Storm Drain Solicitation N4008520R3708.pdf
PDF 865 KB Posted
- Solicitation number
- N4008520R3708
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008520R3708 0002.pdf | ||
| AttachmentC_PPQ.pdf | ||
| 20R3708_0001.pdf | ||
| Att 1 Map_NSA-P_ELIN 001.pdf | ||
| Att 2 and 3.pdf | ||
| J-0200000-06 ELINS to be filled by KTR.xls | XLS spreadsheet | |
| Att 3 Map_PNBC_ELINs 002and003.pdf | ||
| Att 5 Map_PNBC_ELIN 004 (16 jet cleaning inlets).pdf | ||
| Att 2 Map_PNBC_002and003.pdf | ||
| Att 4 Map_PNBC_ELIN 004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 08 May 2020
X
A X B X C
D
EX
X G F 108
109 - 114 X H 115 - 120 carmen.napoli@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 120
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N40085 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
4921 S. Broad St., Building 1 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
CARMEN M. NAPOLI 215-897-3586
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 9
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
10 - 51 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
52 - 54 55 - 62
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 63 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 64 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
65 - 69
PART II - CONTRACT CLAUSES
NAVFAC MID ATLANTIC
PWD PHILADELPHIA
4921 S. BROAD STREET
BLDG 1, 2ND FLOOR
PHILADELPHIA PA 19112
215-897-6932FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
70 - 107
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
13 Mar 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N4008520R3708
Section B - Supplies or Services and Prices
GENERAL INFORMATION
B.1 Contract Title Storm Drain Maintenance and Repair Service Contract at the Philadelphia Naval Business Center and Naval Support Activity (NSA) – Philadelphia, Pennsylvania.
B.2 Type of Contract This is a Firm Fixed-Price contract (Combination Recurring/Non-Recurring) type contract as noted in Section L, Instructions, Conditions and Notice to Bidders.
B.3 Minimum Guarantee The Recurring portion of the base year only is the minimum guarantee for this contract.
B.4 Set-Aside This procurement is being offered for competition to 100% SBA Certified Small Business contractors ONLY. Refer to Section I, FAR Clause 52.219-6, Notice of Total Small Business Set-Aside.
B.5 NAICS Code The NAICS Code assigned to this procurement is 262998 with a small business size standard of $8,000,000.00.
Refer to On-Line Representations and Certifications Applications (ORCA) via https://www.sam.gov/portal/public/SAM/ (FAR 52.219-1 – Small Business Program Representations (OCT 2014)).
B.6 Wage Determination (Service)/Davis Bacon Act (Construction):
Service Contract Act wages are included in this solicitation. Refer to J-0200000-02, Wage Determination.
B.7 Bid Guarantee/Bonding Requirements NOT REQUIRED for this procurement.
B.8 Contract Term This contract contains provisions for a Base Period with four (4) Option Periods. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, 52.217-9, Option to Extend the Term of the Contract (Mar 2000). In the option periods, the Government will adjust the prices, if applicable, based on the new Department of Labor Wage Determination.
B.9 Period of Performance The period of performance will be determined at the time of award.
B.10 Evaluation of Proposal Offeror shall submit a lump sum price for Section B, CLINs 001 through 0010. In addition, offeror shall submit corresponding unit prices located in Section J Attachment J-0200000-07, Exhibits A through E. The Government will evaluate the option years for award as indicated in Section M per FAR 52.217-5, Evaluation of Options (July 1990) The number of proposals to be evaluated for technical acceptability may be limited to the five lowest priced offers at the discretion of the contracting officer. If the number of proposals to be evaluated is limited, technical proposals shall be provided to the evaluator(s) without any identification of prices or any rank order of prices. If no proposals are found to be technically acceptable within the first group of proposals, then the process described will be conducted again as many times as necessary, until such time as the Government identifies a technically acceptable proposal. The source selection method must be incorporated in the request for proposal. If the contracting officer later determines that discussions are necessary, the procedures in FAR
15.306 shall be followed.
