STSL Phase 5-2 Liner Project Bid Summary.pdf
PDF 267 KB Posted
- Solicitation number
- PWG127-SOLID-6476
- Issued by
- San Bernardino County, California
About this file
This is a bid summary document for San Bernardino County's Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill in Redlands, California. The project involves construction of a comprehensive liner system including excavation, fill materials, geomembrane installation, drainage systems, concrete structures, pavement, electrical systems, and landfill gas improvements. The scope encompasses 173 line items with quantities ranging from individual units to hundreds of thousands of square feet, including 315,000 square feet of base liner installation, 600,000 square feet of slope liner installation, 217,500 square feet of asphalt concrete pavement, and numerous subdrain, geotextile, and concrete structural elements. A mandatory pre-bid meeting and job walk was conducted at the landfill site located at 31 Refuse Road, Redlands, California, with prospective bidders required to wear safety vests, hard hats, and working boots. Bids were due September 17, 2026, with the bid opening scheduled for October 1, 2026 at 10:00:59 a.m. California prevailing wage requirements apply to all laborers and workers throughout the project term.
Two bids were received for the project. Archer Civil Construction, LLC, located in Tulare, California, submitted the lowest bid of $29,664,957.17 and ranked first, while Sukut Construction, LLC, based in Santa Ana, California, submitted a bid of $32,974,756.00 and ranked second, resulting in a bid differential of $3,309,798.83 in favor of Archer Civil Construction. The bid summary provides detailed unit pricing for all 173 line items, allowing for comparison of individual cost components between the two bidders across categories including mobilization, excavation and fill work, geosynthetic materials, drainage infrastructure, concrete work, paving, electrical installation, and structural elements. The significant price variance between bidders appears across multiple work categories, with notable differences in geomembrane pricing, excavation rates, and specialized structural components such as the PLC control panel and catwalk installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID $ BID RANK -
COMMENTS
1. Archer Civil Construction, LLC, 1353 South J Street Tulare, CA 92374
$29,664,957.17 1
2. Sukut Construction, LLC, 4010 W. Chandler Avenue Santa Ana, CA 92704 $32,974,756.00 2
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
