IOWA CITY VA HEALTH CARE SYSTEM

1. GENERAL:

a. The Contractor shall have a minimum of five (5) years of specialized continuous experience in testing, inspection, cleaning, adjusting, and appraising electrical distribution systems and apparatus to assure their reliable operations.

b. All work performed shall be fully documented by the Contractor. Testing shall be performed in compliance with manufacturers’ recommendations and applicable NEMA, NEC, NFPA, ASTM, ASA, and VA standards. All outages shall be scheduled and approved in writing in at least two weeks in advance. Outages will be scheduled only at night and on weekends.

c. A complete list of distribution system equipment and apparatus to be inspected, cleaned, tested, and adjusted is found in “Attachment A” of this specification.

2. MAINTENANCE AND TESTING REQUIREMENTS:

a. In addition to complying with the general codes referenced in 1. B., the contractor shall pay special attention to compliance with VHA Directive 1028 and NFPA 70B.

b. Switchgear Equipment, Medium Voltage Circuit Breakers, and Protective Relays:

i. Record switchgear, breaker, and device nameplate information and compare with facility’s one-line diagram, when available. Identify and record discrepancies.

ii. Inspect all electrical equipment, including each breaker, and report damaged, or malfunctioning equipment, loose connections or material or any contamination that must be corrected. Clean where appropriate.

iii. Check equipment for level, security to foundation, and operation of doors.

Report any unfavorable environmental conditions such as excessive moisture.

iv. Visually inspect the equipment ground and record the number and size of ground bus and straps, Report deficiencies, and clean where appropriate.

v. Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase, and phase-to-ground with suitable megohmmeter. Record values, report deficiencies, and clean where appropriate.

vi. Draw or rack each breaker from its cell. Remove arc chutes, clean, inspect, and adjust all contracts as necessary. Measure and record contact resistance in micro-ohms and clean all insulating surfaces. Megger and record phase-to-phase and phase-to-ground. Lubricate as necessary.

vii. Electrically close and trip each breaker with control switch. Manually close and trip each breaker. Trip each breaker with each of its protective devices. Tighten all connections. Record any discrepancies.

viii. Remove each relay from its case. Clean, inspect, and tighten all connection.

Apply three multiples of relay tap current to each relay to verify manufacturers’ time current characteristics. Test each relay for instantaneous pickup. Test all ground fault relays for proper calibration and operation. Report deficiencies and adjust where appropriate.

c. Primary Disconnects

i. De-energize entire substation, clean all insulating surfaces, and clean and dress all contacts.

ii. Measure contact resistance in micro-ohms, Megger each phase-to-ground.

Record any discrepancies.

iii. Clean and inspect cubicle, tighten all untapped connections, and lubricate as necessary.

d. Transformer

i. Record transformer nameplate information and compare with the facility’s one-line diagram, when available. Record discrepancies.

ii. Inspect transformer and accessories and report damage, loose connections ore material, shipping blocks, or contaminations that must be corrected. Clean where appropriate, inspect for leaks and tighten all untapped connections.

Clean insulating surfaces.

iii. Sample all insulating liquids and test dielectric and water content.

e. Low Voltage Circuit Breakers

i. Record switchgear, breaker, and device nameplate information and compare with the facility’s one-line diagram, when available. Record discrepancies.

NOTE: Work includes all service equipment and power distribution panel boards but not branch-circuit panel boards that are used on the various floors in the buildings.

ii. Inspect equipment and each breaker and report damage, loose connections or material, or contamination that must be corrected. Clean where appropriate.

iii. Check equipment for level, security to foundations, and operation of doors.

Report any unfavorable environmental conditions such as excessive moisture or conducting dust that must be corrected. Clean where appropriate.

iv. Visually inspect the equipment ground an record the number and size of ground bus and straps. Report deficiencies.

v. Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase, and phase-to-ground with suitable megohmmeter. Record values, report deficiencies and clean where appropriate.

vi. Clean and inspect each breaker. Megger phase-to-phase, phase-to-ground, and measure contact resistance in micro-ohms. Test each series over current trip device for pickup at 200% and 300% of its rating for instantaneous pickup.

