STATEMENT OF WORK - VOLK FIELD BILLETING BLIND REPLACEMENT - MULTIPLE BUILDINGS.pdf
PDF 180 KB Posted
- Solicitation number
- W50S9H26QA018
- Issued by
-
Department of the Army National Guard
About this file
Statement of Work Summary: Billeting Blind Replacement Project
This Statement of Work specifies the full-depth replacement of window blinds across multiple buildings at Volk Field Air National Guard Base in Camp Douglas, Wisconsin. The project objective is to provide privacy, energy efficiency, light control, and glare reduction through new window treatment installations. For all buildings except Buildings 449 and 475, the contractor must install 1-inch aluminum blinds in bright white with inside mounting using standard brackets, cordless lift mechanisms, and wand tilt on the left side. Buildings 449 and 475 require cellular shades in blue grey and natural tan with cordless operating systems and inside mounting. The contractor is responsible for removal and disposal of existing window treatments, delivery and offload of materials, labor, equipment, and repair of any damage caused during installation. The pricing and award structure establishes seven separate Contract Line-Item Numbers based on project areas: Base Requirement for Buildings 140-149 (100 windows) and six optional areas covering Buildings 449-475, 434-448, 303-315, 405-427, and 125-132 (ranging from 28 to 224 estimated windows). Pricing must remain valid through September 30, 2026, and unfunded CLINs may be awarded if additional funding becomes available.
Work is to be performed during normal base hours of 7:00 a.m. to 4:00 p.m. Monday through Friday, with an estimated 120-calendar-day duration from the Notice to Proceed. The contractor must comply with Volk Field security protocols including background checks, AT Level I training completion within 10 calendar days of contract start, and installation entry requests submitted 15 days prior to arrival. The contractor must provide its own disposal bins and complete daily cleanup, verify all site conditions and quantities prior to quoting, protect all structures and utilities from damage, and notify the government prior to material delivery. Contact for questions: Volk Field Contracting at 608-427-1235 or WI.CRTC.VF.Contracting@us.af.mil.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
BILLETING BLIND REPLACEMENT
PROJECT LOCATION
Work is to be completed at multiple buildings on Volk Field Air National Guard Base (ANGB), Camp Douglas, WI 546518-5001.
SCOPE OF WORK
The objective of this project is to provide a full depth replacement of all billeting building blinds on Volk Field to provide privacy, energy ef�iciency, light control, and glare reduction.
ALUMINUM BLINDS INSTALLATION
Replacement shall include the removal and disposal of existing window treatments and hardware (if applicable), and the installation of new window treatments that meet the following speci�ications.
All buildings expect Bldg. 449 and 475 Material(s): 1 inch Aluminum Color: Bright White Mounting: Inside mount using standard brackets Lift Mechanism: Cordless Lift Tilt Mechanism: Wand tilt Tilt Position: Left Side
For Buildings 449 and 475 Type: Cellular Shades Color: Blue Grey and Natural Tan Mounting: Inside Operating System: Cordless Operating Pole: No/ None
GENERAL REQUIREMENTS
Contractor is responsible for all labor, materials, and equipment necessary to complete the work, to include delivery and of�load of necessary supplies and equipment. Any damage to window frames, interior walls, �loors, or surrounding areas caused by equipment operation, installation, or material storage shall be repaired to original condition as part of the project.
PRICING & AWARD STRUCTURE:
Pricing shall be submitted for Project Area as outlined below. Each project area will be a separate Contract Line-Item Number (CLIN) and each will be awarded based on availability of funds at time of award. Pricing must be valid through 30 September 2026. Any CLINs not funded at time of award shall be held available for award through 30 September 2026, in the event additional funding becomes available.
BASE REQUIREMENT
• Project Area 1: Bldgs. 140-149 (Est. 100 Windows)
OPTIONS
• Project Area 2: Bldg. 449 (Est. 30 Windows)
• Project Area 3: (Est. 28 Windows) Bldg. 475
• Project Area 4: Bldgs. 434, 436, 438, 440, 442, 446, 448 (Est. 154 Windows)
• Project Area 5: Bldgs. 303, 305, 307, 310, 311, 312 & 315 (Est. 63 Windows)
• Project Area 6: Bldgs. 405-413, 417 and 419- 427 (Est. 224 Windows)
• Project Area 7: Bldgs. 125-132 (Est. 144 Windows)
The contractor is responsible for verifying the site conditions and quantities prior to submitting quotes. The above quantities are estimates. Attendance at scheduled site visit is highly encouraged.