SAN BERNARDINO COUNTY
BIDDER'S NAME AND ADDRESS
Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill 10/1/2026 10:00:59am
BID OPENING
DEPARTMENT OF PUBLIC WORKS, SOLID WASTE MANAGEMENT DIVISION
ITEM NO. DESCRIPTION OF WORK
ESTIMATED
QUANTITY
UNIT UNIT PRICE
ESTIMATED
TOTAL COST
UNIT PRICE
ESTIMATED
TOTAL COST
1 Mobilization/Demobilization 1 LS 2,927,301.00 2,927,301.00$ 1,200,000$ 1,200,000$ 2 Construction Support 1 LS 1,764,064.00 1,764,064.00$ 550,000$ 550,000$
3 Survey 1 LS 168,000.00 168,000.00$ 500,000$ 500,000$ 4 Record Drawings 1 LS 56,000.00 56,000.00$ 7,500$ 7,500$
Removal/Demolition 72.0 AC 13,059.00 940,248.00$ 5,600$ 403,200$
6 Remove and Salvage 1 LS 17,337.00 17,337.00$ 180,000$ 180,000$ 7 Asbestos Cement Pipe Abatement 1 LS 12,409.00 12,409.00$ 30,000$ 30,000$ 8 Refuse Excavation and Disposal 500 CY 23.77 11,885.00$ 15.00 7,500$
9 Phase 5-2 Excavation to Phase 5-2 Unclassified Fill 298,200 CY 2.99 891,618.00$ 4.35$ 1,297,170$
Phase 5-2 Excavation to Access Road Unclassified Fill 55,100 CY 2.99 164,749.00$ 7.45$ 410,495$
11 Phase 5-2 Excavation to Stockpile 3 1,595,500 CY 2.59 4,132,345.00$ 5.90$ 9,413,450$
12 Phase 5-2 Excavation to Stockpile A (Deletable) 32,000 CY 2.59 82,880.00$ 5.00$ 160,000$ 13 Phase 5-2 Excavation to Stockpile B (Deletable) 32,000 CY 2.59 82,880.00$ 5.00$ 160,000$ 14 Phase 5-2 Excavation to Stockpile C (Deletable) 32,000 CY 2.59 82,880.00$ 5.00$ 160,000$
Road Fill 4,800 CY 6.14 29,472.00$ 5.00$ 24,000$
Unclassified Fill 2,270 CY 3.27 7,422.90$ 4.80$ 10,896$ 17 Entrance Road Excavation to Stockpile 3 5,230 CY 21.48 112,340.40$ 5.10$ 26,673$
Sheet C-101 954,130 CY 5.00 4,770,650.00$ 4.40$ 4,198,172$ 19 Unsuitable Soil Removal and Replacement 15,000 CY 10.88 163,200.00$ 9.00$ 135,000$ 20 4-Inch Solid HDPE Subdrain Per Detail 3/C-501 1,680 LF 27.97 46,989.60$ 22.00$ 36,960$
Detail B Per Detail 2/C-505 1,350 LF 23.81 32,143.50$ 28.00$ 37,800$
Detail 2/C-505 14,320 LF 20.75 297,140.00$ 21.00$ 300,720$
2/C-505 3,060 LF 67.82 207,529.20$ 38.50$ 117,810$
24 4-Inch Slotted HDPE Subdrain Per Detail 4/C-507 3,075 LF 22.23 68,357.25$ 29.00$ 89,175$
501 (Base) 315,000 SF 0.56 176,400.00$ 0.65$ 204,750$
8 oz/sy Non-Woven Geotextile Per Detail 1/C-501 (Base) 315,000 SF 0.43 135,450.00$ 0.40$ 126,000$
LCRS Gravel (9-Inch Thick) Per Detail 1/C-501 (Base) 315,000 SF 1.53 481,950.00$ 2.20$ 693,000$
12 oz/sy Non-Woven Geotextile Per Detail 1/C-501 (Base) 315,000 SF 0.50 157,500.00$ 0.48$ 151,200$
80 mil Double-Sided Textured HDPE Geomembrane Per Detail 1/C-501 (Base) 315,000 SF 1.09 343,350.00$ 1.05$ 330,750$