Clean and dress all contact surfaces and lubricate as necessary.

f. Generators

i. Record nameplate data including manufacturer, age, and capacity. List fuel type, kW load under load conditions, number of hours of fuel tank capacity, and number of hours of accumulated run time.

ii. Test run the generators in loaded condition. Record the transfer time and evaluated the reliability of the emergency power system.

g. Batteries

i. Provide and replace batteries inside each micro-logic, size ½ AA 3.6 volts – Schneider Electric part number 33593. Approximately 85 batteries.

3. REPORTS:

a. Provide two copies of data, testing, and inspection results to the Maintenance and

Operations (M&O) Engineer of all devices tested as required by the scope. Report shall be securely bound and in an 8 ½ x 11 format. Provide one electronic copy (CD) of the report as either a PDF file or Word document.

b. At a minimum, the report shall include the following:

i. Summary of project

ii. Description of equipment tested

iii. Description of tests

iv. Test Data

v. Analysis and recommendations

c. Test data records shall include the following minimum requirements:

i. Identification of the testing organization

ii. Equipment identification

iii. Humidity, temperature, and other conditions that may affect the results of the tests/calibrations

iv. Date of inspections, tests, maintenance and/or calibrations

v. Identification of the testing technician

vi. Indication of inspections, tests, maintenance and/or calibration to be performed and recorded

vii. Indication of expected results when calibrations are to be performed

viii. Indication of “as-found” and “as-left” results, as applicable

ix. Sufficient spaces to allow all results and comments to be indicated

4. ELECTRICAL GROUNDING SYSTEM TESTING CRITERIA

a. Grounding Testing Procedures

i. This section describes grounding system testing procedures.

ii. These tests should be performed when the site ground system can be safely disconnected from the power company neutral wire.

b. Overview

i. Testing will be performed using one of the three methods which are described as follows:

1. Three-Point / Fall of Potential Testing This method is the most widely accepted. However, performing the test may require access to areas that may be beyond the site property lines. When testing a grounding electrode system consisting of a multi-bonded/ multi-grounding electrode system, the distance required for testing is directly related to the effective diagonal distance of the buried grounding electrode system.

2. Clamp-on Ohmmeter This method shall be used when access to necessary space needed for the Three-point/Fall of Potential test is not available. However, the clamp-on Ohmmeter test can only be performed after AC utilities have been connected to the site and various feed conductors are accessible.

3. Combined Soil Resistivity Testing with Clamp-on Ohmmeter Testing This method shall only be used in special cases where three-point/fall of potential testing or clamp-on ohmmeter testing cannot directly provide a suitable evaluation. The data obtained from soil resistivity testing and clamp-on ohmmeter testing is then used by an engineering firm specializing in grounding electrode system design to make determinations regarding the grounding electrode system.

c. Limitations to Performance Testing

i. The following conditions must be met in order to perform grounding electrode system testing:

1. Three-point/fall of potential testing is possible only if the following conditions can be met:

A. Sufficient land area must be available to perform a three point/ fall-of-potential test. The reference probe may likely need to be inserted into soil that is beyond the site property line. Testing using a clamp-on ohmmeter may be an option in these cases.

B. The grounding electrode system must be able to be isolated from the power company grounded conductor (may be a neutral wire).

2. Clamp-on Ohmmeter testing is possible only if the following conditions can be et:

A. Site must be supplied with commercial power company-provided power.

B. Neutral wire must be present as part of the power company service.

C. Neutral wire must be part of an extensive power company grounding system.

In systems such as 3-phase delta service, the neutral wire may not be part of the extensive power company grounding system.

D. The grounding electrode system must be connected to the power company grounded conductor (may be a neutral wire).

E. For sites using a multi-bonded/multi-grounding electrode system, a point on neutral wire for meter to clamp onto must be available before its first bond to the site.

F. For single grounding electrode system, the grounding electrode conductor must be accessible for meter to clamp onto at a point between the grounding electrode and any other connection (such as the Telephone Company grounding or metallic pipe).

3. Combined Soil Resistivity/Clamp-on Ohmmeter testing is possible only if the following conditions can be met:

A. System must be such that gathering of individual grounding electrode system component values with a clamp-on-ohmmeter can be available.

