NEBRASKA WESTERN IOWA HEALTH CARE SYSTEM
I. Title: Arc Flash Hazard Analysis studies for the Department of Veterans Affairs Nebraska – Western Iowa Health Care System (VAHCS).
II. General Overview: The VAHCS has need of having an Arc Flash Hazard Analysis Study performed for the Omaha and Grand Island Medical Center campuses of the Department of Veterans Affairs Nebraska-Western Iowa Health Care System every five years. The Contractor shall furnish necessary labor, tools, equipment, lodging, and transportation to perform the arc flash hazard analysis studies and compile the appropriate documentation including electrical one-line diagrams, equipment arc flash/PPE labels per NEC with appropriate boundaries, and a comprehensive EasyPower Report with shock time curves for each point of investigation within the study (i.e., electrical equipment falling under the purview of the requirements of the National Electrical Code – NEC).
III. Definitions or Acronyms:
a. CO – Contracting Officer
b. FAR – Federal Acquisition Regulation
c. VA – Department of Veterans Affairs
d. VAHCS – Nebraska – Western Iowa VA Health Care System
e. VATR – VA Technical Representative
IV. Place of Performance:
a. Omaha - Department of Veterans Affairs Nebraska-Western Iowa Health Care System, Omaha Medical Center, 4101 Woolworth Avenue, Omaha, NE 68105
b. Grand Island - Department of Veterans Affairs Nebraska-Western Iowa Health Care System, Grand Island Medical Center, 2201 N Broadwell Ave, Grand Island, NE 68803
V. Period of Performance:
a. See Price/Cost Schedule for dates of performance.
b. Any outstanding equipment lead times shall not be included in the performance period provided the Contractor initiated all necessary equipment orders within 24 hours of contract award notice from the VA contracting department.
c. Hours of Services:
i. Normal operational hours are 06:00-17:00.
ii. Work will not be done on federal holidays, unless the VATR gives prior, written approval. A list of federal holidays is at Federal Holidays (opm.gov).
iii. Work scheduled outside of normal operational hours must be arranged and approved by the VATR with at least 24 hours of advanced notice.
VI. Qualifications:
a. The Prime Contractor shall demonstrate prior experience with at least three prior contracts of similar scope and dollar value to this contract solicitation.
b. All Prime Contractor technicians to perform services under this contract shall be “qualified persons” as defined in NFPA 70, Article 100, Chapter 1.
c. The Prime Contractor shall provide to the VATR documentation of each technician’s qualifications prior to such technician performing services under this contract.
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
d. Failure of the Prime Contractor to submit any of the required information, statements, or certifications may result in rejection of the quote without further consideration for award.
e. All Contractor technicians to perform services under this contract shall be “qualified persons” as defined in NFPA 70, Article 100, Chapter 1.
f. The Contractor shall provide to the VATR documentation of each technician’s qualifications prior to such technician performing services under this contract.
g. Failure to submit any of the required information, statements, or certifications may result in rejection of the quote without further consideration for award.
VII. Scope of Work:
a. VAHCS Contact Information: The VATR is the primary contact who should be the first VA individual contacted. Include the VATR on all correspondence.
i. Omaha VA Medical Center contacts:
1. Primary - Josiah Curley 402-995-5545 & 918-581-4171 Josiah.Curley@va.gov
2. Secondary - Griffin Walsh 402-995-3741 & 531-232-9231
Griffin.Walsh@va.gov
3. Tertiary - Electricians 402-995-3050
ii. Grand Island VA Medical Center Contacts:
1. Primary - Josiah Curley 402-995-5545 & 918-581-4171 Josiah.Curley@va.gov
2. Secondary - William Sis 308-382-3660 & 918-613-1621 William.Sis@va.gov
3. Tertiary - Boiler Plant Operators 308-395-3400
iii. After-Hours Work (i.e., outside of 06:00-17:00):
1. Omaha VA Medical Center
a. Primary - Boiler Plant Operators 402-995-4830
b. Secondary - AC Plant Operators 402-995-3280
2. Grand Island VA Medical Center
a. Primary - Boiler Plant Operators 308-395-3400
b. Contractor Information: The Contractor shall provide to the CO and the VATR specific mobile number(s), email address (es) and/or SMS texting number(s) which can be used to alert the Contractor at all times, including weeknights, weekends, and holidays.