(Base) 315,000 SF 1.23 387,450.00$ 1.20$ 378,000$
Per Detail 1/C-501 (Base) 315,000 SF 0.92 289,800.00$ 0.88$ 277,200$ y y Detail 1/C-501 (Base) 315,000 SF 0.38 119,700.00$ 0.75$ 236,250$
Engineered Fill (12-Inch Thick) Per Detail 1/C-501 (Base) 315,000 SF 0.33 103,950.00$ 0.34$ 107,100$
16 oz/sy Non-Woven Geotextile Per Detail 2/C-501 (Slope) 600,000 SF 0.64 384,000.00$ 0.61$ 366,000$
80 mil Single-Sided Textured HDPE Geomembrane Per Detail 2/C-501 (Slope) 600,000 SF 1.13 678,000.00$ 1.09$ 654,000$
Geosynthetic Clay Liner (GCL) Per Detail 2/C-501 (Slope) 600,000 SF 1.25 750,000.00$ 1.22$ 732,000$
60 mil Double-Sided Textured HDPE Geomembrane Per Detail 2/C-501 (Slope) 600,000 SF 0.93 558,000.00$ 0.90$ 540,000$
4-Inch Thick Veneer Soil Layer on Slopes Per Detail 2/C-501 [Deletable] 107,680 SF 0.44 47,379.20$ 0.55$ 59,224$
Subgrade Preparation Per Detail 2/C-501 (Slope) [Deletable] 600,000 SF 0.31 186,000.00$ 0.37$ 222,000$
Operations Layer (24-Inch Thick) Per Detail 2/C- 501 (Slope) 41,550 SF 1.51 62,740.50$ 1.08$ 44,874$
Ballast Geotextile and Reinforced Scrim Layer Per Detail 2/C-501 (Slope) 554,370 SF 0.96 532,195.20$ 0.90$ 498,933$
42 Operations Layer Per Detail 8/C-501 (Bench) 6,750 LF 13.31 89,842.50$ 29.60$ 199,800$
43 Toe of Slope Liner Transition Per Detail 1/C-502 1,640 LF 11.20 18,368.00$ 11.10$ 18,204$
Perimeter Road Liner Termination Per Detail 3/C-
502 2,510 LF 36.81 92,393.10$ 63.20$ 158,632$
Base Liner Join to Existing Phase 4 Base Liner Per Detail 2/C-504 470 LF 40.27 18,926.90$ 108.00$ 50,760$
Base Liner Join to Existing Phase 5-1 Base Liner Per Detail 4/C-505 350 LF 28.55 9,992.50$ 49.00$ 17,150$
47 Slope Liner Join Per Detail 5/C-502 1,020 LF 33.60 34,272.00$ 33.50$ 34,170$ 48 Bench Liner Join Per Detail 1/C-505 280 LF 67.18 18,810.40$ 78.00$ 21,840$
Temporary Side Slope Liner Termination Per Detail
6/C-511 380 LF 23.66 8,990.80$ 23.50$ 8,930$
50 Base Liner Join Per Detail 8/C-511 530 LF 30.33 16,074.90$ 56.50$ 29,945$
Liner Termination At Edge Of Road Per Detail 3/C-
514 25 LF 28.91 722.75$ 60.00$ 1,500$
Temporary Base Liner Termination Per Detail 5/C-
511 520 LF 11.20 5,824.00$ 27.00$ 14,040$
53 T-Fencing Stakes Every 20-Feet O.C. 27 EA 107.13 2,892.51$ 55.00$ 1,485$
6-Inch Slotted HDPE LCRS Pipe and LCRS Trench Per Detail 3/C-501 1,680 LF 29.19 49,039.20$ 54.00$ 90,720$
55 LCRS Bench Collector Per Detail 9/C-501 5,885 LF 19.92 117,229.20$ 29.00$ 170,665$
LCRS Bench Collector w/ 50' Gravel Window Per Detail 9/C-501 700 LF 23.39 16,373.00$ 44.00$ 30,800$
LCRS Bench Crossing (including 6-inch Solid HDPE LCRS Pipe) Per Detail 9/C-503 13 EA 3,675.48 47,781.24$ 2,800$ 36,400$