NOTE: Offerors MUST be evaluated as technically ACCEPTABLE under factors 1, 2, 3 and 4 in order to be considered technically acceptable overall.
B.11 Contract Line Items and Contract Exhibit Line Items
a. Offeror shall enter unit prices and amounts for Contract Line Items (CLINs) and Contract Exhibit Line Items (ELINs) as indicted in the schedules and accompanying attachments/exhibits.
b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN and ELIN will be recomputed accordingly. The CLIN which includes recomputed ELINs will also be recomputed to take into account the change in the contract ELINs. If the offeror provide a total amount for an CLIN or ELIN, but fails to enter the unit price, the total amount divided by the CLIN or ELIN quantity will be held to be the intended unit price.
c. The Schedule of Recurring Work (CLIN 0001, 0003, 0005, 0007 and 0009) and the Schedule of Non-Recurring Work (CLIN 0002, 0004, 0006, 0008 and 0010) will be used as the basis for deductions in accordance with FAR Clause 52.246-4, Inspection of Services – Fixed Price, refer to Section E.
B.12 Unit Price Adjustment in Option Periods This contract incorporates the Service Contract Act (SCA). The SCA Wage Determination incorporated in Section J is for the Base Year performance period only. The latest Wage Determination available at the time for each option exercised will be incorporated into the contract and the unit prices will be adjusted in accordance with FAR Clauses 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards – Price Adjustment (Multiple Year and Option Contracts) (AUG 2018). The contractor warrants, by submission of his proposal that the price does not include any contingency for future wage increases.
B.13 Non-Recurring Individual Contract Line Item Quantities Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the contractor agrees by signing the task order.
B.14 Unit Prices for Labor
a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be as a Unit Price Task in this contract. Labor for this work will be ordered and paid for based on unit prices for labor proposed by the Contractor listed in the Schedule of Indefinite Quantity work.
b. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Indefinite Quantity Work” accomplished in the time period shown.
c. The Contractor shall enter, in the unit price bid space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the bidders work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards). The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre- expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (i.e. bucket truck, lifting equipment, staging, etc.), equipment set up time, lift time, craft delay allowance, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.
B.15 Period of Performance – Less than One Year Proposals shall be submitted for the performance of work for a period of one year. The contractor is cautioned to recognize that the initial term of the contract may be for a period of less than one year in accordance with the “PERFORMANCE PERIOD OF CONTRACT” clause in section F. In the event that the period of performance is less than one year, the Government will reduce the individual line item quantities to reflect work remaining in the contract term and no other adjustments to the pro-rated contract price will be made.
B.16 Government Purchase Card Non-Recurring work may be ordered at the prices offered by two ways:
1) by the issuing activity using a DD Form 1155 “Order for Supplies and Services”
2) or by authorized Government user via a Government Purchase Card (GPC).
When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.
B.17 Contractor Support of Electronics Facilities Support Contracting (e-FSC)
This procurement allows for the use of DoD FEDMALL (formerly DoD EMALL) for issuing orders. Refer to Section H, Special Contract Requirement.
B.18 Request for Proposal (RFP) Information/Clarification Questions Offerors are required to review the entire solicitation package before submitting questions. All questions must be submitted 10 days after site visit is conducted, by email to carmen.napoli@navy.mil. This is the most efficient way to ensure all questions are answered in a timely manner.
B.19 Solicitation This solicitation includes a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2 and 15. The contractor will be required to meet the specification in these Annexes described in Section C.
