
GR. - GRILLE (WITH VOLUME DAMPER)
M.A.D. - MANUAL AIR OPERATED LOUVER DAMPER
O.A.I. - OUTSIDE AIR INTAKE (FRESH AIR INLET)
ABBREVIATIONS
A.D.- ACCESS DOOR
CONTROL SYMBOLS
VOLUME DAMPER VD
RETURN DUCTWORK
NEW WORK
REFRIGERANT GAS PIPE LINE
D.N. - DRAIN
DIGITAL THERMOSTAT
AND ACCESS DOOR
VENT. - VENTILATION
WMS - WIRE MESH SCREEN
MECHANICAL GENERAL NOTES
CONDENSATE PIPE LINE
EA. - EXHAUST AIR (CFM)
RA. - RETURN AIR (CFM)
SA. - SUPPLY AIR (CFM)
SUMMER:
SUMMER:
72°F(DB)/55% RH
95°F(DB)/75°F(WB)
OUTSIDE AMBIENT DESIGN PARAMETERS:
INSIDE AMBIENT DESIGN PARAMETERS:
MOTORIZED DAMPER MD
AND ACCESS DOOR
COOLING SYSTEM CAPACITY IS BASED ON THE FOLLOWING DESIGN CONDITIONS. (AS PER
THE LATEST ASHRAE STANDARD 170) 1. THE WORK TO BE DONE UNDER THESE SPECIFICATIONS AND THE DRAWINGS CONSISTS OF PROVIDING ALL EQUIPMENT, MATERIALS, LABOR AND SERVICES AND PERFORMING ALL OPERATIONS TO COMPLETE THE MECHANICAL CONSTRUCTION WORK FOR THIS PROJECT.
ANY WORK NOT SPECIFICALLY COVERED BY THESE SPECIFICATIONS OR INDICATED ON THE MECHANICAL/ELECTRICAL/PLUMBING PLANS, BUT NECESSARY TO COMPLETE OR PERFECT ANY PART OF THIS INSTALLATION IN A SUBSTANTIAL MANNER, SHALL BE
PROVIDED WITHOUT EXTRA COST TO THE OWNER.
2. THE TERM "FURNISH" SHALL MEAN TO OBTAIN AND SUPPLY TO THE JOB SITE. THE TERM "INSTALL" SHALL MEAN TO FIX IN POSITION AND CONNECT FOR USE. THE TERM "PROVIDE" SHALL MEAN TO FURNISH AND INSTALL. THE TERM "MECHANICAL WORK" OR “WORK" SHALL MEAN ALL LABOR, MATERIAL, EQUIPMENT, SCAFFOLDING, RIGGING, TOOLS, SUPERVISION, SERVICES AND OTHER INCIDENTALS
NECESSARY FOR COMPLETE AND OPERABLE INSTALLATION.
3. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT, MATERIALS AND LABOR TO PROVIDE A COMPLETE AND OPERATIONAL
SYSTEM AS INDICATED ON THE DESIGN DOCUMENTS.
4. ALL WORK SHALL BE EXECUTED IN A NEAT AND WORKMANLIKE MANNER AND SHALL BE DONE IN ACCORDANCE WITH GOOD TRADE
PRACTICE AND IN CONFORMANCE WITH APPLICABLE MANUFACTURERS RECOMMENDATIONS.
5. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE EXTENT, GENERAL CHARACTER, LOCATION AND ARRANGEMENT OF THE WORK UNDER THIS CONTRACT. WHERE JOB CONDITIONS REQUIRE MINOR CHANGES OR ADJUSTMENTS IN THE INDICATED LOCATIONS OR ARRANGEMENT OF THE WORK, SUCH CHANGES SHALL BE PROVIDED WITHOUT EXTRA COST THE CONTRACTOR SHALL RE-INSTALL
EQUIPMENT THAT HAS INADEQUATE OR UNSAFE ACCESSIBILITY.
6. CONTRACTOR SHALL VERIFY FIELD CONDITIONS AT THE SITE AND NOTIFY THE OWNER/ENGINEER OF ANY DISCREPANCIES PRIOR TO
AWARDING OF BID.
