Statement of Work - Roofing Systems Maintenance 2026.pdf

PDF 151 KB Posted

Attached to
Roofing Systems Maintenance
Solicitation number
6100065877
Issued by
York County, Pennsylvania

About this file

This Statement of Work outlines roofing systems maintenance services for all York County PennDOT stockpile locations managed by the Pennsylvania Department of Transportation. The scope of work includes preventative maintenance, inspections, repairs, and emergency call-out services for roofing systems across 12 stockpile sites throughout York County. Services consist of bi-annual scheduled inspections (April and October), emergency inspections following major storms (up to six additional inspections annually), and repairs as needed to maintain watertight integrity of roof systems. The contractor must respond to non-emergency repair requests within three business days and maintain 24-hour availability for emergency call-outs with technician arrival within one hour. The contract period begins upon full purchase order execution and runs through June 30, 2027, with four optional one-year renewals at original bid rates. Contractors must complete the Inspection Report Form (Appendix C) for all inspections and schedule all work in advance with the Facilities Manager or Contract Administrator. Questions must be submitted by May 1, 2026 at 10:00 AM EST, with a public bid opening scheduled virtually via Microsoft Teams on May 8, 2026 at 11:00 AM EST. Contractors may schedule site tours during business hours (Monday-Friday, 7:00 AM-3:00 PM) by contacting Sean Smoker at 717-718-6983.

This procurement is restricted to DGS-certified small businesses only, with award based on the lowest total bid for all line items. Bid pricing must include all travel, labor, equipment, overhead, and profit, with all work performed between 7:00 AM and 3:00 PM on weekdays excluding holidays; after-hours emergency work is billed at overtime rates. Eligible contractors must maintain a business location no more than 60 miles from any York County stockpile, possess a minimum of five years of roofing experience, provide current insurance certificates, and submit the Worker Protection and Investment Certification Form (BOP-2201) with their bid. The contractor shall warrant all repairs for 180 days and complete projects within 60 calendar days of notice to proceed. All materials, labor, and equipment charges are documented on the Confirmation of Service Form (OS-501), and invoices must be submitted to the Comptroller's Office within 30 calendar days of service completion. Failure to respond within specified timeframes on two occasions constitutes a contract violation permitting the Department to cancel the contract and surcharge the contractor for cost differences incurred.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A - STATEMENT OF WORK

ROOFING SYSTEMS MAINTENANCE OF STOCKPILE BUILDINGS FOR ALL

YORK COUNTY PENNDOT LOCATIONS

CONTACT PERSONS:

Facilities Manager: Sean Smoker Contract Administrator: Jolene Wagner Phone: 717-718-6983 Phone: 717-718-6984

1920 Susquehanna Trail N, York, PA 17404

PURPOSE: This statement of work shall provide for the Maintenance / Inspections / Repairs of roofing systems for all York County PennDOT locations, by way of replacement or repair of existing parts as deemed beneficial to the Commonwealth as determined by the Department Representative. The replacement materials must be new, of the same exact component or a new upgraded component. All repairs must be authorized by the Department Contract Administrator or Facilities Manager.

GENERAL SPECIFICATIONS:

1. All preventative maintenance and inspection work will be performed between the hours of

7:00am and 3:00pm daily, except Saturday, Sunday, and Holidays. The Facilities Manager or Contract Administrator may authorize work on Saturday and Sunday, only as necessary. No work shall be scheduled to occur on the following holidays unless written permission to do so is provided by the Facilities Manager or Contract Administrator:

a. New Year’s Day

b. Dr. Martin Luther King Jr Day

c. President’s Day

d. Memorial Day

e. Juneteenth

f. Independence Day

g. Labor Day

h. Columbus Day

i. Veteran’s Day

j. Thanksgiving Day

k. Day after Thanksgiving Day

l. Christmas Day

Contractor shall be available for call-out on a 24-hour basis.

Contractor shall provide names and telephone numbers for individual(s) in the company who may be contacted should an emergency occur.

Access to the stockpile will include accompaniment by a Department employee, unless otherwise authorized by the PennDOT Facilities Manager

2. Non-emergency repairs requested shall be scheduled within three (3) work days of initial notification.

3. Emergency is defined as:

The event of a natural disaster or fire – when the building would need to be stabilized or made safe to work around.

Emergency service work performed between the hours of 7:00am and 3:00pm daily, except Saturday, Sunday, and Holidays, receive the same labor rate. Emergency service performed at hours other than those above will be billed at an overtime rate.