B. A soil resistivity profile for the site has been performed.

b. If these conditions cannot be met, an added supplemental grounding electrode system can be installed. This supplemental grounding electrode system could be installed and tested prior to its connection to the existing system. This supplemental system should be installed in such a manner as to allow an easy disconnect point for future testing.

d. Three Point / Fall of Potential Test Procedure

The three point/fall of potential test is the most widely accepted and recommended test method. This procedure is described in detail in ANSI/IEEE STD 81.2.

In the three point/fall of potential test, two test rods are driven into the soil. These rods are placed in a straight line from an electrode in the grounding electrode system to be tested (referred to here as connection 'X'). One of the test rods (referred to here as rod 'Z') is placed at a known distance from the 'X' connection. The other test rod (referred to here as rod 'Y') is placed at various distances between the 'x' connection and rod 'Z', a potential difference (voltage drop) will exist between the 'x' connection and rod Y. The fall of potential tester measures the voltage drop between the 'X' connection and rod 'Y', and converts the measurement to a resistance reading using Ohm's Law (R=E/I). In this manner, the resistance at any point between 'x' connection and rod 'z' can be measured. The multiple readings obtained during this test are entered and plotted as data points on a graph. From the graph, the resistance of the grounding electrode system can be determined.

This test requires disconnection of the site grounding electrode system from the power company grounded conductor, and the disconnection of all other grounds that may be connected to the site grounding system, such as telecommunications system grounds.

This is required in order to allow testing that is limited only to the site grounding electrode system. Attempting to perform measurements while the site remains connected to the extensive ground/neutral system of the power company and telecommunications utilities artificially enhances the grounding electrode system reading, resulting in measurement error.

e. Clamp-On Ohmmeter Testing Procedure The clamp-on ohmmeter test can be performed on both single grounding electrode and multi-grounding electrode systems. However, the test can only be accurately performed on a site supplied by commercial power.

NOTE: if the electrical service provided by the power company does not contain a neutral wire that is bonded to the extensive power company ground system (such as a three-phase delta service), the clamp-on ohmmeter will not give an accurate reading. In these cases, this is because the neutral wire is locally derived at the transformer and is not part of the extensive power company grounding system; therefore, it cannot provide an effective low resistance return path.

The clamp-on ohmmeter works on the basis of injecting a known voltage into the grounding electrode system in order to create a current flow whose value is a function of the grounding electrode system resistance. The test current flows from the grounding electrode system through the earth, returning to the grounding electrode system via the power company's multi-grounded neutral wire. The meter then measures this current and converts the measurement to a resistance reading using Ohm's Law (R=E/I). As such, the meter displays a resistance of the grounding electrode system in ohms. Since the power company's grounding system is so extensive, the meter considers it to be of negligible value and disregards its effect on the reading.

This test requires disconnection of the site utility power. This is required in order to allow testing that is limited only to site grounding system. Attempting to perform measurements while the site remains connected to the utility's extensive grounding/neutral system artificially enhances ground readings that result in measurement error.

f. Combined Soil Resistivity Testing with Clamp-On Ohmmeter

Providing site soil resistivity readings along with clamp-on ohmmeter readings is at times the only method available for grounding electrode system resistance verification.

This test can be performed in the energized state where the grounding connections are accessible. Once the external grounding electrode system has been verified, the internal system can then be tested.

This test will verify only the conductivity to the main ground buss of the commercial power system. This test will not confirm the status to the exterior grounding electrode system or fall of potential.

The internal system should be visually inspected and made free of defects prior to testing. Never disconnect any part of the grounding system while in operation. Once visual inspection has been made, a digital low resistance measurement will be made between all bolted/compressed connections and between bolted/compressed connections to enclosures. All bolted connections should be torque to NETA specifications, then retested with a digital low resistance meter. These readings should be documented in a format so that connectivity and conductivity of the grounding electrode system can be demonstrated.

External grounding electrode system test procedures are performed in the de-energized state.

Internal grounding electrode system test procedures can be performed in the de-energized or energized state.

g. Recommended Changes to VHA Directive 1028

The current VHA Directive 1028 grounding testing requirement is, "Inspect and tighten ground connections. Test ground resistance for the entire facility grounding system."