7. COORDINATE HVAC SYSTEM INSTALLATION WITH EXISTING CONDITIONS. VISIT SITE PRIOR TO BID AND INVESTIGATE REQUIREMENTS FOR HVAC SYSTEM INSTALLATION. SEE THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
8. ALL CHANGES MADE IN THE FIELD SHALL BE RECORDED ON AS-BUILT DRAWINGS, SHOP DRAWINGS, AND MAINTENANCE MANUALS.
PROVIDE FINAL AS-BUILT CONDITIONS IN AUTOCAD FORMAT.
9. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS PER SPECS PRIOR TO PURCHASING OR INSTALLING EQUIPMENT AND SYSTEMS INDICATED ON CONTRACT DOCUMENTS. PRIOR TO SUBMITTAL, CONTRACTOR SHALL VERIFY THAT ADEQUATE SPACE EXISTS FOR THE SUBMITTED EQUIPMENT. SHOP DRAWINGS MUST BE REVIEWED BY ARCHITECT/ENGINEER.
10. CONTRACTOR SHALL OBTAIN ALL PERMITS, INSPECTIONS AND APPROVALS PRIOR TO CONSTRUCTION, AND PAY ALL RELATED FEES.
OWNER WILL HIRE AND PAY FOR EXPEDITOR FEES. ALL PERMIT FEES ARE BY CONTRACTOR.
11. ALL MATERIALS, EQUIPMENT AND INSTALLATIONS SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE BUILDING AND MECHANICAL CODES, SMACNA, UL, MANUFACTURERS' RECOMMENDATIONS, AND TO THE REQUIREMENTS OF FEDERAL, STATE AND LOCAL
REGULATORY AGENCIES AND AUTHORITIES HAVING JURISDICTION.
12. IN THE ABSENCE OF OTHER SPECIFIC INSTRUCTIONS, ALL WORK AND MATERIALS SUPPLIED SHALL BE GUARANTEED FOR A PERIOD OF
ONE (1) YEAR FROM THE DATE OF THEIR ACCEPTANCE BY THE OWNER.
13. CONTRACTOR SHALL NOT CONCEAL ANY WORK UNTIL INSPECTED BY MECHANICAL INSPECTOR AND/OR ARCHITECT /ENGINEER.
CONTRACTOR SHALL NOTIFY A/E OF A SCHEDULED INSPECTION TIME WITHIN 72 HOURS.
GENERAL CONTRACTOR SHALL NOT CONCEAL WORK UNTIL APPROVED, REGARDLESS OF SCHEDULE.
14. REFER TO SPECIFICATIONS ON DRAWINGS, DETAILS AND EQUIPMENT SCHEDULES FOR ADDITIONAL INFORMATION.
15. ALL EQUIPMENT, PIPING AND VALVES SHALL HAVE SPECIFIED IDENTIFICATION LABELS AND AS INDICATED.
16. CONTRACTOR AND HIS SUBCONTRACTORS SHALL WORK WITH A FULL SET OF LATEST MECHANICAL DRAWINGS. IT IS CONTRACTOR'S RESPONSIBILITY TO OBTAIN THESE DRAWINGS FROM GENERAL CONTRACTOR OR CONSTRUCTION MANAGER.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED BY OTHER TRADES DUE TO SUBSTITUTION OF OTHER THAN SCHEDULED EQUIPMENT. WHEN EQUIPMENT FURNISHED IS DIFFERENT THAN INDICATED, THE COST OF ADDITIONAL ELECTRICAL
SERVICE, STRUCTURAL AND RELATED WORK SHALL BE PAID BY THIS CONTRACTOR.
