Statement of Work SOW Grader.pdf
PDF 159 KB Posted
- Attached to
- Road Grader Rental for FY25
- Solicitation number
- FA820125Q0021
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation FA820125Q0021 Q and A.docx | DOCX document | |
| Solicitation - FA820125Q0021.pdf | ||
| Combo Synopsis Solicitation Road Grader Rental - Hill AFB UT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR
FORCE 75TH CIVIL ENGINEER
SQUADRON (AFMC) HILL AIR
FORCE BASE UTAH
Work Task: 15474058 Location: Thermal Treatment Unit/UTTR/50037 Project Title: Road Grader Rental for FY25 Capital Project:
Project Manager: Darrell Leslie, NH-III, 75 CES/CEORV
Statement of Work for Road Grader
1. Introduction
This Statement of Work (SOW) outlines the requirements and specifications for the rental of a road grader for Thermal Treatment Unit (TTU) operations for FY 25
2. Scope of Work:
The grader shall be suitable for heavy-duty industrial use in construction projects. The grader should have a 14-16 foot cutting edge blade and equipped with a rear mount ripper. The road grader should have a maximum blade position angle of 65 degrees and can cut to a depth of 18 inches. The rear ripper should have a penetration force of ~ 20,00 lbs. and a pry-out force of ~
30,000 lbs. The grader must comply with all relevant safety standards and regulations.
3. Period of Performance: 30 June - 30 Sept 25
4. Specifications
Engine Power: ~ 250 – 300 HP
Base Power: ~ 240 hp
Blade pull – Base GVW: ~ 20K lbs.
Blade pull – Maximum GVW: ~49K lbs.
Blade Type and size: Cutting edge, ~ 16 feet
Cutting edge width: ~8 inches
Cutting edge thickness: ~ ¾ inch
Blade cut angle (left or right): 90 degrees
Maximum lift above ground: ~17.5 inches
Maximum depth of cut: ~ 18 inches
Ripping depth: ~ 16 inches
Penetration force: ~ 23K lbs.
Pry out force: ~ 32K lbs.
Operating Weight: ~ 55K lbs.
5. Delivery Requirements
The road grader must be delivered to 75 CES/CEOR (Range Support Flight/Utah Test and
Training Range) by NLT 1 May 2025.
Delivery includes assembly, testing, and training of personnel on operation and maintenance.
6. Warranty and Support
The grader should come with a manufacturer's warranty. Supplier should provide technical support, maintenance services, and spare parts availability for the duration of the warranty and beyond.
7. Vendor Requirements
Vendors must provide a detailed quotation including itemized costs, warranty information, delivery timeline, and any additional services offered. Vendors must be reputable, experienced, and certified to sell and service the specified brand/model of road grader.
8. Acceptance Criteria
Acceptance of the road grader will be based on successful delivery, compliance with specifications, and satisfactory performance during testing.
File details come from the government source that posted it. Updated .