It is suggested that the following criteria be added to VHA Directive 1028:

i. Perform visual inspection for bonding conductor and equipment grounding conductor condition, continuity, and termination. Correct any defects.

ii. Perform soil resistivity tests in several locations (if fall-of-potential test method is to be used).

iii. After visual inspection and correction of defects is complete, use a digital low resistance meter to measure resistance between all bolted/compressed connections and between bolted/compressed connections to enclosures. All bolted connections will be torqued to NETA specifications, then retested. These readings shall be documented in a format so that connectivity and conductivity can be calculated as to the effectiveness of the grounding electrode system through-out the systems.

iv. Ground resistance tests shall be performed using fall-of-potential method or calibrated clamp-on ground resistance tester.

ATTACHMENT A

Location Breakers Brand CAT # Micrologic

BLDG #1,

(BW02 Shaft) B06-5 Main SqD - Powerpact PGA36100 ET 1.0I

BLDG #1, USS9

(BW116)

#2 - USS 9 Main SqD - MasterPact WA4JJR64B3SXXXXXXAV 6.0P #3 - Normal - ATS 1 - X- RAY - BW116 (X220H) SqD - MasterPact WA4ATR64A3SXXXXXXA 6.0P

#4 - Normal - ATS 1 - EQ

- BW116 (ADP1H) SqD - MasterPact WA4ATR64C3SXXXXXXA 6.0P

#5 - Normal - ATS 1 - ELV

- BW116 (EDP1H) SqD - MasterPact WA4ASR64A3SXXXXXXA 6.0P

#6 - Normal - ATS 1 - LS - BW116 (LDP1H) SqD - MasterPact WA4ASR64A3SXXXXXXA 6.0P

#7 - Normal - ATS 1 - CB - BW116 (CDP1H) SqD - MasterPact WA4ASR64A3SXXXXXXA 6.0P

#8 - 64 Slice CT SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P #9 - N300H SqD - MasterPact WA4ASR64A3SXXXXXXA 6.0P #10 - NB33H SqD - MasterPact WA4ATR64A3SXXXXXXA 6.0P #11 - N400H SqD - MasterPact WA4PPR64A3SXXXXXXA 6.0P #12 - MCC-1108H SqD - MasterPact WA4PPR64A3SXXXXXXA 6.0P #13 - NB30H SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P #14 - N120H SqD - MasterPact WA4PPR64A3SXXXXXXA 6.0P #15 - N320H SqD - MasterPact WA4ATR64A3SXXXXXXA 6.0P #16 - NX220H SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P #17 - N220H SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P #18 - NDP3H SqD - MasterPact WA4AAR64A3SXXXXXXA 6.0P #19 - Normal - ATS 1 -

EQXOR - 3W103D

(A310H)

SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P

#22 - PNL PMDP SqD - MasterPact WA4AAR64A3SXXXXXXA 6.0P

BLDG #1, GDPH

(BW116)

#1 Emergency - ATS 1 - CB - BW116 (CDP1H) SqD - Powerpact PGA36040U63AE1W 5.0P

#2 Emergency - ATS 1 - EQ - BW116 (ADP1H) SqD - Powerpact PGA36080U63BE1W 5.0P

#3 Emergency - ATS 1 - ELV - BW116 (EDP1H) SqD - Powerpact PGA36080U63AE1W 5.0P

#4 Emergency - ATS 1 - LS - BW116 (LDP1H) SqD - Powerpact PGA36025U63AE1W 5.0P

#5 Emergency - ATS 1 - X-RAY - BW116 (X220H) SqD - Powerpact PGA36080U63BE1W 5.0P

#6 Emergency - ATS 1 - 5MCC - 5S16 (5MCC) SqD - Powerpact PGA36040U63AE1W 5.0P

BLDG #1 PMDP - NB34H SqD - Powerpact JGA36250U53XEHLY 5.2E

(BW200) PMDP - N130L/R SqD - Powerpact HGA36150U53XEH 5.2E

BLDG #1

(3W103B)

NDP3H - Main SqD - Powerpact PGA36120U33CLV 5.0

NDP3H - ATS 1 - EQOR -

3W103D SqD - Powerpact PGA36080U33B 5.0

NDP3H - ATS 1 - CBOR -

3W103D SqD - Powerpact PGA36060U33C 5.0

NDP3H - TN410 SqD - Powerpact JGA36250U31X 3.2 NDP3H - N410H SqD - Powerpact HGA36100U31X 3.2 NDP3H - SPARE SqD - Powerpact JGA36250U31XLY 3.2

