This is a Statement of Work for the installation of a Lenel access control system at the 8500 Complex on Tyndall Air Force Base. The project encompasses the installation, programming, and testing of access control hardware at two buildings: 8504M and B8500, located approximately 5 miles southeast of Tyndall AFB proper on Highway 98.
The contractor must provide all labor, transportation, materials, and equipment to install card readers at three vehicle gates, two turnstiles, one building entrance, and one internal communications room. Installation tasks include placement of Lenel control boards and power supplies in designated communication rooms, as well as networking and power cable installation through existing conduits. The contractor is responsible for programming new hardware to integrate with the existing Lenel OnGuard system, configuring all access points, and conducting comprehensive testing. Project management responsibilities include coordinating with facility security staff and facility managers, with a kickoff meeting required within one week of contract award. Work will be conducted during normal business hours Monday through Friday, 0800 to 1700 local time, excluding holidays and weekends. The government will provide access to 120VAC power from existing system outlets. Project acceptance is contingent upon successful system testing demonstrating that authorized credentials unlock doors and generate proper event logs, unauthorized credentials trigger beep and remain locked while logging events, and system history reporting functions correctly. The schedule will be based on the awarded vendor's submission and deemed technically acceptable at contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA481926Q0066_RFQ_LenelAccessControlSystem.pdf | ||
| FA481926Q0066_Clauses_Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
ACCESS CONTROL SYSTEM INSTALLATION
AT
8500 COMPLEX ON TYNDALL AFB
1. Background
The 8500 Complex at Tyndall AFB requires the integration of a new Lenel access control system.
The new hardware must be compatible with the existing Lenel infrastructure to ensure seamless operation and security. This project involves the installation of new hardware and its integration into the existing system for Buildings 8504M and B8500.
2. Scope of work
The contractor shall provide all necessary labor, transportation, materials, and equipment to successfully install, program, and test the Lenel access control systems for buildings 8504M and B8500. The scope of work includes, but is not limited to, the following tasks:
• 2.1 Installation:
• Install card readers at the three vehicle gates, two turnstiles, one building entrance, and one internal communications room as specified in Section 4.
• Install Lenel control boards and power supplies in the designated communication rooms.
• Install all necessary networking and power cables in existing conduits to connect card readers, control equipment, and the existing network.
• 2.2 Programming and Integration:
• Program the new hardware to integrate seamlessly with the existing Lenel OnGuard system.
• Ensure that all new access points are configured correctly and communicate with the central system.
• 2.3 Testing:
• Conduct comprehensive testing of all new hardware and software to ensure full functionality and compliance with the acceptance criteria outlined in Section 7.0.
• 2.4 Project Management:
• The contractor shall coordinate all work with the facility Security staff and Facility Managers. A project kickoff meeting will be held within one week of contract award to establish project timelines and communication protocols.
3. Period of performance
Schedule will be in accordance with what was submitted by the vendor and deemed technically acceptable. Upon award, that schedule will be implemented into this statement of work. A kickoff meeting will be scheduled within one week of contract award. Work will be conducted during normal business hours Monday through Friday, 0800 to 1700 local time, and excludes holidays and weekends. Possible conditions that may affect scheduling are active missions, facility not ready for installation, holiday schedules, material availability, travel conditions, and shipping requirements.
4. Physical location
The 8500 complex is located outside of Tyndall AFB proper, approximately 5 miles southeast of Airey gate on highway 98, next to the subscale drone launch facility. The complex consists of a single external fence with three vehicle gates and two pedestrian turnstiles. Building 8504M is located on the west side of the compound, and building B8500 is located on the east side of the compound. The following list of locations dictates the installation sites for each of the card readers and associated hardware.
Building Location Name Location Detail Equipment Installation B8504M Main Entry Door East side of building Card reader, pedestal, door hardware B8504M Communication
Room 136 Internal to building off south hallway
Card reader, door hardware, Lenel control boards, power supply
B8504M Turnstile East side of building on fence
Entry/exit card readers, trigger wiring
B8504M Vehicle Gate North-East side of building on fence
Entry/exit card readers, pedestals, trigger wiring
B8500 Vehicle Gate North-West side of building on fence
Entry/exit card readers, pedestals, trigger wiring
B8500 Subscale Drone Access Gate
South-East side of building on fence
Entry/exit card readers, pedestals, trigger wiring
B8500 Turnstile West side of building on fence
Entry/Exit card readers, trigger wiring
B8500 Communication Room 325
Internal to building Lenel control boards, power supply
5. Supplies and equipment
The contractor shall provide all required equipment, supplies, and materials required for project installation. The government will provide access to 120VAC power from the existing system outlets.
6. Acceptance criteria
The project shall be accepted as complete upon successful system testing and system documentation handover. System testing shall include approval by a designated government representative that the following has been tested on each door that has been worked:
• Door unlocks and allows access when an authorized credential (card, pin, or combination of the two) is presented to the card reader.
• Events screen reports access granted with user name.
• Reader beeps but remains locked when unauthorized credentials are presented.
• Events screen reports information read from unauthorized credential.
• System history reporting.