Department will state during the request notification if the call-out is an emergency.

Contractor must be able to respond and perform emergency repairs 365 days a year, 24 hours a day. The contractor is responsible to have a technician on site within one (1) hour of the initial emergency call-out request. Emergency repairs may occur on a limited basis after 3:00pm until 7:00am weekdays and weekends from Friday at 3:00pm until Monday at 7:00am and State Recognized Holidays.

4. Contract Period: begins when PO is fully executed through 06/30/2027 and shall be approximately one (1) year with four (4) optional one (1) year renewals. Each renewal will be mutually agreed upon by the Contractor and the Commonwealth. Renews at original bid rates, rate increase not included. Quantities may be increased following proper approval process due to planned or emergency projects per budget allowances. Quantities are estimated.

5. Contractor business location must be no more than 60 miles from any stockpile location in York County, see Appendix B, to be eligible for this maintenance contract.

6. Length of time to complete project after given notice to proceed with repairs should not exceed 60 calendar days.

7. Experience Required: Contractors bidding on this contract are required to have a minimum of five (5) years of roofing experience and be accustomed to maintenance all roofing systems.

Contractor is required to provide documentation justifying their roofing experience meets the above requirements.

Contractor must furnish a copy of their current insurance certificate upon award of bid.

8. Contractor Qualification:

ONLY CERTIFIED SMALL BUSINESSES ARE ELIGIBLE FOR AWARD: PennDOT has designated this contract as a Small Business Procurement to provide DGS-certified small businesses with opportunities to compete against other DGS-certified small businesses for Commonwealth agency and DGS statewide contracts under the Small Business Procurement Initiative (SBPI) set forth in Executive Order 2011-09. Only certified small businesses are eligible to submit a bid and receive an award. The small business requirements and certification process can be found on the following site:

https://www.dgs.pa.gov/Small%20Business%20Contracting%20Program/Pages/default.aspx

The Small Business Certification will be provided after a supplier completes the self-certification process on the SBPI website. A valid Department of General Services (DGS) Small Business certificate will be required as part of the bid in order to be deemed a responsive bidder

9. Pre-Quote Meeting: There will be no pre-quote meeting.

Contractor may visit any of our 12 stockpile sites to become familiar with the maintenance needs of each location before bidding.

Tours can be scheduled during our business hours: Monday-Friday, 7am-3pm.

Call Sean Smoker at: 717-718-6983 to schedule

10. Questions & Answers: All questions pertaining to Solicitation #6100065877 must be made prior to 05/01/2026 at 10:00A.M. (EST). All questions and answers will be posted to the Solicitation in eMarketplace for public viewing

11. Bid Prices: shall include all travel, labor, equipment, overhead, and profit. Time starts upon arrival at the jobsite and ends when leaving the jobsite. Award shall be based on the total low bid for all line items. All quantities are estimated and may not reflect actual quantities.

PUBLIC BID OPENING: Public Bid Opening Will Be Held Virtually via Microsoft Teams on 05/08/2026 at 11:00A.M. (EST). Please contact Jolene Wagner at jolewagner@pa.gov for meeting invitation

12. Pre-Service Kick-off Meeting: A Pre-Service Kick-off Meeting will be scheduled by the

PennDOT Project Manager or Designee and will occur within 14 days after the fully executed purchase order is delivered to the awarded Contractor. The Contractor’s Representative, Contractor Project Manager, and Foreperson must be present. The meeting will be held at a mutually agreed upon location. Topics to be discussed include bullet points from this statement of work, documentation, and other Contractor responsibilities as required within the scope of work as well as any other contract Terms and Conditions.

13. Service Performance Standards: Services are to be performed in accordance with the PennDOT Publication 23 – Maintenance Manual, Chapter 12.

All repairs shall be performed in accordance with the OEM specifications. All work shall be performed in a safe and orderly manner with minimum interference to persons using the facility. The contractor shall be aware of the latest safety regulations when entering confined areas. When working in such areas, all precautions shall be taken as required by these regulations. The Contractor shall comply with OSHA safety requirements, Federal/State/Local laws, codes, and ordinances which relate to this scope of work

14. Executive Order 2021-06, Worker Protection and Investment:

Pursuant to Executive Order 2021-06, Worker Protection and Investment (October 21, 2021), the Commonwealth is responsible for ensuring that every Pennsylvania worker has a safe and healthy work environment and the protections afforded them through labor laws. To that end, contractors and grantees of the Commonwealth must certify that they are in compliance with all applicable Pennsylvania state labor and workforce safety laws. Such certification shall be made through the Worker Protection and Investment Certification Form (BOP-2201) and submitted with the bid, proposal or quote

15. Contractor shall furnish the personnel and equipment of the type, condition, and quantity necessary for the proper and productive execution of the contracted work.