18. EACH TRADE CONTRACTOR SHALL RECEIVE ALL DRAWINGS AND SPECIFICATION SECTIONS ISSUED AS PART OF THE OVERALL BID PACKAGE. ALL CONTRACTORS ARE TO RECEIVE, REVIEW, AND COORDINATE ALL OF THEIR WORK AS SHOWN OR REFERENCED ON THE
OTHER TRADE DOCUMENTS. ALL WORK SHOWN OR REFERENCED ON THE OTHER
TRADE DOCUMENTS SHALL BE INCLUDED AS PART OF THE OVERALL PROJECT SCOPE FOR THAT PARTICULAR DISCIPLINE AND TRADE.
19. SCHEDULE THE WORK UNDER THIS CONTRACT WITH WORK OF OTHER TRADES AS NOT TO DELAY THE OVERALL PROGRESS OF THE
PROJECT.
20. PRIOR TO EQUIPMENT STARTUP, CONTRACTOR SHALL PERFORM THE SPECIFIED STARTUP AND COMMISSIONING PROCEDURES.
21. NOTIFY ARCHITECT/ENGINEER OF ANY CONFLICTS PRIOR TO PURCHASING EQUIPMENT AND PRIOR TO CUTTING OPENINGS.
22. REVIEW ALL DISCIPLINES DRAWINGS INCLUDING ARCHITECTURAL AND STRUCTURAL, AND COORDINATE IN FIELD ALL WORK WITH OTHER TRADES AND WITH EXISTING CONDITIONS PRIOR TO INSTALLATION OF ANY WORK. REPORT ALL CONFLICTS IMMEDIATELY TO
ARCHITECT AND/OR ENGINEER.
23. VERIFY THE ACTUAL LOCATIONS AND EXACT DIMENSIONS OF ALL EQUIPMENT, CASEWORK, DEVICES, FIXTURES, SWITCHES, SENSORS, ETC. DURING FIELD VISITS AND PRIOR TO PERFORMING ANY ROUGH-IN WORK FOR THE UTILITIES AND DUCTWORK. REPORT
DISCREPANCIES IMMEDIATELY TO ARCHITECT AND/OR ENGINEER.
24. ALL ADJUSTABLE THERMOSTATS AND TEMPERATURE SENSORS SHALL BE MOUNTED 46" ABOVE FINISHED FLOOR.
25. COORDINATE LOCATION OF ALL WALL, FLOOR AND ROOF OPENINGS WITH STRUCTURAL AND OTHER TRADES.
26. COORDINATE THE LOCATIONS OF ALL EQUIPMENT AND REGISTERS WITH THE LATEST ARCHITECTURAL DRAWINGS PRIOR TO
PERFORMING AND ROUGH-IN WORK FOR THE UTILITIES.
27. SCHEDULE ALL WORK, CUTTING AND BUILDING SERVICE INTERRUPTIONS WITH BUILDING OWNER AND CONSTRUCTION MANAGER PRIOR
TO COMMENCING WITH THE WORK.
28. ANY CHANGES AND/OR MODIFICATIONS MUST BE REVIEWED AND APPROVED BY THE ENGINEER AND/OR OWNER'S REPRESENTATIVE
PRIOR TO CONSTRUCTION.
29. PROVIDE ALL ROOFING OPENINGS AND FLASHINGS REQUIRED FOR THE INSTALLATION OF ROOF MOUNTED EQUIPMENT.
30. ALL MATERIALS AND EQUIPMENT INSTALLED IN RETURN AIR PLENUMS SHALL BE NON-COMBUSTIBLE AND UL APPROVED FOR USE IN A RETURN AIR PLENUM SPACE. ALL WIRING SHALL BE NON COMBUSTIBLE OR SHALL BE ENCLOSED IN METAL CONDUIT OR PROTECTED BY
A SHEET METAL COVER SECURED WITH METAL FASTENERS.
31. INSULATION, FITTINGS, COVERS AND FINISHES IN RETURN AIR PLENUM SHALL HAVE A MAXIMUM FLAME SPREAD RATING OF 25 AND A
MAXIMUM SMOKE DEVELOPED RATING OF 50.
