This document includes a statement of work and related federal contract opportunity solicitation. The statement of work is for repair mortar and brick on Building 1 at the James E. Van Zandt VA Medical Center in Altoona, Pennsylvania. Work includes partial demolition of an exterior loading dock wall and ballasted roofs, reconstruction of the loading dock area, and tuckpointing and replacing damaged brick and mortar on building walls and parapets. The solicitation is for the same repair project, issued by the Department of Veterans Affairs Veterans Health Administration with an opportunity type of solicitation. Trades anticipated to work include laborers, carpenters, bricklayers, hazardous material abatement, iron workers, sheet metal workers, insulators, mechanics, plumbers, pipefitters and welders. The completion time for the project is 365 calendar days.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Statement of Work for Repair Mortar and Brick on Bldg. No. 1 Location: Building 1, James E. Van Zandt VA Medical Center, Altoona, PA Project #: 503-19-110 Completion time: 365 calendar days

It is anticipated that this project will be requested for proposal. Guarantee Period Services are not included.

Project Description:

The Contractor shall provide all necessary tools, labor, materials, equipment, permits, license, and supervision for “Repair Mortar and Brick on Bldg. No. 1 ”, Project Number 503-19-110, located at the James E. Van Zandt VA Medical Center in Altoona, PA, in accordance with the drawings and specifications. Work includes the following Demolition: Partial demolition of the Loading Dock exterior wall is indicated on the demolition drawings. The concept is to remove the damaged masonry corner and overhead door for reconstruction to match original condition. The ballasted roof on the lower Bldg. 1 wing facing Bldg. 20 and the entire tall roof on the main Bldg. 1 will be removed to concrete deck including all flashing at the roof perimeter and around existing roof equipment, drains, etc.

Construction: Loading Dock: Reconstruction of corner masonry wall to match existing conditions. Overhead door will be disassembled and reassembled for construction work. Portion of parapet wall fascia and extension will be temporary removed for wall reconstruction. Dock security will include a backup LED warning light system, proper bump guards, and bollards to protect the adjacent stair railing and the masonry walls. Building 1 parapet wall facing Building 20: Tuckpointing the damaged upper wall portion with vapor permeable mortar that matches existing mortar in color and texture. Replacement of edge flashing with proper seal and drip edge on entire roof. Replacement of ballasted roofing with adhered membrane roofing on entire roof portion. Building 1 walls facing West: Tuckpointing and brick replacement of damaged masonry wall portions with vapor permeable mortar that matches existing mortar in color and texture. Cracked brick replacement with matching bricks. Building 1 wall facing East: Tuckpointing and brick replacement of damaged masonry wall portions with vapor permeable mortar that matches existing mortar in color and texture. Cracked brick replacement with matching bricks. Building 1 main roof: Replacement of edge flashing with proper seal and drip edge on entire roof. Replacement of ballasted roofing with adhered membrane roofing on entire roof portion.

A detailed Statement of Work is provided within the Specification and Drawing package.

Anticipated Trades: Laborers, Carpenter, Brick Layers / Masons, Hazardous Material Abatement, Iron Workers/Erectors, Sheet Metal Workers, Insulators, Mechanics, Plumbers, Pipefitters, Welders.