B.20 Notice to Offeror Offeror are required to submit both Section B, Bid Schedule and Section J, Exhibit Line Items (ELINs) with their proposals. The total of the CLIN in Section B – Bid Schedule is equal to the sum of the ELINs in Section J as shown below:
CLINs ELINs 0001 A001 through A004 0002 A700 through A709 0003 B001 through B004 0004 B700 through B709 0005 C001 through C004 0006 C700 through C709 0007 D001 through D004 0008 D700 through D709 0009 E001 through E004 0010 E700 through E709
B.21 Submitting your Proposal Proposals may be submitted either electronically or hand carried, which includes FedEX, UPS, or any other commercial carrier to:
NAVFAC Mid-Atlantic PWD Pennsylvania Attn: Carmen Napoli 4921 S. Broad Street Philadelphia, PA 19112
A site visit will be held on 14 April 2020 at 8:00 AM EST time; however; the site visit is NOT mandatory for contract award but is encouraged. If the offeror attends the site visit, it will be at your own expense. The Government will not compensate or be responsible for any associated costs of the optional site visit. In order to attend the site visit, individuals must submit SECNAV Form 5512-1, Department of the Navy Local Population ID Card/Base Access pass Registration by 20 March 2020. The point of contact for attending will be Jason Alfaro at jason.alfaro1@navy.mil or 215-897-3011. Contractors will meet in the parking lot at 4921 S. Broad Street, Building 1, Philadelphia, PA.
NOTE: The site visit log will NOT be made available to contractors nor will it be posted onto the FBO Websites.
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED Each Base Year: Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN A001-A004
FOB: Destination
PSC CD: S299
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED Each Base Year: Non-Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN A700-A709
UNIT UNIT PRICE MAX AMOUNT
0003 UNDEFINED Each OPTION Option Year 1: Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN B001-B004
PSC CD: S299
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED Each OPTION Option Year 1: Non-Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN B700-B709
UNIT UNIT PRICE MAX AMOUNT
0005 UNDEFINED Each OPTION Option Year 2: Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN C001-C004
UNIT UNIT PRICE MAX AMOUNT
0006 UNDEFINED Each OPTION Option Year 2: Non-Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN C700-C709
UNIT UNIT PRICE MAX AMOUNT
0007 UNDEFINED Each OPTION Option Year 3: Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN D001-D004
UNIT UNIT PRICE MAX AMOUNT
0008 UNDEFINED Each OPTION Option Year 3: Non-Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN D700-D709
UNIT UNIT PRICE MAX AMOUNT
0009 UNDEFINED Each OPTION Option Year 4: Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN E001-E004
UNIT UNIT PRICE MAX AMOUNT
0010 UNDEFINED Each OPTION Option Year 4: Non-Recurring
FFP
Storm Drain Maintenance and Repair Services
ELIN E700-E709
Section C - Descriptions and Specifications
ANNEXES 1, 2 AND 15
0100000 – General Information Spec Item Title 1 General Information
1.1 Outline of Services
1.2 Project Location
1.3 Acquisition of Additional Work
1.4 Background Information
1.5 Verification of Workload and Conditions
1.6 Climate Patterns
1.7 Related Information
1.8 Navy Approach to Service Contracting
1.8.1 Partnering Philosophy
1.8.2 Contractor's Knowledge
1.8.3 Industry Best Practices
1.9 Standard Template
1.10 Navy PBSA Approach
1.11 Technical Proposal Certification
0100000 – General Information Spec Item Title Description 1 General Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at the Naval Support Activity – Philadelphia, 700 Robbins Avenue, Philadelphia, PA 19111 and the Philadelphia Naval Business Center, Philadelphia, PA 19112. This procurement is for a Fixed- Firm Price contract type, performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items for Storm and Sanitary Sewer Collection System Services.
The PWS is organized into annexes. Annex 1 is "General Information".
Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
The annex numbers are identified as 1 through 18 in the description column, but the full-expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page). N/A indicates that the annex is not applicable.