32. PROVIDE ACCESS PANELS AS REQUIRED FOR ALL VALVES, DAMPERS, CONTROLS, OR OTHER EQUIPMENT.
33. ALL ROOFING WORK SHALL BE PERFORMED BY AUTHORIZED ROOFING CONTRACTOR TO MAINTAIN ROOF WARRANTY.
34. SUPPORT ALL EQUIPMENT, PIPING AND DUCTWORK FROM BUILDING STRUCTURE TO PROVIDE A VIBRATION FREE INSTALLATION.
OTHERWISE ADHERE TO THE DETAILS IN THE CONTRACT DOCUMENTS. NOTIFY ARCHITECT AND/OR STRUCTURAL ENGINEER OF ALL WEIGHTS AND METHODS OF SUPPORT. PROVIDE DETAILS TO COORDINATE CONCRETE PADS AND STEEL PLATFORMS REQUIRED FOR
MECHANICAL WORK.
35. CUTTING AND PATCHING AS REQUIRED AND WHERE NECESSARY TO ACCOMMODATE NEW WORK AND THE REPAIR OF EXISTING WORK.
36. CONTRACTOR SHALL PROTECT ALL SURFACES DURING RIGGING AND CONSTRUCTION INCLUDING BUT NOT LIMITED TO THE LOBBY AND HALLWAY FLOORS AND WALLS. CONTRACTOR SHALL RESTORE ALL SURFACES (WALLS, CEILINGS, FLOORS AND ROOFS) THAT ARE DAMAGED BY THE WORK OF THIS CONTRACT TO THEIR ORIGINAL CONDITION AT NO EXTRA COST TO THE OWNER.
37. REMOVE ALL TRASH, DEBRIS AND DEMOLITION MATERIAL FROM PREMISES AT THE END OF EACH DAY.
38. PROVIDE ACCESS PANELS IN NON LAY-IN-CEILINGS FOR SERVICE AND MAINTENANCE OF ALL CONCEALED EQUIPMENT AND DEVICES, SUCH AS HEAT PUMPS, ELECTRIC DUCT HEATERS, COILS, SMOKE DETECTORS, BALANCING DAMPERS
AND FIRE DAMPERS.
39. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.
40. COORDINATE LOCATION OF NEW DUCTWORK, AIR DEVICES AND EQUIPMENT WITH LIGHT FIXTURES, SPRINKLER PIPING AND HYDRONIC
PIPING.
41. SHEETMETAL FITTINGS SHOWN SHALL BE PROVIDED. NO SUBSTITUTES WILL BE ALLOWED WITHOUT PRIOR CONSENT FROM ENGINEER.
42. PROVIDE BALANCING DAMPERS IN ALL DUCT BRANCHES TO AIR DEVICES.
43. EQUIPMENT INDICATED ON THE DRAWINGS, TOGETHER WITH ITS BASE AND /OR SUPPORT, DUCTWORK CONNECTIONS, SERVICE CLEARANCES, WALL, FLOOR AND ROOF PENETRATIONS, AND ELECTRICAL REQUIREMENTS IS BASED ON THE MODEL INDICATED IN THE SCHEDULES. IF CONTRACTOR FURNISHES AN EQUIVALENT SUBSTITUTION, THE CONTRACTOR SHALL MAKE THE REQUIRED
MODIFICATIONS IN THE WORK WITHOUT THE CHANGE IN CONTRACT AMOUNT.
44. DUCTWORK SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. COORDINATE WITH ELECTRICAL CONTRACTOR DUCTWORK SHALL
NOT COVER OR LIMIT ACCESS TO EXISTING J-BOXES.
45. INSTALLATION OF WORK SHALL PROVIDE REASONABLE ACCESSIBILITY FOR OPERATION, INSPECTION AND MAINTENANCE OF EQUIPMENT AND ACCESSORIES. PROVIDE CLEARANCES REQUIRED BY MANUFACTURERS AND APPLICABLE CODES.
46. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. VERIFY AND PROVIDE DUCT AND PIPE TRANSITIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION.