c. REPORTING:
i. Contractor personnel shall report to the VA site representative to sign in and acquire a badge when arriving at VA property.
ii. Contractor personnel shall report to the VA site representative to sign out and return the badge before departing the VA facility at the end of each week.
iii. Contractor personnel shall wear an identification badge provided by VA when working on VA property.
d. SERVICES:
i. Grand Island VAMC
1. Arc Flash Hazard Analysis & Study
a. The Contractor shall collect data and create documentation to prepare comprehensive electrical grid one-line diagrams for a short circuit/arc flash hazard analysis describing in detail all electrically powered VA equipment down to the low voltage 208/120 VAC circuit breakers and distribution panels for each VA owned building on the medical center campus. These electrical one-line diagrams shall thoroughly label and detail which electrical circuits are considered life safety, critical, equipment (i.e., LS, CR, and EQ branches being defined as systems being feed by a Class X Type 10 diesel generator (or Type U) since existing circuits are known to be comingled), and optional.
b. The Contractor shall create respective equipment labels per the NEC requirements containing the Limited Approach Boundary and PPE requirement for all points of investigate contained within the study.
c. The Contractor shall create a comprehensive EasyPower report with time curves, recommendations, and campus one-lines for the electrical utility system’s layout.
ii. Omaha VAMC
1. Arc Flash Hazard Analysis & Study
a. The Contractor shall collect data and create documentation to prepare comprehensive electrical grid one-line diagrams for a short circuit/arc flash hazard analysis describing in detail all electrically powered VA equipment down to the low voltage 208/120 VAC circuit breakers and distribution panels for each VA owned building on the medical center campus. These electrical one-line diagrams shall thoroughly label and detail which electrical circuits are considered life safety, critical, equipment (i.e., LS, CR, and EQ branches being defined as systems being feed by a Class X Type 10 diesel generator (or Type U) since existing circuits are known to be comingled), and optional.
b. The Contractor shall create respective equipment labels per the NEC requirements containing the Limited Approach Boundary and PPE requirement for all points of investigate contained within the study.
c. The Contractor shall create a comprehensive EasyPower report with time curves, recommendations, and campus one-lines for the electrical utility system’s layout.
iii. The Contractor shall include four hours of NFPA 70E training for up to 4 VA employees within the required services.
iv. All work will be done safely and in accordance with OSHA Regulations, VA Directives, and the State of Nebraska regulations. The Contractor shall ensure that workplace safety regulations are adhered at all times and that a clean, non-cluttered workspace is maintained.
v. The Contractor shall not leave equipment on location unless the VATR has given written permission to the Contractor to do so.
vi. The Contractor will provide a schedule to the VATR five days prior to the start of the performance period for completing the services outlined in this document. The work schedules, and any modifications to such scheduling, must also be approved in advance by the VATR.
e. Applicable Requirements: In the performance of the tasks associated with this contract, the Contractor shall comply with each of the following requirements:
i. NFPA 99
ii. NFPA 70 – National Electrical Code (NEC)
iii. NFPA 70E
iv. VHA Directive 1028
f. Applicable Documents: In the performance of the tasks associated with this contract, the Contractor shall comply with the following requirements: The Contractor will be responsible for providing documentation to the VATR of incremental work completed. Documentation should be submitted to the VATR when maintenance of any kind is performed, inspection of equipment is completed, inventory of materials is certified, emergency repair work is finished, and data collection is performed. The documents (in the form of electronic documents, preferably PDFs) should regularly be emailed to the VATR at least one week after inspection to include maintenance provided, whether or not the unit passed, and any other deficiencies with the equipment to include cost line items and weekly so that a comprehensive schedule of the Contractor’s work is retained for records as required by government records agencies. No digital files shall be accepted through means of a USB as these instruments pose a risk to VA security.