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff – N/A Annex 4 Public Safety – N/A Annex 5 Air Operations – N/A Annex 6 Port Operations – N/A Annex 7 Ordnance – N/A Annex 8 Range Operations – N/A Annex 9 Health Care Support – N/A Annex 10 Supply – N/A Annex 11 Personnel Support – N/A Annex 12 Morale, Welfare and Recreation Support – N/A Annex 13 Galley – N/A Annex 14 Housing – N/A Annex 15 Facilities Support Sub Annex 1502000 – Facility Investment Annex 16 Utilities – N/A Annex 17 Base Support Vehicles and Equipment – N/A Annex 18 Environmental – N/A
1.2 Project Location The work shall be performed at various locations and could vary from location to location. The following is an example of the dispersion of work at the various locations.
(1) Cleaning of storm drain inlets at the Naval Support Activity, Philadelphia.
(2) Cleaning of the storm water collection system at the Naval Support Activity, Philadelphia.
(3) Cleaning of the sanitary sewer collection system at the Naval Support Activity, Philadelphia.
(4) Pumping out the manholes of the storm and sanitary sewer collection systems at the Naval Support Activity, Philadelphia.
(5) Cleaning of storm drain inlets at the Philadelphia Naval Business Center.
(6) Cleaning of the storm water collection system at the Philadelphia Naval Business Center
(7) Cleaning of the sanitary sewer collection system at the Philadelphia Naval Business Center.
(8) Pumping out the manholes of the storm and sanitary sewer collection systems at the Philadelphia Naval Business Center.
1.3 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.4 Background Information Naval Support Activity-Philadelphia (NSA-P) and the Philadelphia Naval Business Center (PNBC) are predominantly office environments with some shop and storage facilities. The Office personnel work first and second shifts from 0700 to 2400 hours Monday through Friday.
1.5 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.
As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
1.6 Climate Patterns The Philadelphia region has four distinct seasons. The city’s climate is moderated by its proximity to the Atlantic Ocean: high humidity in summer, frequent high winds and bitter cold in the winter. January’s average temperature is 33F/1C and tends to dip below freezing in the evening. July’s average temperature is 75F/24C with sunny and humid days that sometimes exceed 90F/10-15C. Clear skies 25% of the time;
partly cloudy skies 31%; cloudy skies 44%. Annual rainfall: 40in/100cm;
heaviest rain in July and August. Annual snowfall: 20in/50cm.
1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in
"Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.8 Navy Approach to
Service Contracting
The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.
The Navy also supports the following principles:
1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.
Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.
Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (results).
1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.
Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the management and administrative requirements. Specification Item 3 will always contain the Recurring Work requirements.
Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher-level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.
Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 must be priced and their price must be allocated across the Exhibit Line Items.
1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.11 Technical Proposal
Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
0200000 – Management and Administration Spec Item Title 2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Informal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.8 Directives, Instructions, and References
2.3.9 Invoicing Procedures
2.3.10 Forms
2.4 Government-Furnished Property, Materials and Services
2.4.1 Government-Furnished Facilities (GFF)
2.4.2 Government-Furnished Utilities
2.4.3 Government-Furnished Materials (GFM)
2.4.4 Government-Furnished Equipment (GFE)
2.4.5 Government-Furnished Services (GFS)
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Service Interruptions
2.6.7 Quality Management System (QMS)
2.6.7.1 Quality Management (QM) Plan
2.6.7.2 Quality Inspection and Surveillance
2.6.7.3 Quality Inspection and Surveillance Report
2.6.8 Property Management Plan
2.6.9 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental/Energy Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 DBIDS Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.10 Employee Status
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Chemical Hazard Communication Program
2.9.3.3 Confined Space Program
2.9.3.5 Fall Prevention and Protection Plan
2.9.5 Accident and Damage Reporting
2.9.5.1 Accident Reporting and Notification Criteria
2.9.6 Fire Protection
2.9.7 Monthly On-Site Labor Report
2.9.8 OSHA Citations and Violations
2.9.9 Safety Inspections and Monitoring
2.9.10 Safety Certification
2.9.11 Safety Apparel on Jobsites
2.9.12 Emergency Medical Treatment
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.4 Non-Regulated Waste Disposal
2.10.2.5 Regulated Waste Disposal
2.10.2.6 Universal Waste
2.10.2.7 Spill Prevention, Containment, and Clean-up
2.10.2.8 Hazardous Material Management
2.10.2.9 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.10 Noise Control
2.10.2.11 Salvage
2.10.2.12 Asbestos Containing Material (ACM)
2.10.2.13 Clean Air Act (CAA)
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Notification to the Government for Work Above the Recurring Work Limitations
2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-Recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Material and Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.3 Non-Recurring Work ELINS
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular Working Hours
The Government's regular working hours are from 0700-1800, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to
Contractor Working Hours
The Contractor shall perform services during regular government working hours unless stated in a particular section of the specification or as directed on the task order.