BLDG #1

(3W103D)

CDP3H - Main SqD - Powerpact LGA36400U31X 3.3 CDP3H - C410H SqD - Powerpact HGA36100U31X 3.2 CDP3H - TCDP3 SqD - Powerpact JGA36250U31XLY 3.2 CDP3H - SPARE SqD - Powerpact JGA36250U31XLY 3.2 CDP3 - Main SqD - Powerpact LGA36400U31X 3.3 CDP3 - COR1A SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR1B SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR2A SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR2B SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR3A SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR3B SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR4A SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR4B SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR5A SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR5B SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR6A SqD - Powerpact HDA36100U31X 3.2 CDP3 - COR6B SqD - Powerpact HDA36100U31X 3.2 CDP3 - C402L & R SqD - Powerpact JDA36250U31XLY 3.2 CDP3 - C401 SqD - Powerpact JDA36250U31XLY 3.2 ADP3H - Main SqD - Powerpact PGA36080U31BLV 3.0 A310H - Main SqD - Powerpact LGM36400U31X 3.3

BLDG #1 GDPH-

OR (3W103D)

#2 Emergency - ATS 1 - CBOR - 3W103D SqD - Powerpact PGA36060U63CE1 5.0P

#3 Emergency - ATS 1 - EQOR - 3W103D SqD - Powerpact PGA36080U63BE1W 5.0P

#4 Emergency - ATS 1 - EQXOR - 3W103D SqD - Powerpact PGA36040U63AE1W 5.0P

BLDG #1

(2W152)

X220H - CATH PANEL SqD - Powerpact LGA36400U33X 3.3S 2W174 CT SqD - Powerpact HGA36150U33X 3.2S

BLDG #1

(2W144) Breaker MD SqD – Powerpact LJL36400U31XSA 3.3

BLDG #1

(4W61A) 4BDH - Main SqD - Powerpact MGA36600LV ET 1.0

BLDG #1 (12th)

1200 - Main SqD - Powerpact MJA36800LV ET 1.0 1200H Main SqD - Powerpact RKA36120LV ET 1.0I 1200H - T1200 SqD - Powerpact MJA36350 ET 1.0 ATS - ELEVATOR SqD - Powerpact MJA36400 ET 1.0

BLDG #2 (130A)

USS2A - Main SqD - Powerpact RKF36100U44A 6.0A 201H-2 SqD - Powerpact PKA36025U31A 3.0 101H-2 SqD - Powerpact PKA36025U31A 3.0 XFMR T300 SqD - Powerpact PKA36040U31A 3.0 102H-2 SqD - Powerpact PKA36040U31B 3.0 ELEVATOR SqD - Powerpact PKA36025U31A 3.0 SPARE SqD - Powerpact PKA36025U31A 3.0 EWH-1 SqD - Powerpact PKA36025U31A 3.0 101DP-2 - Main SqD - Powerpact RGA36100CU31ALV 3.0

BLDG #7

4000A MAIN SqD – Masterpact WA6KKZ64A3SXXXXXX 6.0P

(ERMS)

CHILLER #1 SqD - Powerpact RKF36160U63BE1 5.0P CHILLER #2 SqD - Powerpact RKF36160U63BE1 5.0P MCC 95-1 SqD - Powerpact RKA36120CU63CE1 5.0P MCC 95-2 SqD - Powerpact RKA36120CU63CE1 5.0P 7-1-1 SqD - Powerpact LJA36400CU43XEN 5.3A

BLDG #7

(AGNUS)

Chiller Generator Breaker SqD - Powerpact RGR36250CU44AABSK 6.0A

BLDG #11

#1 - Main SqD - Masterpact WA5JGR64A3SXXXXXXA 6.0A

(ERMS)

#4 - Chiller #3 SqD - Masterpact WA5EER64A3SXXXXXXA 6.0A #5 - 7-1-3 SqD - Masterpact WA5EAR64A3SXXXXXXA 6.0A #6 - MDPH-50 SqD - Masterpact WA5EAR64A3SXXXXXXA 6.0A

BLDG #16 (ESP)

(MEZZ)