g. Technical Acceptability Factors:
i. The Prime Contractor shall demonstrate prior experience with at least five prior contracts of similar scope and dollar value when compared to this contract solicitation.
ii. The Prime Contractor must explain in writing how they meet the FAR regulations on subcontracting limitations for this solicitation.
iii. Prime Contractor and Subcontractor (if any) technicians to perform services under this contract shall be “qualified persons” as defined in NFPA 70, Article 100, Chapter 1.
iv. The Prime Contractor shall provide to the VATR documentation of each technician’s qualifications prior to such technicians performing services under this contract.
v. The Prime Contractor and Subcontractors (if any) must have an arc flash hazard analysis software available at its disposable such as EasyPower (or like application) to perform time curve computations, equipment recommendations based on data analysis, and one-line diagram creation.
vi. Failure of the Prime Contractor to submit any of the required information, statements, or certifications may result in rejection of the quote without further consideration for award.
VIII. General Requirements:
a. It shall be understood that, throughout performance of the contract, the Contractor’s personnel, while on VA property, shall adhere to all requirements and regulations that govern the VA Health Care System and its property.
b. The Contractor shall not store equipment or materials on the VA facility property. Any damage to VA caused by the Contractor shall be repaired to its previous condition, or better, by the contractor at no additional cost to the Government.
c. Among all other requirements, the VA Health Care System and its property is now entirely smoke-free.
d. The Contractor and their personnel shall follow all U.S. Department of Veterans Affairs (VA) policies, standard operating procedures, applicable laws, and applicable regulations while on VA property, including access regarding COVID. Violations of this may result in citation and disciplinary measures for persons violating the law.
e. The Contractor and their personnel shall wear visible identification at all times while they are on premises.
f. VA does not provide parking spaces at the work site; the Contractor must obtain parking at the work site if needed. It is the responsibility of the Contractor to park in the appropriate designated parking areas. VA shall not invalidate or make reimbursement for parking violations of the Contractor under any conditions.
g. Possession of weapons is prohibited.
h. The Contractor shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.
i. All parts and services provided by the Contractor shall be warrantied for one (1) year from the date installed or service provided.
IX. Repairs:
a. If additional repairs are required to make the equipment operational, Contractor shall provide the nature of the repair and a budgetary cost estimate for such repairs in writing.
Contractor shall also provide a comparison quote to the VA for what any repairs or replacement parts would have cost for commercial pricing, so the Government has a basis for making a price fair and reasonableness determination. In the alternative, Contractor shall provide a copy of an awarded contract with a federal agency for the same or similar repairs. If the cost for repairs exceeds the amount in the applicable line item in the Price/Cost Schedule, the Contracting Officer may issue a bilateral contract modification to increase funding for authorized repairs after a determination of price fair and reasonableness.
b. Any additional charges claimed must be approved by the CO before service commences. Any additional work performed by the Contractor without the prior written approval of the CO will be performed by the Contractor at no additional cost to the Government.
c. The Contractor shall provide all replacement parts needed to keep the system in operating condition as originally designed by the manufacturer. Parts may be repaired or replaced, as the contractor deems appropriate, so long as amount listed in CLINs cited in Price/Cost Schedule are not exceeded. No used parts will be used to repair this equipment.
X. Gray Market Prevention:
Gray market items are Original Equipment Manufacturers’ (OEM) goods sold through unauthorized channels in direct competition with authorized distributors. This procurement is for a services contract for maintenance of equipment for VA Health Care Systems. No remanufactures or gray market items will be acceptable.
The use of gray market items to the VA in the fulfillment of an order/award/contract constitutes a breach of contract. Accordingly, VA reserves the right enforce any of its contractual remedies. This includes termination of the contract or, solely at VA’s election, allowing the Contractor to replace, at no cost to the Government, any remanufactured or gray market item(s) delivered to a VA Health Care System upon discovery of such items.