58 Leachate Test Port Per Detail 1/C-507 585 LF 17.74 10,377.90$ 22.00$ 12,870$ 59 LCRS Cleanout Per Detail 4/C-502 4 EA 2,210.60 8,842.40$ 1,390$ 5,560$
Archer Civil Construction, LLC Sukut Construction, LLC
6-Inch Solid HDPE LCRS Riser and Support on Slope Per Detail 4/C-503 1,225 LF 16.68 20,433.00$ 26.00$ 31,850$
61 6-Inch Solid HDPE LCRS Pipe Per Detail 5/C-501 75 LF 41.72 3,129.00$ 31.00$ 2,325$
Relocate 6-Inch HDPE LCRS Pipe Above Grade Per Detail 5/C-516 1,900 LF 7.35 13,965.00$ 13.00$ 24,700$
63 Concrete V-Ditch D=6" Per Detail 3/C-509 200 LF 30.24 6,048.00$ 93.00$ 18,600$
64 Concrete V-Ditch D=1' Per Detail 1/C-503 4,610 LF 33.60 154,896.00$ 29.50$ 135,995$ 65 Concrete V-Ditch D=1.5' Per Detail 1/C-503 6,960 LF 45.36 315,705.60$ 40.00$ 278,400$
66 Concrete V-Ditch D=2' Per Detail 1/C-503 3,150 LF 55.44 174,636.00$ 49.00$ 154,350$ 67 Bench Crossing Per Detail 2/C-507 15 EA 1,344.00 20,160.00$ 2,800$ 42,000$
Concrete Trapezoidal Channel D=2', B=1.5' Per Detail 2/C-503 375 LF 77.84 29,190.00$ 79.00$ 29,625$
Concrete Trapezoidal Channel D=2.5', B=1.5' Per Detail 2/C-503 195 LF 82.88 16,161.60$ 87.00$ 16,965$
Concrete Trapezoidal Channel D=2', B=2' Per Detail
2/C-503 35 LF 81.76 2,861.60$ 240.00$ 8,400$
Concrete Trapezoidal Channel D=2.5', B=2.5' Per Detail 2/C-503 765 LF 99.68 76,255.20$ 95.00$ 72,675$
Concrete Trapezoidal Channel D=3', B=2' Per Detail
2/C-503 190 LF 104.16 19,790.40$ 122.00$ 23,180$
Concrete Trapezoidal Channel D=2.5', B=2' Per Detail 2/C-503 1,720 LF 93.52 160,854.40$ 86.00$ 147,920$
74 18-Inch Dual Wall HDPE Pipe Per Detail 5/C-501 50 LF 670.88 33,544.00$ 228$ 11,400$ 75 36-Inch HDPE Pipe Per Detail 5/C-501 1,180 LF 277.76 327,756.80$ 197$ 232,460$ 76 42-Inch HDPE Pipe Per Detail 5/C-501 120 LF 818.72 98,246.40$ 427$ 51,240$
77 Concrete Collar/Seep Collar Per Detail 7/C-502 23 EA 7,467.84 171,760.32$ 770$ 17,710$ 78 Brow Ditch Per Detail 5/C-506 1,980 LF 30.24 59,875.20$ 29.00$ 57,420$ 79 Earthen Berm Per Detail 8/C-502 630 LF 9.58 6,035.40$ 8.30$ 5,229$ 80 Standpipe Per Detail 1/C-508 1 LS 37,543.52 37,543.52$ 23,800$ 23,800$ 81 Spillway Per Detail 2/C-508 1 LS 22,400.00 22,400.00$ 29,000$ 29,000$
Channel to Pipe Transition Structure Per Detail 3/C-
505 3 EA 11,200.00 33,600.00$ 3,280$ 9,840$
Pipe to Channel Transition Structure Per Detail 7/C-
506 2 EA 11,500.00 23,000.00$ 3,400$ 6,800$
84 Splash Wall Per Detail 4/C-506 445 LF 61.60 27,412.00$ 44.00$ 19,580$
85 Rip Rap Pad Per Detail 5/C-503 1,180 SF 15.34 18,101.20$ 15.00$ 17,700$