Contractor shall be responsible for the disposal of items/materials removed to an approved site unless otherwise indicated to be retained by the Facilities Manager.

16. Contractor shall maintain all equipment in good condition, subject to acceptance by PennDOT, prior to and during use in connection with this contract.

17. Contractor shall provide all lubricants, fuel, fluids, and antifreeze for equipment. Contractor shall ensure that all equipment and operators are in conformance with applicable PA Motor Vehicle Laws and Federal regulations

18. The authorized Department Representative calling for service must provide their name, title, and phone number. This information must appear on the service call work order. The work order is to be completed with a description of work and services needed along with a cost estimate for repairs. The work orders are to be signed by the Department Representative and the Contractor’s Service Technician. A copy is to be given to the Department. Estimate may be waived per Facilities Manager or Contract Administrator discretion.

19. All labor and materials used at this facility will be documented on a Confirmation of Service

Form (OS-501). This form will be signed by the contractor’s representative and faxed/emailed to the Department Contract Administrator following completion of work assignment. Supporting documentation for materials used will be attached to the OS-501 and the invoice. This form shall serve as backup documentation for payment. Invoices shall be submitted to the Comptroller’s Office listed on the Purchase Order within 30 calendar days from the date of service. Untimely or incomplete submissions of the invoice, OS-501, and any required supporting documentation may delay processing of payment.

20. Two (2) instances of failure to respond within the timed constraints, unless otherwise permitted in writing by the Department Contract Administrator, can constitute a violation of the contract which gives the Department, at its discretion, the right to cancel the contract and retain services from the next lowest bidder and surcharge the low bidding contractor for cost differences incurred during current contract term.

21. The Contractor shall repair or replace any of PennDOT’s property, real or physical, or private property damaged during the performance of their duties at no additional cost to PennDOT.

SCOPE OF WORK:

The Contractor shall provide preventative maintenance, testing and/or inspections services to roofing systems managed by the Department. Any repair service performed must be as a direct result of and be required to complete the specific preventative maintenance and or inspection activities. All repairs shall be performed in accordance with the OEM specifications. All work shall be performed in accordance with National Roofing Contractors Association Codes and Standards and with all State and Local laws, codes, and ordinances which relate to the work.

All work shall be performed in a safe and orderly manner with minimum interference to persons using the facility. The contractor shall be aware of the latest safety regulations when entering confined areas. When working in such areas, all precautions shall be taken as required by these regulations. The Contractor shall comply with all local, state, and federal laws and with OSHA safety requirements.

Time starts upon arrival at the job site and ends when leaving the job site.

Contractor must pay any sub-contractor for services requested by the Contractor.

1. Repairs The Contractor shall make repairs as needed to the roofing system that will maintain the systems watertight integrity and warranty the work performed for 180 days from last date of service of project. Some repairs may be made under warranty from manufacturer, some will be made through the use of this contract.

Contractor shall be available for emergency calls on a 24-hour basis.

The contractor is responsible to have a technician on site within one (1) hour of the initial emergency call-out request

Technician Specifics:

Roofing Technician Must be qualified to perform roofing maintenance services. All work shall be performed in accordance with National Roofing Contractors Association Codes and Standards and with all State and Local laws, codes, and ordinances which relate to the work.

Technician may use camera technology to check for wet insulation when looking for source of the system failure. Any fees for this service should be included in the bid price.

Technician may be provided photos or a drawing indicating suspected source of failure by the Facilities Manager or designated representative.

2. Stockpile Inspections Perform two (2) scheduled roof system inspections per year for all buildings at each York County PennDOT stockpile. The inspections should be 6 months apart with the first inspection scheduled in April, the second in October. Each inspection must be scheduled prior to Contractor arriving at the site. Additional inspection may be requested after each major storm occurrence, up to six (6) additional inspections – see Emergency Inspections.

Complete the attached Inspection Report Form, Appendix C, for each stockpile inspection.

