PLANS_STSL_Phase 5-2 Liner_IFB_2026-06-18_signed~1.pdf
PDF 32 MB Posted
- Solicitation number
- PWG127-SOLID-6476
- Issued by
- San Bernardino County, California
About this file
This is an Invitation for Bid (IFB) document issued by the San Timoteo Sanitary Landfill for the Unit 2 Phase 5-2 Liner Construction Project located in Redlands, California. The project involves the construction of a liner system at the sanitary landfill facility. A mandatory pre-bid meeting and job walk are required for all bidders at the San Timoteo Sanitary Landfill, 31 Refuse Road, Redlands, CA 92373, with attendees required to bring appropriate Personal Protective Equipment including a safety vest, hard hat, and working boots. The IFB document dated June 18, 2026, establishes the framework for contractor selection and project execution, with specific attention to site conditions and safety requirements that bidders must understand prior to submission.
The document establishes the bidding procedures and requirements for the liner construction project. Bidders must comply with all specifications outlined in the IFB, including technical requirements for materials, installation methods, and quality assurance protocols. The mandatory job walk ensures that all prospective contractors have adequate opportunity to assess site conditions, understand project scope, and identify potential challenges before preparing their bids. All interested parties must attend the pre-bid meeting and subsequent site walk to be eligible for bid submission, ensuring informed competition and accurate cost estimation for this specialized landfill construction work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .