Statement of Work (SOW) Carpet and Paint 20129 V3600.pdf
PDF 111 KB Posted
- Attached to
- Carpet Purchasing, Installation, and Painting
- Solicitation number
- FA704626QRJS1
- Issued by
-
Department of the Air Force
About this file
This is a Statement of Work (SOW) dated April 20, 2026, for renovation work at AFOTEC Building 20129, Kirtland Air Force Base, New Mexico. The contractor shall furnish all materials, labor, coordination, and supervision necessary to complete the project, which includes removing and replacing carpet and cove base in the main hallway, installing transition strips between hallway carpet and doorway entrances, and painting the main hallway from floor to ceiling including doors and door frames.
The work must comply with current versions of the International Building Code, National Electric Code, ADA standards, and all applicable commercial codes. The on-site performance period is 90 workdays, with access restricted to duty hours from 7:30 a.m. to 4:30 p.m., Monday through Friday, unless prior approval is obtained from AFOTEC/A-4F. The contractor must maintain a clean and orderly work site, protect adjacent areas from damage, remove all demolition materials and waste daily from the building with off-base disposal per all local, state, and federal regulations, and comply with Air Force Instructions 91-202 and 91-203, AFOSH Standards, and OSHA requirements. Worker badges must be displayed prominently at all times in the secure facility. The contractor is responsible for any damages caused to features outside the work area and must obtain written approval from AFOTEC/A-4F before implementing any changes to the SOW. Project managers are Victor Napolitano (505-846-5106, victor.napolitano.1@us.af.mil) and Robert Montaño (505-846-1572, robert.montano.2@us.af.mil).
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Date: 20 April 2026 Revision:
Original Date: 20 April 2026
Project Title: Bldg. 20129; remove and replace carpet and cove base in main hallway. Install transition strips between the hallway carpet and each doorway. Bldg. 20129; paint main hallway floor to ceiling, doors and door frames.
The contractor shall furnish all materials, labor, coordination and supervision necessary to accomplish the work in the AFOTEC Building 20129, Kirtland AFB, NM. Work shall be performed in a neat, substantial and in a workmanlike manner.
1. Division 01 GENERAL CONDITIONS
1.1. All work shall meet the current versions of International Building Code, National Electric Code, ADA and all applicable commercial codes and standards.
1.2. Maintain the work site in a clean and orderly manner so that the safest possible site is provided for workers.
1.3. QUANTITIES: The Contractor shall field verify project requirements. A site visit where conditions may be field verified by the Contractor will be arranged by AFOTEC/A-4F.
1.4. REGULATIONS AND REQUIREMENTS: Contractor activities shall follow Federal, AFOTEC and Kirtland AFB regulations and directives for security, safety, traffic, fire, and personnel clearances.
1.5. PROTECTION AND CLEAN UP: Protect adjacent areas with appropriate coverings.
Clean the job area at the completion of each workday, including intervening spaces used for transporting goods and materials. Protect floors, walls and ceilings in areas affected by the work.
1.6. DEMOLITION: Demolition material and waste generated under this contract shall be removed from the building daily by the Contractor. Disposal of these materials and wastes shall be off-base in accordance with all local, state and federal regulations.
1.7. SUBMITTAL REQUIREMENTS: The Contractor shall obtain approval for submitted materials prior to incorporating them into the work.
1.8. SAFETY: Compliance with the current versions of Air Force Instructions (AFI) 91-202, AFI 91-203, and AFOSH Standards, 29 CFR 1910 and 29 CFR 1926 is mandatory. Contractor shall provide as a minimum, signs, barriers, and or caution tape as a safety precaution around the work site. Contractors are subject to inspections of job sites by the Department of Labor.
Resolution of Department of Labor Citations for Violations of Occupational Safety and Health Standards is a contractor responsibility.
1.9. SECURITY AND ACCESS: Building 20129 is a secure facility and AFOTEC visitor badges shall be displayed by the Contractor’s workers. Badges shall be prominently displayed above the waist at all times.
1.9.1. The Contractor will have access to the work area in Building 20129 only during duty hours from 7:30 am to 4:30 pm, Monday through Friday, during the construction period.
Work outside this time frame must be approved by the AFOTEC/A-4F prior to the work being done.
1.10. DAMAGES: Features outside of the work area that are damaged by the Contractor shall be repaired and finished to match existing area at the Contractor’s expense. The Contractor shall be responsible for replacement of any items damaged during the construction performance period of this contract.
1.11. PERFORMANCE: The on-site performance period is 90 workdays for all work in Building 20130. All work shall be completed in a professional manner and without delay once the on-site work period is started.
1.12. CHANGES: Changes to this Statement of Work shall be requested in writing to and approved prior to execution. The Contractor shall notify the AFOTEC/A-4F of differing site conditions as they are found and obtain approval for any changes required.
1.13. SALVAGE: All salvageable materials and equipment shall be the property of the Contractor unless otherwise noted in this SOW and/or drawings. The Contractor is responsible for the removal of all salvageable materials and equipment from the job site.
1.14. MATERIALS: All materials shall meet applicable specifications, standards, and codes.
1.15. EXECUTION: All work shall be performed in accordance with manufacturers’ published specification, shall meet accessibility standards (ADA) and shall conform to applicable current versions of International Building Code and all applicable local commercial codes.
1.16. POINT OF CONTACT:
1.16.1. Project managers for this project are Victor Napolitano of Engineering, Facilities and Logistics Division (AFOTEC/A-4F), office # 505-846-5106, cell # 505-263-3772, e-mail victor.Napolitano.1@us.af.mil and Robert Montaño of Engineering, Facilities and Logistics Division (AFOTEC A4F), office # 505-846-1572, cell # 505-307-2459, e-mail robert.montano.2@us.af.mil.
1.17. REFERENCES:
1.17.1. NFPA 101, 2009, Life Safety Code
2. Division 02 SITE CONSTRUCTION
2.1. Protect existing surfaces from damage.
3. Division 03 CONCRETE (Not used).
4. Division 04 MASONRY (Not used).
5. Division 05 METALS (Not used).
6. Division 06 WOODS & PLASTICS (Not used.)
7. Division 07 THERMAL & MOISTURE PROTECTION (Not used).
8. Division 08 DOORS & WINDOWS.(Not used)
9. Division 09 FINISHES.(Not used)
10. Division 10 SPECIALTIES (Not used).
11. Division 11 EQUIPMENT. (Not used).
mailto:victor.Napolitano.1@us.af.mil
12. Division 12 FURNISHINGS. (Not used).
13. Division 13 SPECIAL CONSTRUCTION (Not used).
14. Division 14 CONVEYING SYSTEMS (Not used).
15. Division 15 MECHANICAL (Not used).
16. Division 16 ELECTRICAL.
16.1 Equipment, material, installation, and workmanship shall be in accordance with mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
END SCOPE OF WORK
Project Title: Bldg. 20129; remove and replace carpet and cove base in main hallway. Install transition strips between the hallway carpet and each doorway. Bldg. 20129; paint main hallway floor to ceiling, doors and door frames.