Installation methods and materials shall be in accordance with standard commercial practices.
VOLK FIELD GENERAL INFORMATION
1. Smoking on Volk Field premises is allowed only in designated areas.
2. Seat belts must be worn, and cell phones may only be used in stationary vehicles and equipment.
Note: You may not talk or text with phones while driving on Volk Field premises.
3. No one will be allowed access without of�icial prior arrangement and representation by a prime contractor.
4. Individuals are not allowed access to any restricted areas once on base. Access is allowed “Only” in areas required to conduct the work of this project.
5. All vehicles and persons are subject to search at the discretion of security personnel.
6. Persons interested in viewing the project site shall have a current picture I.D & provide full name
(including full middle name), valid Driver’s License number and date of birth at least three (3) business workdays prior to scheduled arrival.
7. Volk Field is a secure installation and background checks of contractor employees will be conducted once a contract has been awarded.
8. Volk Field hours of operation are from 6:30 am to 4:00 pm, Monday-Friday
WORK SCHEDULING
1. Normal base work hours for the Contractor are de�ined as 7:00-4:00 Monday-Friday, excluding
Saturdays, Sundays, and Federal Holidays.
2. If the Contractor desires to work during periods other than above, they must coordinate with the
Volk Field Contracting Of�icer in advance of his intention to work during other periods.
a. If the Contracting Of�icer determines that they are reasonably available, the Contracting
Of�icer may authorize the Contractor to perform work beyond normal duty hours/days.
3. The project work duration is estimated to be approximately 120 calendars days from the date the contractor is provided Notice to Proceed.
a. Additional coordination will be required after the completion of work to facilitate project closeout requirements.
GENERAL CONDITIONS
The contractor shall comply with all applicable local, State and Federal laws and regulations. The contractor shall provide supervision overseeing all work. The contractor shall �ield verify all site conditions, quantities, measurements, and requirements. The contractor shall protect and barricade all work areas to ensure safety. The contractor shall protect all structures, utilities, vegetation, sidewalks, and vehicles from damage. The contractor shall be responsible to replace any damaged materials with new materials, at no additional cost to the Government.
DISPOSAL OF MATERIALS AND CLEANUP
The contractor shall not use any Government disposal bins, dumpsters or trash receptacles for any reason at any time. The contractor shall provide appropriate disposal bins/trash receptacles.
Approval of disposal bins/trash receptacle location(s) shall be coordinated through the customer.
The contractor shall clean up after each work period and dispose of all debris at the close of each day.
MATERIAL & EQUIPMENT ACCOUNTABILITY
The contractor shall notify the Government prior to delivery of any material or equipment to the site. The contractor shall ensure someone is available to receive delivered materials and able to store them safely in an area designated by the Government. Any materials delivered without prior coordination and without having someone to take receipt, shall not be accepted and turned away.
ANTITERRORISM / OPERATIONS SECURITY / INFORMATION PROTECTION INFORMATION
1. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Of�icer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Of�ice. The contractor shall ensure compliance with all personal identity veri�ication requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
2. For Contractors that do not require CAC but require access to a DoD Facility and/or Installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identi�ication Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), Contractors are required to be veri�ied prior to Installation access. To facilitate faster installation entry; Form 1 Installation Entry Request must be submitted 15 days prior to the contractor’s arrival through the main gate. Entry may be denied if the Form 1 Installation Entry Request is not received. Please use the attached Installation Entry / Access spreadsheet, when complete email to: usaf.wi.wi-crtc.list.entry-request@mail.mil
3. AT Level I Training. All contractor supervisors, job site lead employees, to include subcontractor supervisor and job site lead employees, requiring access to Government Installations, Facilities and Controlled access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certi�icates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT Level I Awareness training is available through https://jko.jten.mil/courses/AT-level1/launch.html by completing JS-US007: Level I Anti- Terrorism Awareness Training.
Questions concerning this SOW can be directed to Volk Field Contracting at 608-427-1235 or by email at WI.CRTC.VF.Contracting@us.af.mil mailto:WI.CRTC.VF.Contracting@us.af.mil