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage
Determinations
Wage Determinations are included in J-0200000-02.
2.2.3 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, and 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
The Contractor shall attend administrative and coordination meetings. The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.
The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Partnering should accomplish three goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
A project’s characteristics determine whether the formal or informal partnering process level is to be used.
2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.3.2 Contract Partnering
Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.
Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager (PM)
* Quality Control Manager (QCM)
* Site Safety and Health Officer (SSHO)
2.3.4 Permits and
Licenses The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause
52.228-5, INSURANCE – WORK ON A GOVERNMENT
INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.8 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.9 Invoicing
Procedures
Refer to Section G for invoicing instructions. The Contractor shall submit a monthly invoice, properly filled out to include the Recurring work Price services performed and Non-Recurring services performed for that month.
Invoicing procedures are identified in J-0200000-04.
2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.
2.4 Government-
Furnished Property, Materials and Services
In accordance with Section H, paragraph H.10 Govt-Furnished Property and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities utilities, materials, equipment and services for use in connection with this contract as stated below.
2.4.1 Government-
Furnished Facilities
None – The Government will not furnish any facilities for use under this contract.
(GFF)
2.4.2 Government-
Furnished Utilities Fire hydrants for potable water may be available for use under the FFP section of the contract at NSA Philadelphia. Contractor shall coordinate with the TPOC prior to any use of the system.
The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
2.4.3 Government-
Furnished Materials (GFM)
None – The Government will not furnish any material for use under this contract.
2.4.4 Government-
Furnished Equipment (GFE)
None – The Government will not furnish any equipment for use under this contract.
2.4.5 Government-
Furnished Services
(GFS)
None – The Government will not furnish any services for use under this contract.
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO and COR may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite.
Energy efficient tools and equipment shall be used when available. The KO and COR may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours. Trouble calls will be classified as either routine (respond within 24 hours and complete within 4 hours during regular working hours) or emergency (respond within 2 hours and complete within 4 hours at any time of day or night).
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following workday for inquiries after regular working hours.
2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business.
In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.
2.6.4 Deliverables Records and reports are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government.
Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.
Deliverables shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable.
Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
2.6.5 Service
Interruptions
If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures prior to removing from service. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.
2.6.7 Quality
Management System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:
Accurate documentation of work processes, procedures, and output measures.
A systematic procedure for assessing compliance with performance objectives and standards.
Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.7.1 Quality
Management (QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.
The Contractor’s QM Plan shall include, at a minimum, the following:
• Policy and objectives of Quality Management System (QMS)
• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications
• Approach to assuring quality of services provided and conformance with performance objectives and standards
• Methods and procedures for effective planning, operation and control of processes and performance of work
• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work
• Documentation and records management
• Communication with government (customers)
2.6.7.2 Quality Inspection
and Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the KO after termination of the contract per Section F.
2.6.7.3 Quality Inspection
and Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.9 System and
Equipment Replacement
The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work.
Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.
2.7 Personnel
Requirements
The Contractor shall comply with the personnel requirements stated below.
2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.
The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager (Quality Manager cannot be the same person as the PM), SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.
2.7.1.1 Project Manager
(PM)
The…