86 Downdrain Channel Anchor Per Detail 3/C-506 11 EA 560.00 6,160.00$ 2,050$ 22,550$
87 Cutoff Wall Per Detail 8/C-503 60 LF 72.80 4,368.00$ 22$ 1,296$
88 Concrete Inlet Per Detail 2/C-517 1 EA 1,120.00 1,120.00$ 3,570$ 3,570$ 89 Join Existing Channel Per Detail 3/C-503 2 EA 896.00 1,792.00$ 1,620$ 3,240$
90 Transition Structure Per Detail 8/C-509 1 EA 19,040.00 19,040.00$ 6,480$ 6,480$ 91 Flume to V-Ditch Transition Per Detail 7/C-509 1 EA 672.00 672.00$ 1,080$ 1,080$ 92 Transition Structure Per Detail 9/C-509 1 EA 12,320.00 12,320.00$ 5,000$ 5,000$
Adjust Existing Down Drain to Grade. Tie To New Channel 1 LS 896.00 896.00$ 3,111$ 3,111$
94 Concrete Cross Gutter Per 10/C-509 160 LF 228.48 36,556.80$ 234$ 37,440$ 95 Transition from Cross Gutter to V-Ditch 10 LF 112.00 1,120.00$ 106$ 1,060$ 96 Transition from Curb and Gutter to Cross Gutter 16 LF 125.44 2,007.04$ 93$ 1,488$
97 Retaining Wall Per Detail 1/C-510 1 LS 184,219.28 184,219.28$ 195,000$ 195,000$ 98 Channel to Pipe Transition Per Detail 4/C-511 1 EA 3,360.00 3,360.00$ 4,104$ 4,104$ 99 Channel Transition Per Detail 2/C-514 1 LS 2,240.00 2,240.00$ 4,860.00$ 4,860$
100 Plunge Pool Per Detail 3/C-511 1,250 SF 26.88 33,600.00$ 20.00$ 25,000$ 101 Aggregate Channel Per Detail 1/C-516 130 LF 44.80 5,824.00$ 29.00$ 3,770$ 102 Trench Plate Per Detail 2/C-506 (Type 1) 1 EA 4,840.00 4,840.00$ 9,000$ 9,000$ 103 Trench Plate Per Detail 2/C-506 (Type 2) 3 EA 5,141.00 15,423.00$ 9,800$ 29,400$ 104 8'x12'x1/2" Thick Steel Plates Per Detail 2/C-506 2 EA 11,463.00 22,926.00$ 5,000$ 10,000$ 105 K-Rail 360 LF 32.06 11,541.60$ 51$ 18,360$ 106 SWMD Operations Trailer Per Specifications 1 LS 180,000.00 180,000.00$ 40,000$ 40,000$ 107 Observation Deck Per Detail 5/C-505 and 1/S-104 1 LS 129,834.00 129,834.00$ 103,000$ 103,000$ 108 4-Inch AC over 8-Inch CMB 12,770 SF 2.65 33,840.50$ 4.50$ 57,465$ 109 6-Inch AC over 12-Inch CMB 217,500 SF 3.98 865,650.00$ 6.45$ 1,402,875$
Geotextile Underlayment 1,190 SF 4.93 5,866.70$ 2.80$ 3,332$
111 Speed Bump Per Detail 2/C-509 4 EA 3,136.00 12,544.00$ 3,100$ 12,400$
6-Inch AC Curb Type D1-6 Per SPPWC Std Plan with 2' Openings every 10' 205 LF 9.00 1,845.00$ 17.00$ 3,485$
113 Curb Transition 6 EA 504.00 3,024.00$ 654$ 3,924$ 114 6-Inch Curb and Gutter Per SBCDPW Std 116 1,255 LF 66.08 82,930.40$ 81.00$ 101,655$
Caltrans Type B4 Curb Per Std Plan A87A Per Detail
5/C-509 250 LF 66.08 16,520.00$ 114.00$ 28,500$
Asphalt Dike Type D Per Caltrans Std Plan A87B and Per Detail 6/C-509 205 LF 9.00 1,845.00$ 9.00$ 1,845$