GDP-OR SqD - Masterpact WA4ECR63A3FXXXXXXA 5.0P SUB MAIN SqD - Masterpact WA4EBR44A3SXXXXXXA 5.0P ATS 16 - BOILER SqD - Masterpact WA4AAR44A3SXXXXXXA 5.0P GDPH SqD - Masterpact WA4AAR44A3SXXXXXXA 5.0P ESS SWITCH GEAR SqD - Masterpact WA4AAR44A3SXXXXXXA 5.0P

BLDG #16

(MEZ) MDP SqD - Powerpact MJP36500 ET 1.0

BLDG # 41

(B25)

MDPH-41 – MAIN SqD - Powerpact MG 600 ET 1.0 EDPH-41 - MAIN SqD - Powerpact MG 800 ET 1.0

BLDG #41 RESEARCH GENERATOR SqD X-6304-117 none

(DOTTY) (KOHLER 400)

BLDG #42

(B41B) MDPH-42 – MAIN SqD - Powerpact MG 800 ET 1.0

BLDG #43

Normal Main SqD - MasterPact WA4EAR44A3SXXXXXXA 6.0A Normal - ATS 43 - CB SqD - MasterPact WA4ASR44A3SXXXXXXA 6.0A Normal - ATS 43 - EQ SqD - MasterPact WA4ASR44A3SXXXXXXA 6.0A Normal - ATS 43 - LS SqD - MasterPact WA4PWR44A3SXXXXXXA 6.0A Normal - ATS 1 - BIO - SB12A SqD - MasterPact WA4AAR44A3SXXXXXXA 6.0A

Emergency Main SqD - MasterPact WA4EAR44A3SXXXXXXA 6.0A Emergency - ATS 43 - CB SqD - MasterPact WA4ASR44A3SXXXXXXA 6.0A Emergency - ATS 43 - EQ SqD - MasterPact WA4ASR44A3SXXXXXXA 6.0A Emergency - ATS 43 - LS SqD - MasterPact WA4PWR44A3SXXXXXXA 6.0A Emergency - ATS 1 - BIO

- SB12A SqD - MasterPact WA4AAR44A3SXXXXXXA 6.0A

BLDG #44

N2 - South Main - Coralville (Left) SqD - MasterPact WA4FFR74A3CFFFXXCA 6.0H

N3 - SB02H SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N4 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N5 - 1000A BUS SqD - MasterPact WA4EER74A3SXXXXXXA 6.0H N6 - TB05-3 SqD - MasterPact WA4AAR74A3SXXXXXXA 6.0H N7 - 301-1H SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N8 - PNL 505H SqD - MasterPact WA4AAR74A3SXXXXXXA 6.0H N9 - B05-2H SqD - MasterPact WA4AAR74A3SXXXXXXA 6.0H N10 - 11MCC SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N11 - PNL 108H SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N12 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N13 - PNL 1200H SqD - MasterPact WA4EER74A3SXXXXXXA 6.0H

BLDG #44

N14 - Normal - ATS 1 - 5MCC SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H

N15 - BLDG #1 EMG

SWBD SqD - MasterPact WA4EAR74B3SXXXXXXA 6.0H

N16 - TIE BREAKER SqD - MasterPact WA4FFR74A3CFFFXXCA 6.0H N17 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N18 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N19 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N20 - B05-1H SqD - MasterPact WA4EER74A3SXXXXXXA 6.0H N21 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N22 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N23 - B06-1H SqD - MasterPact WA4EER74B3SXXXXXXA 6.0H N24 - T1000 SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H

N25 - 600A BUSS SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H N26 - North Main - Iowa City (Right) SqD - MasterPact WA4FFR74A3CFFFXXCA 6.0H

BLDG #45

(MARLEY)

EMERGENCY

GENERATOR MAIN

BREAKER

SqD - PowerPact 244-9920 5.0P

BLDG #50 MDPH-50 SqD - PowerPact PJA36080U33ALV 5.0

BLDG #1

(SB12A) ATS 1 - BIO - SB12A ASCO 7000 J7ACTBB30260N5XC 260

BLDG #1

(BW116)