Report in writing any and all deficiencies, malfunctions, unsafe conditions, and repairs required on the Inspection Report Form. Submit those reports to the Facilities Manager or Contract Administrator.

Stockpile Inspection Specifics:

Roof System o Ensure proper operation overall

Roof Surface o Remove all debris including but not limited to sand, dirt, leaves, etc.

Roof Vent (if applicable) o Inspect for leaks and condition

Eaves / Soffit o Check for condition

Drain Areas (Flat Roof Systems) o Confirm drains are clear of debris and functioning correctly

Rain Gutter / Down Spouting o Check condition and ensure proper operation

Framing Structure o Ensure no damaged or rotted beams/ trusses/ rafters

Bird Netting (Material Buildings) o Ensure intact and in good condition

3. Emergency Inspections:

Contractor shall be available for emergency calls on a 24-hour basis.

The contractor is responsible to have a technician on site within one (1) hour of the initial emergency call-out request

Complete the attached Inspection Report Form, Appendix C, for each emergency inspection.

Report in writing any and all deficiencies, malfunctions, unsafe conditions, and repairs required on the Inspection Report Form. Submit those reports to the Facilities Manager or Contract Administrator.

Emergency Inspection Specifics:

Roof System o Ensure proper operation overall

Roof Surface o Remove all debris including but not limited to sand, dirt, leaves, etc.

Roof Vent (if applicable) o Inspect for leaks and condition

Eaves / Soffit o Check for condition

Drain Areas (Flat Roof Systems) o Confirm drains are clear of debris and functioning correctly

Rain Gutter / Down Spouting o Check condition and ensure proper operation

Framing Structure o Ensure no damaged or rotted beams/ trusses/ rafters

Bird Netting (Material Buildings) o Ensure intact and in good condition

PAY ITEMS:

Note: All repairs and inspections must be pre-scheduled with the Facilities Manager or Contract Administrator to ensure access to the stockpile and that there will be minimal interference with PennDOT work operations.

Pay Item 1: Technician 1, Regular Hours Technician must be qualified to perform services requested satisfactorily.

All work performed must meet or exceed regulations of the Pennsylvania Department of Labor and Industry. The work shall be performed in accordance with all State and Local laws, codes, and ordinances related to the service requested.

Pay Item 1 Unit of Measure – 1 person – Hour

Pay Item 2: Technician 2, Regular Hours Technician must be qualified to perform services requested satisfactorily. This is for a 2nd technician to assist with a project. No pre-authorization is required.

All work performed must meet or exceed regulations of the Pennsylvania Department of Labor and Industry. The work shall be performed in accordance with all State and Local laws, codes, and ordinances related to the service requested.

If a 3rd technician is needed the Contract Administrator or Facilities Manager must be notified to ensure sufficient funds are available and they will instruct which line item to insert those hours.

Pay Item 2 Unit of Measure – 1 person – Hour

Pay Item 3: Technician 1, After Regular Hours Technician must be qualified to perform services requested satisfactorily.

All work performed must meet or exceed regulations of the Pennsylvania Department of Labor and Industry. The work shall be performed in accordance with all State and Local laws, codes, and ordinances related to the service requested.

Pay Item 3 Unit of Measure – 1 person – Hour

Pay Item 4: Technician 2, After Regular Hours Technician must be qualified to perform services requested satisfactorily. This is for a 2nd technician to assist with a project. No pre-authorization is required.

All work performed must meet or exceed regulations of the Pennsylvania Department of Labor and Industry. The work shall be performed in accordance with all State and Local laws, codes, and ordinances related to the service requested.

If a 3rd technician is needed the Contract Administrator or Facilities Manager must be notified to ensure sufficient funds are available and they will instruct which line item to insert those hours.

Pay Item 4 Unit of Measure – 1 person – Hour

Pay Item 5: Equipment Contractor must provide or rent all equipment necessary to complete work. Cost shall include all lubricants, fuel, fluids and antifreeze the Contractor may need to provide for equipment.

Contractor must pay any sub-contractor for services requested by the Contractor. Contractor shall ensure all equipment and operators are in conformance with applicable PA Motor Vehicle laws and federal regulations.

Pay Item 5 Unit of Measure – 1 equipment – Hour

Pay Item 6: Stockpile Inspection Shall be conducted bi-annually in the Spring and Fall – April and October.

The Stockpile Inspection Report form can be found in Appendix C. The Contractor may use their own inspection report form if approved by Contract Administrator and Facilities Manager.

