This is a Quality Assurance Checklist for Structure Selection Reports prepared by the Colorado Department of Transportation (CDOT) Staff Bridge Unit. The checklist serves as a standardized quality assurance tool to ensure comprehensive evaluation and documentation of structure selection processes prior to submission of Final Inspection Report (FIR) documents to regional offices. The checklist requires documentation across multiple technical areas including project description, site characteristics, existing structures, traffic impacts, constructability analysis, utilities coordination, geotechnical and hydraulic summaries, environmental concerns, and roadway design features. It mandates inclusion of structural design criteria, loading specifications (including collision and earthquake loads), aesthetic requirements, and consideration of future widening possibilities. The checklist requires detailed evaluation of rehabilitation alternatives, inspection summaries, load testing requirements, and comprehensive structural alternatives analysis covering concrete girders, steel girders, abutments, piers, and walls.

The checklist further requires documentation of Alternative Bid Evaluation (ABC) design ratings, maintenance and durability strategies, corrosion resistance analysis, and construction cost summaries for all evaluated alternatives. Projects funded through the Bridge Tonn Enhancements (BTE) program must include specific rating spreadsheet results from the CDOT website. The document mandates inclusion of general layout drawings, typical sections, quantity summaries, cost estimate tables, ABC rating spreadsheets, and a comprehensive list of any requested variances from CDOT Structural Standards with approval status. All documentation must be signed by the CDOT Staff Bridge Unit Leader or designee prior to FIR submittal, thereby certifying approval of structure selection report findings, recommendations, and all design deviations from established standards and criteria.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Structure Selection Report QA Checklist This checklist is to serve as quality assurance of the structure selection process. The sections in the report need not be in the same order as this checklist. This checklist must be signed by Staff Bridge Unit Leader or designee prior to submittal of FIR documents to the Region.

Structure Number(s): ____________________________________________________________________

Cover Sheet ☐Name of the Project and Site Address ☐Structure Number(s) ☐Property Owner Name and Contact Information ☐Report Preparer Name and Contact Information ☐Submittal and Revision Dates as Applicable

Executive Summary ☐Project Description ☐Structure Recommendations

Site Description and Design Features ☐Existing Structure(s) ☐N/A:_____________________________ ☐Vicinity Map ☐ROW Impact ☐N/A:_____________________________ ☐Traffic Detour ☐N/A:_____________________________

☐Constructability & Construction Phasing ☐N/A:_____________________________ ☐Utilities ☐N/A:_____________________________ ☐Geotechnical Summary ☐Hydraulics Summary ☐N/A:_____________________________ ☐Environmental Concerns ☐N/A:_____________________________ ☐Roadway Design Features ☐Cross Section

☐Vertical Alignment ☐Horizontal Alignment

Structural Design Criteria ☐Design Specifications ☐Loading ☐N/A:_____________________________

☐Collision Load ☐Earthquake Load

☐Aesthetic Requirements ☐N/A:_____________________________ ☐Possible Future Widenings ☐N/A:_____________________________

Structure Selection ☐Selection Criteria ☐Rehabilitation Alternatives ☐N/A:_____________________________ ☐Inspection Summary

☐Load Testing Requirements ☐N/A:_____________________________ Add figures/sketches to the following topics as needed to clarify discussion:

☐Structure Layout Alternatives

☐Vertical Clearances ☐Horizontal Clearances ☐Skew ☐Span Configurations

☐Superstructure Alternatives ☐N/A:_____________________________ ☐Concrete Girder Alternatives

☐Steel Girder Alternatives

☐Substructure Alternatives ☐N/A:_____________________________

☐Abutment Alternatives (GRS, Integral, Semi-integral, etc.)

☐Pier Alternatives

☐Wall Alternatives ☐N/A:_____________________________ ☐ABC Design (include pre-scoping ABC rating results from spreadsheet found on the CDOT website) ☐Maintenance and Durability ☐Corrosive Resistance ☐Summary of Structure Type Evaluation Table ☐Construction Costs (including costs of alternatives)

BTE Funded Projects ☐Strategies for Enhancing Bridge Service Life Tier ☐Strategies Selected

Other Figures and Appendices ☐General Layout of the Selected Structure Alternative Typical Sections (if not provided in the report) ☐Summary of Quantities and Cost Estimate Tables ☐ABC Rating spreadsheet

List of Variances Requested Variance:____________________________________________________________________ Approved?☐Yes ☐No

Requested Variance:____________________________________________________________________ Approved?☐Yes ☐No

Requested Variance:____________________________________________________________________ Approved?☐Yes ☐No If you need more space, use an additional sheet(s) of paper. Submit all project variances as early as possible.

CDOT Staff Bridge Quality Assurance Sign-off By signing this checklist Staff Bridge Unit Leader acknowledges approval of the Structure Selection Report findings, recommendations, and all design deviations from the CDOT Structural Standards and design criteria.

Print Name Signature Date

Cover Sheet
Executive Summary
Site Description and Design Features
Structural Design Criteria
Structure Selection
BTE Funded Projects
Other
Figures and Appendices
List of Variances
CDOT Staff Bridge Quality Assurance Sign-off