Stonegate Culvert_Adendum No_ 1_20250623.pdf
PDF 99 KB Posted
- Attached to
- BID 2025-35 STONEGATE TRAIL CULVERT REPLACEMENT
- Solicitation number
- PE-66243-NONST-2025-000000071
- Issued by
- Henry County, Georgia
About this file
This is Addendum No. 1 to the bidding documents for the Stonegate Trail Culvert Replacement project issued by the City of Perry, Georgia. The project involves replacing four existing 48-inch reinforced concrete pipe (RCP) culverts with three 5-foot by 10-foot concrete box culverts, along with associated site work including paving, drainage systems, headwalls, and aprons. A mandatory pre-bid meeting is scheduled for June 17, 2025, at 2:00 p.m., with sealed bids due on June 26, 2025, at 2:00 p.m. at the City of Perry administration building located at 1211 Washington Street. The addendum provides clarifications on 11 specific technical and contractual questions, including traffic control requirements, paving specifications, construction means and methods, temporary drainage maintenance, headwall details, stone bed requirements, and removal/disposal procedures for existing culverts. Contractors are required to submit an appropriate traffic control plan compliant with Georgia Department of Transportation requirements and must include costs for maintaining temporary storm drain systems as part of line item 13 (demolition). The contractor is responsible for removing four existing 48-inch RCP culverts and delivering them to 500 Ball Street in Perry, while assuming no liability for damage to the existing RCP during removal.
The project is locally funded by the City of Perry under Contract No. 2025-35, with ISE Project No. 1013.2403. Bidding documents are available for download at no charge from www.intse.com; however, bidders must submit a $25.00 payment to Integrated Science & Engineering to become qualified to submit a bid. The addendum addresses specific cost inclusions, requiring contractors to include a 12-inch thick layer of No. 57 stone under all box culverts and aprons in their bid pricing for line items 15 and 16 respectively. The city does not require retention of brick headwalls and will not provide existing asphalt depth information; contractors must assume this as an unknown variable in their estimates. The project specifications reference GDOT detail 1120 for headwall design and require adherence to Section 01 55 26 of the contract documents for traffic control procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID 2025_35 STONEGATE TRAIL CULVERT REPLACEME.pdf | ||
| Bid Summary Sheet 2025_35.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
Stonegate Trail Culvert Replacement
City of Perry City Hall
1211 Washington Street
Perry, GA 31069
Bids Due: June 26, 2025 @ 2:00p
Pre-Bid Meeting: June 17, 2025 @ 2:00p (Required)
Cost of Plans: Hard Copy -
Electronic Copy - $25.00
ISE Project #: 1013.2403
Owner Contract No.: 2025-35
Date:
INCORPORATE CHANGES INTO THE CONTRACT DOCUMENTS AS DESCRIBED BELOW AND
ATTACHED TO THIS ADDENDUM:
1. Will a traffic control plan be provided or described? Will permanent road closure signage be required? Will TP III Barricades with ROAD CLOSED signage attached be required? Will there be a waiting period before the road can be closed?
Answer: The contract requires the submission of an appropriate plan, as specified in Section 01 55 26
Traffic Control, that complies with all applicable Georgia Department of Transportation (DOT) requirements.
2. There are two paving typical section on sheet C-701. Which one is to be used for this project?
Answer: Use the paving section titled “Typical Paving & 24” Conc. Rollover Curb & Gutter.” It includes 6” of GAB and 2” asphalt surface course.
3. On the initial ESPC plan on sheet C-510 the construction exit south of the site is shown with temporary pipe in the stream diversion. Will a dimension and material of these pipes be provided? Can this construction exit be deleted and only use the North exit?
Answer: The dimensions and material will not be provided. This is a construction means and methods item that is at the contractor's discretion. Yes, this can be deleted, and only use the North exit.
4. Is the downstream rock necessary?
Answer: Yes
5. It appears that temporary measures will be required to keep the 24” longitudinal storm drain system working until the culvert is completed and final storm drains, and end treatments can be placed. Include this in the bid?
Answer: Please include the cost of keeping these in service as part of line item 13 demolition.
6. Should the 2 longitudinal drains stop at the wingwalls?
Answer: Yes
7. To confirm the City of Perry wants the RCP but not any portion of the brick wingwalls? Is the contractor responsible for any damage to the RCP during its removal?
Answer: The city does not want any portion of the brick headwalls. It will be the contractor's responsibility to haul them away. The contractor is not responsible for any damage to the existing RCP during its removal. The contractor will be required to remove the four existing 48” RCP culverts and deliver them to 500 Ball Street in Perry. Perry will be responsible for unloading them once they arrive at
500 Ball Street.
8. What type of headwalls will be required for the proposed 18” and 24” HDPE culverts?
Answer: These headwalls should follow GDOT detail 1120 as shown on drawing sheet number C-701
9. Can you provide the existing asphalt depth?
Answer: The depth is unknown.
10. Are we to assume there will be No. 57 stone underneath all the box culverts, and apron?
Answer: Yes. Assume a 12” thick layer of Np. 57 stone under all these structures. Include the cost of this stone in Line Item 15 for the culverts and 16 for the aprons.
11. What is the location of the bid opening?
Answer: The location of the bid opening will not be at City Hall as previously indicated. It will be at the exact location where we held the pre-construction conference. City of Perry administration building at
1211 Washington Street.