117 6-Inch AC Curb Type D1-6 Per SPPWC Std Plan 2,950 LF 9.00 26,550.00$ 9.00$ 26,550$ 118 Thickened Edge Per Detail 1/C-506 640 LF 6.93 4,435.20$ 6.80$ 4,352$
119 Pavement Overlay Per Detail 1/C-509 660 LF 2.68 1,768.80$ 2.65$ 1,749$
8-Inch PCC Curb and Gutter Per SPPWC STD Plan 120-3 Type A2-6 Per Detail 1/C-504 345 LF 75.04 25,888.80$ 110.00$ 37,950$
Commercial Driveway Approach Depressed with Curb 940 SF 12.32 11,580.80$ 38.00$ 35,720$
122 Silt Fence Per Detail 3/C-508 12,300 LF 5.26 64,698.00$ 5.25$ 64,575$
123 Fiber Rolls Per Detail 6/C-502 1,446,400 SF 0.24 347,136.00$ 0.24$ 347,136$ 124 Sandbag Chevron Per Detail 6/C-503 18 EA 145.60 2,620.80$ 139$ 2,502$ 125 Hydroseed 1,446,400 SF 0.12 173,568.00$ 0.25$ 361,600$
4-Inch-Wide Double Yellow Stripe Per Detail 21 On Caltrans Std Plan A20A 3,430 LF 0.89 3,052.70$ 0.90$ 3,087$
A20B, Detail 27B 6,955 LF 0.44 3,060.20$ 0.60$ 4,173$
Plan A20A, Detail 8 2,700 LF 0.33 891.00$ 0.32$ 864$
129 “Speed Limit” Sign Per CA MUTCD Std R2-1 (15) 8 EA 420.00 3,360.00$ 456$ 3,648$ 130 “Bump” Sign Per CA MUTCD Std W8-1 5 EA 420.00 2,100.00$ 556$ 2,780$ 131 Caltrans Type I 10' Arrow Per Std Plan A24A 3 EA 56.00 168.00$ 100$ 300$
"Slower Traffic Keep Right" Sign Per MUTCD Std R4-
3 3 EA 420.00 1,260.00$ 456$ 1,368$
133 "Stay In Lane" Sign Per MUTCD Std R4-9 2 EA 420.00 840.00$ 456$ 912$ 134 "Lane Drop" Sign Per MUTCD Std W4-2 1 EA 420.00 420.00$ 556$ 556$ 135 Caltrans Type VI Lane Drop Arrow 2 EA 168.00 336.00$ 275$ 550$
Poly Processing 11,800 Gallon Upright Slope Bottom IMFO Tanks, Pumps (2), Piping, Fittings, Pipe Supports, Hardware, Valves, Ladders, and Associated Appurtenances Per Sheets C-601 Through C-605 1 LS 247,117.00 247,117.00$ 490,000$ 490,000$
137 Fill Stand Per Detail 4/C-606 1 LS 15,000.00 15,000.00$ 47,300$ 47,300$
Dual Wall (6-Inch Interior, 10-Inch Exterior) LCRS Pipe Per Detail 5/C-501 225 LF 73.32 16,497.00$ 97.00$ 21,825$
139 Core Through Existing Concrete Wall and Seal 1 EA 11,026.00 11,026.00$ 635$ 635$ 140 Catwalk Per Sheet C-603 1 LS 63,078.00 63,078.00$ 385,000$ 385,000$ 141 Adjust Existing Manhole to Grade Per SSPWC 1 LS 2,665.60 2,665.60$ 3,200$ 3,200$
142 Fence and Gate Reconstruction Per Detail 3/C-504 30 LF 283.36 8,500.80$ 315.00$ 9,450$ 143 4.5' Wire Mesh Fence Per Detail 1/C-512, 1/C-513, 13,680 LF 22.40 306,432.00$ 27.00$ 369,360$ 144 Wire Mesh Gate Per Detail 1/C-512 41 LF 562.24 23,051.84$ 850.00$ 34,850$
6-Inch C900 PVC Fire Water Line Per Detail 5/C-
501 2,860 LF 120.96 345,945.60$ 45.00$ 128,700$
1-Inch C900 PVC Fire Water Line Per Detail 5/C-
501 135 LF 209.44 28,274.40$ 39.00$ 5,265$