47. PROVIDE VIBRATION ISOLATION FOR ROTATING, REVOLVING OR RECIPROCATING EQUIPMENT, INCLUDING DUCTWORK CONNECTIONS TO THIS EQUIPMENT TO PREVENT TRANSMISSION OF NOISE AND VIBRATION TO BUILDING STRUCTURE AND OCCUPIED SPACES.
VIBRATION ISOLATION DEVICES SHALL INCLUDE SPRING VIBRATION ISOLATORS, NEOPRENE PADDING AND DUCT /PIPE FLEXIBLE
CONNECTIONS.
48. PROVIDE FLEXIBLE CONNECTIONS AT ALL FANS INLET AND OUTLET CONNECTIONS.
49. EFFECTIVELY PROTECT ALL MATERIALS AND EQUIPMENT FROM DUST, DIRT AND DAMAGE UNTIL FINAL ACCEPTANCE CLOSE ALL DUCT AND EQUIPMENT OPENINGS DURING CONSTRUCTION WITH SUITABLE PROTECTIVE COVERING BEFORE, DURING AND FOLLOWING
INSTALLATION.
50. REMOVE TEMPORARY AIR FILTERS AND PROVIDE NEW FLLTERS IN ALL AIR CONDITIONING EQUIPMENT WITHIN THE SCOPE OF WORK
UPON COMPLETION OF CONSTRUCTION AND BEFORE BALANCING.
51. CONTROL WIRE AND CONDUIT SHALL COMPLY WITH NEC AND ELECTRICAL SPECIFICATIONS.
52. ALL SERVICES TO EXISTING BUILDINGS SHALL BE MAINTAINED DURING CONSTRUCTION UNLESS OTHERWISE INDICATED.
53. PROVIDE SELECTIVE CEILING DEMOLITION TO PLACE NEW DUCTWORK AND DIFFUSERS. REPLACE DAMAGED CEILING TILES AND GRIDS
RESULTING FROM DEMOLITION. NEW CEILING TILES SHALL MATCH WITH EXISTING.
54. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING CONDITIONS AND COORDINATION WITH ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO STRUCTURAL, LIGHTING, ELECTRICAL, PLUMBING, AND OTHER EXISTING AND NEW WORK. VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO PURCHASING EQUIPMENT. ALL DISCREPANCIES OR POTENTIAL PROBLEMS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER PRIOR TO BIDDING. PROVIDE ADDITIONAL MATERIALS AND LABOR TO RELOCATE OR REPLACE MECHANICAL WORK AS REQUIRED TO ALLOW SPACE FOR THE WORK OF ALL TRADES.
55. THE WORK INCLUDES CONNECTION TO AN EXISTING MECHANICAL, ELECTRICAL, FIRE ALARM, AND CONTROL SYSTEMS ON THE PROJECT. CONTRACTOR SHALL INCLUDE IN HIS BID PRICE ANY LABOR AND MATERIALS NECESSARY TO UNCOVER, TRACE, TEST, FIELD VERIFY, AND MEASURE ANY EXISTING EQUIPMENT OR SYSTEMS THAT ARE AFFECTED BY THE WORK UNDER THIS CONTRACT.
56. THE DRAWINGS INDICATE APPROXIMATE LOCATIONS BASED UPON INFORMATION OBTAINED WITHOUT REMOVING CEILING TILES OR WALLS. THEREFORE, THE CONTRACTOR SHALL INCLUDE IN THEIR BID CONTINGENCY COSTS TO ADDRESS CONFLICTS BETWEEN DESIGN
AND EXISTING CONDITIONS.
57. THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL COSTS RELATED TO REMOVING AND REPLACING ALL CEILINGS AS REQUIRED FOR THE
MECHANICAL AND ELECTRICAL WORK ON THIS PROJECT.
58. THE CONTRACTOR SHALL INCLUDE IN THE BID THE RELOCATION OF ANY EXISTING JUNCTION BOXES (OF ANY KIND) THAT WILL BE
INACCESSIBLE DUE TO THE WORK IN THIS PROJECT.
59. PRIOR TO DEMOLITION, THE CONTRACTOR SHALL LOG ALL EXISTING EQUIPMENT AND TRACE ELECTRICAL, FIRE ALARM, AND CONTROL
CIRCUITS THAT SERVE SUCH EQUIPMENT.
