Stockpile_Replenishment_Haul_Route_and_Laydown_Area_Exhibit.pdf
PDF 3 MB Posted
- Attached to
- DBB Prima Zone 4 Phase A Main Gas Line Project
- Solicitation number
- 299-3104108-AR
- Issued by
- Orange County, San Francisco City, California
About this file
This is a stockpile replenishment haul route and laydown area exhibit prepared for the County of Orange, OC Waste & Recycling, in connection with the DBB Prima Zone 4 Phase A Main Gas Line Project at Prima Deshecha Landfill in San Juan Capistrano, California. The exhibit is an AutoCAD-generated site plan drawing dated October 7, 2026, drawn to a scale of 1 inch equals 300 feet, depicting the proposed haul route for stockpile replenishment materials, the designated laydown area, and the stockpile location relative to Zone 4 Header. The drawing indicates the existing breccia stockpile, proposes a stockpile replenishment route, identifies Avenida La Pata as a key thoroughfare, and notes approximate distances of 240 feet and 350 feet for route segments. The plan is subject to change per Orange County Waste & Recycling operational needs and serves as a visual reference for contractors bidding on the project, with bids due October 12, 2026, at 2:00 p.m. and a mandatory pre-bid meeting and site visit scheduled for September 30, 2026, at 9:00 a.m.
The exhibit supports the broader DBB Prima Zone 4 Phase A Main Gas Line Project with an estimated contract value of $9,120,900. The project requires a California Class A General Engineering Contractor's license, a 10 percent bid security, and adherence to California prevailing wage requirements under Labor Code Section 1773. A minimum of 3 percent of the total contract value must be subcontracted to certified Orange County Local Small Business (OCLSB) or Disabled Veteran Business Enterprise (DVBE) subcontractors, with qualified OCLSB or DVBE bidders eligible for a 5 percent preference deduction of up to $100,000 maximum for evaluation purposes. Five contractors are pre-qualified to bid: ARB, Inc.; Big Ben, Inc.; Environmental Construction, Inc.; Sukut Construction, LLC; and Toro Enterprises, Inc. The successful bidder must provide Performance and Payment Bonds each equal to 100 percent of contract price within 14 calendar days of award, with bids remaining valid for 365 days.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF
DESIGNED
SCALE
DRAWN CHECKED
DATE
SHEET
Proposed Haul Route subject to change per OCWR needs
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 1" = 300'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text G:\ENGINEERING\DWGS\MISC. AUTOCAD DRAWINGS\2026\ZONE 4 HEADER STOCKPILE\ZONE 4 HEADER STOCKPILE OPTIONS.DWG 10/7/2026 1:58 PM ocwrasaleh 10/7/2026 1:58 PM ocwrasaleh10/7/2026 1:58 PM ocwrasaleh ocwrasalehocwrasaleh
AutoCAD SHX Text
AutoCAD SHX Text
LANDFILL
AutoCAD SHX Text
AYS
AutoCAD SHX Text
PROPOSED HAUL ROUTE
AutoCAD SHX Text
STOCKPILE A REPLENESHMENT
AutoCAD SHX Text
ZONE 4 HEADER
AutoCAD SHX Text 10/7/2026
AutoCAD SHX Text 1" = 300'
AutoCAD SHX Text
PRIMA DESHECHA
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PROPOSED ROUTE TO STOCKPILE PROPOSED ROUTE FROM STOCKPILE PROPOSED LAYDOWN AREA
AutoCAD SHX Text
PROPOSED STOCKPILE
AutoCAD SHX Text
EXISTING BRECCIA STOCKPILE
AutoCAD SHX Text
AVENIDA LA PATA
AutoCAD SHX Text ~240'
AutoCAD SHX Text ~350
File details come from the government source that posted it. Updated .