147 Fire Hydrant Per Detail 3/C-516 5 EA 17,455.20 87,276.00$ 21,000$ 105,000$ 148 Thrust Block Per Detail 2/C-516 1 EA 570.00 570.00$ 352.00$ 352$
6-Inch Non-Rising Stem Gate Valve Per Detail 4/C-
516 2 EA 7,956.00 15,912.00$ 4,000$ 8,000$
150 6-Inch Blind Flange 1 EA 650.72 650.72$ 750.00$ 750$ 151 Groundwater Well ST-2 Extension Per Detail 7/C- 1 EA 5,600.00 5,600.00$ 5,500$ 5,500$
STD Plan 601-5 85 LF 300.00 25,500.00$ 912$ 77,520$
Landfill Gas Improvements Per Sheets LFG-101 to LFG-502
1.5" HDPE SDR-9 Air Pipe and Fittings Per Detail
1/LFG-501 840 LF 44.58 37,447.20$ 5.15$ 4,326$
2" HDPE SDR-11 Condensate Pipe and Fittings Per Detail 1/LFG-501 840 LF 48.30 40,572.00$ 7.40$ 6,216$
Header Branch Flange and Bollard Per Detail 6/LFG-
501 2 EA 23,007.00 46,014.00$ 7,014.00$ 14,028$
156 12" HDPE SDR-17 Header Per Detail 1/LFG-501 840 LF 256.48 215,443.20$ 65.00$ 54,600$
12" Manual Butterfly Valve Assembly and Pressure Ports Per Detail 3/LFG-501 1 LS 23,242.00 23,242.00$ 14,150.00$ 14,150$
158 Isolation Valve Vault Per Detail 3/LFG-501 1 EA 38,554.00 38,554.00$ 21,775.00$ 21,775$
20" HDPE SDR-17 Pipe and Fittings, Above Grade and Soil Mound Per Detail 2/LFG-502 250 LF 453.03 113,257.50$ 121.50$ 30,375$
160 20" HDPE SDR-17 Elbow, Above Grade 4 EA 5,077.00 20,308.00$ 2,120.00$ 8,480$
161 20" HDPE SDR-17 Flange Adapter 1 EA 8,980.00 8,980.00$ 3,500.00$ 3,500$ 162 20" PVC Flange Adapter 1 EA 12,630.00 12,630.00$ 3,800.00$ 3,800$ 163 Pipe Connection Per Detail 4/LFG-501 1 EA 10,185.00 10,185.00$ 19,000.00$ 19,000$
Electrical Per Sheets E-001 to E-613 164 Trenching, Conduit, and Wiring 1 LS 206,248.00 206,248.00$ 115,000.00$ 115,000$ 165 Panel HA - 480V, 100A, 3PH, 3W, NEMA 3R 1 EA 5,600.00 5,600.00$ 11,600.00$ 11,600$
Mini Power Center "MPC-LA" - 15KVA, 480-
120/240V, 1PH, 3W, NEMA 3R, 10KAIC 1 EA 5,600.00 5,600.00$ 17,000.00$ 17,000$
Combination Motor Starter - 3HP, 480V, 3PH, NEMA
3R 1 EA 28,000.00 28,000.00$ 15,500.00$ 15,500$
168 PLC Control Panel 1 EA 140,000.00 140,000.00$ 125,000.00$ 125,000$ 169 Sump Pump Control Panel 1 EA 33,600.00 33,600.00$ 27,600.00$ 27,600$
170 Local Pump Control Station 1 EA 5,600.00 5,600.00$ 7,900$ 7,900$ 171 PLC and OIT Programming 1 EA 56,000.00 56,000.00$ 35,600.00$ 35,600$
Structural Per Sheets S-001 to S-500 172 Concrete Tank Pad and Foundation Per 1/S-101 1 LS 56,156.00 56,156.00$ 224,000.00$ 224,000$ 173 Spill Pad Per 1/S-102 1 LS 76,944.00 76,944.00$ 27,500.00$ 27,500$
TOTAL BID 29,664,957.17$ 32,974,756$ 3,309,798.83$ Difference
| Bid Sumary Comparison |
| STSL Phase 5-2 Liner Project Bid Summary2.pdf |
| Bid Schedule R1 |