60. THE CONTRACTOR SHALL INCLUDE IN THEIR BID COSTS REQUIRED TO RELOCATE EXISTING CONDUITS OF ANY KIND IN ORDER TO
INSTALL NEW EQUIPMENT, DUCTWORK, AND PIPING. .
61. SEISMIC REQUIREMENTS AS SPECIFICATIONS.
TO THE BEST OF APPLICANT KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT PLANS AND
APPLICATIONS ARE IN COMPLIANCE WITH THE NYS ENERGY CODE 2020 (BASED ON IECC 2018).
NYS ENERGY CODE 2020 (IECC 2018)
HVAC DESIGN CRITERIA
MUA - MAKE-UP AIR (CFM)
SUMMARY OF WORK:
THE WORK SHALL BE AS SHOWN AND CALLED FOR IN THE CONTRACT DOCUMENTS AND SHALL
INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING GENERAL ITEMS OF WORK:
PROVIDE HEAT PUMP SPLIT SYSTEM FOR EXISTING DANCE STUDIO AT LEVEL SUB-C AT THE
PERFORMING ARTS CENTER, WITH ALL ASSOCIATED APPURTENANCES AND SUPPORTS.
PROVIDE A CONDENSATE PUMP, AND DIGITAL THERMOSTAT WITH SETBACK CAPABILITIES.
PROVIDE ENERGY RECOVERY VENTILATOR (ERV) FOR MECHANICAL VENTILATION MEANS AS
PER REQUIRED BY NYS CODE REGULATIONS.
PROVIDE MAXIMUM OVER CURRENT PROTECTION AS PER PROJECT REQUIREMENTS.
NO CHANGE IN BULK, EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.
*SCOPE OF WORK IS NOT RELATED TO FLOOD MITIGATION OR DAMAGES DUE TO FLOOD.
LIST OF DRAWINGS
MECH. SYMBOLS AND NOTESM-001
MECHANICAL NEW WORKM-101
BI
D
MECHANICAL EQUIPMENT SCHEDULESM-00202
MECHANICAL SPECIFICATIONS SHEET 1 OF 2M-60105
MECHANICAL SPECIFICATIONS SHEET 2 OF 2M-60206
MECHANICAL DETAILSM-50104
T
AC - AIR CONDITIONING UNIT
ACCU - AIR COOLED CONDENSING UNIT
04/22/26
04/22/2026 ISSUED FOR BID
M-002
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
M-101
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
VD VDVDVD
VD VD VD VD
VD
MD MD
VD
T5
VD
VD
M-501
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
TRANSVERSE JOINT DETAIL
ACOUSTICAL DUCT LINER DETAIL
TURNING VANES
DETAIL AT DAMPERS AND
LONGITUDINAL JOINT DETAIL
ACCESS DOOR NOSING DETAIL
MITERED ELBOWS WITH DOUBLE THICKNESS TURNING VANES
NOT TO SCALE
VANED ELBOW
TURNING VANE
NOT TO SCALE
TYPICAL DUCT HANGING DETAILSLOW PRESSURE BALANCING DAMPER
NOT TO SCALE
DRAIN PAN WATER SEAL PIPING DETAIL
NOT TO SCALEBRANCH DUCT CONNECTIONS
TYPICAL RECTANGULAR SUPPLY AND RETURN DUCTWORK
NOT TO SCALE
TYPICAL PIPE HANGING DETAILS
NOT TO SCALE
TYPICAL SIDE WALL GRILLE INSTALLATION
NOT TO SCALE
1. 2.
6. 7. 8.
3.
NOT TO SCALE
11. 12.
9.
13. 14.
17.16. 18.