ATS 1 - X-RAY - BW116

(X220H) ASCO 7000 J7ACTBB30600N5XC 600

ATS 1 - EQ - BW116

(ADP1H) ASCO 7000 J7ACTBB30600N5XC 600

ATS 1 - ELV - BW116

(EDP1H) ASCO 7000 J7ACTBB30400N5XC 400

ATS 1 - LS - BW116

(LDP1H) ASCO 7000 J7ACTBB30260N5XC 260

ATS 1 - CB - BW116

(CDP1H) ASCO 7000 J7ACTBB30400N5XC 400

BLDG #1

(3W103D)

ATS 1 - CBOR - 3W103D ASCO 7000 J7ACTBB30400N5XC 400

ATS 1 - EQOR - 3W103D ASCO 7000 J7ACTBB30600N5XC 600

ATS 1 - EQXOR -

3W103D ASCO 7000 J7ADTBB30400N5XC 400

BLDG #1 (5S16) ATS 1 – 5EQ - 5S16

(5MCC) ASCO 7000 400

BLDG #1 (12th) ATS 1 - ELV - (12TH) Zenith ZTSH40EC-5 400

BLDG #7

(Chiller Plant) ATS - Chiller ASCO 7000 F7ACTBC34000N5XM 4000

BLDG #16

(Boiler Plant) ATS 16 - BOILER ASCO 7000 F7ACTBC3600N5XC 600

BLDG #40

ATS-4 KOHLER MODEL K KCT - AMWA - 0400S 400

ATS-3 KOHLER MODEL K KCT - AMWA - 0230S 230

BLDG #41

ATS-2-41 KOHLER MODEL K KCT - AMWA - 0230S 230

ATS-1-41 KOHLER MODEL K KCT - AMWA - 0400S 400

BLDG #42

ATS-E ASCO 7000 D07ATSC30100N50C 100

ATS-X ASCO 7000 J07ATSC30400N50C 400

BLDG #43

(Courtyard)

ATS 43 - CB ASCO 7000 J7ACTBB30400N5XC 400

ATS 43 - EQ ASCO 7000 J7ACTBB30400N5XC 400

ATS 43 - LS ASCO 7000 J7ACTBB30150N5XC 150

Location Main Feeder Breakers Brand CAT # Schweitzer

BLDG #7 MEZZ

2U - BLDG #16 Boiler Plant SqD V5D7133Y000 SEL-351A

2L - Spare SqD V5D7133Y000 SEL-351A 3U - BLDG #1 - T4 South Transformer SqD V5D7133Y000 SEL-351A

3L - Spare SqD V5D7133Y000 SEL-351A 4L - Iowa City Main SqD V5D7133Y000 SEL-351

6L - BLDG #11 - T8 -

Chiller #3 SqD V5D7133Y000 SEL-351A

7L - Left Tie (NC) SqD V5D7133Y000 SEL-351A 8L - Bertha Generator (2000KW) SqD V5D7133Y000 SEL-300G

9L - Right Tie (NO) SqD V5D7133Y000 SEL-351A 12L - Coralville Main SqD V5D7133Y000 SEL-351

13U - BLDG #20, 40, 41,

42 SqD V5D7133Y000 SEL-351A

13L - Spare SqD V5D7133Y000 SEL-351A 14U - BLDG #2 SqD V5D7133Y000 SEL-351A 14L - BLDG #1 - T3 North Transformer SqD V5D7133Y000 SEL-351A

15U - T1 - Chiller #4/5 SqD V5D7133Y000 SEL-351A 15L - Spare SqD V5D7133Y000 SEL-351A 16U - Space - No Breaker

SEL-351

16L - T7 Clinical Addition SqD V5D7133Y000 SEL-351A MEZZ Breaker Location Transformers 13.8 - 480 Brand CAT # KVA

15U T1 (BLDG# 7), Chiller #4, #5, (4000A Bolt Lock) SqD 2694042819 2500

14U T2 (BLDG #2), USS2A SqD TX02558001 750

14L T3 (BLDG #44, Right), (North Courtyard XFMR) SqD F5EE14722L 1500

3U T4 (BLDG #44, Left), (South Courtyard XFMR) SqD F5EE14722K 1500

2U T5 (BLDG #16), Boiler Plant WESTINGHOUSE A37E533GTP 300

16L T7 (BLDG #1), CA - USS9 SqD F5EE147T27 1500

6L T8 (BLDG #11) (Under BLDG #7 MEZ) SqD F5EE1487DP 1500

13U T9 (BLDG #41), Research SqD F5EE0165SN 1000