XI. Invoicing Submissions: Contractor shall invoice in arrears for services completed. Invoices shall correspond with Contract Line Items in the Price/Cost Schedule. In addition to requirements set forth herein, Contractor shall submit final invoice on any services performed no later than 30 days after the end of the period of performance of the contract.
XII. Documenting Performance: The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using the Contractor Performance Assessment Reporting System (CPARS) at https://www.cpars.gov.
If the VA prepares a Contract Discrepancy Report (CDR) due to an issue with the Contractor or performance and presents it to the Contractor for corrective action, the Contractor shall acknowledge receipt of the CDR in writing within one (1) business day of receipt. The Contractor https://www.cpars.gov/ shall review the CDR and provide a response to the CO. Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
XIII. Security Requirements: The Contractor shall comply with all VA security requirements. The VATR shall coordinate with Contractor to ensure such requirements are met.
XIV. Limitations on Subcontracting: By submission of an offer and execution of a contract, the
Offeror/Contractor agrees in performance of the contract in the case of a contract for Services, it will not pay more than 75 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 75 percent subcontract amount that cannot be exceeded. An independent contractor shall be considered a subcontractor. “Similarly Situated” means that entity subcontracted to is same type of entity as the Prime Contractor (i.e., SDVOSB subcontracts to SDVOSB, small business subcontracts to small business).
XV. Records Management Obligations:
A. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
B. Definitions “Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
1. includes Department of Veterans Affairs records.
2. does not include personal materials.
3. applies to records created, received, or maintained by Contractors pursuant to their Department of Veterans Affairs contract.
4. may include deliverables and documentation associated with deliverables.
C. Requirements
1. Contractor shall comply with all applicable records management laws and regulations, as well as
National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. Department of Veterans Affairs and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of Department of Veterans Affairs or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to Department of Veterans Affairs. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to Department of Veterans Affairs control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the contract or order. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts.
The Contractor (and any sub-contractor) is required to abide by Government and Department of Veterans Affairs guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with Department of Veterans Affairs policy.
8. The Contractor shall not create or maintain any records containing any non-public Department of Veterans Affairs information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. The Department of Veterans Affairs owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which Department of Veterans Affairs shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227- 20.
11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take Department of Veterans Affairs-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
D. Flowdown of requirements to subcontractors
1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract or order, and require written subcontractor acknowledgment of same.
1. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
XVI. VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors
1. Contractor employees who work in or travel to VHA locations must comply with the following:
a. Documentation requirements:
1) If fully vaccinated, shall show proof of vaccination.
i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.
2) If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval.
This includes tests available by a doctor’s order or an FDA approved over-the-counter test.
3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by the VATR or other hospital personnel.
4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.
a. Contractor employees who work away from VA locations, but who will have direct contact with
VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces.
Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
3. Contractor must immediately notify their VATR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.
XVII. Service Contract Labor Standards Requirement: Contractor shall provide hourly wages in accordance with U.S. Department of Labor (USDOL) Wage Determinations and FAR Subpart 22.10 (Service Contract Labor Standards); USDOL Wage Determinations are attached.
For guidance on Service Contract Labor Standards and to find the nearest USDOL resource, please refer to https://www.dol.gov/whd/local/index.htm.
XVIII. Post-Award Conference: Upon award of contract, Contractor shall attend a post-award conference via conference call with the Contract Specialist and the VATR.
https://www.va.gov/covid19screen/ https://www.va.gov/covid19screen/ https://www.dol.gov/whd/local/index.htm
XIX. Reports and Deliverables: Contractor shall be responsible for complying with all reporting and deliverable requirements. Contractor shall be responsible for assuring the accuracy and completeness of all reports and other deliverables as well as the timely submission of each.
Contractor shall comply with requirements regarding the appropriate reporting formats, instructions, submission timetables, and technical assistance as required. All reports and deliverables are to be sent by electronic mail unless otherwise specified by the CO.