LIQUID
(INSULATED)
SUCTION
INDOOR: EVAPORATOR SECTION
INDOOR: EVAPORATOR SECTION
(INSULATED) NOTES:
1. INSTALL UNITS AS PER MANUFACTURER'S RECOMMENDATIONS.
2. INSULATE BOTHREFRIGERANT PIPING AS PER MANUFACTURER'S RECOMMENDATIONS.
COMP
OUTDOOR: CONDENSING UNIT
VRF OR VRV: REFRIGERANT PIPING SCHEMATIC
NOT TO SCALE
INSULATION ON
HANGER RODS
1-5/8" CHANNEL
(TYPICAL)
3/8"X3" LAG
SCREW WITH
WASHER
ROOF OR
CEILING JOIST.
1" CHANNEL
REFRIGERANT
PIPE IN MECHANICAL
ROOM OR CEILING
SPACE.
SUCTION LINE
PIPE CLAMP
MOUNT ABOVE CEILING
SUSPENDED REFRIGERANT PIPE SUPPORT AT THE CEILING
NOT TO SCALE
MOTORIZED LOUVER DAMPER
SECTION A-A
NOT TO SCALE
FRONT ELEVATION
DETAIL OF AUXILIARY DRAIN PAN FOR CEILING HUNG UNITS
NOT TO SCALE
(REFER TO ARCH. DWGS.)
ELEVATION
RETURN GRILLE ON OUTTER
PRIVATE OFFICE WALL. MOUNT AS
HIGH AS POSSIBLE.
DOOR
CORRIDOR/OPEN AREA
RETURN GRILLE
AIRFLOW
SECTION
RETURN GRILLE
AIRFLOW
PRIVATE OFFICE
6" MIN.
TYPICAL RETURN GRILLE INSTALLATION DETAIL
NOT TO SCALE
CONDENSING UNIT MOUNTING DETAIL
NOT TO SCALE
ERV MOUNTING DETAIL
NOT TO SCALE
NOT TO SCALE
ERV MOUNTING DETAIL5.
10.
15.
NON-HARDENING FIRE
SEAL BOTH SIDES WITH
U.L. FIRESTOP SYSTEM
(TYP. FOR BOTH SIDE OF WALL) PROOF CAULK
1/2" to 3/4" 1/2" to 3/4"
PIPE WITH
INSULATION
AIRTIGHT WITH NON-HARDENING
PACK OPENING ALL AROUND
METAL PIPE
SLEEVE
MINERAL WOOL
INSULATION TIGHTLY
PACKED FOR FULL
PIPE SLEEVE OF SIZE
TO PASS PIPE
INTERIOR WALL
INTERIOR WALL
PIPE PENETRATION OF INTERIOR NON-RATED WALL
NOT TO SCALE
PIPE PENETRATION OF RATED WALL OR FLOOR
NOT TO SCALE
HVAC EQUIPMENT HANGING DETAIL - METAL DECK
NOT TO SCALE
M-601
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
M-6
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
04/22/26
LIST OF DRAWINGS
DWG NUMBER DESCRIPTION
ELECTRICAL COVER SHEETE-001.00
E-100.00
E-201.00
E-202.00
E-200.00
ELECTRICAL NEW WORK
ELECTRICAL SPECIFICATIONS SHEET 1 OF 3
ELECTRICAL SPECIFICATIONS SHEET 1 OF 3
ELECTRICAL SPECIFICATIONS SHEET 1 OF 3
E-001
(not to scale)
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
E-101
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
E-200
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
E-201
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
E-202
State University of New York at Purchase College 735 Anderson Hill Road
Purchase, New York 10577
CONSTRUCTION OF HVAC FOR
SUB-C DANCE STUDIO
The Performing Arts Center Building
| Mechanical Drawings.pdf |
| Sheets and Views |
| M-00s Design-M-001 |
| M-00s Design-M-002 |
| M-00s Design-M-101 |
| M-00s Design-M-501 |
| M-00s Design-M-601 |
| M-00s Design-M-602 |
| Electrical Drawings.pdf |
| E-001 |
| E-001 |
| E-101 |
| E-101 |
| E-200 |
| E-200 |
| E-201 |
| E-201 |
| E-202 |
| E-202 |
File details come from the government source that posted it. Updated .