Pay Item 6 Unit of Measure – 1 stockpile – Each

Pay Item 7: Emergency Inspections Department will state during the request notification if the call-out is an emergency. In an emergency the contractor is responsible for having a technician on site within one (1) hour of the call-out request. Emergency repairs may occur on a limited basis after 3:00pm until 7:00am weekdays and weekends from Friday at 3:00pm until Monday at 7:00am and State Recognized Holidays.

Pay Item 7 Unit of Measure – 1 stockpile – Each

Pay Item 8: Materials No material purchase in excess of $500 may be initiated at any one appointment without approval from the Facilities Manager or Contract Administrator. The Department reserves the right to supply materials to be installed by the contractor, when it is deemed to be in the best interest of the Commonwealth.

Pay Item 8 Unit of Measure – 1 dollar – Each

APPENDIX A – SPECIFICATIONS

PennDOT’s Strategic Environmental Management Program (SEMP) Requirements:

The contractor must comply with PennDOT’s Strategic Environmental Management Program (SEMP) Requirements. The requirements of this program can be found on PennDOT’s website at www.pa.gov

SEMP is an environmental management system that ensures PennDOT employees and business partners continue appropriate environmental stewardship in everyday maintenance practices. Three areas of focus include Winter Services, Stockpile and Garage Management, and Maintenance Operations. SEMP establishes best management practices within maintenance to make certain PennDOT follows the key principles of the Green Plan Policy, protects the environment, conserves resources, and complies with environmental laws and regulations.

This work consists of repair and maintenance of facility and material storage buildings. Prior to performing work, submit estimate resulting from inspections of buildings. Do not complete work until estimate is approved and notification is given by the Department Contract Administrator or Facilities Manager.

Materials & Construction

All work performed by skilled craftsman in a professional manner is warranted for a period of one (1) year form completion of work and acceptance of work by the Department.

All hand tools (hammers, screw drivers, drills, drill bits, saws, saw blades, chisels, etc), fastening devices (nails, staples, screws, adhesives, etc.), safety equipment (gloves, goggles, safety glasses, hardhats, etc), ladders, and scaffolding are considered incidental to the work performed. The Department will not provide any of these tools.

Contractor is responsible for arranging rental tools and/or equipment needed to perform the repair or maintenance. Equipment rental cost must be included in the estimate in the same units as indicated on the purchase order.

APPENDIX B – LOCATIONS

Stockpile #01 1920 Susquehanna Trail – North York, PA 17404 (Manchester Township)

Stockpile #02 5900 Route 30 East York, PA 17406 (Hellam Township)

Stockpile #03 2230 North George St York, PA 17402 (Manchester Township)

Stockpile #05 6971 Lincoln Highway Thomasville, PA 17364 (Paradise Township

Stockpile #06 19 Glenwood Road Dillsburg, PA 17019 (Franklin Township)

Stockpile #07 988 E. Forrest Avenue New Freedom, PA 17349 (Shrewsbury Township)

Stockpile #08 3441 Blue Hill Rd Hanover, PA 17331 (Manheim Township)

Stockpile #10 4321 Fox Run Road Dover, PA 17315 (Dover Township)

Stockpile #12 985 Bacon Road Felton, PA 17322 (Chanceford Township)

Stockpile #16 250 Alum Rock Road New Park, PA 17352 (Fawn Township)

Stockpile #17 131 Snodgrass Road Airville, PA 17302 (Lower Chanceford Township)

Stockpile #25 1500 Old Trail Road Etters, PA 17319 (Newberry Township)

APPENDIX C – INSPECTION REPORT FORM

York County PennDOT Stockpile Inspection Report Form

Service Location: ______________________________________ Date:__________________

Roofing Technician: _________________________________________________ (name of technician who performed the inspection)

Photos or supporting documentation attached? YES NO

Condition

Preventative Recommendation

Comments or Repair Needed

Roofing System Ensure proper operation

Roof Surface Remove all debris including but not limited to sand, dirt, leaves, etc.

Roof Vent (if applicable) Inspect for leaks

Eaves / Soffit Check condition

Drain Areas (Flat Roof Systems) Confirm drains are clear of debris.

Rain Gutter / Down Spouting Check condition, ensure proper operation

Framing Structure Ensure no damaged beams / rafters / trusses

Bird Netting (Material Buildings) Ensure they are intact (in material buildings)